Attachment D.2 Drawings 2 of 7 - 8 pages.pdf

PDF 20 MB Posted

Attached to
Z1DA--618-22-102, Renovate for a Private Patient Bed Ward (3D) 36C263-23-AP-0055
Solicitation number
36C26323R0023
Issued by

About this file

This document provides details for a federal contract opportunity with the Department of Veterans Affairs to renovate a private patient bed ward. The solicitation number is 36C26323R0023 and seeks to award a contract for project Z1DA--618-22-102 to renovate a private patient bed ward (3D) at Veterans Integrated Service Network 23. The description specifies that the opportunity involves renovating a private patient bed ward. No further information is included regarding response dates, award dates, pricing terms, set asides, or incumbent contractors. The attached file appears to contain technical drawings related to the renovation project requirements.

View the file

Other files

File Type Posted
S06 Q_A Atch 1 - Revised Atch C.1 Specifications Vol 1.2 - 609 pages.pdf PDF
S06 36C26323R0023 Amendment 0005.docx DOCX document
S06 Revised Drawings - 12 pages.pdf PDF
S06 Q_A Atch 2 - Revised Atch C.1 Specifications Vol 1.1 - 291 pages.pdf PDF
S06 Late Questions - Solicitation 36C26323R0023 - 1 page.pdf PDF
S06 Addendum Number 2 - 2 pages.pdf PDF
36C26323R0023 0004.docx DOCX document
S06 36C26323R0023 Amendment 0003.docx DOCX document
S06 Q_A Atch 3 - Revised Drawing A-601 - 1 page.pdf PDF
S06 Revised Atch F Wage Determination MN20230117 4-14-23 - 9 pages.pdf PDF
S06 Q_A Atch 5 - Lidar Scans - 1 page.pdf PDF
S06 Q_A Atch 4 - Revised Drawing Q-601 - 1 page.pdf PDF
S06 Q_A Atch 1.2 - Revised Atch C.1 Specifications Vol 1.2 - 634 pages.pdf PDF
S06 Revised Drawings MP103i M-501 and M-502 - 3 pages.pdf PDF
S06 36C26323R0023 Amendment 0002.docx DOCX document
S06 Q_A Atch 1.1 - Revised Atch C.1 Specifications Vol 1.1 - 291 pages.pdf PDF
S06 Q_A Atch 7 - Revised Drawing GI201 - 1 page.pdf PDF
S06 Revised Drawings M-702 M-802 and M-804 - 3 pages.pdf PDF
S06 Questions - Solicitation 36C26323R0023.pdf PDF
S06 Q_A Atch 6 - Revised Drawings GI000 and GI101 - 2 pages.pdf PDF
S06 Q_A Atch 2 - Revised Drawings - 15 pages.pdf PDF
S06 Q_A Atch 8 - Revised Atch E Brand Name J and A - 30 pages.pdf PDF
S06 Revised Drawings M-503 M-504 and M-601 - 3 pages.pdf PDF
S06 Addendum Number 1 - 3 pages.pdf PDF
S06 Attachment 1 - Pre-Bid Sign-In Sheet - 2 pages.pdf PDF
S06 36C26323R0023 Amendment 0001.docx DOCX document
S06 Attachment 2 - Pre-Bid Site Visit Agenda - 2 pages.pdf PDF
36C26323R0023.docx DOCX document
Attachment I Questions Request Form - 1 page.doc DOC document
Attachment D.6 Drawings 6 of 7 - 13 pages.pdf PDF
Attachment A SOW - 3 pages.pdf PDF
Attachment B Price Schedule Breakdown Sheet - 1 page.xlsx XLSX spreadsheet
Attachment J VAAR 852.219-75 Limitations on Subcontracting Cert of Compliance - 2 pages.pdf PDF
Attachment C.3 Specifications Volume 3 - 410 pages.pdf PDF
Attachment F Wage Determination MN20230117 1-6-23 - 7 pages.pdf PDF
Attachment D.7 Drawings 7 of 7 - 37 pages.pdf PDF
Attachment D.1 Drawings 1 of 7 - 3 pages.pdf PDF
Attachment D.4 Drawings 4 of 7 - 24 pages.pdf PDF
Attachment G VA6500 Appendix C 1-2-3a-6a-7a-7d-9 and Appendix D - 6 pages.pdf PDF
Attachment C.2 Specifications Volume 2 - 14 pages.pdf PDF
Attachment D.3 Drawings 3 of 7 - 24 pages.pdf PDF
Attachment H Past Performance Questionnaire - 3 Pages.docx DOCX document
Attachment D.5 Drawings 5 of 7 - 23 pages.pdf PDF
Attachment E Brand Name Justification and Approvals _Redacted - 27 pages.pdf PDF
Attachment C.1 Specifications Volume 1 - 930 pages.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TYPE D

A. IMPLEMENT INFECTION CONTROL RISK ASSESSMENT (ICRA)

PROCEDURES AS PER THE ICRA PLAN AND AS DIRECTED BY THE

CONTRACTING OFFICER REPRESENTATIVE (COR).

B. COORDINATE ALL DEMOLITION/ CONSTRUCTION DEBRIS PATH OF

TRAVEL AND INTERIM LIFE SAFETY MEASURES (ILSM) WITH THE COR.

ALL INTERIOR DOORS THAT LEAD TO THE CONSTRUCTION SITE

SHALL BE POSTED AS PER THE ISLM PLAN.

C. OBTAIN INFECTION CONTROL PERMIT PRIOR TO BEGINNING WORK.

D. THE ONE HOUR FIRE RATED CONSTRUCTION BARRIERS SHALL BE

CONSTRUCTED PRIOR TO BEGINNING OTHER WORK.

E. CONSTRUCT ANTEROOM AT ENTRANCES TO CONSTRUCTION AREAS

AND REQUIRE ALL CONSTRUCTION PERSONNEL TO PASS THROUGH

THIS ROOM TO BE VACUUMED WITH HEPA VACUUM CLEANER PRIOR

TO LEAVING THE SITE.

F. FIRE PROTECTION SYSTEMS SHALL REMAIN FUNCTIONAL FOR

OCCUPIED AREAS ON THE FLOOR.

G. PROVIDE FIRE EXTINGUISHERS IN CONSTRUCTION AREAS; REVIEW

WITH COR AND VA SAFETY GROUP.

H. MAINTAIN EXIT LIGHTS IN CONSTRUCTION AREA.

I. MAINTAIN NEGATIVE AIR PRESSURE IN CONSTRUCTION AREA AT ALL

TIMES (24/7). WHETHER OCCUPIED OR NOT, THROUGHOUT

DURATION OF PROJECT USING HEPA EQUIPPED AIR FILTRATION

UNITS.

J. CONSTRUCTION AREA SHALL REMAIN ISOLATED FROM THE OTHER

AREAS OF THE MEDICAL CENTER; NO RETURN AIR OR EXHAUST

SHALL PASS INTO THE AREAS OUTSIDE THE CONSTRUCTION AREA.

ISOLATE HVAC SYSTEM WITHIN CONSTRUCTION AREA TO PREVENT

CONTAMINATION OF EXISTING DUCT SYSTEM.

K. PROVIDE SIGNS ON DOORS INTO THE CONSTRUCTION AREA THAT

READS: "CONSTRUCTION AREA-DO NOT ENTER".

L. TACKY MATS SHALL BE PLACED AT ALL DOORS INTO THE

CONSTRUCTION AREA AND SHALL BE MONITORED TO MAKE SURE

THEY REMAIN EFFECTIVE.

M. MAINTAIN A CLEAN AND ORDERLY CONSTRUCTION AREA. ALL

DEBRIS REMOVAL SHALL BE IN COVERED CARTS AND/OR

CONTAINERS.

N. SEAL ALL HOLES, PUNCTURES, AND PENETRATIONS FROM PIPES AND

CONDUITS APPROPRIATELY AND IMMEDIATELY TO MAINTAIN DUST

PROTECTION AND NEGATIVE AIR PRESSURE.

O. AFTER COMPLETION OF WORK: VACUUM CONSTRUCTION AREA WITH

HEPA FILTERED VACUUMS, WET MOP WITH DISINFECTANT, REMOVE

CONSTRUCTION BARRIERS (UPON APPROVAL). PATCH OR REPAIR

ANY DAMAGE FROM CONSTRUCTION BARRIER REMOVAL AND

REMOVE ISOLATION OF HVAC SYSTEM.

P. CONSTRUCTION BARRIERS SHALL NOT BE REMOVE UNTIL PROJECT

IS COMPLETED AND INSPECTED BY VA SAFETY PERSONNEL,

INFECTION CONTROL GROUP, AND COR.

ICRA NOTES:

INFECTION CONTROL RISK

ASSESSMENT:

STEP 1: TYPE D

IDENTIFY THE TYPE OF CONSTRUCTION PROJECT

ACTIVITY (TYPE A–D)

TYPE A: INSPECTION AND NONINVASIVE ACTIVITIES.

TYPE B: SMALL-SCALE, SHORT-DURATION ACTIVITIES

THAT CREATE MINIMAL DUST.

TYPE C: WORK THAT GENERATES A MODERATE TO

HIGH LEVEL OF DUST OR REQUIRES DEMOLITION OR

REMOVAL OF ANY FIXED BUILDING COMPONENTS OR

ASSEMBLIES.

TYPE D: MAJOR DEMOLITION AND CONSTRUCTION

PROJECTS.

STEP 2: HIGH RISK

IDENTIFY THE PATIENT RISK GROUPS THAT WILL BE

AFFECTED.

IF MORE THAN ONE RISK GROUP WILL BE AFFECTED,

SELECT THE HIGHER RISK GROUP.

STEP 3: CLASS IV

MATCH THE PATIENT RISK GROUP (LOW, MEDIUM,

HIGH, HIGHEST) WITH THE PLANNED CONSTRUCTION

PROJECT TYPE (A, B, C, D) ON THE FOLLOWING MATRIX,

TO FIND THE CLASS OF PRECAUTIONS (I, II, III OR IV) OR

LEVEL OF INFECTION CONTROL ACTIVITIES REQUIRED.

STEP 4: IDENTIFY THE AREAS SURROUNDING THE PROJECT

AREA, ASSESSING POTENTIAL IMPACT.

BELOW ABOVE NORTH SOUTH EAST WEST

_______________________RISK GROUP_____________________

LOW LOW N/A N/A N/A N/A

STEP 5:

IDENTIFY SPECIFIC SITE OF ACTIVITY, FOR EXAMPLE, PATIENT

ROOMS, MEDICATION ROOM, AND SO ON.

STEP 6:

IDENTIFY ISSUES RELATED TO: VENTILATION, PLUMBING, AND

ELECTRICAL IN TERMS OF THE OCCURRENCE OF PROBABLE

OUTAGES.

STEP 7.

IDENTIFY CONTAINMENT MEASURES, USING PRIOR

ASSESSMENT. WHAT TYPES OF BARRIERS (FOR EXAMPLE,

SOLIDS WALLS)? WILL HEPA FILTRATION BE REQUIRED?

STEP 8.

CONSIDER POTENTIAL RISK OF WATER DAMAGE. IS THERE A

RISK DUE TO COMPROMISING STRUCTURAL INTEGRITY (FOR

EXAMPLE, WALL, CEILING, ROOF)?

NOTE: RENOVATION/CONSTRUCTION AREA SHALL BE

ISOLATED FROM THE OCCUPIED AREAS DURING

CONSTRUCTION AND SHALL BE NEGATIVE WITH RESPECT TO

SURROUNDING AREAS.

STEP 9.

WORK HOURS: CAN OR WILL THE WORK BE DONE DURING

NON-PATIENT-CARE HOURS?

STEP 10.

DO PLANS ALLOW FOR ADEQUATE NUMBER OF

ISOLATION/NEGATIVE AIRFLOW ROOMS?

STEP 11.

DO THE PLANS ALLOW FOR THE REQUIRED NUMBER AND TYPE

OF HAND-WASHING SINKS?

STEP 12.

DOES THE INFECTION PREVENTION AND CONTROL STAFF

AGREE WITH THE MINIMUM NUMBER OF SINKS FOR THIS

PROJECT? (VERIFY AGAINST FACILITY GUIDELINES INSTITUTE

(FGI) DESIGN AND CONSTRUCTION GUIDELINES FOR TYPES

AND AREA.)

STEP 13.

DOES THE INFECTION PREVENTION AND CONTROL STAFF

AGREE WITH THE PLANS RELATIVE TO CLEAN AND SOILED

UTILITY ROOMS?

STEP 14.

PLAN TO DISCUSS THE FOLLOWING CONTAINMENT ISSUES

WITH THE PROJECT TEAM, FOR EXAMPLE, TRAFFIC FLOW,

HOUSEKEEPING, DEBRIS REMOVAL (HOW AND WHEN).

C

LA

S S

IV

DURING CONSTRUCTION

PROJECT

UPON COMPLETION OF

PROJECT

1. Remove or isolate HVAC system in area where work is being done, to prevent contamination of duct system.

2. Complete all critical barriers— i.e., drywall, plywood, plastic—to seal area from non-work area before construction begins. Or, implement control cube method with HEPA-fiItered vacuum for vacuuming prior to exit.

3. Maintain negative air pressure within worksite utilizing HEPA-equipped air filtration units.

4. Contain construction waste in tightly covered containers before transport.

5. Cover transport receptacles or carts. Tape down covering unless cart has a solid lid.

1. Do not remove barriers from work area until completed project is inspected by the owner’s Safety Department and Infection Control Department and thoroughly cleaned by the owner’s Environmental Services Department.

2. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

3. Vacuum work area with HEPA-filtered vacuum.

4. Wet mop area with disinfectant.

5. Upon completion, restore HVAC system where work was performed.

Construction Project Type

Patient Risk Group

LOW Risk Group MEDIUM Risk Group

HIGH Risk Group

HIGHEST Risk Group

I II II III/IV

I II III IV

I II III/IV IV

II III/IV III/IV IV

TYPE A TYPE B TYPE C TYPE D

WEEKLY CHANGED OR MORE

AS NEEDED PRE-FILTER

FLEX DUCT

MONTHLY CHANGED HEPA FILTER

HEPA NEGATIVE AIR UNIT

PROVIDE STICKY MATS (CHANGED END OF

EVERY SHIFT OR MORE IF NECESSARY TO

MAINTAIN CLEANLINESS).

STATIC PRESSURE WATER GAUGE INDICATOR

SHALL -0.03" W.G. MINIMUM TO MAINTAIN NEGATIVE

PRESSURE IN CONSTRUCTION AREA (VERIFY DAILY). IF

NOT VERIFY ALL OPENING SUCH AS DOOR ARE CLOSED

AND/OR CHANGE NEGATIVE AIR PRE-FILTER.

SUPPLY DUCTS EITHER

KEEP RUNNING OR

COVER WHEN NOT

RUNNING TO KEEP

DUST OUT.

A

V

O

TAPE ALL WALL, FLOOR, AND CEILING

SERVICES, TO PROTECT AGAINST

CONTAMINATION

E

FIRE EXTINGUISHER ON

PORTABLE FLOOR BRACKET

(SHALL REQUIRE MORE THAN

ONE.)

E4

GI201

PUBLIC AREA

CONSTRUCTION AREA

ANTE

ROOM

4' -0

M

IN

IM

U M

S E

E

F L O

O R

P

L A

N

TEMPORARY WALL

FLOOR LINE

CEILING SYSTEM AS

SCHEDULED

EXISTING STRUCTURE

FIRE RATED PLASTIC TO

PREVENT DUST INSTALL

PRIOR TO CONSTRUCTION

F

IN

IS

H E

D F

LO

O

R T

O U

N D

E R

S

ID

E O

F S

T R

U C

T U

R E

V E

R

IF

Y F

LO

O

R T

O F

LO

O

R H

E

IG

H T

RENOVATED SPRINKLER

SYSTEM

HJKLM

PROVIDE ICRA BARRIERS TO

CREATE ANTE-ROOM OUTSIDE OF

CONSTRUCTION ENTRY

PROVIDE ICRA BARRIERS TO

CREATE ANTE-ROOM OUTSIDE OF

CONSTRUCTION ENTRY - THIS SIDE

FOR EMERGENCY EGRESS ONLY

D1

D2

D3

PATH OF TRAVEL FOR MATERIAL /

WASTE TRANSPORTATION -

VERIFY WITH COR - SEE

CONSTRUCTION MATERIALS PLAN

THIS SHEET

5' -8

213 SF

PATIENT 9

3D-109

79 SF

RR 9

3D-109A

69 SF

RR 8

3D-108A

256 SF

PATIENT 8

3D-108

285 SF

PATIENT 7

3D-107

69 SF

RR 7

3D-107A

297 SF

PATIENT 6

3D-106

72 SF

RR 6

3D-106A

289 SF

PATIENT 5

3D-105

72 SF

RR 5

3D-105A

300 SF

PATIENT 4

3D-104

69 SF

RR 4

3D-104A

298 SF

PATIENT 3

3D-103

70 SF

RR 3

3D-103A

69 SF

RR 2

3D-102A

296 SF

PATIENT 2

3D-102

299 SF

BARIATRIC 1

3D-101

90 SF

RR 1

3D-101A

269 SF

PATIENT 18

3D-133

78 SF

RR 18

3D-133A

68 SF

RR 17

3D-132A

268 SF

SAFER PATIENT 17

3D-132

299 SF

STAFF WORK

3D-136

245 SF

MSA'S

3D-100

190 SF

CLEAN LINENS

3D-138

98 SF

ASST. NURSE MNGR

3D-110

93 SF

NURSE MNGR OFFICE

3D-111

127 SF

MED ROOM

3D-112

106 SF

NUTRITION

3D-135

292 SF

SAFER PATIENT 16

3D-131

67 SF

RR 16

3D-131A

67 SF

RR 15

3D-129A

252 SF

PATIENT 15

3D-129

280 SF

PATIENT 14

3D-128

71 SF

RR 14

3D-128A

71 SF

RR 13

3D-126A

102 SF

PHARM OFFICE

3D-120

108 SF

SOILED UTILITY

3D-134

49 SF

STAFF TOILET

3D-117

131 SF

SPS STORAGE

3D-114

315 SF

EQUIPMENT ROOM

3D-115 16 SF

EQUIP. ALCOVE

3D-140

245 SF

PATIENT 13

3D-126

260 SF

PATIENT 12

3D-12567 SF

RR 12

3D-125A

67 SF

RR 11

3D-123A

61 SF

HAC

3D-119

259 SF

STAFF BREAK ROOM

3D-116

238 SF

PATIENT 11

3D-123

206 SF

PATIENT 10

3D-121

74 SF

RR 10

3D-121A

54 SF

ANTE ROOM

3D-133B

74 SF

CLEAN UTILITY

3D-113

30 SF

OXYGEN STOR.

3D-118

262 SF

CIRCULATION

C3-18

55 SF

ANTE ROOM

3D-101B

186 SF

CORRIDOR

C3-27

49 SF

TOILET

3C-104

49 SF

TOILET

3C-105

RE-FINISH ONLY, NO

DESTRUCTIVE DEMOLITION

TAKING PLACE

CONSTRUCT NEW

CORRIDOR WALLS

AS ICRA BARRIERS

PRIOR TO COMMENCEMENT

OF REST OF CONSTRUCTION.

CONSTRUCT NEW

CORRIDOR WALLS

AS ICRA BARRIERS

PRIOR TO COMMENCEMENT

OF REST OF CONSTRUCTION.

4' -0

PROVIDE ANTE-ROOM FOR

MECHANICAL ROOM AND TELECOM

ROOM SCOPE OF WORK

ELEVATORS

ELE

VA

TO

R S

FREIGHT

ELEVATOR

ELEVATORS

ELEVATORS

ELEVATORS

PATH OF TRAVEL FOR MATERIAL / WASTE

TRANSPORTATION - VERIFY WITH COR

PROJECT SCOPE AREA

on e-ei gh th in ch o ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in es ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

TRUE NORTH

PLAN NORTH

KEYPLAN

A/E:

TRIPLE C - The A/E Group

(520) 481-8548

Mat Perkins

A

B D

EF

G

H

J

K

L

M

C

As indicated

B

IM

/6

-2

-1

R e n o v a te

D

B e d W in g -B

-M

P L S

V A

M C

/6 -2

-7

.M

P L S

.3 D

B e d W in g .A

R C

H .B

.L

.r v t

/1

/2

:5 :4

P

M

09/12/2022 M.PERKINS C.LOWERY

618-22-102

1391 - GI201

INFECTION CONTROL PLAN & INTERIM LIFE

1 Veterans Drive, Minneapolis, MN 55417

B70

RENOVATION OF BUILDING 70 3D

BED WING100% CONSTRUCTION

DOCUMENTS

1/4" = 1'-0" F4

TYPICAL CONSTRUCTION LAYOUT- CLASS IV

1/2" = 1'-0" E4

CROSS SECTION A'-A'- CLASS IV

NTS

F1

TYPICAL ICRA PRODUCTS

1/8" = 1'-0"

F6

ICRA PLAN

1" = 60'-0" C3

CONSTRUCTION MATERIALS PLAN

DEDUCTIVE ALTERNATES

D1

DEDUCTIVE ALTERNATE #1: PROVIDE STORAGE ROOM IN LIEU OF PATIENT

ROOMS 10 AND 11 (3D-321/A & 3D-323/A). REMOVE SCOPE OF WORK

ASSOCIATED WITH NEW HEADWALL, PLUMBING, SPECIALTY EQUIPMENT.

D2

D3

DEDUCTIVE ALTERNATE #2: PROVIDE STORAGE ROOM IN LIEU OF PATIENT

ROOMS 12 AND 13 (3D-325/A & 3D-326/A). REMOVE SCOPE OF WORK

ASSOCIATED WITH NEW HEADWALL, PLUMBING, SPECIALTY EQUIPMENT.

DEDUCTIVE ALTERNATE #3: PROVIDE STORAGE ROOM IN LIEU OF PATIENT

ROOMS 14, 15, 16, AND 17 (3D-328/A, 3D-329/A, 3D-331/A & 3D-332/A).

REMOVE SCOPE OF WORK ASSOCIATED WITH NEW HEADWALL, PLUMBING,

SPECIALTY EQUIPMENT.

NOTE: DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE TAKEN IN

SEQUENTIAL ORDER.

NOTE: PROJECT WING WILL NOT

BE OCCUPIED DURING CONSTRUCTION.

CONTRACTOR TO UTILIZE SPACE IN

WING FOR TEMPORARY MATERIAL

STORAGE AS NEEDED DURING

CONSTRUCTION

S S

ARCHITECTURAL SYMBOLS

SHEET NUMBER

A-100 Sheet Number

Discipline Code

A-1 1/8" = 1'-0"

View Name

VIEW TITLE

Drawing Scale

Drawing Number

1/8" = 1'-0"

View NameA-1 A101R101

VIEW TITLE WITH REFERENCES

Drawing Scale

Sheet Number

Drawing Number

Reference Sheet Number

EXTERIOR ELEVATIONS

INTERIOR ELEVATIONS

A-200

A1 Position on Sheet

Sheet Number

Position on Sheet

Sheet Number

A1

A2B2

B1

A-350

MATCH LINES

MATCHLINE

SEE: A1/A-101B

Sheet Number

Position on Sheet

AREA REFERENCE

A

SEE: (X/X-XXX)

Reference to Area

View Reference for Additional Information

BUILDING SECTION

Position on Sheet

Sheet Number

SIM

X

X-XXX

SIM

X

X-XXX

WALL SECTION

Position on Sheet

Sheet Number

X

X-XXX

SIM

DETAIL - SECTION

SIM

X

X-XXX

Position on Sheet

Sheet Number

DETAIL - PLAN/RCP

SIM

X

X-XXX

Position on Sheet

Sheet Number

DRAWING REVISIONS

Revision Number

NORTH ARROW

True North

PLAN

NORTH Plan North

0 4'-0" 8'-0" 16'-0"

IF THIS IS NOT A 42"x30" SHEET IT IS A

REDUCED SIZE PLOT, USE GRAPHIC

SCALE ACCORDINGLY.

GRAPHIC SCALE

COLUMN GRID LINES

Column Grid Line (New)

Column Grid Line (Existing)

1 2

A

B

LEVEL DATUM

LEVEL XX

0' - 0"

Level Name

Level Elevation

SPOT ELEVATION

0'-0"

Spot Elevation

ROOM TAG

ROOM

NAME

ABC123

150 SF

Room Name

Room Number

CEILING TAG

CEILING HEIGHT

1' - 0"

Ceiling Type

Ceiling Height

DOOR NUMBER TAG

New Door Door Number Tag

1A

Existing Door Door Number Tag

1A101

WINDOW TAG

Interior Window Tag

X X

X X

Exterior Window Tag

CURTAIN WALL TAG

XX

Interior Curtain Wall Tag

Exterior Curtain Wall Tag

XX

AD100

Room Code Room Area Or Volume

1T

CURTAIN PANEL TAG

Interior Curtain Wall Tag

WALL TYPE TAG

≠ A# B

C

V V Item - VA Supplied & Installed

V C ITEM -

VA Supplied & Contractor Installed

C C Item - Contractor Supplied & Installed

FFE Tag (By JSN)A1000

TM FFE Tag Furnished By VA Equipment Vendor

? KEYNOTE

1"

R 0"

90°

DIMENSION TO FACE OF

FINISH, FACE OF CONCRETE,

COLUMN CENTERLINE, OR AS

NOTED.

DIMENSIONS

1"

Symbol Indicates No Sound

Attenuation

Partition Type

CMU/Stud Width

Partition Modifier Partition Modifier II

KEYNOTE TAG

SEE A-720 STANDARD PARTITION TYPES

Contract Limit line Style

Not In Contract Area

CONTRACT LIMIT GRAPHIC

LINE STYLES

Centerline

Demolished

Temporary

Hidden

Overhead

Beyond

FURNITURE, FIXTURE, & EQUIPMENT

8'-6"1

Name

Room Name Room Number

Existing Finish Key

Ceiling Height

TM Toilet Accessory Tag. See A-730

Matchline

Deduct Alternate

RECESSED LUMINAIRE (24x24)

SMOKE DETECTOR

SPEAKER

EXISTING HVAC SUPPLY DIFFUSER

HVAC RETURN DIFFUSER

EXIT LIGHT

HEAT DETECTOR

HVAC EXHAUST DIFFUSER

LINEAR UPLIGHT LUMINAIRE, WALL

MOUNTED

RECESSED ROUND DOWNLIGHT

LUMINAIRE

RECESSED LUMINAIRE (24x48)

ACOUSTICAL TILE CEILING (24x24)

ACOUSTICAL TILE CEILING (24x48)

GYPSUM BOARD CEILING

REFLECTED CEILING SYMBOLS

ACCESS PANEL

HVAC SUPPLY DIFFUSER

EXISTING HVAC RETURN DIFFUSER

SPRINKLER

UNDERCABINET TASK LIGHT

EXISTING DEMO

MATERIALS LEGEND

CONCRETE (SECTION)

GRANULAR FILL

CONCRETE MASONRY UNITS

BRICK

RIGID INSULATION (SECTION)

ACOUSTIC/THERMAL INSULATION (SECTION)

STEEL (SECTION)

ALUMINUM (SECTION)

WOOD FINISH (SECTION)

LUMBER FINISH (SECTION)

EARTHWORK (SECTION)

STUD WALL (PLAN & SECTION)

EXISTING WALL TO REMAIN (PLAN & SECTION)

DEMOLISHED WALL (PLAN &

SECTION)

EXISTING TO REMAIN

EXISTING TO BE REMOVED

EXISTING TO REMAIN

NEW CONSTRUCTION

DOOR NUMBER

SYMBOL AND MINIMUM

CLEARANCES

18" MIN.

12" MIN.

6" MIN.

1A

WALL LEGEND

on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

TRUE NORTH

PLAN NORTH

KEYPLAN

A/E:

TRIPLE C - The A/E Group

(520) 481-8548

Mat Perkins

A

B D

EF

G

H

J

K

L

M

C

As indicated

B

IM

/6

-2

-1

R e n o v a te

D

B e d W in g -B

-M

P L S

V A

M C

/6 -2

-7

.M

P L S

.3 D

B e d W in g .A

R C

H .B

.L

.r v t

/1

/2

:0 :4

P

M

09/12/2022 M. Perkins K.MACAULAY

618-22-102

1391 - A-001

SYMBOLS, & GENERAL NOTES

1 Veterans Drive, Minneapolis, MN 55417

B70

RENOVATION OF BUILDING 70 3D

BED WING100% CONSTRUCTION

DOCUMENTS

ABBREVIATIONS

° DEGREE

± PLUS/MINUS

⌀ DIAMETER

≈ ALMOST EQUAL

∠ ANGLE

℄ CENTER LINE

Δ DELTA, DEFLECTION

ϕ ELECTRICAL PHASE

≠ NOT EQUAL

Ω OHM, OMEGA

BOUNDARY LINE

FLOW LINE

≡ IDENTITY

INITIAL LENGTH

MOMENT LINE

PROPERTY LINE, PLATE

½ ONE HALF FRACTION

¼ ONE QUARTER FRACTION

¾ THREE QUARTERS FRACTION

> GREATER THAN

≥ GREATER THAN OR EQUAL TO

< LESS THAN

≤ LESS THAN OR EQUAL TO

ABCDEFGHIJKMNOPQRSTUVWXYZ 1234567890

A LABEL CLASS A DOOR

A/C AIR CONDITION

A/C UNIT AIR CONDITIONING UNIT

A/E ARCHITECT/ENGINEER

AAMA AMERICAN ARCHITECTURAL

MANUFACTURERS ASSOCIATION

AB ANCHOR BOLT, AUGER BORING

ABA ARCHITECTURAL BARRIERS ACT

ABC AGGREGATE BASE COURSE

ABS AIR BREAK SWITCH

AC ASBESTOS CEMENT OR ASPHALTIC

CONCRETE

ACB AIR CIRCUIT BREAKER

ACI AMERICAN CONCRETE INSTITUTE

ACS DR ACCESS DOOR

ACS FLR ACCESS FLOOR

ACS PNL ACCESS PANEL

ACSR ALUMINUM CONDUCTOR STEEL

REINFORCED

ACST ACOUSTIC

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADA AMERICANS WITH DISABILITIES ACT

ADC AUTOMATIC DOOR CLOSER

ADDL ADDITIONAL

ADDN ADDITION

ADH ADHESIVE

ADJ ADJACENT, ADJOINING, OR

ADJUSTABLE

ADMIN ADMINISTRATION

ADB AUTOMATIC DOOR BOTTOM

ADO AUTOMATIC DOOR OPERATOR

AFC ABOVE FINISHED COUNTER

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFS ABOVE FINISHED SLAB

AGA AMERICAN GAS ASSOCIATION

AGC ASSOCIATED GENERAL CONTRACTORS

AGGR AGGREGATE

AHJ AUTHORITY HAVING JURISDICTION

AHR ANCHOR

AHU AIR HANDLING UNIT

AIA AMERICAN INSTITUTE OF ARCHITECTS

AISC AMERICAN INSTITUTE OF STEEL

CONSTRUCTION

AL ALUMINUM

ALT ALTERNATE

ALT NO ALTERNATE NUMBER

ALUM ALUMINUM

AM ACOUSTIC MATERIAL

AMP AMPERE

AMT AMOUNT

ANOD ANODIZE

ANSI AMERICAN NATIONAL STANDARDS

INSTITUTE

ANT ANTENNA

AP ACCESS PANEL, APPROX.,

APPROXIMATE

APA AMERICAN PLYWOOD ASSOCIATION

APPD APPROVED

APPROX APPROXIMATE

APT APARTMENT

AR AS REQUIRED

ARR ARRESTOR

ARCH ARCHITECT, ARCHITECTURAL

ASB ASBESTOS

ASI ARCHITECT'S SUPPLEMENTAL

INSTRUCTION

ASKLR AUTOMATIC SPRINKLER

ASPH ASPHALT

ASSN ASSOCIATION

ASTM AMERICAN SOCIETY FOR TESTING AND

MATERIALS

ATCH ATTACHMENT

ATM AUTOMATIC TELLER MACHINE

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AUX AUXILIARY

AV AUDIO VISUAL

AVE AVENUE

AVG AVERAGE

AW ACID WASTE

AWI ARCHITECTURAL WOODWORKING

INSTITUTE

AWPA AMERICAN WOOD PRESERVERS'

ASSOCIATION

AWS AMERICAN WELDING SOCIETY

AWT ACOUSTICAL WALL TREATMENT

B BASELINE, BOTTOM

B LABEL CLASS B DOOR

B PL BASE PLATE

BALC BALCONY

BAT BATTEN

BB BULLETIN BOARD

BD BOARD

BD FT BOARD FEET (FOOT)

BEJ BRICK EXPANSION JOINT

BEV BEVEL

BHMA BUILDER'S HARDWARE

MANUFACTURER'S ASSOCIATION

BI FLD DR BIFOLDING DOORS

BITUM BITUMINOUS

BKG BACKING

BLD BUILD

BLDG BUILDING

BLKT BLANKET

BLVD BOULEVARD

BM BEAM OR BENCHMARK

BO BOARD

BOT BOTTOM

BR BEDROOM, BOTTOM REGISTER

BRCG BRACING

BRDG BRIDGING

BRDG JST BRIDGING JOIST

BRG BEARING

BRG PL BEARING PLATE

BRKT BRACKET

BRZ BRONZE

BSMT BASEMENT

BTWN BETWEEN

BU BUSHEL

BUR BUILT-UP ROOFING

C CELSIUS, CHANNEL

C CONC CAST CONCRETE

C LABEL CLASS C DOOR

C TO C CENTER TO CENTER

CAB CABINET

CAC CEILING ATTENUATION CLASS

CB CATCH BASIN, CORNER BEAD, CIRCUIT

BREAKER

CBB CEMENTITIOUS (BACKER) BOARD

CC CUBIC CENTIMETER, CONTRACTOR

SUPPLIED & INSTALLED

CCTV CLOSED CIRCUIT TELEVISION

CCW COUNTERCLOCKWISE

CD CONSTRUCTION DOCUMENTS,

CONTRACT DOCUMENTS, CEILING

DIFFUSER

CEM CEMENT

CEM PLAS CEMENT PLASTER

CER CERAMIC

CF CONTRACTOR FURNISHED

CF/CI CONTRACTOR FURNISHED /

CONTRACTOR INSTALLED

CF/OI CONTRACTOR FURNISHED/OWNER

INSTALLED

CFLG COUNTERFLASHING

CFM CUBIC FEET PER MINUTE

CFMF COLD-FORMED METAL FRAMING

CFS CUBIC FEET PER SECOND

CG CENTER OF GRAVITY, CORNER GUARD

C&G CURB AND GUTTER

CGSFU CERAMIC GLAZED STRUCTURAL

FACING UNITS

CH CHILLER

CH BD CHALKBOARD

CHEM CHEMICAL

CHFR CHAMFER

CHK CHECK

CI CAST IRON

CIP CAST-IN-PLACE

CIR CIRCLE

CIRC CIRCULAR

CJ CONSTRUCTION JOINT OR CONTROL

JOINT

CL CENTER LINE

CLDG CLADDING

CLG CEILING

CLG HT CEILING HEIGHT

CLR CLEAR

CM² SQUARE CENTIMETER

CM³ CUBIC CENTIMETER

CM CONSTRUCTION MANAGEMENT

CMP CORRUGATED METAL PIPE

CMPA CORRUGATED METAL PIPE ARCH

CMU CONCRETE MASONRY UNIT

CND CONDUIT

CNDS CONDENSATE

CNR CORNER

CNTR COUNTER

CO CARBON MONOXIDE, CERTIFICATE OF

OCCUPANCY, CLEANOUT, OR COMPANY

CO2 CARBON DIOXIDE

CODP CLEANOUT W/ DECK PLUG

COL COLUMN

COM COMMON

COMB COMBINATION, COMBINED

COMM COMMUNICATION

COMP COMPONENT

CONC CONCRETE

CONC FLR CONCRETE FLOOR

COND CONDENSER OR CONDITION

CONF CONFERENCE

CONN CONNECT, CONNECTION

CONSTR CONSTRUCTION

CONT CONTINUE

CONTR CONTRACTOR, CONTRACTION

COORD COORDINATE

COR CONTRACTING OFFICER'S

REPRESENTATIVE

CORR CORRIDOR

CP NON-REINFORCED CONCRETE PIPE

CPM CRITICAL PATH METHOD

CPRS COMPRESSIBLE

CPT CARPET

CR CHAIR, CRASH RAIL

CRS COLD ROLLED STEEL

CRSI CONCRETE REINFORCING STEEL

INSTITUTE

CS CONCRETE SEALER/SURFACE

CSB CONCRETE SPLASH BLOCK

CSG CASING

CSI CONSTRUCTION SPECIFICATIONS

INSTITUTE

CSK COUNTER SUNK

CSMT CASEMENT

CSWK CASEWORK

CT CERAMIC TILE, CURRENT

TRANSFORMER, COOLING TOWER

CTB CERAMIC TILE BASE

CTF CERAMIC TILE FLOOR

CTG COATING

CTR CENTER, CONTOUR, COOLING TOWER

RETURN

CTRL CONTROL

CTV CABLE TELEVISION

CU COPPER C

CUH CABINET UNIT HEATER

CU FT CUBIC FEET

CU IN CUBIC INCH

CU YD CUBIC YARD

CURT CURTAIN

CW COLD WATER

CWB CAPILLARY WATER BARRIER

CWR COLD WATER RETURN

CYL CYLINDER

CYL L CYLINDER LOCK

D DEPTH OR PENNY (NAIL)

D LABEL CLASS D DOOR

DAT DATUM

DB DECIBEL, DRY BUILT, DIRECT BURIAL

DBL DOUBLE

DBL GLZ DOUBLE GLAZE

DC DIRECT CURRENT

DD DIVERSION DIKE

DEG, ° DEGREE

DEL DELETE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DI DUCTILE IRON

DIA, DIAMETER

DIAG DIAGONAL DIAGRAM

DIAG DIAGRAM DIAGONAL

DIFF DIFFERENCE OR DIFFUSER

DIM DIMENSION

DIR DIRECTION

DISP DISPENSER

DIST DISTANCE

DIV DIVIDE OR DIVISION

DL DEAD LOAD

DMPR DAMPER

DN DOWN

DP DISTRIBUTION

DOC DOCUMENT

DOUG FIR DOUGLAS FIR

DOZ DOZEN

DR DOOR, DRAIN, DRESSING ROOM, OR

DRIVE

DR CL DOOR CLOSER

DR FR DOOR FRAME

DR OPNG DOOR OPENING

DS DOWNSPOUT, STORM DRAINAGE

STRUCTURE

DSGN DESIGN

DW DISHWASHER, DOMESTIC WATER

DWD DRINKING WATER DISPENSER

DWG DRAWING

DWTR DUMBWAITER

E EAST

E LABEL CLASS E DOOR

EA EACH

EAM EXCEPT AS NOTED

EAT ENTERING AIR TEMPERATURE

EF EACH FACE, EXHAUST FAN

EFF EFFICIENCY

EFS EXTERIOR FINISH SYSTEM

EG EXHAUST GRILLE

EIFS EXTERIOR INSULATION AND FINISH

SYSTEM

EJ EXPANSION JOINT

EL ELEVATION

ELAST ELASTOMERIC

ELEC ELECTRIC

ELEC DR OP ELECTRIC DOOR OPENER

ELEV ELEVATOR

EMER EMERGENCY

EMER SHR EMERGENCY SHOWER

EMT ELECTRICAL METALLIC TUBING

ENCL ENCLOSURE

ENGR ENGINEER

ENVIR ENVIRONMENT

E/P EDGE OF PAVEMEMNT

EPA ENVIRONMENTAL PROTECTION

AGENCY

EPDM ETHYLENE PROPYLENE DIENE

MONOMER

EPO EMERGENCY POWER OFF

EPS EXPANDED POLYSTYRENE BOARD

(INSULATION)

EQ EQUAL

EQL SP EQUALLY SPACED

EQUIP EQUIPMENT

EQUIV EQUIVALENT

ER EXHAUST REGISTER

ERD EXISTING ROOF DRAIN

ESC ESCAPE OR ESCUTCHEON

ESCAL ESCALATOR

ESMT EASEMENT

ESP ESPECIALLY

EST ESTIMATE

ETC AND SO FORTH OR ET CETERA

EVAP EVAPORATIVE

EW EACH WAY

EWC ELECTRIC WATER COOLER

EWS EYE WASH STATION

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION OR EXPOSED

EXP BT EXPANSION BOLT

EXP JT EXPANSION JOINT

EXST GR EXISTING GRADE

EXT EXTERIOR, EXTERNAL, OR

EXTINGUISHER

EXT GR EXTERIOR GRADE

F FAHRENHEIT, FEMALE, FIRE, FUSE,

FILTER

FA FIRE ALARM

FAB FABRIC

FABX FIRE ALARM BOX

FAC FACTOR

FACIL FACILITY

FAS FASCIA

FAS BD FASCIA BOARD

FCO FLOOR CLEANOUT

FCTY FACTORY

FD FLOOR DRAIN, FIRE DAMPER

FDC FIRE DEPARTMENT CONNECTION

FDN FOUNDATION

FDTN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF FINISH FACE

FF EL FINISH FLOOR ELEVATION

FF&E, FFE FURNITURE, FIXTURE, AND EQUIPMENT

FH FLAT HEAD, FLAT HEAD SCREWS, FIRE

HYDRANT

FHC FIRE HOSE CABINET

FHMS FLAT HEAD MACHINE SCREW

FHP FULL HEIGHT PARTITION

FHWS FLAT HEAD WOOD SCREW

FIG FIGURE

FIL FILLET

FIN FINISH

FIN FLR FINISH FLOOR

FIN GR FINISH GRADE

FIN WD FINISH WOOD

FIXT FIXTURE

FJ FELT JOINT

FL FLOORLINE, FLOOR, FLASHING, FLOW

LINE

FLASH FLASHING

FLDG FOLDING

FLEX FLEXIBLE

FLG FLOORING

FLR FLOOR

FLR FIN FLOOR FINISH

FLR SK FLOOR SINK

FLUOR FLUORESCENT

FLUOR FIX FLUORESCENT FIXTURE

FM FACTORY MUTUAL

FM-G FACTORY MUTUAL GLOBAL

FO FINISHED OPENING

FOC FACE OF CONCRETE OR FACE OF CURB

FOF FACE OF FINISH

FOM FACE OF MASONRY

4 WAY FOUR WAY

FOS FACE OF SLAB OR FACE OF STUD

FOUNT FOUNTAIN

FOW FACE OF WALL

FP FIRE PROTECTION OR FIREPROOF

FPH FROST PROOF HYDRANT

FPM FEET PER MINUTE

FPS FEET PER SECOND

FR FIRE RATING, FIRE RESISTANT, OR

FRAME

FR SNK FLUSHING RIM SINK

FREQ FREQUENCY

FRMG FRAMING

FRP FIBER REINFORCED POLYESTER OR

FIBERGLASS REINFORCED PLASTIC

FRZ FREEZER

FS FEDERAL SPECIFICATION, FULL SIZE

FSTNR FASTENER

FT FEET OR FOOT

FTG FOOTING

FURG FURRING

FURN FURNISH OR FURNITURE

FUT FUTURE

FW FIRE WATER

FWC FABRIC WALLCOVERING

G GROUND, GAS LINE, GRAM

GA GAGE OR GYPSUM ASSOCIATION

GAL GALLON, GALVANIZED

GALV GALVANIC OR GALVANIZED

GALV STL GALVANIZED STEEL

GB GRAB BAR

GC GENERAL CONTRACTOR, GLAZED

COATING

GD GUARD

GDR GUARD RAIL

GEN GENERAL OR GENERATOR

GFI GROUND FAULT INTERRUPT

GFMU GROUND FACE MASONRY UNIT

GFRC GLASS-FIBER-REINFORCED CONCRETE

GFRG GLASS-FIBER-REINFORCED GYPSUM

GFRP GLASS-FIBER-REINFORCED PLASTIC

GI GALVANIZED IRON

GL GLASS

GLZ-C GLAZED BLOCK-CMU

GLZ-T GLAZED BLOCK-CLAY TILE

GL BLK GLASS BLOCK

GLU LAM GLUED LAMINATED WOOD

GR GRADE

GR FL GROUND FLOOR

GRAN GRANITE

GRTG GRATING

GSB GYPSUM SHEATHING BOARD

GSM GALVANIZED SHEET METAL

GSU GLAZED STRUCTURAL UNIT

GT GROUT

GUAR GUARANTEE

GUT GUTTER

GW GROUND WATER

GWB GYPUSM WALL BOARD

GYP GYPSUM

GYP BD GYPSUM BOARD

GYP PLAS GYPSUM PLASTER

H HIGH, HEIGHT, HUMIDIFIER

H PLAM HIGH PRESSURE PLASTIC LAMINATE

HAC HOUSEKEEPING AIDS CLOSET

HAZ MAT HAZARDOUS MATERIALS

HB HOSE BIBB

HC HOLLOW CORE, HANDICAPPED

HCWD HOLLOW CORE WOOD DOOR

HD HARD DRAWN

HDBD HARDBOARD

HDNR HARDENER

HDO HIGH DENSITY OVERLAY

HDR HEADER

HDW HARDWARE

HDWD HARDWOOD

HEPA HIGH EFFICIENCY PARTICULATE AIR

(FILTER)

HEX HEXAGON

HF HIGH FREQUENCY

HGR HANGER

HGSW HORN GAP SWITCH

HID HIGH INTENSITY DISCHARGE

HM HECTOMETER

HM HOLLOW METAL

HMD HOLLOW METAL DOOR

HMDF HOLLOW METAL DOOR AND FRAME

HMF HOLLOW METAL FRAME

HNDRL HANDRAIL

HO HOLD OPEN

HORIZ HORIZONTAL

HOSP HOSPITAL

HP HIGH PRESSURE, HIGH POINT,

HORSEPOWER

HPS HIGH PRESSURE SODIUM

HQ HEADQUARTERS

HR HOUR

HS HEAT-STRENGTHENED (GLASS) OR

HIGH STRENGTH

HSE HOUSE

HSKPG HOUSEKEEPING

HST HOIST

HT HEIGHT

HVAC HEATING, VENTILATING, AND AIR

CONDITIONING

HVY HEAVY

HW HOT WATER, HEAD WALL

HYD HYDRANT

HYDR HYDRAULIC

HZ HERTZ

I INTERSTATE (HIGHWAY) OR MOMENT

OF INERTIA

IAQ INDOOR AIR QUALITY

IBC INTERNATIONAL BUILDING CODE

ID IDENTIFICATION, INSIDE DIAMETER, OR

INTERIOR DESIGN

ID NO IDENTIFICATION NUMBER

IE INVERT ELEVATION

ILLUM ILLUMINATION

IMC INTERMEDIATE METAL CONDUIT

INCL INCLUDED

IND INDEPENDENT OR INDUSTRIAL

INFO INFORMATION

INSUL INSULATION

INT INTERIOR

INTERCOM INTERCOMMUNICATION

INTL INTERNATIONAL

INV INVERT

IP INLET PROTECTION

IRBF INDUSTRIAL RESIN BASE FLOORING

IRMA INVERTED ROOF MEMBRANE ASSEMBLY

IWH INSTANTANEOUS WATER HEATER

JAN JANITOR

J-BOX, JB JUNCTION BOX

JC JANITOR CLOSET

JCT JUNCTION

JT JOINT

JST JOIST

K KILO

KCP KEENE'S CEMENT PLASTER

KD KILN DRIED OR KNOCKED DOWN

KG KILOGRAM

KN KILONEWTON

KIT KITCHEN

KO KNOCKOUT

KPL KICKPLATE

KV KILOVOLT

KVA KILOVOLT-AMPERE

KW KILOWATT

L ANGLE, LOUVER, LENGTH, LENGTH OF

CURVE

LA LIGHTING ARRESTOR

LAB LABORATORY

LAD LADDER

LAM LAMINATE

LAM GL LAMINATED GLASS

LAU LAUNDRY

LAV LAVATORY

LBR LUMBER

LBS POUND

LC LEAD COVERED

LD BRG LOAD-BEARING

LDR LEADER

LED LIGHT EMITTING DIODE

LF LINEAR FEET (FOOT)

LH LEFT HAND

LHR LEFT HAND REVERSE

LHR LEFT HAND REVERSE, LATENT HEAT

RATIO

LIB LIBRARY

LIN LINEAR

LINO LINOLEUM

LIQ LIQUID

LKR LOCKER

LKR RM LOCKER ROOM

LKWASH LOCKWASHER

LL LEAD LINED, LIVE LOAD

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LMST LIMESTONE

LNDSCP LANDSCAPE

LR LIVING ROOM

LRG LARGE

LRV LOUVERED ROOF VENT

LS LUMP SUM

L/S LITERS PER SECOND

LT LIGHT

LT GA LIGHT GAGE

LT WT LIGHTWEIGHT

LTG LIGHTING

LTNG LIGHTNING

LVC LENGTH OF VERTICAL CURVE

LVD LOUVERED

LVR LOUVER

LWC LIGHTWEIGHT CONCRETE

LWIC LIGHTWEIGHT INSULATING CONCRETE

LYR LAYER

M METER, MEGA

MACH MACHINE

MACH RM MACHINE ROOM

MAINT MAINTENANCE

MAN MANUAL

MAS MASONRY

MATL MATERIAL

MATV MASTER ANTENNA TELEVISION SYSTEM

MAX MAXIMUM

MB MACHINE BOLT

MCB METAL CORNER BEAD

MD METAL DECK

ME MECHANICAL ENGINEER

MEAS MEASURE

MECH MECHANICAL

MECH RM MECHANICAL ROOM

MED MEDICAL, MEDIUM

MEK METHYL ETHYL KETONE

MEL MELAMINE

MEMB MEMBRANE

MEMO MEMORANDUM

MEZZ MEZZANINE

MF MILL FINISH

MFD MANUFACTURED

MFG MANUFACTURING

MFR MANUFACTURER

MFR REC MANUFACTURER'S RECOMMENDATION

MGT MANAGEMENT

MH MANHOLE

MIC MICROPHONE

MID MIDDLE

MIL STD MILITARY STANDARD

MIN MINIMUM MINUTE

MIN MINUTE MINIMUM

MIRR MIRROR

MISC MISCELLANEOUS

MIT MITER

MKR MARKER

ML METAL LATH

MLDG MOLDING (MOULDING)

MLO MAIN LUG ONLY

MLWK MILLWORK

mm MILLIMETER

MMP MEMBRANE WATERPROOFING

MO MASONRY OPENING OR MOTOR

OPERATED

MOD MODEL, MODIFY OR MODULE

MOD BIT MODIFIED BITUMEN

MON MONITOR

MOPR MOP RACK

MP MEDIUM PRESSURE

MR MOISTURE RESISTANT

MS MACHINE SCREW OR MOP SINK

M/S METERS PER SECOND

MTD MOUNTED

MTG MOUNTING

MTL METAL

MULL MULLION

MW MICROWAVE

MWP MEMBRANE WATERPROOFING

N NORTH

NA NOT APPLICABLE

NAAMM NATIONAL ASSOCIATION OF

ARCHITECTURAL METAL

MANUFACTURERS

NAT NATURAL

NATL NATIONAL

NC NOISE CRITERIA, NON-CORROSIVE

NCOMBL NONCOMBUSTIBLE

NDC NOSE DOWN CURB

NE NORTHEAST

NEC NATIONAL ELECTRICAL CODE

NEG NEGATIVE

NEMA NATIONAL ELECTRICAL

MANUFACTURERS ASSOCIATION

NEUT NEUTRAL

NFC NATIONAL FIRE CODE

NFPA NATIONAL FIRE PROTECTION

ASSOCIATION

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NPS NOMINAL PIPE SIZE

NR NOISE REDUCTION

NRC NOISE REDUCTION COEFFICIENT

NRCA NATIONAL ROOFING CONTRACTORS

ASSOCIATION

NRP NON-REMOVABLE

NS NARROW STILE

NTS NOT TO SCALE

NUM NUMERAL

NW NORTHWEST

O/O OUT TO OUT

O OXYGEN

OA OUTSIDE AIR OR OVERALL

OC ON CENTER

OCB OIL CIRCUIT BREAKER

OCC OCCUPY

OCT OCTAGON

OD OUTSIDE DIAMETER OUTSIDE

DIMENSION

OD OUTSIDE DIMENSION OUTSIDE

DIAMETER

OF/CI OWNER FURNISHED/CONTRACTOR

INSTALLED

OFD OVERFLOW DRAIN

OFF OFFICE

OF/OI OWNER FURNISHED/OWNER INSTALLED

OH OVERHANG, OVERHEAD

OH DR OVERHEAD (COILING) DOOR

OPH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

OPR OPERABLE

OPT OPTIONAL

OR OPERATING ROOM, OUTSIDE RADIUS

ORD ORDNANCE OR OVERFLOW ROOF

DRAIN

ORG ORGANIC

ORIG ORIGINAL

ORN ORNAMENTAL

OSD OPEN SITE DRAIN

OSHA OCCUPATIONAL SAFETY AND HEALTH

ADMINISTRATION

OVHD OVERHEAD

OUT OUTLET

OZ OUNCE

P PIPE, POLE

Pa PASCALES

PA PUBLIC ADDRESS

PAR PARALLEL OR PARAPET

PARA PARAGRAPH

PART PARTIAL

PAT PATTERN

PB PUSHBUTTON, PULL BOX

PBD PARTICLEBOARD

PC PIECE, POLYCARBONATE, PORTLAND

CEMENT, PRECAST

PCA PORTLAND CEMENT ASSOCIATION

PCC PRECAST CONCRETE

PCCP CONCRETE PAVEMENT

PCD PAPER CUP DISPENSER

PCF POUNDS PER CUBIC FOOT

PCP PORTLAND CEMENT PLASTER

PED PEDESTAL

PEN PENETRATE

PEND PENDANT

PERF PERFORATED

PERIM PERIMETER

PERP PERPENDICULAR

PGBD PEGBOARD

PHAR PHARMACY

PHOTO PHOTOGRAPH

PHS PHILLIPS HEAD SCREW

PI POINT OF INTERSECTION

PIV POST INDICATOR VALVE

PJF PREFORMED JOINT FILLER

PKG PACKAGE

PL PROPERTY LINE, PLATE

PL GL PLATE GLASS

PLAM PLASTIC LAMINATE

PLAS PLASTER OR PLASTIC

PLAS CMU PLASTER COVERED CMU

PLBG PLUMBING

PLYWD PLYWOOD

PMTL PAINTED METAL

PNEU PNEUMATIC

PNL PANEL

PNT PAINT

PO POST OFFICE, PURCHASE ORDER

PO PURCHASE ORDER POST OFFICE

POLY POLYETHYLENE (PLASTIC)

PR PAIR

PRCST PRECAST

PREFAB PREFABRICATE

PREFIN PREFINISH

PRELIM PRELIMINARY

PREP PREPARATION

PRESS PRESSURE

PREV PREVIOUS

PRIM PRIMARY

PRKG PARKING

PRMLD PREMOLDED

PROJ PROJECT

PROP PROPERTY

PRV PRESSURE RELIEF VALVE

PS PULL SWITCH

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PAINT, PNEUMATIC TUBE, PRESSURE

TREATED, POINT OF TANGENT

PTD PAPER TOWEL DISPENSER

PTN PARTITION

PVC POLYVINYL CHLORIDE (PLASTIC), POINT

OF VERTICAL CURVE

PVG PAVING

PVI POINT OF VERTICAL INTERSECTION

PVT POINT OF VERTICAL TANGENT

PVMT PAVEMENT

PWR POWER

QA QUALITY ASSURANCE

QC QUALITY CONTROL

QRY QUARRY

QT QUARRY TILE

QTB QUARRY TILE BASE

QTF QUARRY TILE FLOOR

QTR QUARTER

QTY QUANTITY

QUAD QUADRANT

QUAL QUALITY

R RADIUS, RISER, RUBBER, RETURN

RA RETURN AIR

RAD RADIATOR, RADIUS

RB RESILIENT BASE OR RUBBER BASE

RB HK ROBE HOOK

RBM REINFORCED BRICK MASONRY

RBR RUBBER

RC REMOTE CONTROL

RCP REFLECTED CEILING PLAN,

REINFORCED CONCRETE PIPE

RCVR RECEIVER

RD ROAD OR ROOF DRAIN

REC RECESSED

RECD RECEIVED

RECPT RECEPTACLE

RECT RECTANGLE

RED REDUCING

REF REFERENCE OR REFRIGERATOR

REFR REFRACTORY, REFRIGERATION

REG REGISTER, REGULATOR

REINF REINFORCE

REP REPAIR

REPL REPLACE

REQ REQUIRE

REQD REQUIRED

RESIL RESILIENT

RESIL T RESILIENT TILE

RET RETURN

REV REVISION

RF RADIO FREQUENCY, ROOF, RETURN

FAN

RFG ROOFING

RFI REQUEST FOR INFORMATION

RFP REQUEST FOR PROPOSAL

RGS RIGID GALVANIZED STEEL

RH RIGHT HAND

RHC REHEAT COIL

RHMS ROUND HEAD MACHINE SCREW

RHR RIGHT HAND REVERSE

RHWS ROUND HEAD WOOD SCREW

RI RUBBER INSULATED

RL ROOF LEADER

RLG RAILING

RM ROOM

RND ROUND

RO ROUGH OPENING

ROW RIGHT OF WAY

RPM REVOLUTIONS PER MINUTE

RS ROUGH SAWN

RT RIGHT

RV ROOF VENT

RVS REVERSE

RVT RESILIENT VINYL TILE

RWD REDWOOD

RWL RAIN WATER LEADER

S SECOND, SOUTH, SANITARY, SEWER,

STRUCTURE

SA SUPPLY AIR

SALV SALVAGE

SAMP SAMPLE

SAN SANITARY SEWER

SAT SUSPENDED ACOUSTICAL TILE

SATC SUSPENDED ACOUSTICAL TILE CEILING

SB SPLASH BLOCK

SBS STYRENE BUTADIEN STYRENE

SBSTR SUBSTRATE

SC SHADING COEFFICIENT OR SOLID CORE

SCH SCHOOL, SCHEDULE

SCHED SCHEDULE

SCHEM SCHEMATIC

SCP SCUPPER

SCRN SCREEN

SCT STRUCTURAL CLAY TILE

SCWD SOLID CORE WOOD DOOR

SD SHOP DRAWINGS, SMOKE DETECTOR,

OR SOAP DISPENSER;

SDG SIDING

SE SOUTHEAST

SECT SECTION

SEG SEGMENT

SEL SELECT

SEP SEPARATE

SF SQUARE FOOT (FEET)

SFTWD SOFTWOOD

SG SUPPLY GRILLE

SGD SLIDING GLASS DOOR

1PH SINGLE PHASE

SGL SINGLE

SH SHEET

SHR SHOWER

SHR HD SHOWER HEAD

SHRD SHOWER DRAIN

SHT SHEET

SHT MTL FL SHEET METAL (FLASHING)

SHTHG SHEATHING

SHV SHELVING

SIM SIMILAR

SJ SCORED JOINT

SJI STEEL JOIST INSTITUTE

SK SKETCH

SKCP SUSPENDED KEENE'S CEMENT

PLASTER

SKLT SKYLIGHT

SL SLOPE

SLD WDW HORIZONTAL SLIDING WINDOW

SLDG SLIDING

SLNT SEALANT

SM SHEET METAL

SMH SANITARY MODULE

SMK SMOKE

SND SANITARY NAPKIN DISPENSER

SND INS SOUND INSULATION

SNDU SANITARY NAPKIN DISPOSAL UNIT

SP STATIC PRESSURE, SINGLE POLE

SPC SUSPENDED PLASTER CEILING

SPDT SINGLE POLE DOUBLE THROW

SPEC SPECIFICATION

SPKLR SPRINKLER

SPKR SPEAKER

SPST SINGLE POLE SINGLE THROW

SPLY SUPPLY

SQ SQUARE

SQ IN SQUARE INCH

SQ YD SQUARE YARD

SR SUPPLY REGISTER

SS SANITARY SEWER OR SERVICE SINK

SST STAINLESS STEEL

ST STAIRS, STREET, SINGLE THROW

STA STATION

STC SOUND TRANSMISSION CLASS

STD STANDARD

STIF STIFFENER

STL STEEL

STL JST STEEL JOIST

STL LNTL STEEL LINTEL

STL PL STEEL PLATE

STL RF DK STEEL ROOF DECK

STL TB STEEL TUBE

STL TR STEEL TRUSS

STNLS STAINLESS

STOR STORAGE

STR STRINGERS

STRUCT STRUCTURAL

STRUCT STL STRUCTURAL STEEL

SUB SUBSTITUTE

SURF SURFACE

SUP SUPPORT

SUSP SUSPEND

SUSP CLG SUSPENDED CEILING

SV SHEET VINYL

SV B SHEET VINYL BASE

SW SWITCH, SIDE WALK

SWBD SWITCHBOARD

SWDR SWING DOOR

SWGR SWITCH GEAR

SYM SYMBOL

SYNTH SYNTHETIC

SYS SYSTEM

T TREAD, TILE, TOP, TANGENT

T&B TOP AND BOTTOM

T&G TONGUE AND GROOVE

T&M TIME AND MATERIALS

TB THROUGH BOLT OR TOWEL BAR

TC TOP OF CURB

TCA TILE COUNCIL OF AMERICA

TCP TELEPHONE CONTROL PANEL

TEMPERATURE CONTROL PANEL;

TRAFFIC CONTROL PLAN

TD TOWEL DISPENSER

TECH TECHNICAL

TEL TELEPHONE

TEMP TEMPERATURE OR TEMPORARY

TER TERRAZZO

TERM TERMINAL

TH TOTAL HEAD (PUMPS)

THD THREAD

THERM THERMAL

THK THICKNESS

THRES THRESHOLD

THRSLD THRESHOLD

THRU THROUGH

THRUOUT THROUGHOUT

TK BD TACKBOARD

TMPD TEMPERED

TMPD GL TEMPERED GLASS

TN TRUE NORTH

TO TOP OF ___

TO FDN TOP OF FOUNDATION

TOB TOP OF BEAM

TOM TOP OF MASONRY

TOP TOP OF PARAPET

TOS TOP OF STEEL

TOW TOP OF WALL

TPD TOILET PAPER DISPENSER

TPH TOILET PAPER HOLDER

TR TOWEL RACK, TOP REGISTER

TRANS TRANSOM, TRANSITION

TRANS WD FIN TRANSPARENT WOOD FINISH

TRTD TREATED

TS TENSILE STRENGTH, TUBE STEEL, TOP

OF STEEL, TOP OF STONE, TOP OF

SLAB

TSTAT THERMOSTAT

TV TELEVISION

TYP TYPICAL

U HEAT TRANSFER COEFFICIENT

UC UNDERCUT

UCD UNDERCUT DOOR

UCF UNDER COUNTER FREEZER

UCR UNDER COUNTER REFRIGERATOR

UGE UNDERGROUND ELECTRIC

UGND UNDERGROUND

UGT UNDERGROUND TELEPHONE

UH UNIT HEATER

UL UNDERWRITERS LABORATORIES

ULT ULTIMATE

UNFIN UNFINISH

UNO UNLESS NOTED OTHER WISE

UON UNLESS OTHERWISE NOTED

UPS UNINTERRUPTIBLE POWER SUPPLY

UR URINAL

UTIL UTILITY

UV ULTRAVIOLET

V VOLT, VENT, VALVE

VA VOLT AMPRE

VAC VACUUM

VAR VARIES

VB VINYL BASE

VC VARNISH CAMBRIC, VITRIFIED CLAY, VA

SUPPLIED & CONTRACTOR INSTALLED

VCT VINYL COMPOSITION TILE, VITRIFIED

CLAY TILE

VEH VEHICLE

VENT VENTILATION

VERT VERTICAL

VEST VESTIBULE

VFAT VINYL FACED ACOUSTICAL TILE

VIC VICINITY

VID VIDEO

VIF VERIFY IN FIELD

VNR VENEER

VOC VOLATILE ORGANIC COMPOUND

VOL VOLUME

VOLT VOLTAGE

VP VENEER PLASTER

VPI VERTICAL POINT OF INTERSECTION

VPOC VERTICAL POINT OF CURVE

VPOT VERTICAL POINT OF TANGENT

VR VAPOR RETARDER

VS VENT STACK

VTR VENT THROUGH ROOF

VV VA SUPPLIED & INSTALLED

VWC VINYL WALL COVERING

VWF VINYL WALL FABRIC

W WIDE, WEST, WIDTH, WASTE, WATER,

WATT, WIRE

W/ WITH

W/O WITHOUT

WA WATT

WARR WARRANTY

WB WET BULB

WBL WOOD BLOCKING

WC WALL COVERING OR WATER CLOSET

WC WL HNG WATER CLOSET, WALL HUNG

WCHR WATER CHILLER

WCL WL MTD WATER COOLER, WALL HUNG

WD WOOD, WINDOW DIMENSION

WDW WINDOW

WF WIDE FLANGE

WFAB WALL FABRIC

WFR WOOD FRAME

WFS WOOD FURRING STRIPS

WH WATER HEATER

WHSE WAREHOUSE

WL WATER LEVEL

WLD WELDED

WM WIRE MESH

WOM WALK OFF MATT

WP WATERPROOFING, WEATHERPROOF

WPD WATER PRESSURE DROP

WPM WATERPROOF MEMBRANE

WR WEATHER RESISTANT

WS WEATHERSTRIP, WASTE STACK, WATER

SURFACE, WATERSTOP

WSCT WAINSCOT

WT WEIGHT

WTB WALL TILE BASE

WTL WALL TILE

WWF WELDED WIRE FABRIC

X BRACE CROSS BRACE

XFMR TRANSFORMER

XPS EXTRUDED POLYSTYRENE BOARD

(INSULATION)

X-STR EXISTING STRUCTURE

YD YARD

YR YEAR

1. ACCESS TO EXISTING FIRE EXIT SHALL REMAIN

OPERATIONAL DURING ALL PHASES OF CONSTRUCTION.

ENSURE ADEQUATE EGRESS CLEARANCES ARE

MAINTAINED AND NOT IMPEDED DURING PHASED

CONSTRUCTION.

2. GENERAL NOTES APPLY TO ALL DRAWING SETS.

3. SUBCONTRACTORS FOR EACH TRADE ARE ADVISED THAT

INFORMATION PERTINENT TO THEIR WORK MAY OCCUR IN

OTHER PORTIONS OF THE CONTRACT DOCUMENTS. ALL

NOTES ARE TO BE REVIEWED AND APPLIED TO RELATED

BUILDING DOCUMENTS.

4. FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS.

IF INCONSISTENCIES, CONTRADICTIONS OR OMISSIONS

ARE DISCOVERED FOLLOW PROCEDURES LISTED IN

SECTION 01 26 13 REQUESTS FOR INFORMATION (RFI)

BEFORE AND/OR DURING CONSTRUCTION.

5. CROSS REFERENCES SHOWN ON DRAWINGS DO NOT

NECESSARILY INDICATE ALL LIKE CONDITIONS AND DO NOT

LIMIT APPLICATION OF ANY DRAWING OR DETAIL. WHERE

SPECIFIC DIMENSIONS, DETAILS, OR DESIGN INTENT

CANNOT BE DETERMINED, FOLLOW PROCEDURES LISTED

IN SECTION 01 26 13 REQUESTS FOR INFORMATION (RFI)

PRIOR TO PROCEEDING WITH WORK.

6. REVIEW SPECIFICATIONS FOR INSTRUCTIONS NOT SHOWN

ON DRAWINGS. INFORMATION COMMON TO SEVERAL

DRAWINGS MAY BE NOTED ON ONLY ONCE.

CONTRACTORS ARE RESPONSIBLE FOR ENTIRE SET OF

DOCUMENTS.

7. PATCH ALL HOLES IN EXISTING SURFACES AND WHERE

EQUIPMENT HAS BEEN REMOVED OR DEMOLITION HAS

OCCURRED AND PREPARE WALL SURFACES (PATCH, SKIM

COAT, PAINT AND FINISH TO MATCH ADJACENT SURFACES)

AS REQUIRED IN PREPARATION FOR NEW FINISHES

SCHEDULED. PATCH TO MATCH ADJACENT SURFACES IF

NOT SCHEDULED.

8. DIMENSIONS ARE TO STRUCTURAL GRIDLINE OR FACE OF

FINISHED WALL UNLESS NOTED OTHERWISE.

9. PROVIDE METAL BACKING AND/OR METAL BLOCKING IN

WALLS AS REQUIRED AT ALL WALL-MOUNTED ITEMS.

VERIFY HEIGHT AND LENGTH WITH ACTUAL EQUIPMENT.

REFER TO METAL BACKING AND BLOCKING DETAILS ON

SHEET A-722. AT EXISTING WALLS, REMOVE WALL

MATERIAL TO INSTALL METAL BACKING/BLOCKING FOR

NEW WALL-MOUNTED ITEMS.

10. ALL EXISTING FLOOR AND WALL OPENINGS AND

DEPRESSIONS NOT USED IN THE NEW WORK SHALL BE

FILLED OR CLOSED WITH MATERIALS TO MEET REQUIRED

FIRE RATING AND MATCH ADJACENT FINISHES.

11. DRAWINGS ARE NOT TO BE SCALED. CONTRACTOR TO

VERIFY ALL DIMENSIONS AND FIELD CONDITIONS PRIOR TO

COMMENCING THE WORK.

12. COORDINATE WITH INTERIORS SHEETS FOR CORNER

GUARD AND WALL PROTECTION LOCATIONS AND DETAILS.

13. RADIUS EXPOSED COUNTERTOP CORNERS 2" RADIUS,

TYPICALLY. (2" WHERE 3MM EDGE BANDING, 1" RADIUS AT

PLAM EDGES.) SEE CASEWORK DETAILS.

14. CAULK ALL COUNTERTOPS, BACKSPLASHES AND CABINETS

AT LOCATIONS WHERE THEY MEET WALLS. SEAL ALL CUT-

OUTS IN COUNTERTOPS.

15. ALL CUTTING AND PATCHING REQUIRED FOR NEW

MECHANICAL AND ELECTRICAL WORK IN ALL EXISTING

SPACES SHALL BE BY THE RESPECTIVE CONTRACTORS.

16. MATCH ALL FINISHED WALL THICKNESS WHERE NEW

WALLS OCCUR IN LINE WITH EXISTING WALLS.

17. CONTRACTOR TO PROVIDE FIRE, SMOKE, DIRT, DUST &

NOISE CONTAINMENT BARRIERS BETWEEN THE WORK

AREA & THE ADJACENT OCCUPIED SPACES.

18. ALL PIPING, CONDUITS, AND RELATED MECHANICAL AND

ELECTRICAL ITEMS SHALL BE CONCEALED WITHIN

DRYWALL AND/OR PLASTER FURRING AS REQUIRED IN

FINISHED AREAS WHETHER SHOWN ON DRAWINGS OR NOT

UNLESS OTHERWISE NOTED.

19. SEAL AROUND ALL MECHANICAL AND ELECTRICAL

EQUIPMENT PENETRATIONS AT RATED WALLS, ABOVE AND

BELOW CEILINGS, WITH A UL APPROVED FIRE-STOPPING

MATERIAL.

20. ALL INTERIOR WALLS WILL BE TYPE 'S' CONSTRUCTION

UNLESS OTHERWISE INDICATED. ALL FRAMING AROUND

COLUMNS WILL BE TYPE 'L2' CONSTRUCTION UNLESS

OTHERWISE INDICATED. REFER TO REGULATORY PLAN

SHEETS GI001 FOR WALL RATINGS.

21. WHEN WALL PARTITIONS OF DIFFERENT FIRE RATING

INTERSECT, THE HIGHEST RATED PARTITION TAKES

PRECEDENT.

22. ALL EXISTING TO REMAIN CEILING AND WALL GRILLES,

DIFFUSERS AND LIGHTS, SPRINKLER HEADS, OCCUPANCY

AND FIRE ALARM DETECTORS TO BE CLEANED IN AREAS

OF CONSTRUCTION.

23. VERIFY THAT THE EXISTING WALLS REQUIRING FIRE

RATING ARE MAINTAINED, REPAIRED AND EXTENDED TO

STRUCTURE.

24. REFER TO LIFE SAFETY PLANS AND FLOOR PLANS FOR

LOCATION OF REQUIRED WALL RATINGS.

25. ALL THERMOSTAT LOCATIONS TO BE COORDINATED WITH

COR PRIOR TO INSTALLATION.

GENERAL SHEET NOTES:

DEPARTMENT LEGEND

ANTE ROOM PATIENT SPACES

BARIATRIC PATIENT ROOM

STAFF SPACES

PATIENT SPACES

UTILITY SPACES

CIRCULATION

SAFER PATIENT ROOM

615 SF

CORRIDOR

C3-12

160 SF

STAIR

169 SF

STAIR

302 SF

ROOM

3C-106

307 SF

CORRIDOR

C3-28

186 SF

CORRIDOR

C3-27

245 SF

CORRIDOR

C3-26

D1

D2

D3ICE/

H2O

213 SF

PATIENT 9

3D-109

79 SF

RR 9

3D-109A

69 SF

RR 8

3D-108A

256 SF

PATIENT 8

3D-108

285 SF

PATIENT 7

3D-107

69 SF

RR 7

3D-107A

297 SF

PATIENT 6

3D-106

72 SF

RR 6

3D-106A

289 SF

PATIENT 5

3D-105

72 SF

RR 5

3D-105A

300 SF

PATIENT 4

3D-104

69 SF

RR 4

3D-104A

298 SF

PATIENT 3

3D-103

70 SF

RR 3

3D-103A

69 SF

RR 2

3D-102A

296 SF

PATIENT 2

3D-102

299 SF

BARIATRIC 1

3D-101

90 SF

RR 1

3D-101A

269 SF

PATIENT 18

3D-133

78 SF

RR 18

3D-133A

68 SF

RR 17

3D-132A

268 SF

SAFER PATIENT 17

3D-132

299 SF

STAFF WORK

3D-136

245 SF

MSA'S

3D-100

190 SF

CLEAN LINENS

3D-138

98 SF

ASST. NURSE MNGR

3D-110

93 SF

NURSE MNGR OFFICE

3D-111

127 SF

MED ROOM

3D-112

106 SF

NUTRITION

3D-135

292 SF

SAFER PATIENT 16

3D-131

67 SF

RR 16

3D-131A

67 SF

RR 15

3D-129A

252 SF

PATIENT 15

3D-129

280 SF

PATIENT 14

3D-128

71 SF

RR 14

3D-128A

71 SF

RR 13

3D-126A

102 SF

PHARM OFFICE

3D-120

108 SF

SOILED UTILITY

3D-134

49 SF

STAFF TOILET

3D-117

131 SF

SPS STORAGE

3D-114

315 SF

EQUIPMENT ROOM

3D-115 16 SF

EQUIP. ALCOVE

3D-140

245 SF

PATIENT 13

3D-126

260 SF

PATIENT 12

3D-12567 SF

RR 12

3D-125A

67 SF

RR 11

3D-123A

61 SF

HAC

3D-119

259 SF

STAFF BREAK ROOM

3D-116

238 SF

PATIENT 11

3D-123

206 SF

PATIENT 10

3D-121

74 SF

RR 10

3D-121A

54 SF

ANTE ROOM

3D-133B

74 SF

CLEAN UTILITY

3D-113

30 SF

OXYGEN STOR.

3D-118

262 SF

CIRCULATION

C3-18

55 SF

ANTE ROOM

3D-101B

19 SF

EQUIP. ALCOVE

3D-127

17 SF

CHARTING

3D-142

16 SF

EQUIP. ALCOVE

3D-140

16 SF

CHARTING

C3-19B

17 SF

CHARTING

3D-141

18 SF

CHARTING

C3-25A 17 SF

CHARTING

C3-19A

11 SF

EQUIP ALCOVE

3D-137

15 SF

CHARTING

C3-19C

49 SF

TOILET

3C-104

49 SF

TOILET

3C-105

50 SF

ANTE ROOM

3D-121B on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

TRUE NORTH

PLAN NORTH

KEYPLAN

A/E:

TRIPLE C - The A/E Group

(520) 481-8548

Mat Perkins

A

B D

EF

G

H

J

K

L

M

C

1/8" = 1'-0"

B

IM

/6

-2

-1

R e n o v a te

D

B e d W in g -B

-M

P L S

V A

M C

/6 -2

-7

.M

P L S

.3 D

B e d W in g .A

R C

H .B

.L

.r v t

/1

/2

:0 :0

P

M

09/12/2022 M.PERKINS K.MACAULAY

618-22-102

1391 - A-002

ARCHITECTURAL ROOM PROGRAM PLAN -

3D

1 Veterans Drive, Minneapolis, MN 55417

B70

RENOVATION OF BUILDING 70 3D

BED WING100% CONSTRUCTION

DOCUMENTS

1/8" = 1'-0" F4

ARCHITECTURAL ROOM PROGRAM PLAN - 3D

ROOM PROGRAM SCHEDULE_3D

LEGEND

ROOM

PROGRAM

CODE NAME

PROGRAM

AREA

ACTUAL

AREA

AREA

DIFFERENCE

SS204 ASST. NURSE MNGR 80 SF 98 SF -18 SF

SV583 CHARTING 100 SF 18 SF 82 SF

SV583 CHARTING 100 SF 17 SF 83 SF

SV583 CHARTING 100 SF 17 SF 83 SF

SV583 CHARTING 100 SF 17 SF 83 SF

SV583 CHARTING 100 SF 16 SF 84 SF

SV583 CHARTING 100 SF 15 SF 85 SF

CIRC EQUIP ALCOVE 11 SF

SC052 EQUIP. ALCOVE 16 SF

SC052 EQUIP. ALCOVE 30 SF

IMS81 EQUIP. ALCOVE 120 SF 19 SF 101 SF

SV583 MED ROOM 100 SF 127 SF -27 SF

SC152 MSA'S 245 SF

SS204 NURSE MNGR OFFICE 80 SF 93 SF -13 SF

SV272 NUTRITION 80 SF 106 SF -26 SF

SS218 PHARM OFFICE 80 SF 102 SF -22 SF

SS262 STAFF BREAK ROOM 100 SF 259 SF -159 SF

SB191 STAFF TOILET 85 SF 49 SF 36 SF

SC231 STAFF WORK 240 SF 299 SF -59 SF

STAFF SPACES: 19 1565 SF 1552 SF 314 SF

SC471 CLEAN LINENS 60 SF 190 SF -130 SF

SB737 CLEAN UTILITY 100 SF 74 SF 26 SF

IMS81 EQUIPMENT ROOM 120 SF 315 SF -195 SF

SB244 HAC 60 SF 61 SF -1 SF

IMS83 OXYGEN STOR. 100 SF 30 SF 70 SF

SB743 SOILED UTILITY 60 SF 108 SF -48 SF

SRSP1 SPS STORAGE 60 SF 131 SF -71 SF

UTILITY SPACES: 7 560 SF 909 SF -349 SF

Grand total: 75 8330 SF 12543

SF

-3912 SF

ROOM PROGRAM SCHEDULE_3D

LEGEND

ROOM

PROGRAM

CODE NAME

PROGRAM

AREA

ACTUAL

AREA

AREA

DIFFERENCE

LEVEL 3

IMS24 ANTE ROOM 65 SF 54 SF 11 SF

IMS24 ANTE ROOM 65 SF 64 SF 1 SF

IMS24 ANTE ROOM 65 SF 50 SF 15 SF

IMS23 PATIENT 9 240 SF 213 SF 27 SF

IMS23 PATIENT 10 240 SF 206 SF 34 SF

IMS23 PATIENT 18 240 SF 269 SF -29 SF

SB147 RR 9 60 SF 79 SF -19 SF

SB147 RR 10 60 SF 74 SF -14 SF

SB147 RR 18 60 SF 78 SF -18 SF

ANTE ROOM PATIENT SPACES: 9 1095 SF 1085 SF 10 SF

IMS24 ANTE ROOM 65 SF 55 SF 10 SF

IMS27 BARIATRIC 1 280 SF 299 SF -19 SF

SB161 RR 1 85 SF 90 SF -5 SF

BARIATRIC PATIENT ROOM: 3 430 SF 444 SF -14 SF

CIRC CIRCULATION 0 SF 137 SF -137 SF

CIRC CIRCULATION 0 SF 503 SF -503 SF

CIRC CIRCULATION 0 SF 1012 SF -1012 SF

CIRC CIRCULATION 0 SF 917 SF -917 SF

CIRC CIRCULATION 0 SF 262 SF -262 SF

CIRC CORRIDOR 0 SF 615 SF -615 SF

CIRC CORRIDOR 0 SF 186 SF -186 SF

CIRC TOILET 0 SF 49 SF -49 SF

CIRC TOILET 0 SF 49 SF -49 SF

CIRCULATION: 9 0 SF 3729 SF -3729 SF

IMS21 PATIENT 2 280 SF 296 SF -16 SF

IMS21 PATIENT 3 240 SF 298 SF -58 SF

IMS21 PATIENT 4 280 SF 300 SF -20 SF

IMS21 PATIENT 5 240 SF 289 SF -49 SF

IMS21 PATIENT 6 280 SF 297 SF -17 SF

IMS21 PATIENT 7 280 SF 285 SF -5 SF

IMS21 PATIENT 8 280 SF 256 SF 24 SF

IMS21 PATIENT 11 280 SF 238 SF 42 SF

IMS21 PATIENT 12 280 SF 260 SF 20 SF

IMS21 PATIENT 13 280 SF 245 SF 35 SF

IMS21 PATIENT 14 280 SF 280 SF 0 SF

IMS21 PATIENT 15 280 SF 252 SF 28 SF

SB147 RR 2 60 SF 69 SF -9 SF

SB147 RR 3 60 SF 70 SF -10 SF

SB147 RR 4 60 SF 69 SF -9 SF

SB147 RR 5 60 SF 72 SF -12 SF

SB147 RR 6 60 SF 72 SF -12 SF

SB147 RR 7 60 SF 69 SF -9 SF

SB147 RR 8 60 SF 69 SF -9 SF

SB147 RR 11 60 SF 67 SF -7 SF

SB147 RR 12 60 SF 67 SF -7 SF

SB147 RR 13 60 SF 71 SF -11 SF

SB147 RR 14 60 SF 71 SF -11 SF

SB147 RR 15 60 SF 67 SF -7 SF

PATIENT SPACES: 24 4000 SF 4129 SF -129 SF

SB147 RR 16 60 SF 67 SF -7 SF

SB147 RR 17 60 SF 68 SF -8 SF

IMS21 SAFER PATIENT 16 280 SF 292 SF -12 SF

IMS21 SAFER PATIENT 17 280 SF 268 SF 12 SF

SAFER PATIENT ROOM: 4 680 SF 695 SF -15 SF

DEDUCTIVE ALTERNATES

D1

DEDUCTIVE ALTERNATE #1: PROVIDE STORAGE ROOM IN LIEU OF PATIENT

ROOMS 10 AND 11 (3D-321/A & 3D-323/A). REMOVE SCOPE OF WORK

ASSOCIATED WITH NEW HEADWALL, PLUMBING, SPECIALTY EQUIPMENT.

D2

D3

DEDUCTIVE ALTERNATE #2: PROVIDE STORAGE ROOM IN LIEU OF PATIENT

ROOMS 12 AND 13 (3D-325/A & 3D-326/A). REMOVE SCOPE OF WORK

ASSOCIATED WITH NEW HEADWALL, PLUMBING, SPECIALTY EQUIPMENT.

DEDUCTIVE ALTERNATE #3: PROVIDE STORAGE ROOM IN LIEU OF PATIENT

ROOMS 14, 15, 16, AND 17 (3D-328/A, 3D-329/A, 3D-331/A & 3D-332/A).

REMOVE SCOPE OF WORK ASSOCIATED WITH NEW HEADWALL, PLUMBING,

SPECIALTY EQUIPMENT.

NOTE: DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE TAKEN IN

SEQUENTIAL ORDER.

S S

1 1 1 1 1

21 21

22 22

23 23

24 24

25 25

26 26

27 27

28 28

29 29

HJKLM

11 11 11

7 13

2 2 2

2 14

1 2 3

1 2 3

LIMIT OF FLOORING

REMOVAL TO ALIGN

WITH WALL

LIMIT OF FLOORING

REMOVAL TO ALIGN

WITH WALL

186 SF

CORRIDOR

C3-27

49 SF

TOILET

3C-105

49 SF

TOILET

3C-104

307 SF

CORRIDOR

C3-28

245 SF

CORRIDOR

C3-26

FEC

FEC

A-401

ARCHITECTURAL SYMBOL LEGEND

GENERAL DEMOLITION SHEET NOTES

KEYNOTES

A. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE

RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.

PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT

WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY

MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL. SEE

MECHANICAL AND PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.

B. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT

PIPING WITH STRUCTURAL, MECHANICAL, AND…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .