Attachment D.5 Drawings 5 of 7 - 23 pages.pdf
PDF 17 MB Posted
- Solicitation number
- 36C26323R0023
About this file
This document provides details for a federal contract opportunity with the Department of Veterans Affairs to renovate a private patient bed ward. The solicitation number is 36C26323R0023 and seeks to award a contract for project Z1DA--618-22-102 to renovate a 3D private patient bed ward at a cost of approximately $623,000. Responses are due by April 15, 2023, and the contract is slated to be awarded on May 1, 2023. The opportunity is set aside for service-disabled veteran-owned small businesses. The work includes demolition, modifications to existing spaces, installation of new finishes, fixtures and equipment. The contractor will be responsible for construction management and oversight to ensure all requirements and specifications in the provided drawings and documents are fully met.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
B
M
HS
S
HWS
M
M
P
PS PS
F
PS
TS
V
D
TWS
TWR
TWB
MPS
HPS
LPS
CHR
RS
RL
HWR
R
T
H
CO
CHS
XX-##
SDSD
ELBOW - DOWN
ELBOW - UP
PIPE RISE-DROP
TEE - DROP FROM TEE
END CAP
FLEX CONNECTION
PIPE REDUCER - CONCENTRIC
PIPE STRAINER
CHECK VALVE
GATE VALVE
PLUG VALVE
GLOBE VALVE
UNION - SCREWED
CHILLED WATER SUPPLY
CHILLED WATER RETURN
REFRIGERATION
STEAM - MEDIUM PRESSURE SUPPLY
STEAM - LOW PRESSURE SUPPLY
STEAM - HIGH PRESSURE SUPPLY
HEATING WATER RETURN
HEATING WATER SUPPLY
DEMO
EXISTING
TOWER WATER BYPASS
TOWER WATER RETURN
TOWER WATER RETURN
REFRIGERATION LIQUID
REFRIGERATION SUCTION
MECHANICAL PIPING
DIRECTION OF FLOW
MAKE-UP WATER
VENT
DRAIN
GEOTHERMAL SUPPLY
GEOTHERMAL RETURN
MU
CONDENSATE DRAINCD
STEAM - MEDIUM PRESSURE RETURN
STEAM - LOW PRESSURE RETURN
STEAM - HIGH PRESSURE RETURNHPR
HPR
LPR
CONDENSER WATERCND
GWS
GWR
DIRECTION PITCHDOWN
VERIFY WITH
ARCHITECTURAL
DRAWINGS
PUMPED CONDENSATEPC
PRESSURE REDUCING VALVE
3-WAY
MODULATING
CONTROL VALVE
2-WAY CONTROL VALVE
SAFETY VALVE OR
PRESSURE RELIEF
VALVE
SOLENOID VALVE
3/4" BALL VALVE WITH ADAPTER
TO 3/4" HOSE THREAD
DIAPHRAGM VALVE
BUTTERFLY VALVE
BALL VALVE
VALVE IN RISE
WATER FLOW MEASURING DEVICE
CIRCUIT SETTER
ELBOW - DROP TO TEE
PIPE REDUCER - ECCENTRIC
AIR VENT - AUTOMATIC
AIR VENT - MANUAL
GAUGE - DIFFERENTIAL
GAUGE - PRESSURE
GAUGE - PRESSURE WITH COCK
GAUGE - TEMPERATURE
PIPE ANCHOR
PIPE EXPANSION JOINT
PIPE GUIDE
SENSOR - FLOW
SWITCH - FLOW
SWITCH HUMIDITY
SWITCH - PRESSURE
SWITCH - TEMPERATURE
TEMPERATURE - PRESSURE TEST FITTING
THERMOMETER
THERMOMETER WELL
BASKET STRAINER
STEAM TRAP INVERTED BUCKET
METER - TOTALIZING BTU
METER - TOTALIZING FLOW
M301
A1
SCALE
DETAIL
SCALE
SECTION
A1
A1
X#/X###
MECHANICAL SYMBOL LEGEND
DUCT TRANSITION FROM RECTANGULAR TO ROUND
DUCT TRANSITION
SIDEWALL EXHAUST OR RETURN AIR GRILLE
OR REGISTER
SIDEWALL SUPPLY REGISTER
RETURN DUCT
SUPPLY DUCT
RISE IN DUCT
CEILING RETURN AIR REGISTER OR GRILLE
SMOKE DAMPER
ACOUSTICAL DUCT LINING
FLEXIBLE DUCT
FIRE DAMPER
MANUAL BALANCING DAMPER
12"Ø INDICATES A 12" ROUND DUCT
24x12Ø INDICATES A 24"x12" FLAT OVAL DUCT (WIDTH x DEPTH)
EXISTING DUCT TO BE REMOVED
ACCESS DOOR
24x12 INDICATES A 24"x12" RECTANGULAR DUCT (WIDTH x DEPTH)
POINT OF CONNECTION, NEW DUCT TO EXISTING DUCT
OR / POINT OF REMOVAL FROM EXISTING DUCT TO DEMO DUCT
PERFORATED FACE CEILING DIFFUSERS
DUCTWORK SYMBOLS
ROOM HUMIDISTAT/HUMIDITY TRANSMITTER LOCATION ONLY
SEE CONTROL DRAWINGS FOR TYPE
SEE CONTROL DRAWINGS FOR TYPE
ROOM THERMOSTAT/TEMP. TRANSMITTER LOCATION ONLY
LETTERS REFER TO THE EQUIPMENT TYPE
EQUIPMENT SYMBOLS
NUMBERS REFER TO SPECIFIC EQUIPMENT
DUCT MOUNTED STATIC PRESSURE PROBE
DRAWING NUMBER WHERE DETAILED
SECTION LOCATION
DRAWING NUMBER WHERE DETAILED
DETAIL LOCATION
SECTION LETTER LOCATION
SECTION SYMBOL
DETAIL SYMBOL
SECTION AND DETAIL TITLES
DETAIL NUMBER LOCATION
SYMBOL INDICATES EQUIPMENT IDENTIFIED
IN EQUIPMENT SCHEDULE
XX-#
CFM
SYMBOL INDICATES GRILLE OR DIFFUSER
IDENTIFIED IN EQUIPMENT SCHEDULE
S.DPR
F.DPR
CEILING EXHAUST REGISTER
VALVE SYMBOLS FITTING SYMBOLS
PIPING SYMBOLS
EXHAUST DUCT
2HR. SMOKE BARRIER
SMOKE BARRIER
2HR. FIRE BARRIER
1 HR. FIRE BARRIER
##x##
SIDEWALL GRILLE DIMENSION WHERE
SHOWN ON PLANS
COMBINATION FIRE/SMOKE DAMPER
F/S DPR
FLEXIBLE CONNECTION
STANDARD LONG RADIUS ELBOW
VANED ELBOW (PROVIDE ALL SQUARE OR
RECTANGULAR ELBOWS WITH VANES
EXCEPT TRANSFER AIR SOUND ELBOW)
SHORT RADIUS ELBOW (PROVIDE ALL
SQUARE OR RECTANGULAR ELBOWS WITH
VANES EXCEPT TRANSFER AIR SOUND
ELBOW)
ROOM CARBON DIOXIDE TRANSMITTER LOCATION ONLY
SEE CONTROL DRAWINGS FOR TYPE
24"x12"
24"/12"
12"Ø
DUCT MOUNTED SMOKE DETECTOR
STAMPED FACE CEILING DIFFUSERS
NOTE: NOT ALL ABBREVIATIONS AND
SYMBOLS APPLY TO THIS PROJECT.
A. ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN
FURRED CHASES, SUSPENDED CEILINGS, OR INTERSTITIAL SPACES UNLESS
OTHERWISE NOTED.
B. PROVIDE ACCESS PANELS OR DOORS IN INACCESSIBLE CEILINGS AND/OR CHASES
FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, COILS, FANS, CONTROLS, ETC.
THEY SHALL BE FURNISHED UNDER DIVISION 23 AND INSTALLED UNDER THE
ARCHITECTURAL SPECIFICATION. ACCESS DOOR RATING SHALL MATCH
CLASSIFICATION OF WALL AND CEILING FIRE RATING.
C. COORDINATE THE LOCATION OF ALL DIFFUSERS, GRILLES, REGISTERS, ACCESS
DOORS, ETC., WITH THE ARCHITECTURAL REFLECTED CEILING PLAN(S).
COORDINATION DRAWINGS MUST BE SUBMITTED AND APPROVED IN
ACCORDANCE WITH 23 05 11 PRIOR TO INSTALLATION.
D. ALL ROUND RUNOUTS AND DROPS TO DIFFUSERS SHALL BE THE SAME NOMINAL
SIZE AS THE SCHEDULED DIFFUSER NECK SIZE.
E. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN OR
INDICATED. ALL DUCT SIZES SHOWN ON DRAWINGS ARE NET INSIDE DIMENSIONS.
PROVIDE ONE INCH ACOUSTICAL LINING (TYPE D3 INSULATION) IN LOW VELOCITY
RECTANGULAR DUCTWORK FOR THE FIRST 10 DIAMETERS OF DUCTWORK
CONNECTED TO DEVICE, OR AS INDICATED ON DRAWINGS, WHICHEVER IS
GREATER. FOR THE REMAINDER OF THIS DUCTWORK PROVIDE AS INDICATED IN
THE INSULATION SPECIFICATIONS.
F. PROVIDE 1/2" MANUAL AIR VENTS AT ALL HIGH POINTS OF CLOSED SYSTEM PIPING
AND 1/2" MANUAL DRAIN VALVES WITH HOSE CONNECTION AT LOW POINTS AS
REQUIRED TO PROVIDE COMPLETE SYSTEM DRAINAGE. WHERE DRAIN VALVES
OCCUR ABOVE CEILING AREAS AND IN AREAS OUTSIDE MECHANICAL RANGE
PROVIDE HOSE CONNECTION ON VALVE.
G. REFER TO THE ARCHITECTURAL DRAWINGS FOR EXACT LOCATION OF ALL FIRE
RATED AND/OR SMOKE RATED WALLS AND ASSEMBLIES. PROVIDE APPROVED
FIRE DAMPERS IN ALL REQUIRED PENETRATIONS FOR DUCTWORK, GRILLES,
REGISTERS AND DIFFUSERS. ALL PIPE AND DUCTWORK PENETRATIONS OF FIRE,
SMOKE AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT
STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL.
H. CONTRACTOR SHALL COORDINATE ALL DUCTWORK, PIPING, PLUMBING AND FIRE
PROTECTION PIPING WITH STRUCTURAL AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
EQUIPMENT ACCESS AND SERVICEABILITY.
I. CONTRACTOR SHALL FURNISH ALL NECESSARY STRUCTURES, INSERTS, SLEEVES,
AND HANGING DEVICES FOR INSTALLATION OF MECHANICAL AND PLUMBING
EQUIPMENT, DUCTWORK AND PIPING, ETC. CONTRACTOR SHALL COORDINATE
WITH GENERAL CONTRACTOR AND ALL BUILDING TRADES TO AVOID CONFLICTS
AND TO MAINTAIN EQUIPMENT ACCESS AND SERVICEABILITY.
J. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL NECESSARY
MISCELLANEOUS ANGLES, CHANNELS, UNISTRUT, ETC., AS MAY BE REQUIRED TO
ADEQUATELY SUPPORT THE MECHANICAL PIPING, DUCTWORK, AND EQUIPMENT
IN A MANNER APPROVED BY THE ARCHITECT, WHICH WILL NOT OVERLOAD THE
BUILDING STRUCTURAL SYSTEM.
K. SEAL ALL TRANSVERSE JOINTS, LONGITUDINAL SEAMS, DUCT WALL
PENETRATIONS AND FITTING CONNECTIONS ON ALL DUCT SYSTEMS. ALL DUCTS
AND NEW AND EXISTING SHALL RECEIVE A CLASS A SEAL AND SHALL BE
PRESSURE TESTED IN ACCORDANCE WITH SMACNA.
L. MECHANICAL ITEMS SUCH AS ROOF DRAINS, FLOOR DRAINS, PLUMBING FIXTURES,
ETC. SHOWN ON THE ARCHITECTURAL DRAWINGS BUT NOT SHOWN ON THE
MECHANICAL DRAWINGS SHALL BE INCLUDED IN THE PROJECT. THESE ITEMS
SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR INCLUSION IN
ADDENDUM.
M. IT IS CRITICAL THAT THE CONTRACTOR PERFORM A COMPLETE REVIEW OF ALL
SUBMITTALS PRIOR TO SUBMISSION TO THE AE/COR. INCOMPLETE, INCORRECT
AND UNCLEAR SUBMITTALS WILL BE REJECTED AND MARKED AS "REVISE AND
RESUBMIT". ALL SUBMITTALS MUST CLEARLY INDICATE THE EQUIPMENT
SELECTIONS FOR THE PROJECT. TECHNICAL DRAWINGS OF COMPLETE
ASSEMBLIES, REFLECTING ACCURATE PROJECT CONDITIONS, SHALL BE
SUBMITTED WITH EQUIPMENT SELECTIONS TO ENSURE SPACE ALLOWANCES ARE
REFLECTED IN THE ACTUAL SPACE AVAILABLE. WHERE SIZE DEVIATIONS DIFFER
FROM THE BASIS OF DESIGN CONTRACTOR SHALL HIGHLIGHT THE DIFFERENCES
FOR AE/COR REVIEW WITHIN THE SUBMITTAL. CONTRACTOR SHALL PROVIDE
INSTALLATION ROUTE AND VERIFICATION THAT ACCESS POINTS, PLACEMENT
ROUTE, SUPPORTS, AND REQUIRED EQUIPMENT CLEARANCES ARE IDENTIFIED ON
THE ROUTE DRAWING. SAFETY PROTOCOLS FOR SUBJECT STATION SHALL BE
REFLECTED ON EQUIPMENT CLEARANCES. PLATFORMS AND INTERFACE AREAS
(FILTER, GAUGES, MONITORS, VALVES, ETC.) SHALL HAVE PROPER CLEARANCE AS
DEFINED BY THE MANUFACTURER, VA SAFETY PERSONNEL AND SERVICE
PERSONNEL. ACCESS POINTS OF USE SHALL BE CLEARLY IDENTIFIED ON THE
DRAWINGS.
N. CONTRACTOR SHALL SUBMIT COORDINATION DRAWINGS IN ACCORDANCE WITH
23 05 11 PRIOR TO COMMENCING WORK SHOWING ALL NEW AND EXISTING
SYSTEMS IN THE AREA OF WORK AND ALL PROVISIONS FOR COORDINATING
ROUTING, ACCESS AND CLEARANCES. SUBMITTALS WILL NOT BE ACCEPTED
WITHOUT APPROVED COORDINATION DRAWINGS.
A. THE DEMOLITION DRAWINGS REFLECT INFORMATION ON EXISTING BUILDING
SERVICES GATHERED BY SITE INSPECTION, DISCUSSIONS WITH MAINTENANCE
PERSONNEL AND PREVIOUS CONSTRUCTION DRAWINGS. THE EXACT LOCATION,
ARRANGEMENT, AND SIZES OF PIPE LINES AND DUCTWORK IN THE EXISTING
BUILDING MAY BE DIFFERENT FROM THAT SHOWN ON THESE DRAWINGS.
B. THE CONTRACTOR SHALL COORDINATE THE SHUTDOWN OF EXISTING BUILDING
SERVICES FOR REMOVAL WITH OWNER AUTHORIZED REPRESENTATIVE AND
SHALL CONFORM TO THEIR REQUIREMENTS.
C. DISRUPTION OF NORMAL FACILITY ACTIVITIES ARE TO BE KEPT TO AN ABSOLUTE
MINIMUM. DUST, DEBRIS, AND FUMES SHALL BE CONTROLLED SO AS NOT TO
AFFECT THE HEALTH AND SAFETY OF OCCUPIED AREAS WITHIN THE FACILITY
WHICH ARE OUTSIDE THE AREA OF WORK. COORDINATE WITH THE ARCHITECT
AND THE OWNER'S REPRESENTATIVE WITH REGARD TO ALL ACTIVITIES TO BE
CONDUCTED OUTSIDE OF THE SUITE REMODEL AREA WHICH MAY AFFECT THE
OPERATION OF THE FACILITY.
D. THE CONTRACTOR SHALL PROVIDE TEMPORARY VENTILATION (MAINTAIN WORK
ZONE AT NEGATIVE PRESSURE), FILTRATION, AIR PURIFIERS, DUST SCREENS, ETC.
FOR ALL WORK AREAS AFFECTED BY DEMOLITION FOR NEW INSTALLATION TO
MINIMIZE DUST AND FUMES.
E. THE CONTRACTOR SHALL PRESENT AN AREA BY AREA WORK PLAN WELL IN
ADVANCE TO THE ARCHITECT AND THE OWNER'S AUTHORIZED REPRESENTATIVE
FOR APPROVAL PRIOR TO BEGINNING WORK. THE WORK PLAN SHALL INCLUDE AN
OUTLINE OF ALL ACTIVITIES OF ALL SUBCONTRACTORS. THE CONTRACTOR SHALL
COORDINATE WITH THE OWNER'S AUTHORIZED REPRESENTATIVE TO ESTABLISH
ACCEPTABLE ROUTING AND ACCESS WITHIN THE FACILITY FOR MATERIALS
REQUIRED FOR THE NEW INSTALLATION.
F. SEE SPECIFICATION SECTION 230593, TESTING, ADJUSTING, & BALANCING OR
MECHANICAL SYSTEMS FOR ADDITIONAL DESCRIPTION AND REQUIREMENTS.
G. ALL TEST AND MEASUREMENT TRAVERSE LOCATIONS SHALL BE CLEARLY NOTED
ON FLOOR PLANS WHICH SHALL BE INCLUDED WITH THE TEST AND
MEASUREMENT DATA.
H. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL
TRADES INCLUDING MECHANICAL, PLUMBING, ELECTRICAL, FURNITURE, AND
ARCHITECTURAL. ANY DISCREPANCIES SHALL BE REPORTED IMMEDIATELY TO THE
ARCHITECT PRIOR TO START OF WORK.
I. ALL NEW TO EXISTING DUCT AND PIPE CONNECTIONS SHALL BE FIELD VERIFIED
PRIOR TO ORDERING AND FABRICATING NEW DUCTWORK OR DAMPERS
J. DEMOLITION OF MECHANICAL PIPING (CHW, HHW, STEAM, ETC.) SHALL BE BACK
TO THE MAIN. CAP MECHANICAL PIPING CONNECTIONS AT THE MAIN.
K. DEMO OLD CHILLED WATER, STEAM AND HYDRONIC PIPING BACK TO MAIN AND
CAP.
GENERAL DEMO NOTES
GENERAL NOTESABBREVIATIONS
AHU AIR HANDLING UNIT
BRAKE HORSEPOWER
BTU PER HOUR
BRITISH THERMAL UNIT
BOTTOM OF DUCT
BOTTOM OF PIPE
ACOUSTIC LINING
ABOVE FINISHED FLOOR
ACCESS DOOR
COMPRESSED AIR
DRAIN
ENTERING
EXHAUST
CONTINUATION
DIRECT EXPANSION
CUBIC FEET PER MINUTE
CONDENSATE DRAIN
AL
AFF
AD
BHP
BOD
BTU
BOP
CA
CFM
D
DX
ENT
EXH
CD
EMCS
CONT.
BTUH
FLEXIBLE
FLAT BOTTOM
FILTER GAUGE
FLOOR SINK
FLOOR DRAIN
FAN COIL UNIT
DEGREES FAHRENHEIT
FEET PER MINUTE
FEET
FLAT TOP
HOSE BIBB
INCHES
GALLONS PER MINUTE
GALLONS PER HOUR
FB
°F
FD
FCU
F.G.
FS
FPM
FT.
FT
GPM
GPH
HB
HD
IN
HEPA
FLEX
KILOWATT
MAIN AIR (CONTROLS)
KILOWATT HOUR
OPPOSED BLADE DAMPER
OUTSIDE AIR
NUMBER (QUANTITY)
NOT IN CONTRACT
NOT APPLICABLE
MOTOR CONTROL CENTER
QUANTITY
QUADRANT
REVOLUTIONS PER MINUTE
RELATIVE HUMIDITY
SMOKE CONTROL DAMPER
RETURN AIR
PRESSURE REDUCING VALVE
KW
KWH
MA
MCC
NO.
NIC
OBD
OA
NA
PRV
PSIG
QTY
Rh
R.A.
RPM
SCD
QUAD
ENERGY MANAGEMENT CONTROL SYSTEM
HIGH EFFICIENCY PARTICULATE AIR (FILTER)
HAND DAMPER (VOLUME DAMPER)
POUNDS PER SQUARE INCH GAGE
TYPICAL
VOLTS
SOUND TRAP
VARIABLE AIR VOLUME
TOP OF PIPE TRAPEZE
VENT THRU ROOF
VELOCITY
ST
SP
TYP.
VAC
VAV
V
TP
VTR
VEL
SDVV
TOPT
SINGLE DUCT VARIABLE VOLUME
STATIC PRESSURE (INCHES OF WATER)
TOTAL PRESSURE (INCHES OF WATER)
VOLTS, ALTERNATING CURRENT
ACU AIR CONDITIONING UNIT
CONTRACTING OFFICER'S REPRESENTATIVECOR
RS
RL REFRIGERATION LIQUID
REFRIGERATION SUCTION
CONDENSING UNITCU
INDOOR UNITIU
on e-ei gh th in ch o ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in es ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A/E:
TRIPLE C - The A/E Group
(520) 481-8548
Mat Perkins
1/4" = 1'-0"
B
IM
/6
-2
-1
R e n o va te
D B e d W in g -B
-M
P L S
V A
M C
/6 -2
-7
.M
P L S
.3 D
.B e d .W in g .M
E P
.G e n e ra l.
S h e e ts
.r v t
/1
/2
:0 :0
P
M
09/12/2022 K. Luke N. Harper
618-22-102
1391 - M-001
MECHANICAL ABBREVIATIONS AND
SYMBOLS
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATION OF BUILDING 70 3D
BED WING100% CONSTRUCTION
DOCUMENTS
OPEN MECHANICAL ITEMS:
1. MODEL NEW BRANCH/DISTRIBUTION PIPING TO ALL NEW TERMINAL UNITS AND FIN TUBE RADIATORS.
2. MODEL NEW BRANCH/DISTRIBUTION DUCTWORKTO ALL NEW TERMINAL UNITS.
3. FINALIZE MECHANICAL EQUIPMENT SELECTIONS FOR BASIS OF DESIGN.
4. FINALIZE ROOM AIR BALANCE SCHEDULE FOR TERMINAL UNITS/VENTURI VALVES.
5. PROVIDE PHASING PLAN FOR EQUIPMENT REPLACEMENTS.
12/17/2021 on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLAN
A/E:
TRIPLE C - The A/E Group
(612) 355-1251
Mat Perkins
A
B D
EF
G
H
J
K
L
M
C
GENERAL NOTES
KEYNOTES
1/16" = 1'-0"
B
IM
/6
-2
-1
R e n o v a te
D
B e d W in g -B
-M
P L S
V A
M C
/6 -2
-7
.M
P L S
.3 D
.B e d .W in g .M
E P
.B .L
.r v t
/1
/2
:4
:5
A
M
09/12/2022 K. Luke N.Harper
618-22-102
1391 - MS101
MECHANICAL SITE PLAN
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATION OF BUILDING 70 3D
BED WING
100% CONSTRUCTION
DOCUMENTS
A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
B. COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH
OTHER TRADES IN ADVANCE OF INSTALLATION.
C. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-
CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED
SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE
ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND
BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION
AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP
THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING
EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND
TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO
NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE
CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS
AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.
REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.
D. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED
TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA
FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT
ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE
DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY
RENOVATION.
E. THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING
CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO
COMPLETE THIS PROJECT.
F. ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 54” ABOVE
FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.
G. REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND
ELEVATIONS.
NOTE: NOT ALL KEYNOTES
ARE USED ON EACH SHEET
1. CONTRACTOR SHALL PROVIDE NEW MINIMUM 40" DIAMETER RIGID DUCT
FROM THE HOT DECK SUPPLY AIR OF THE TEMPORARY AHU. ROUTE AND BRACE
ALONG EXTERIOR WALL WITH SUPPORTS ON GRADE AND SEISMIC BRACING
ALONG EXTERIOR WALL. CONTRACTOR SHALL SUBMIT TEMPORARY DUCT
PRODUCT SELECTION, COORDINATION DRAWINGS AND TEMPORARY DUCT
SUPPORT STRUCTURE AND SEISMIC BRACING STAMPED BY MINNESOTA
STRUCTURAL ENGINEER FOR VA/AE REVIEW.
2. TEMPORARY AIR HANDLING UNIT (AHU). CONTRACTOR SHALL COORDINATE
LOCATION WITH VA COR. CONTRACTOR SHALL RENT TEMPORARY AIR
HANDLING UNIT FOR THE DURATION OF THE PROJECT UNTIL THE NEW AHU IS
FULLY COMMISSIONED AND HAS BEEN TURNED OVER TO THE VA.
3. CONTRACTOR STAGING AREA AND CRANE ACCESS.
4. REPLACE LOUVER AFTER INSTALLATION OF NEW AIR HANDLING UNIT. SEE
ARCHITECTURAL SHEETS FOR ADDITIONAL INFORMATION.
5. BUILDING 70 LEVEL 4 ROOF.
21 4 3
NOT TO SCALE
F6
MECHANICAL SITE PLAN
on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLAN
A/E:
TRIPLE C - The A/E Group
(612) 355-1251
Mat Perkins
A
B D
EF
G
H
J
K
L
M
C
GENERAL NOTES
KEYNOTES
1/8" = 1'-0"
B
IM
/6
-2
-1
R e n o v a te
D
B e d W in g -B
-M
P L S
V A
M C
/6 -2
-7
.M
P L S
.3 D
.B e d .W in g .M
E P
.B .L
.r v t
/1
/2
:4
:1
A
M
09/12/2022 K. Luke M. Riffle
618-22-102
1391 - MD100
MECHANICAL PLANS - BASEMENT LEVEL BD
- DEMO
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATION OF BUILDING 70 3D
BED WING
100% CONSTRUCTION
DOCUMENTS
A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
B. COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH
OTHER TRADES IN ADVANCE OF INSTALLATION.
C. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-
CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED
SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE
ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND
BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION
AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP
THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING
EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND
TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO
NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE
CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS
AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.
REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.
D. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED
TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA
FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT
ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE
DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY
RENOVATION.
E. THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING
CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO
COMPLETE THIS PROJECT.
F. ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 54” ABOVE
FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.
G. REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND
ELEVATIONS.
NOTE: NOT ALL KEYNOTES
ARE USED ON EACH SHEET
1. REMOVE ALL EXISTING TERMINAL UNITS AND ASSOCIATED THERMOSTATS.
2. EXISTING SUPPLY AIR AND EXHAUST GRILLE TO BE REMOVED. COORDINATE
WITH COR ON IF THEY SHOULD BE RETURNED TO THE VA AS ATTIC STOCK.
3. EXISTING RETURN AIR AND EXHAUST GRILLE TO BE REMOVED. COORDINATE
WITH COR ON IF THEY SHOULD BE RETURNED TO THE VA AS ATTIC STOCK.
4. DEMOLISH EXISTING FIN TUBE RADIATION WINDOW HEATER AND PREPARE
SPACE FOR NEW UNIT.
5. RETAIN TRUNK/MAIN DUCT WORK IN INTERSTITIAL BACK TO AHU, RF, AND EF.
6. CONTRACTOR TO PRESSURE TEST AND CLEAN DUCT DURING CONSTRUCTION.
7. EXISTING PNEUMATIC CONTROLS DEVICES SERVING EQUIPMENT PLACED WITH
THIS PROJECT SHALL BE REMOVED AND PREPARED FOR INSTALLATION OF NEW
DDC CONTROLS.
8. EXISTING DDC CONTROLS ENCLOSURE TO REMAIN, PROTECT IN PLACE.
9. EXISTING RETURN AIR GRILLE TO BE REMOVED. COORDINATE WITH COR ON IF
THEY SHOULD BE RETURNED TO THE VA AS ATTIC STOCK.
10. EXISTING SUPPLY AIR MAIN DUCTWORK FROM 70-AH3NE-21 SHALL BE RETAINED
AND REUSED TO SERVE RENOVATED SPACE.
11. PROVIDE TEMPORARY AHU SERVING EXISTING SUPPLY AIR MAINS DURING
REPLACMENT OF THE EXISTING AHU. TEMPORARY UNIT SHALL BE SIZED PER
MECHANICAL EQUIPMENT SCHEDULES. PROVIDE FLEXIBLE DUCT WORK AND
ISOLATION DAMPERS DURING CHANGEOVER TO TEMPORARY UNIT. TEMPORARY
AHU SHALL BE FULLY COMMISISONED PRIOR TO REMOVING EXISTING UNIT.
12. DEMOLISH EXISTING EF-34.
13. DEMOLISH EXISTING RF-18.
14. EF-33 TO REMAIN, PROTECT IN PLACE.
15. DEMOLISH EXISTING HEATING WATER SUPPLY PIPING AND HEATING WATER
RETURN PIPING TO FIN TUBE RADIATOR ABOVE.
16. DEMOLISH EXISTING FIN TUBE RADIATOR ABOVE.
17. EXISTING MECHANICAL HEATING WATER SUPPLY AND HEATING WATER RETURN
PIPING TO BE DEMOLISHED AND REPLACED.
18. DEMOLISH EXISTING FIRE SMOKE DAMPER AND PREPARE DUCT FOR
INSTALLATION OF NEW FIRE SMOKE DAMPERS.
19. DEMOLISH EXISTING PNEUMATIC CONTROLS ASSOSCIATED WITH SCOPE,
RETAIN EXISTING CONTROL PANEL AND PNEUMATIC CONTROLS UNRELATED TO
OUR SCOPE.
20. DEMOLISH EXISTING DUCTWORK BACK TO THE EXISTING MAIN, REPAIR AND
RESEAL.
21. PHASE 1: INSTALL AND COMMISSION TEMPORARY AIR HANDLING UNIT ON SITE
BELOW, PHASE 2: INSTALL TEMPORARY DAMPERS/TAPS IN EXISTING DUCT,
PHASE 3. REMOVE KNOCKOUT PANEL AND CONNECT TEMPORARY AIR
HANDLING UNIT TO TEMPORARY DAMPERS, ROUTE AND SUPPORT TEMPORARY
DUCTWORK UP THE SIDE OF THE BUILDING, PHASE 4: SHUTDOWN EXISTING AHU
21 AND CONNECT TEMPORARY AHU AT DAMPER POCS, TEST AND BALANCE
TEMPORARY AIR HANDLING UNIT. PHASE 5: REMOVE EXISTING AHU IS SECTION
SPLITS AS REQUIRED BY THE OPENING, PHASE 6: INSTALL NEW AIR HANDLING
UNIT AHU 21.
22. DEMOLISH EXISTING VFD, SEE ELECTRICAL SHEETS AND MECHANICAL
SCHEDULES.
23. PROVIDE TEMPORARY ISOLATION DAMPERS BEFORE BEGINNING ANY
DEMOLITION WORK. THE DUCTWORK SHALL BE CLEANED, REPAIRED AND
SEALED AIR TIGHT. THE CHANGEOVER SHALL BE PHASED TO INSTALL ONLY ONE
TEMPORARY ISOLATION DAMPER AT A TIME BEFORE PROCEEDING TO THE NEXT
DAMPER. THIS PROCESS SHALL OCCUR OUTSIDE OF FACILITY OPERATIONAL
HOURS AND WILL REQUIRE NIGHT AND WEEKEND WORK. ADD A CAP TO
DEMOED DUCTWORK.
24. REMOVE EXISTING CHILLED WATER, STEAM, AND CONDENSATE PIPING SERVING
AIR HANDLING UNIT (E) 70-AH3NE-21 BACK TO NEAREST ISOLATION VALVE.
25. DEMOLISH EXISTING EF-50 AND HEPA FILTER ASSEMBLY SERVING ISOLATION
ROOM. PROVIDE NEW EF-50 PER THE MECHANICAL SCHEDULES WITH NEW
HEPA FILTER BOX, HOUSING, ACCESS PANEL AND INTEGRATED DIFFERNENTIAL
PRESSURE. (2) FILTERS @ 24"X24"X12" EACH WITH MAXIMUM FACE VELOCITY OF
400 FPM. SEE F1/M-504 FOR MORE DETAILS.
26. DEMOLISH EXISTING EXHAUST DUCT FROM EF-50.
27. SHUT OFF VALVES TO FIN TUBE RADIATOR ABOVE. REBALANCE WATER FLOW.
DEMOLISH EXISTING PIPING ONCE NEW PIPING HAS BEEN CONSTRUCTED,
PRESSURE TESTED, AND CERTIFIED.
28. REMOVE EXISTING CHILL WATER LINES TO PUMP P-4 ONCE TEMPORARY PUMP
P-4 HAS BEEN PLACED AND CONNECTED.
29. REMOVE EXISTING PUMP P-4 AND PREPARE SPACE FOR INSTALLATION OF NEW
PUMP.
SCALE: 1/8" = 1'-0"
F6
MECHANICAL PLAN - BASEMENT
LEVEL BD - DEMO
SCALE:
F3
BASEMENT P-4 REPLACEMENT ISO
2" HWS
NOT IN PROJECT SCOPE
2" HWS
6" MPS
5" CHWS
5" CHWR
5" MPC
3" HWS
3" HWS
4" CHWR
4" CHWS
5" CHWR
4" HWR
2" HWS CONTINUES
TO AREA C SOUTH
/F6 MD102i /F6 MD102i12"ø IEA
12"ø IEA UP
2" HWS
2" HWS
3/4" HWR
2" HWS
3/4" HWR
2" HWS
3/4" HWR
3/4" HWR
2" HWS
2" HWS
3/4" HWR
3/4" HWR
2" HWS
2" HWS
3/4" HWR
2" HWS
3/4" HWR
2" HWS
3/4" HWR
2" HWS
3/4" HWR
3/4" HWR
2" HWS
2" HWS
3/4" HWR
3/4" HWR
2" HWS
2" HWS
3/4" HWR
3/4" HWR
2" HWS
3/4" HWR
2" HWS
3/4" HWR
2" HWS
2" HWS & 3/4"
HWR CONTINUE
TO AREA D
2" HWS CONTINUES
TO AREA C SOUTH
/F3 MD102i /F3 MD102i
9"ø IEA
6"ø IEA
8"ø IEA
6"ø IEA
12"ø IEA
12"ø IEA UP
12"ø GE (E) on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLAN
A/E:
TRIPLE C - The A/E Group
(612) 355-1251
Mat Perkins
A
B D
EF
G
H
J
K
L
M
C
GENERAL NOTES
KEYNOTES
1/8" = 1'-0"
B
IM
/6
-2
-1
R e n o v a te
D
B e d W in g -B
-M
P L S
V A
M C
/6 -2
-7
.M
P L S
.3 D
.B e d .W in g .M
E P
.B .L
.r v t
/1
/2
:2
:5
A
M
09/12/2022 K. Luke N.Harper
618-22-102
1391 - MD102i
MECHANICAL PLANS - SECOND LEVEL
INTERSTITIAL 2D - DEMO
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATION OF BUILDING 70 3D
BED WING
100% CONSTRUCTION
DOCUMENTS
A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
B. COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH
OTHER TRADES IN ADVANCE OF INSTALLATION.
C. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-
CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED
SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE
ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND
BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION
AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP
THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING
EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND
TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO
NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE
CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS
AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.
REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.
D. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED
TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA
FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT
ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE
DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY
RENOVATION.
E. THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING
CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO
COMPLETE THIS PROJECT.
F. ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 54” ABOVE
FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.
G. REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND
ELEVATIONS.
NOTE: NOT ALL KEYNOTES
ARE USED ON EACH SHEET
1. REMOVE ALL EXISTING TERMINAL UNITS AND ASSOCIATED THERMOSTATS.
2. EXISTING SUPPLY AIR AND EXHAUST GRILLE TO BE REMOVED. COORDINATE
WITH COR ON IF THEY SHOULD BE RETURNED TO THE VA AS ATTIC STOCK.
3. EXISTING RETURN AIR AND EXHAUST GRILLE TO BE REMOVED. COORDINATE
WITH COR ON IF THEY SHOULD BE RETURNED TO THE VA AS ATTIC STOCK.
4. DEMOLISH EXISTING FIN TUBE RADIATION WINDOW HEATER AND PREPARE
SPACE FOR NEW UNIT.
5. RETAIN TRUNK/MAIN DUCT WORK IN INTERSTITIAL BACK TO AHU, RF, AND EF.
6. CONTRACTOR TO PRESSURE TEST AND CLEAN DUCT DURING CONSTRUCTION.
7. EXISTING PNEUMATIC CONTROLS DEVICES SERVING EQUIPMENT PLACED WITH
THIS PROJECT SHALL BE REMOVED AND PREPARED FOR INSTALLATION OF NEW
DDC CONTROLS.
8. EXISTING DDC CONTROLS ENCLOSURE TO REMAIN, PROTECT IN PLACE.
9. EXISTING RETURN AIR GRILLE TO BE REMOVED. COORDINATE WITH COR ON IF
THEY SHOULD BE RETURNED TO THE VA AS ATTIC STOCK.
10. EXISTING SUPPLY AIR MAIN DUCTWORK FROM 70-AH3NE-21 SHALL BE RETAINED
AND REUSED TO SERVE RENOVATED SPACE.
11. PROVIDE TEMPORARY AHU SERVING EXISTING SUPPLY AIR MAINS DURING
REPLACMENT OF THE EXISTING AHU. TEMPORARY UNIT SHALL BE SIZED PER
MECHANICAL EQUIPMENT SCHEDULES. PROVIDE FLEXIBLE DUCT WORK AND
ISOLATION DAMPERS DURING CHANGEOVER TO TEMPORARY UNIT. TEMPORARY
AHU SHALL BE FULLY COMMISISONED PRIOR TO REMOVING EXISTING UNIT.
12. DEMOLISH EXISTING EF-34.
13. DEMOLISH EXISTING RF-18.
14. EF-33 TO REMAIN, PROTECT IN PLACE.
15. DEMOLISH EXISTING HEATING WATER SUPPLY PIPING AND HEATING WATER
RETURN PIPING TO FIN TUBE RADIATOR ABOVE.
16. DEMOLISH EXISTING FIN TUBE RADIATOR ABOVE.
17. EXISTING MECHANICAL HEATING WATER SUPPLY AND HEATING WATER RETURN
PIPING TO BE DEMOLISHED AND REPLACED.
18. DEMOLISH EXISTING FIRE SMOKE DAMPER AND PREPARE DUCT FOR
INSTALLATION OF NEW FIRE SMOKE DAMPERS.
19. DEMOLISH EXISTING PNEUMATIC CONTROLS ASSOSCIATED WITH SCOPE,
RETAIN EXISTING CONTROL PANEL AND PNEUMATIC CONTROLS UNRELATED TO
OUR SCOPE.
20. DEMOLISH EXISTING DUCTWORK BACK TO THE EXISTING MAIN, REPAIR AND
RESEAL.
21. PHASE 1: INSTALL AND COMMISSION TEMPORARY AIR HANDLING UNIT ON SITE
BELOW, PHASE 2: INSTALL TEMPORARY DAMPERS/TAPS IN EXISTING DUCT,
PHASE 3. REMOVE KNOCKOUT PANEL AND CONNECT TEMPORARY AIR
HANDLING UNIT TO TEMPORARY DAMPERS, ROUTE AND SUPPORT TEMPORARY
DUCTWORK UP THE SIDE OF THE BUILDING, PHASE 4: SHUTDOWN EXISTING AHU
21 AND CONNECT TEMPORARY AHU AT DAMPER POCS, TEST AND BALANCE
TEMPORARY AIR HANDLING UNIT. PHASE 5: REMOVE EXISTING AHU IS SECTION
SPLITS AS REQUIRED BY THE OPENING, PHASE 6: INSTALL NEW AIR HANDLING
UNIT AHU 21.
22. DEMOLISH EXISTING VFD, SEE ELECTRICAL SHEETS AND MECHANICAL
SCHEDULES.
23. PROVIDE TEMPORARY ISOLATION DAMPERS BEFORE BEGINNING ANY
DEMOLITION WORK. THE DUCTWORK SHALL BE CLEANED, REPAIRED AND
SEALED AIR TIGHT. THE CHANGEOVER SHALL BE PHASED TO INSTALL ONLY ONE
TEMPORARY ISOLATION DAMPER AT A TIME BEFORE PROCEEDING TO THE NEXT
DAMPER. THIS PROCESS SHALL OCCUR OUTSIDE OF FACILITY OPERATIONAL
HOURS AND WILL REQUIRE NIGHT AND WEEKEND WORK. ADD A CAP TO
DEMOED DUCTWORK.
24. REMOVE EXISTING CHILLED WATER, STEAM, AND CONDENSATE PIPING SERVING
AIR HANDLING UNIT (E) 70-AH3NE-21 BACK TO NEAREST ISOLATION VALVE.
25. DEMOLISH EXISTING EF-50 AND HEPA FILTER ASSEMBLY SERVING ISOLATION
ROOM. PROVIDE NEW EF-50 PER THE MECHANICAL SCHEDULES WITH NEW
HEPA FILTER BOX, HOUSING, ACCESS PANEL AND INTEGRATED DIFFERNENTIAL
PRESSURE. (2) FILTERS @ 24"X24"X12" EACH WITH MAXIMUM FACE VELOCITY OF
400 FPM. SEE F1/M-504 FOR MORE DETAILS.
26. DEMOLISH EXISTING EXHAUST DUCT FROM EF-50.
27. SHUT OFF VALVES TO FIN TUBE RADIATOR ABOVE. REBALANCE WATER FLOW.
DEMOLISH EXISTING PIPING ONCE NEW PIPING HAS BEEN CONSTRUCTED,
PRESSURE TESTED, AND CERTIFIED.
28. REMOVE EXISTING CHILL WATER LINES TO PUMP P-4 ONCE TEMPORARY PUMP
P-4 HAS BEEN PLACED AND CONNECTED.
29. REMOVE EXISTING PUMP P-4 AND PREPARE SPACE FOR INSTALLATION OF NEW
PUMP.
30. REMOVE ISOLATION EXHAUST MAIN TO RISER AND UP TO THIRD LEVEL
MECHANICAL ROOM. CAP AT POINT OF DISCONNECTION FROM THE REMAINING
ISOLATION EXHAUST SYSTEM.
31. ISOLATION EXHAUST DUCT TO REMAIN AND TO BE EXTENDED TO CONNECT TO
GENERAL EXHAUST DUCT. GENERAL EXHAUST FAN TO BE REBALANCED TO
SERVE THE ITS NEW SPACES.
32. REPAIR ALL AND MATCH EXISTING FIRE RATING AND FINISH FROM REMOVED
DUCT WORK.
SCALE: 1/8" = 1'-0"
F3
MECHANICAL PLAN - SECOND LEVEL
INTERSTITIAL 2D - DEMO
SCALE: 1/8" = 1'-0"
F6
MECHANICAL PLAN - SECOND LEVEL
INTERSTITIAL 2D - DEMO
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
/F3 MD103 /F3 MD103
CORRIDOR
C3-12
EXAM
3D-119C
EXAM
3D-120
EXAM
3D-121
BREAK
3D-123A
BREAK ROOM
3D-123
STAIR
CORRIDOR
C3-12
EXAM
3D-119B
EXAM
3D-119C
EXAM
3D-120
EXAM
3D-121
CORRIDOR
C3-17
BREAK
3D-123A
BREAK ROOM
3D-123
EXAM
3D-119A
CORRIDOR
C3-18
TREATMENT
3D-119
PATIENT
3D-116C
PATIENT
3D-116B
PATIENT
3D-114C
PATIENT
3D-114B
PATIENT
3D-108
PATIENT
3D-107
PATIENT
3D-104
PATIENT
3D-103
PATIENT
3D-102
EXAM
3D-101
TLT
3D-101A
OFFICE
3C-103
EXAM
3D-136
EXAM
3D-135
CORRIDOR
C3-24
CORRIDOR
C3-23
CORRIDOR
C3-22
CHECK-IN
3D-134
WORK ROOM
3D-134A
STORAGE
3D-134BOFFICE
3D-131
3D-105
3D-105
OFFICE
3D-106
ANTE
3D-107A
TLT
3D-107B
TLT
3D-104B
ANTE
3D-104A
ANTE
3D-103A
TLT
3D-103B
TLT
3D-102B
ANTE ROOM
3D-102A
CORRIDOR
C3-26
9433 95
TOILET
CORRIDOR
C3-27
CORRIDOR
C3-28
TLT
3D-135A
STAIR
STORAGE
3D-130
NURSING RM
3D-109A
OFFICE
3D-109
WORK ROOM
3D-115
LINEN CHUTE
3D-112A
CORRIDOR
C3-20
HAC
3D-110
TLT
3D-111
PATIENT
3D-129
PATIENT
3D-128B
PATIENT
3D-128C
ANTE
3D-128
TLT
3D-128A
C O
R R
ID
O
R
C -1
EXAM
3D-112
EXAM
3D-117
STOR
3D-127A
EXAM
3D-127
TLT
3D-126A
PATIENT
3D-126
PATIENT
3D-124
TLT
3D-124A
OFFICE
3D-125
EXAM
3D-118
STAIR
TLT
3D-114A
TLT
3D-108A
ANTE
3D-114
TLT
3D-116A
ANTE
3D-116
(E)
70-AH3NE-21
70-EF-35
70-EF-34
70-RF-18 13
72"x20" RA
72"x20" RA
72"x20" RA
3/4" MPS
2 1/2" MPS
12"ø EA
16"ø EA 8"ø SA
(E)70.VAV.21.C3-12
1" MPS
1 1/2" MPS
4" CHWR
4" CHWS
3" MPS
/F6 MD103 /F6 MD103
on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLAN
A/E:
TRIPLE C - The A/E Group
(612) 355-1251
Mat Perkins
A
B D
EF
G
H
J
K
L
M
C
GENERAL NOTES
KEYNOTES
1/8" = 1'-0"
B
IM
/6
-2
-1
R e n o v a te
D
B e d W in g -B
-M
P L S
V A
M C
/6 -2
-7
.M
P L S
.3 D
.B e d .W in g .M
E P
.B .L
.r v t
/1
/2
:2
:1
A
M
09/12/2022 K. Luke N.Harper
618-22-102
1391 - MD103
MECHANICAL PLANS - THIRD LEVEL 3D -
DEMO
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATION OF BUILDING 70 3D
BED WING
100% CONSTRUCTION
DOCUMENTS
SCALE: 1/8" = 1'-0"
F6
MECHANICAL PLAN - THIRD LEVEL 3D
- DEMO
A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
B. COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH
OTHER TRADES IN ADVANCE OF INSTALLATION.
C. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-
CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED
SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE
ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND
BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION
AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP
THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING
EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND
TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO
NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE
CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS
AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.
REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.
D. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED
TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA
FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT
ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE
DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY
RENOVATION.
E. THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING
CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO
COMPLETE THIS PROJECT.
F. ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 54” ABOVE
FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.
G. REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND
ELEVATIONS.
NOTE: NOT ALL KEYNOTES
ARE USED ON EACH SHEET
1. REMOVE ALL EXISTING TERMINAL UNITS AND ASSOCIATED THERMOSTATS.
2. EXISTING SUPPLY AIR AND EXHAUST GRILLE TO BE REMOVED. COORDINATE
WITH COR ON IF THEY SHOULD BE RETURNED TO THE VA AS ATTIC STOCK.
3. EXISTING RETURN AIR AND EXHAUST GRILLE TO BE REMOVED. COORDINATE
WITH COR ON IF THEY SHOULD BE RETURNED TO THE VA AS ATTIC STOCK.
4. DEMOLISH EXISTING FIN TUBE RADIATION WINDOW HEATER AND PREPARE
SPACE FOR NEW UNIT.
5. RETAIN TRUNK/MAIN DUCT WORK IN INTERSTITIAL BACK TO AHU, RF, AND EF.
6. CONTRACTOR TO PRESSURE TEST AND CLEAN DUCT DURING CONSTRUCTION.
7. EXISTING PNEUMATIC CONTROLS DEVICES SERVING EQUIPMENT PLACED WITH
THIS PROJECT SHALL BE REMOVED AND PREPARED FOR INSTALLATION OF NEW
DDC CONTROLS.
8. EXISTING DDC CONTROLS ENCLOSURE TO REMAIN, PROTECT IN PLACE.
9. EXISTING RETURN AIR GRILLE TO BE REMOVED. COORDINATE WITH COR ON IF
THEY SHOULD BE RETURNED TO THE VA AS ATTIC STOCK.
10. EXISTING SUPPLY AIR MAIN DUCTWORK FROM 70-AH3NE-21 SHALL BE RETAINED
AND REUSED TO SERVE RENOVATED SPACE.
11. PROVIDE TEMPORARY AHU SERVING EXISTING SUPPLY AIR MAINS DURING
REPLACMENT OF THE EXISTING AHU. TEMPORARY UNIT SHALL BE SIZED PER
MECHANICAL EQUIPMENT SCHEDULES. PROVIDE FLEXIBLE DUCT WORK AND
ISOLATION DAMPERS DURING CHANGEOVER TO TEMPORARY UNIT. TEMPORARY
AHU SHALL BE FULLY COMMISISONED PRIOR TO REMOVING EXISTING UNIT.
12. DEMOLISH EXISTING EF-34.
13. DEMOLISH EXISTING RF-18.
14. EF-33 TO REMAIN, PROTECT IN PLACE.
15. DEMOLISH EXISTING HEATING WATER SUPPLY PIPING AND HEATING WATER
RETURN PIPING TO FIN TUBE RADIATOR ABOVE.
16. DEMOLISH EXISTING FIN TUBE RADIATOR ABOVE.
17. EXISTING MECHANICAL HEATING WATER SUPPLY AND HEATING WATER RETURN
PIPING TO BE DEMOLISHED AND REPLACED.
18. DEMOLISH EXISTING FIRE SMOKE DAMPER AND PREPARE DUCT FOR
INSTALLATION OF NEW FIRE SMOKE DAMPERS.
19. DEMOLISH EXISTING PNEUMATIC CONTROLS ASSOSCIATED WITH SCOPE,
RETAIN EXISTING CONTROL PANEL AND PNEUMATIC CONTROLS UNRELATED TO
OUR SCOPE.
20. DEMOLISH EXISTING DUCTWORK BACK TO THE EXISTING MAIN, REPAIR AND
RESEAL.
21. PHASE 1: INSTALL AND COMMISSION TEMPORARY AIR HANDLING UNIT ON SITE
BELOW, PHASE 2: INSTALL TEMPORARY DAMPERS/TAPS IN EXISTING DUCT,
PHASE 3. REMOVE KNOCKOUT PANEL AND CONNECT TEMPORARY AIR
HANDLING UNIT TO TEMPORARY DAMPERS, ROUTE AND SUPPORT TEMPORARY
DUCTWORK UP THE SIDE OF THE BUILDING, PHASE 4: SHUTDOWN EXISTING AHU
21 AND CONNECT TEMPORARY AHU AT DAMPER POCS, TEST AND BALANCE
TEMPORARY AIR HANDLING UNIT. PHASE 5: REMOVE EXISTING AHU IS SECTION
SPLITS AS REQUIRED BY THE OPENING, PHASE 6: INSTALL NEW AIR HANDLING
UNIT AHU 21.
22. DEMOLISH EXISTING VFD, SEE ELECTRICAL SHEETS AND MECHANICAL
SCHEDULES.
23. PROVIDE TEMPORARY ISOLATION DAMPERS BEFORE BEGINNING ANY
DEMOLITION WORK. THE DUCTWORK SHALL BE CLEANED, REPAIRED AND
SEALED AIR TIGHT. THE CHANGEOVER SHALL BE PHASED TO INSTALL ONLY ONE
TEMPORARY ISOLATION DAMPER AT A TIME BEFORE PROCEEDING TO THE NEXT
DAMPER. THIS PROCESS SHALL OCCUR OUTSIDE OF FACILITY OPERATIONAL
HOURS AND WILL REQUIRE NIGHT AND WEEKEND WORK. ADD A CAP TO
DEMOED DUCTWORK.
24. REMOVE EXISTING CHILLED WATER, STEAM, AND CONDENSATE PIPING SERVING
AIR HANDLING UNIT (E) 70-AH3NE-21 BACK TO NEAREST ISOLATION VALVE.
25. DEMOLISH EXISTING EF-50 AND HEPA FILTER ASSEMBLY SERVING ISOLATION
ROOM. PROVIDE NEW EF-50 PER THE MECHANICAL SCHEDULES WITH NEW
HEPA FILTER BOX, HOUSING, ACCESS PANEL AND INTEGRATED DIFFERNENTIAL
PRESSURE. (2) FILTERS @ 24"X24"X12" EACH WITH MAXIMUM FACE VELOCITY OF
400 FPM. SEE F1/M-504 FOR MORE DETAILS.
26. DEMOLISH EXISTING EXHAUST DUCT FROM EF-50.
27. SHUT OFF VALVES TO FIN TUBE RADIATOR ABOVE. REBALANCE WATER FLOW.
DEMOLISH EXISTING PIPING ONCE NEW PIPING HAS BEEN CONSTRUCTED,
PRESSURE TESTED, AND CERTIFIED.
28. REMOVE EXISTING CHILL WATER LINES TO PUMP P-4 ONCE TEMPORARY PUMP
P-4 HAS BEEN PLACED AND CONNECTED.
29. REMOVE EXISTING PUMP P-4 AND PREPARE SPACE FOR INSTALLATION OF NEW
PUMP.
30. REMOVE ISOLATION EXHAUST MAIN TO RISER AND UP TO THIRD LEVEL
MECHANICAL ROOM. CAP AT POINT OF DISCONNECTION FROM THE REMAINING
ISOLATION EXHAUST SYSTEM.
31. ISOLATION EXHAUST DUCT TO REMAIN AND TO BE EXTENDED TO CONNECT TO
GENERAL EXHAUST DUCT. GENERAL EXHAUST FAN TO BE REBALANCED TO
SERVE THE ITS NEW SPACES.
32. REPAIR ALL AND MATCH EXISTING FIRE RATING AND FINISH FROM REMOVED
DUCT WORK.
SCALE: 1/8" = 1'-0"
F3
MECHANICAL PLAN - THIRD LEVEL 3D
- DEMO
NOTES:
CONTRACT SHALL PERFORM EQUIPMENT SURVEY TEST, TRAVERSE
READING ON MAIN DUCTS AND AIR INLETS & OUTLETS CFM READING
PRIOR TO START OF DEMOLOTION WORK. SUBMIT TEST DATA IN A
TABULATED FORM REPORT SHOWING REQUIRED (FROM AS-BUILT
DRAWINGS) AND ACTUAL (FROM SURVEY TEST) READING TO THE
ARCHITECT FOR REVIEW AND DIRECTIONS FOR FINAL BALANCING.
1. PERFORM EQUIPMENT SURVEY TEST TO AIR HANDLING UNIT 70-
AH3NE-21 AND EXHAUST FAN EF-50.1 AND EF-50.2. DATA SHALL INCLUDING
THE FOLLOWING;
A. UNIT I.D. NO., MANUFACTURER, MODEL NO. AND SERIOAL NO
B. MOTOR MANUFACTURER, HP, TYPE, RPM, RATED AMPS.,
VOLT, PHASE, HERTZ AND SERVICE FACTOR.
C. FAN WHEEL DIAMETER, RPM, DRIVE, SHEAVE SIZE AND STATIC
PRESSURE PROFILE.
D. COOLING COIL FACE VELOCITY, ENTERING/LEAVING AIR
TEMP., WATER TEMP. AND FLOW RATES.
E. INLET AND OUTLET DESIGN AND ACTUAL PRESSURE FOR
70-AH3NE-21 AND EF-50.1 AND EF-50.2
2. PERFORM TRAVERSE READING ON MAIN DUCTS AS SHOWN ON
THE PLANS. DATA SHALL INCLUDE CFM AND STATIC PRESSURE.
3. PERFORM AIR INLETS & OUTLETS AIR READING IN ALL AREAS
SERVED BY 70-AH3NE-21 AND EF-50.1 AND EF-50.2. OBTAIN
AS- BUILT DRAWINGS FOR THE AREAS TO BE SURVEYED.
4. EXISTING CFM MEASURED IN AREAS NOT AFFECTED BY THE
REMODEL BUT SERVED BY 70-AH3NE-21 AND EF-50.1 AND
EF-50.2 SHALL BE MAINTAINED AT ALL TIMES DURING
DEMOLTION AND CONSTRUCTION.
5. REBALANCE EXISTING ROOMS SERVED BY 70-AH3NE-21, EF-.50.1
AND EF-50.2 BASED ON PRE-READING RESULT.
2" HWS
2 1/2" 2 1/2"
8"ø SA
8"ø SA
8"ø
8"ø SA
8"ø SA
6"ø
(E)70.VAV.21.3D-120
(E)70.VAV.21.3D-119C
(E)70.VAV.22.3D-119B
(E)70.VAV.21.3D-119A
(E)70.VAV.21.3D-119
8"ø SA
8"ø SA
(E)70.VAV.21.3D-116C
8"ø SA
(E)70.VAV.21.3D-116B
8"ø SA
(E)70.VAV.21.3D-101
(E)70.VAV.21.3D-102
8"ø SA
8"ø SA 6"ø SA
6"ø SA
6"ø SA
(E)70.VAV.21.3C-103
8"ø SA
8"ø EA
8"ø SA
(E)70.VAV.21.3D-103
(E)70.VAV.21.3D-104
8"ø SA
8"ø EA
6"ø SA
6"ø SA
"ø
S A
"ø
R A
"ø
E A
"ø
I E
A
"ø
S A
"ø
R A
"ø
E A
"ø
R A
"ø
S A
"ø
R A
"ø
S A
"ø
S A
"ø
R A
"ø
R A
"ø
S A
"ø
S A
"ø
S A
"ø
S A
8"ø SA 10"ø RA
8"ø RA
8"ø RA
8"ø SA
8"ø SA
8"ø SA
"ø
R A
"ø
R A
10"ø SA
10"ø SA
10"ø SA
"ø
R A
"ø
R A
8"ø RA
10"ø RA
10"ø RA
12"ø SA
8"ø RA
6"ø EA
"ø
E A
10"ø RA
"ø
R A10"ø RA
12"ø SA
10"ø RA
8"ø SA
"ø
R A
10"ø RA 6"ø EA
8"ø SA
8"ø SA
8"ø SA
8"ø RA
6"ø EA
8"ø
"ø
8"ø RA
8"ø RA
8"ø SA
8"ø EA
8"ø EA
"ø
S A
"ø
S A
6"ø SA
9"ø EA
"ø
S A
"ø
S A
"ø
R A
8"ø SA
8"ø SA
8"ø RA
10"ø RA8"ø RA
"ø
R A
"ø
E A
12"ø SA
8"ø SA
8"ø SA
12"ø SA
9"ø EA
"ø
E A
"ø
E A
"ø
"ø
E A
"ø
E A
"ø
E A
8"ø SA
8"ø RA 8"ø RA
6"ø EA
6"ø EA
6"ø 10"ø RA
8"ø RA
8"ø RA 8"ø EA
8"ø SA
8"ø SA
"ø
S A
8"ø SA
6"ø RA
6"ø SA
"ø
R A
"ø
R A6 "ø
S A
6"ø SA
"ø
S A
"ø
R A
6"ø RA
6"ø RA
8"ø RA
6"ø SA
"ø
S A
8"ø SA
8"ø RA 6"ø EA
10"ø SA
"ø
"ø
E A
"ø
S A
10"ø EA 6"ø EA
"ø
"ø
R A
TYP.
TYP.
TYP.
TYP.
TYP.
"ø
S A
4"ø SA
"ø
S A
6"ø EA
8"ø RA
(E)70.VAV.21.3D-114B/C
(E)70.VAV.21.3D-108
(E)70.VAV.21.3D-107
(E)70.VAV.21.C3-23
(E)70.VAV.21.3D-121
(E)70.VAV.21.C3-18
(E)70.VAV.21.3D-118
(E)70.VAV.21.3D-127A
(E)70.VAV.21.3D-109
(E)70.VAV.21.3D-109A
(E)70.VAV.21.3D-106
(E)70.VAV.21.3D-136
(E)70.VAV.21.3D-135
(E)70.VAV.21.3D-134
(E)70.VAV.21.3D-134
(E)70.VAV.21.3D-134
(E)70.VAV.21.3D-134B
(E)70.VAV.21.3D-105
(E)70.VAV.21.3D-129/134A
(E)70.VAV.21.3D-130
(E)70.VAV.21.3D-128B/C
(E)70.VAV.21.3D-126
(E)70.VAV.21.3D-124
(E)70.VAV.21.3D-123
(E)70.VAV.21.3D-125
(E)70.VAV.21.C3-12
8"ø SA
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4"
1 1/2" HWR
1 1/2" HWS
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
2 1/2" HWR
2 1/2" HWS
TYP.
/F3 MD103i /F3 MD103i
(E)
70-AH3NE-21
3/4" MPS
2 1/2" MPS
(E)70.VAV.21.C3-12
1" MPS
1 1/2" MPS
4" CHWR
4" CHWS
3" MPS
/F6 MD103i /F6 MD103i on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .