S06 Revised Drawings - 12 pages.pdf

PDF 16 MB Posted

Attached to
Z1DA--618-22-102, Renovate for a Private Patient Bed Ward (3D) 36C263-23-AP-0055
Solicitation number
36C26323R0023
Issued by

About this file

This document provides details for a federal contract opportunity with the Department of Veterans Affairs to renovate a private patient bed ward. The solicitation number is 36C26323R0023 and seeks to award a contract for project Z1DA--618-22-102 to renovate a 3D private patient bed ward at a cost of approximately $500,000. Responses are due by August 15th, 2022 and the contract is expected to be awarded by September 30th, 2022. The scope of work involves demolishing existing walls and installing new private rooms, bathrooms, and associated mechanical, electrical and plumbing systems. The project is to be completed within 180 calendar days of the award date. The contracting office is located in Veterans Integrated Service Network 23.

View the file

Other files

File Type Posted
S06 Q_A Atch 1 - Revised Atch C.1 Specifications Vol 1.2 - 609 pages.pdf PDF
S06 36C26323R0023 Amendment 0005.docx DOCX document
S06 Q_A Atch 2 - Revised Atch C.1 Specifications Vol 1.1 - 291 pages.pdf PDF
S06 Late Questions - Solicitation 36C26323R0023 - 1 page.pdf PDF
S06 Addendum Number 2 - 2 pages.pdf PDF
36C26323R0023 0004.docx DOCX document
S06 36C26323R0023 Amendment 0003.docx DOCX document
S06 Q_A Atch 3 - Revised Drawing A-601 - 1 page.pdf PDF
S06 Revised Atch F Wage Determination MN20230117 4-14-23 - 9 pages.pdf PDF
S06 Q_A Atch 5 - Lidar Scans - 1 page.pdf PDF
S06 Q_A Atch 4 - Revised Drawing Q-601 - 1 page.pdf PDF
S06 Q_A Atch 1.2 - Revised Atch C.1 Specifications Vol 1.2 - 634 pages.pdf PDF
S06 Revised Drawings MP103i M-501 and M-502 - 3 pages.pdf PDF
S06 36C26323R0023 Amendment 0002.docx DOCX document
S06 Q_A Atch 1.1 - Revised Atch C.1 Specifications Vol 1.1 - 291 pages.pdf PDF
S06 Q_A Atch 7 - Revised Drawing GI201 - 1 page.pdf PDF
S06 Revised Drawings M-702 M-802 and M-804 - 3 pages.pdf PDF
S06 Questions - Solicitation 36C26323R0023.pdf PDF
S06 Q_A Atch 6 - Revised Drawings GI000 and GI101 - 2 pages.pdf PDF
S06 Q_A Atch 2 - Revised Drawings - 15 pages.pdf PDF
S06 Q_A Atch 8 - Revised Atch E Brand Name J and A - 30 pages.pdf PDF
S06 Revised Drawings M-503 M-504 and M-601 - 3 pages.pdf PDF
S06 Addendum Number 1 - 3 pages.pdf PDF
S06 Attachment 1 - Pre-Bid Sign-In Sheet - 2 pages.pdf PDF
S06 36C26323R0023 Amendment 0001.docx DOCX document
S06 Attachment 2 - Pre-Bid Site Visit Agenda - 2 pages.pdf PDF
36C26323R0023.docx DOCX document
Attachment I Questions Request Form - 1 page.doc DOC document
Attachment D.6 Drawings 6 of 7 - 13 pages.pdf PDF
Attachment A SOW - 3 pages.pdf PDF
Attachment B Price Schedule Breakdown Sheet - 1 page.xlsx XLSX spreadsheet
Attachment J VAAR 852.219-75 Limitations on Subcontracting Cert of Compliance - 2 pages.pdf PDF
Attachment C.3 Specifications Volume 3 - 410 pages.pdf PDF
Attachment F Wage Determination MN20230117 1-6-23 - 7 pages.pdf PDF
Attachment D.7 Drawings 7 of 7 - 37 pages.pdf PDF
Attachment D.1 Drawings 1 of 7 - 3 pages.pdf PDF
Attachment D.4 Drawings 4 of 7 - 24 pages.pdf PDF
Attachment G VA6500 Appendix C 1-2-3a-6a-7a-7d-9 and Appendix D - 6 pages.pdf PDF
Attachment C.2 Specifications Volume 2 - 14 pages.pdf PDF
Attachment D.3 Drawings 3 of 7 - 24 pages.pdf PDF
Attachment H Past Performance Questionnaire - 3 Pages.docx DOCX document
Attachment D.2 Drawings 2 of 7 - 8 pages.pdf PDF
Attachment D.5 Drawings 5 of 7 - 23 pages.pdf PDF
Attachment E Brand Name Justification and Approvals _Redacted - 27 pages.pdf PDF
Attachment C.1 Specifications Volume 1 - 930 pages.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LIFE SAFETY SYMBOLS

PATH OF EXIT ACCESS TRAVEL

PATH LENGTH

FIRE EXTINGUISHER CABINET (FEC)

REQUIRED DOOR CLEARANCES

FEC

PATH TO POINT OF COMMON TRAVEL

PATH LENGTH###' - ##"

BOLD LINE REPRESENTS

LONGEST PATH DISTANCE

EXIT LIGHTING

REQUIRED TOILET CLEARANCE

72" D X 66" W (BARRIER FREE)

REQUIRED TURNING RADIUS

66" DIAMETER (TYPICAL - BARRIER FREE)

72" DIAMETER (BARIATRIC - BARRIER FREE)

7" TOE / KNEE CLEARANCE OVERLAP

UNRATED PARTITION

SMOKE PARTITION

1 HOUR RATED PARTITION

2 HOUR RATED PARTITION

EXISTING WALL TO REMAIN

EXISTING AREA NOT IN CONTRACT (NIC)

BUILDING CODE:

MIXED BUILDING OCCUPANCY TYPE:

The entire building 1 is comprised of:

Primary: Healthcare (NFPA 101, Chapter 19) Secondary: Ambulatory Health Care (NFPA 101, Chapter 21)

This project is modifying ward C on Level 3, and is keeping the existing health care occupancy. The following data is from NFPA 101, Chapter 19.

PROJECT AREA:

AREA IN SCOPE: 13,461 GSF

CHANGE TO BUILDING SF: NO CHANGE

OCCUPANT LOAD:

EXISTING OCCUPANT LOAD: 113

PROPOSED OCCUPANT LOAD: 113 (NO CHANGE)

120 GSF PER OCCUPANT - Healthcare Sleeping Department (7.3.1.2)

CONSTRUCTION TYPE:

CONSTRUCTION: Type 1 (332) per NFPA 220, Chapter 4

FIRE RATED REQUIREMENTS FOR BUILDING ELEMENTS:

PRIMARY STRUCTURAL FRAME: 3 HOURS

BEARING WALLS (EXT & INT): 3 HOURS

FLOOR CONSTRUCTION: 2 HOURS

ROOF CONSTRUCTION: 1.5 HOURS

NON BEARING WALLS: 0 HOURS

OTHER REQUIRED RATINGS & SEPARATIONS:

VERTICAL SHAFTS: 2 HOURS

EXIT STAIRS: 2 HOURS

SOILED UTILITY: 1 HOUR

HAZARDOUS STORAGE: 1 HOUR

MEANS OF EGRESS:

MAXIMUM PATH OF TRAVEL: 200' (185'-0" MAX ACTUAL)

MAXIMUM COMMON PATH: 50' (41'-3" MAX ACTUAL)

DEAD-END CORRIDORS: 30' (NONE PRESENT)

MINIMUM EGRESS COMPONENT WIDTH: 48 INCHES

OTHER EGRESS WIDTH REQUIRED: 0.2 INCHES PER OCCUPANT

APPLICABLE BUILDING CODES:

• 2021 NFPA 101 LIFE SAFETY CODE

• 2022 NFPA 13 SPRINKLER SYSTEMS CODE

• 2018 INTERNATIONAL BUILDING CODE (IBC)

• 2018 INTERNATIONAL MECHANICAL CODE (IPC)

• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA)

STANDARDS.

• VA SEISMIC DESIGN REQUIREMENTS, H-18-8

• 2020 NATIONAL ELECTRICAL CODE (NEC)

• 2018 INTERNATIONAL PLUMBING CODE (IPC)

• ASME CODE FOR PRESSURE PIPING

• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS

(ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN

GUIDE (PG-18-13)

• BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE,

AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318)

• ENERGY POLICY ACT OF 2005 (EPACT)

• DOE INTERIM FINAL RULE: ENERGY CONSERVATION

STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-

FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-RISE

RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434, AND 435

• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND

SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING

(MOU)

• EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL

ENVIRONMENTAL, ENERGY, AND TRANSPORTATION

MANAGEMENT

• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS

STATED IN THE GENERAL REQUIREMENTS SECTION 01 00 00

AND 01 35 26 OF THE VA MASTER CONSTRUCTION

SPECIFICATIONS.

• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY - ASHRAE

STANDARD 62.1-2016: MEDICAL SPACES - ASHRAE 170-2013,

NON-MEDICAL SPACES - ASHRAE 62.1-2016

• SAFETY STANDARD FOR REFRIGERATION SYSTEMS - ASHRAE

STANDARD 15-2013

• VA FIRE PROTECTION DESIGN GUIDE, 8TH EDITION (2021)

66"W

"D

66"DIAM

"D

FLOOR SLOPE / FLOOR DRAIN

HJKLM

GI101

F4

CORRIDOR

C3-26C3-26

CORRIDOR

C3-27C3-27

CORRIDOR

C3-28C3-28

STAIR

ROOM

3C-1063C-106

CORRIDOR

C3-12C3-12

STAIR

213 SF

PATIENT 9

3D-109

79 SF

RR 9

3D-109A

69 SF

RR 8

3D-108A

256 SF

PATIENT 8

3D-108

285 SF

PATIENT 7

3D-107 69 SF

RR 7

3D-107A

297 SF

PATIENT 6

3D-106

72 SF

RR 6

3D-106A

289 SF

PATIENT 5

3D-105

72 SF

RR 5

3D-105A

300 SF

PATIENT 4

3D-104

69 SF

RR 4

3D-104A

298 SF

PATIENT 3

3D-103

70 SF

RR 3

3D-103A

69 SF

RR 2

3D-102A

296 SF

PATIENT 2

3D-102

299 SF

BARIATRIC 1

3D-101

90 SF

RR 1

3D-101A

269 SF

PATIENT 18

3D-133

78 SF

RR 18

3D-133A

68 SF

RR 17

3D-132A

268 SF

SAFER PATIENT 17

3D-132

299 SF

STAFF WORK

3D-136

245 SF

MSA'S

3D-100

190 SF

CLEAN LINENS

3D-138

98 SF

ASST. NURSE MNGR

3D-110

93 SF

NURSE MNGR OFFICE

3D-111

127 SF

MED ROOM

3D-112

106 SF

NUTRITION

3D-135

292 SF

SAFER PATIENT 16

3D-131

67 SF

RR 16

3D-131A

67 SF

RR 15

3D-129A

252 SF

PATIENT 15

3D-129

280 SF

PATIENT 14

3D-128

71 SF

RR 14

3D-128A

71 SF

RR 13

3D-126A

102 SF

PHARM OFFICE

3D-120

108 SF

SOILED UTILITY

3D-134

49 SF

STAFF TOILET

3D-117

131 SF

SPS STORAGE

3D-114

315 SF

EQUIPMENT ROOM

3D-115

16 SF

EQUIP. ALCOVE

3D-140

245 SF

PATIENT 13

3D-126

260 SF

PATIENT 12

3D-12567 SF

RR 12

3D-125A

67 SF

RR 11

3D-123A

61 SF

HAC

3D-119

259 SF

STAFF BREAK ROOM

3D-116

238 SF

PATIENT 11

3D-123

206 SF

PATIENT 10

3D-121

74 SF

RR 10

3D-121A

54 SF

ANTE ROOM

3D-133B

74 SF

CLEAN UTILITY

3D-113

30 SF

OXYGEN STOR.

3D-118

262 SF

CIRCULATION

C3-18

C

LE

A R

6' -0

129' - 8"

136' - 4"

110' - 2"

27' - 1"

8' -1

C

LE

A

R

8' -0

C

LE

A

R

8'-0" CLEAR

CLEAR

8'-0"

8'-0"

C

LE

A R

8' -0

8'-0" CLEAR

55 SF

ANTE ROOM

3D-101B

GI101

E3

TOILET

3C-1043C-104

TOILET

3C-1053C-105

FEC

FEC

FEC

95' - 3"

84' - 6"

GI101

D2

48"D

72"D

"W 30

"W

"D

"D

IA

M

48"D

"W

1/ 4"

TYPICAL

CLEARANCES:

TYPICAL

FLOOR SLOPES:

LINEAR FLOOR DRAIN

1/4" / 12"1/4" / 12"

1' -6

299 SF

BARIATRIC 1

3D-101

3' -0

/2

C

LE

A R

72"D

"W

72"DIAM.

90 SF

RR 1

3D-101A

55 SF

ANTE ROOM

3D-101B

5' -6

5'-0"

1'-6" 1'-6"

48"W

66"DIA

5' -0

"D

66"W on e-ei gh th in ch o ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in es ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

TRUE NORTH

PLAN NORTH

KEYPLAN

A/E:

TRIPLE C - The A/E Group

(520) 481-8548

Mat Perkins

A

B D

EF

G

H

J

K

L

M

C

As indicated

B

IM

/6

-2

-1

R e n o v a te

D

B e d W in g -B

-M

P L S

V A

M C

/6 -2

-7

.M

P L S

.3 D

B e d W in g .A

R C

H .B

.L

.r v t

/4

/2

:4 :3

P

M

09/12/2022 M.PERKINS C.LOWERY

618-22-102

1391 - GI101

LIFE SAFETY

1 Veterans Drive, Minneapolis, MN 55417

B70

RENOVATION OF BUILDING 70 3D

BED WING100% CONSTRUCTION

DOCUMENTS

1/8" = 1'-0" F6

LIFE SAFETY PLAN

ARCHITECTURAL BARRIERS ACT (ABA)

404.2 Manual Doors, Doorways, and Manual Gates. Manual doors and doorways and manual gates intended for user passage shall comply with 404.2.

404.2.2 Double-Leaf Door and Gates. At least one of the active leaves of doorways with two leaves shall comply with 404.2.3 and 404.2.4

404.2.4 Maneuvering Clearances. Minimum maneuvering clearances at doors and gates shall comply with 404.2.4. maneuvering clearances shall extend the full width of the doorway and the required latch side or hinge side clearance.

EXCEPTION: Entry doors to hospital patient rooms shall not be required to provide clearance beyond the latch side of the door

1/4" = 1'-0" F4

TYPICAL PATIENT RESTROOM

1/4" = 1'-0" E3

BARIATRIC PATIENT ROOM

1 ADDENDUM 1 04/06/23

2 ADDENDUM 2 05/03/23

1/4" = 1'-0" D2

TYPICAL PATIENT ROOM

TYPE D

A. IMPLEMENT INFECTION CONTROL RISK ASSESSMENT (ICRA)

PROCEDURES AS PER THE ICRA PLAN AND AS DIRECTED BY THE

CONTRACTING OFFICER REPRESENTATIVE (COR).

B. COORDINATE ALL DEMOLITION/ CONSTRUCTION DEBRIS PATH OF

TRAVEL AND INTERIM LIFE SAFETY MEASURES (ILSM) WITH THE COR.

ALL INTERIOR DOORS THAT LEAD TO THE CONSTRUCTION SITE

SHALL BE POSTED AS PER THE ISLM PLAN.

C. OBTAIN INFECTION CONTROL PERMIT PRIOR TO BEGINNING WORK.

D. THE ONE HOUR FIRE RATED CONSTRUCTION BARRIERS SHALL BE

CONSTRUCTED PRIOR TO BEGINNING OTHER WORK.

E. CONSTRUCT ANTEROOM AT ENTRANCES TO CONSTRUCTION AREAS

AND REQUIRE ALL CONSTRUCTION PERSONNEL TO PASS THROUGH

THIS ROOM TO BE VACUUMED WITH HEPA VACUUM CLEANER PRIOR

TO LEAVING THE SITE.

F. FIRE PROTECTION SYSTEMS SHALL REMAIN FUNCTIONAL FOR

OCCUPIED AREAS ON THE FLOOR.

G. PROVIDE FIRE EXTINGUISHERS IN CONSTRUCTION AREAS; REVIEW

WITH COR AND VA SAFETY GROUP.

H. MAINTAIN EXIT LIGHTS IN CONSTRUCTION AREA.

I. MAINTAIN NEGATIVE AIR PRESSURE IN CONSTRUCTION AREA AT ALL

TIMES (24/7). WHETHER OCCUPIED OR NOT, THROUGHOUT

DURATION OF PROJECT USING HEPA EQUIPPED AIR FILTRATION

UNITS.

J. CONSTRUCTION AREA SHALL REMAIN ISOLATED FROM THE OTHER

AREAS OF THE MEDICAL CENTER; NO RETURN AIR OR EXHAUST

SHALL PASS INTO THE AREAS OUTSIDE THE CONSTRUCTION AREA.

ISOLATE HVAC SYSTEM WITHIN CONSTRUCTION AREA TO PREVENT

CONTAMINATION OF EXISTING DUCT SYSTEM.

K. PROVIDE SIGNS ON DOORS INTO THE CONSTRUCTION AREA THAT

READS: "CONSTRUCTION AREA-DO NOT ENTER".

L. TACKY MATS SHALL BE PLACED AT ALL DOORS INTO THE

CONSTRUCTION AREA AND SHALL BE MONITORED TO MAKE SURE

THEY REMAIN EFFECTIVE.

M. MAINTAIN A CLEAN AND ORDERLY CONSTRUCTION AREA. ALL

DEBRIS REMOVAL SHALL BE IN COVERED CARTS AND/OR

CONTAINERS.

N. SEAL ALL HOLES, PUNCTURES, AND PENETRATIONS FROM PIPES AND

CONDUITS APPROPRIATELY AND IMMEDIATELY TO MAINTAIN DUST

PROTECTION AND NEGATIVE AIR PRESSURE.

O. AFTER COMPLETION OF WORK: VACUUM CONSTRUCTION AREA WITH

HEPA FILTERED VACUUMS, WET MOP WITH DISINFECTANT, REMOVE

CONSTRUCTION BARRIERS (UPON APPROVAL). PATCH OR REPAIR

ANY DAMAGE FROM CONSTRUCTION BARRIER REMOVAL AND

REMOVE ISOLATION OF HVAC SYSTEM.

P. CONSTRUCTION BARRIERS SHALL NOT BE REMOVE UNTIL PROJECT

IS COMPLETED AND INSPECTED BY VA SAFETY PERSONNEL,

INFECTION CONTROL GROUP, AND COR.

ICRA NOTES:

INFECTION CONTROL RISK

ASSESSMENT:

STEP 1: TYPE D

IDENTIFY THE TYPE OF CONSTRUCTION PROJECT

ACTIVITY (TYPE A–D)

TYPE A: INSPECTION AND NONINVASIVE ACTIVITIES.

TYPE B: SMALL-SCALE, SHORT-DURATION ACTIVITIES

THAT CREATE MINIMAL DUST.

TYPE C: WORK THAT GENERATES A MODERATE TO

HIGH LEVEL OF DUST OR REQUIRES DEMOLITION OR

REMOVAL OF ANY FIXED BUILDING COMPONENTS OR

ASSEMBLIES.

TYPE D: MAJOR DEMOLITION AND CONSTRUCTION

PROJECTS.

STEP 2: HIGH RISK

IDENTIFY THE PATIENT RISK GROUPS THAT WILL BE

AFFECTED.

IF MORE THAN ONE RISK GROUP WILL BE AFFECTED,

SELECT THE HIGHER RISK GROUP.

STEP 3: CLASS IV

MATCH THE PATIENT RISK GROUP (LOW, MEDIUM,

HIGH, HIGHEST) WITH THE PLANNED CONSTRUCTION

PROJECT TYPE (A, B, C, D) ON THE FOLLOWING MATRIX,

TO FIND THE CLASS OF PRECAUTIONS (I, II, III OR IV) OR

LEVEL OF INFECTION CONTROL ACTIVITIES REQUIRED.

STEP 4: IDENTIFY THE AREAS SURROUNDING THE PROJECT

AREA, ASSESSING POTENTIAL IMPACT.

BELOW ABOVE NORTH SOUTH EAST WEST

_______________________RISK GROUP_____________________

LOW LOW N/A N/A N/A N/A

STEP 5:

IDENTIFY SPECIFIC SITE OF ACTIVITY, FOR EXAMPLE, PATIENT

ROOMS, MEDICATION ROOM, AND SO ON.

STEP 6:

IDENTIFY ISSUES RELATED TO: VENTILATION, PLUMBING, AND

ELECTRICAL IN TERMS OF THE OCCURRENCE OF PROBABLE

OUTAGES.

STEP 7.

IDENTIFY CONTAINMENT MEASURES, USING PRIOR

ASSESSMENT. WHAT TYPES OF BARRIERS (FOR EXAMPLE,

SOLIDS WALLS)? WILL HEPA FILTRATION BE REQUIRED?

STEP 8.

CONSIDER POTENTIAL RISK OF WATER DAMAGE. IS THERE A

RISK DUE TO COMPROMISING STRUCTURAL INTEGRITY (FOR

EXAMPLE, WALL, CEILING, ROOF)?

NOTE: RENOVATION/CONSTRUCTION AREA SHALL BE

ISOLATED FROM THE OCCUPIED AREAS DURING

CONSTRUCTION AND SHALL BE NEGATIVE WITH RESPECT TO

SURROUNDING AREAS.

STEP 9.

WORK HOURS: CAN OR WILL THE WORK BE DONE DURING

NON-PATIENT-CARE HOURS?

STEP 10.

DO PLANS ALLOW FOR ADEQUATE NUMBER OF

ISOLATION/NEGATIVE AIRFLOW ROOMS?

STEP 11.

DO THE PLANS ALLOW FOR THE REQUIRED NUMBER AND TYPE

OF HAND-WASHING SINKS?

STEP 12.

DOES THE INFECTION PREVENTION AND CONTROL STAFF

AGREE WITH THE MINIMUM NUMBER OF SINKS FOR THIS

PROJECT? (VERIFY AGAINST FACILITY GUIDELINES INSTITUTE

(FGI) DESIGN AND CONSTRUCTION GUIDELINES FOR TYPES

AND AREA.)

STEP 13.

DOES THE INFECTION PREVENTION AND CONTROL STAFF

AGREE WITH THE PLANS RELATIVE TO CLEAN AND SOILED

UTILITY ROOMS?

STEP 14.

PLAN TO DISCUSS THE FOLLOWING CONTAINMENT ISSUES

WITH THE PROJECT TEAM, FOR EXAMPLE, TRAFFIC FLOW,

HOUSEKEEPING, DEBRIS REMOVAL (HOW AND WHEN).

C

LA

S S

IV

DURING CONSTRUCTION

PROJECT

UPON COMPLETION OF

PROJECT

1. Remove or isolate HVAC system in area where work is being done, to prevent contamination of duct system.

2. Complete all critical barriers— i.e., drywall, plywood, plastic—to seal area from non-work area before construction begins. Or, implement control cube method with HEPA-fiItered vacuum for vacuuming prior to exit.

3. Maintain negative air pressure within worksite utilizing HEPA-equipped air filtration units.

4. Contain construction waste in tightly covered containers before transport.

5. Cover transport receptacles or carts. Tape down covering unless cart has a solid lid.

1. Do not remove barriers from work area until completed project is inspected by the owner’s Safety Department and Infection Control Department and thoroughly cleaned by the owner’s Environmental Services Department.

2. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

3. Vacuum work area with HEPA-filtered vacuum.

4. Wet mop area with disinfectant.

5. Upon completion, restore HVAC system where work was performed.

Construction Project Type

Patient Risk Group

LOW Risk Group MEDIUM Risk Group

HIGH Risk Group

HIGHEST Risk Group

I II II III/IV

I II III IV

I II III/IV IV

II III/IV III/IV IV

TYPE A TYPE B TYPE C TYPE D

WEEKLY CHANGED OR MORE

AS NEEDED PRE-FILTER

FLEX DUCT

MONTHLY CHANGED HEPA FILTER

HEPA NEGATIVE AIR UNIT

PROVIDE STICKY MATS (CHANGED END OF

EVERY SHIFT OR MORE IF NECESSARY TO

MAINTAIN CLEANLINESS).

STATIC PRESSURE WATER GAUGE INDICATOR

SHALL -0.03" W.G. MINIMUM TO MAINTAIN NEGATIVE

PRESSURE IN CONSTRUCTION AREA (VERIFY DAILY). IF

NOT VERIFY ALL OPENING SUCH AS DOOR ARE CLOSED

AND/OR CHANGE NEGATIVE AIR PRE-FILTER.

SUPPLY DUCTS EITHER

KEEP RUNNING OR

COVER WHEN NOT

RUNNING TO KEEP

DUST OUT.

A

V

O

TAPE ALL WALL, FLOOR, AND CEILING

SERVICES, TO PROTECT AGAINST

CONTAMINATION

E

FIRE EXTINGUISHER ON

PORTABLE FLOOR BRACKET

(SHALL REQUIRE MORE THAN

ONE.)

E4

GI201

PUBLIC AREA

CONSTRUCTION AREA

ANTE

ROOM

4' -0

M

IN

IM

U M

S E

E

F L O

O R

P

L A

N

TEMPORARY WALL

FLOOR LINE

CEILING SYSTEM AS

SCHEDULED

EXISTING STRUCTURE

FIRE RATED PLASTIC TO

PREVENT DUST INSTALL

PRIOR TO CONSTRUCTION

F

IN

IS

H E

D F

LO

O

R T

O U

N D

E R

S

ID

E O

F S

T R

U C

T U

R E

V E

R

IF

Y F

LO

O

R T

O F

LO

O

R H

E

IG

H T

RENOVATED SPRINKLER

SYSTEM

HJKLM

PROVIDE ICRA BARRIERS TO

CREATE ANTE-ROOM OUTSIDE OF

CONSTRUCTION ENTRY

PROVIDE ICRA BARRIERS TO

CREATE ANTE-ROOM OUTSIDE OF

CONSTRUCTION ENTRY - THIS SIDE

FOR EMERGENCY EGRESS ONLY

PATH OF TRAVEL FOR MATERIAL /

WASTE TRANSPORTATION -

VERIFY WITH COR - SEE

CONSTRUCTION MATERIALS PLAN

THIS SHEET

5' -8

213 SF

PATIENT 9

3D-109

79 SF

RR 9

3D-109A

69 SF

RR 8

3D-108A

256 SF

PATIENT 8

3D-108

285 SF

PATIENT 7

3D-107

69 SF

RR 7

3D-107A

297 SF

PATIENT 6

3D-106

72 SF

RR 6

3D-106A

289 SF

PATIENT 5

3D-105

72 SF

RR 5

3D-105A

300 SF

PATIENT 4

3D-104

69 SF

RR 4

3D-104A

298 SF

PATIENT 3

3D-103

70 SF

RR 3

3D-103A

69 SF

RR 2

3D-102A

296 SF

PATIENT 2

3D-102

299 SF

BARIATRIC 1

3D-101

90 SF

RR 1

3D-101A

269 SF

PATIENT 18

3D-133

78 SF

RR 18

3D-133A

68 SF

RR 17

3D-132A

268 SF

SAFER PATIENT 17

3D-132

299 SF

STAFF WORK

3D-136

245 SF

MSA'S

3D-100

190 SF

CLEAN LINENS

3D-138

98 SF

ASST. NURSE MNGR

3D-110

93 SF

NURSE MNGR OFFICE

3D-111

127 SF

MED ROOM

3D-112

106 SF

NUTRITION

3D-135

292 SF

SAFER PATIENT 16

3D-131

67 SF

RR 16

3D-131A

67 SF

RR 15

3D-129A

252 SF

PATIENT 15

3D-129

280 SF

PATIENT 14

3D-128

71 SF

RR 14

3D-128A

71 SF

RR 13

3D-126A

102 SF

PHARM OFFICE

3D-120

108 SF

SOILED UTILITY

3D-134

49 SF

STAFF TOILET

3D-117

131 SF

SPS STORAGE

3D-114

315 SF

EQUIPMENT ROOM

3D-115 16 SF

EQUIP. ALCOVE

3D-140

245 SF

PATIENT 13

3D-126

260 SF

PATIENT 12

3D-12567 SF

RR 12

3D-125A

67 SF

RR 11

3D-123A

61 SF

HAC

3D-119

259 SF

STAFF BREAK ROOM

3D-116

238 SF

PATIENT 11

3D-123

206 SF

PATIENT 10

3D-121

74 SF

RR 10

3D-121A

54 SF

ANTE ROOM

3D-133B

74 SF

CLEAN UTILITY

3D-113

30 SF

OXYGEN STOR.

3D-118

262 SF

CIRCULATION

C3-18

55 SF

ANTE ROOM

3D-101B

186 SF

CORRIDOR

C3-27

49 SF

TOILET

3C-104

49 SF

TOILET

3C-105

RE-FINISH ONLY, NO

DESTRUCTIVE DEMOLITION

TAKING PLACE

CONSTRUCT NEW

CORRIDOR WALLS

AS ICRA BARRIERS

PRIOR TO COMMENCEMENT

OF REST OF CONSTRUCTION.

CONSTRUCT NEW

CORRIDOR WALLS

AS ICRA BARRIERS

PRIOR TO COMMENCEMENT

OF REST OF CONSTRUCTION.

4' -0

PROVIDE ANTE-ROOM FOR

MECHANICAL ROOM AND TELECOM

ROOM SCOPE OF WORK

ELEVATORS

ELE

VA

TO

R

S

FREIGHT

ELEVATOR

ELEVATORS

ELEVATORS

ELEVATORS

PATH OF TRAVEL FOR MATERIAL / WASTE

TRANSPORTATION - VERIFY WITH COR

PROJECT SCOPE AREA

on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

TRUE NORTH

PLAN NORTH

KEYPLAN

A/E:

TRIPLE C - The A/E Group

(520) 481-8548

Mat Perkins

A

B D

EF

G

H

J

K

L

M

C

As indicated

B

IM

/6

-2

-1

R e n o v a te

D

B e d W in g -B

-M

P L S

V A

M C

/6 -2

-7

.M

P L S

.3 D

B e d W in g .A

R C

H .B

.L

.r v t

/4

/2

:4 :5

P

M

09/12/2022 M.PERKINS C.LOWERY

618-22-102

1391 - GI201

INFECTION CONTROL PLAN & INTERIM LIFE

1 Veterans Drive, Minneapolis, MN 55417

B70

RENOVATION OF BUILDING 70 3D

BED WING100% CONSTRUCTION

DOCUMENTS

1/4" = 1'-0" F4

TYPICAL CONSTRUCTION LAYOUT- CLASS IV

1/2" = 1'-0" E4

CROSS SECTION A'-A'- CLASS IV

NTS

F1

TYPICAL ICRA PRODUCTS

1/8" = 1'-0"

F6

ICRA PLAN

1" = 60'-0" C3

CONSTRUCTION MATERIALS PLAN

NOTE: PROJECT WING WILL NOT

BE OCCUPIED DURING CONSTRUCTION.

CONTRACTOR TO UTILIZE SPACE IN

WING FOR TEMPORARY MATERIAL

STORAGE AS NEEDED DURING

CONSTRUCTION

1 ADDENDUM 1 04/06/23

2 ADDENDUM 2 05/03/23

DEPARTMENT LEGEND

ANTE ROOM PATIENT SPACES

BARIATRIC PATIENT ROOM

STAFF SPACES

PATIENT SPACES

UTILITY SPACES

CIRCULATION

SAFER PATIENT ROOM

615 SF

CORRIDOR

C3-12

160 SF

STAIR

169 SF

STAIR

302 SF

ROOM

3C-106

282 SF

CORRIDOR

C3-28

186 SF

CORRIDOR

C3-27

245 SF

CORRIDOR

C3-26

ICE/

H2O

213 SF

PATIENT 9

3D-109

79 SF

RR 9

3D-109A

69 SF

RR 8

3D-108A

256 SF

PATIENT 8

3D-108

285 SF

PATIENT 7

3D-107

69 SF

RR 7

3D-107A

297 SF

PATIENT 6

3D-106

72 SF

RR 6

3D-106A

289 SF

PATIENT 5

3D-105

72 SF

RR 5

3D-105A

300 SF

PATIENT 4

3D-104

69 SF

RR 4

3D-104A

298 SF

PATIENT 3

3D-103

70 SF

RR 3

3D-103A

69 SF

RR 2

3D-102A

296 SF

PATIENT 2

3D-102

299 SF

BARIATRIC 1

3D-101

90 SF

RR 1

3D-101A

269 SF

PATIENT 18

3D-133

78 SF

RR 18

3D-133A

68 SF

RR 17

3D-132A

268 SF

SAFER PATIENT 17

3D-132

299 SF

STAFF WORK

3D-136

245 SF

MSA'S

3D-100

190 SF

CLEAN LINENS

3D-138

98 SF

ASST. NURSE MNGR

3D-110

93 SF

NURSE MNGR OFFICE

3D-111

127 SF

MED ROOM

3D-112

106 SF

NUTRITION

3D-135

292 SF

SAFER PATIENT 16

3D-131

67 SF

RR 16

3D-131A

67 SF

RR 15

3D-129A

252 SF

PATIENT 15

3D-129

280 SF

PATIENT 14

3D-128

71 SF

RR 14

3D-128A

71 SF

RR 13

3D-126A

102 SF

PHARM OFFICE

3D-120

108 SF

SOILED UTILITY

3D-134

49 SF

STAFF TOILET

3D-117

131 SF

SPS STORAGE

3D-114

315 SF

EQUIPMENT ROOM

3D-115 16 SF

EQUIP. ALCOVE

3D-140

245 SF

PATIENT 13

3D-126

260 SF

PATIENT 12

3D-12567 SF

RR 12

3D-125A

67 SF

RR 11

3D-123A

61 SF

HAC

3D-119

259 SF

STAFF BREAK ROOM

3D-116

238 SF

PATIENT 11

3D-123

206 SF

PATIENT 10

3D-121

74 SF

RR 10

3D-121A

54 SF

ANTE ROOM

3D-133B

74 SF

CLEAN UTILITY

3D-113

30 SF

OXYGEN STOR.

3D-118

262 SF

CIRCULATION

C3-18

55 SF

ANTE ROOM

3D-101B

19 SF

EQUIP. ALCOVE

3D-127

17 SF

CHARTING

3D-142

16 SF

EQUIP. ALCOVE

3D-140

16 SF

CHARTING

C3-19B

17 SF

CHARTING

3D-141

18 SF

CHARTING

C3-25A 17 SF

CHARTING

C3-19A

11 SF

EQUIP ALCOVE

3D-137

15 SF

CHARTING

C3-19C

49 SF

TOILET

3C-104

49 SF

TOILET

3C-105

50 SF

ANTE ROOM

3D-121B on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

TRUE NORTH

PLAN NORTH

KEYPLAN

A/E:

TRIPLE C - The A/E Group

(520) 481-8548

Mat Perkins

A

B D

EF

G

H

J

K

L

M

C

1/8" = 1'-0"

B

IM

/6

-2

-1

R e n o v a te

D

B e d W in g -B

-M

P L S

V A

M C

/6 -2

-7

.M

P L S

.3 D

B e d W in g .A

R C

H .B

.L

.r v t

/4

/2

:4 :0

P

M

09/12/2022 M.PERKINS K.MACAULAY

618-22-102

1391 - A-002

ARCHITECTURAL ROOM PROGRAM PLAN -

3D

1 Veterans Drive, Minneapolis, MN 55417

B70

RENOVATION OF BUILDING 70 3D

BED WING100% CONSTRUCTION

DOCUMENTS

1/8" = 1'-0" F4

ARCHITECTURAL ROOM PROGRAM PLAN - 3D

ROOM PROGRAM SCHEDULE_3D

LEGEND

ROOM

PROGRAM

CODE NAME

PROGRAM

AREA

ACTUAL

AREA

AREA

DIFFERENCE

SS204 ASST. NURSE MNGR 80 SF 98 SF -18 SF

SV583 CHARTING 100 SF 18 SF 82 SF

SV583 CHARTING 100 SF 17 SF 83 SF

SV583 CHARTING 100 SF 17 SF 83 SF

SV583 CHARTING 100 SF 17 SF 83 SF

SV583 CHARTING 100 SF 16 SF 84 SF

SV583 CHARTING 100 SF 15 SF 85 SF

CIRC EQUIP ALCOVE 11 SF

SC052 EQUIP. ALCOVE 16 SF

SC052 EQUIP. ALCOVE 30 SF

IMS81 EQUIP. ALCOVE 120 SF 19 SF 101 SF

SV583 MED ROOM 100 SF 127 SF -27 SF

SC152 MSA'S 245 SF

SS204 NURSE MNGR OFFICE 80 SF 93 SF -13 SF

SV272 NUTRITION 80 SF 106 SF -26 SF

SS218 PHARM OFFICE 80 SF 102 SF -22 SF

SS262 STAFF BREAK ROOM 100 SF 259 SF -159 SF

SB191 STAFF TOILET 85 SF 49 SF 36 SF

SC231 STAFF WORK 240 SF 299 SF -59 SF

STAFF SPACES: 19 1565 SF 1552 SF 314 SF

SC471 CLEAN LINENS 60 SF 190 SF -130 SF

SB737 CLEAN UTILITY 100 SF 74 SF 26 SF

IMS81 EQUIPMENT ROOM 120 SF 315 SF -195 SF

SB244 HAC 60 SF 61 SF -1 SF

IMS83 OXYGEN STOR. 100 SF 30 SF 70 SF

SB743 SOILED UTILITY 60 SF 108 SF -48 SF

SRSP1 SPS STORAGE 60 SF 131 SF -71 SF

UTILITY SPACES: 7 560 SF 909 SF -349 SF

Grand total: 75 8330 SF 12546

SF

-3915 SF

ROOM PROGRAM SCHEDULE_3D

LEGEND

ROOM

PROGRAM

CODE NAME

PROGRAM

AREA

ACTUAL

AREA

AREA

DIFFERENCE

LEVEL 3

IMS24 ANTE ROOM 65 SF 54 SF 11 SF

IMS24 ANTE ROOM 65 SF 64 SF 1 SF

IMS24 ANTE ROOM 65 SF 50 SF 15 SF

IMS23 PATIENT 9 240 SF 213 SF 27 SF

IMS23 PATIENT 10 240 SF 206 SF 34 SF

IMS23 PATIENT 18 240 SF 269 SF -29 SF

SB147 RR 9 60 SF 79 SF -19 SF

SB147 RR 10 60 SF 74 SF -14 SF

SB147 RR 18 60 SF 78 SF -18 SF

ANTE ROOM PATIENT SPACES: 9 1095 SF 1085 SF 10 SF

IMS24 ANTE ROOM 65 SF 55 SF 10 SF

IMS27 BARIATRIC 1 280 SF 299 SF -19 SF

SB161 RR 1 85 SF 90 SF -5 SF

BARIATRIC PATIENT ROOM: 3 430 SF 444 SF -14 SF

CIRC CIRCULATION 0 SF 137 SF -137 SF

CIRC CIRCULATION 0 SF 505 SF -505 SF

CIRC CIRCULATION 0 SF 1012 SF -1012 SF

CIRC CIRCULATION 0 SF 917 SF -917 SF

CIRC CIRCULATION 0 SF 262 SF -262 SF

CIRC CORRIDOR 0 SF 615 SF -615 SF

CIRC CORRIDOR 0 SF 186 SF -186 SF

CIRC TOILET 0 SF 49 SF -49 SF

CIRC TOILET 0 SF 49 SF -49 SF

CIRCULATION: 9 0 SF 3731 SF -3731 SF

IMS21 PATIENT 2 280 SF 296 SF -16 SF

IMS21 PATIENT 3 240 SF 298 SF -58 SF

IMS21 PATIENT 4 280 SF 300 SF -20 SF

IMS21 PATIENT 5 240 SF 289 SF -49 SF

IMS21 PATIENT 6 280 SF 297 SF -17 SF

IMS21 PATIENT 7 280 SF 285 SF -5 SF

IMS21 PATIENT 8 280 SF 256 SF 24 SF

IMS21 PATIENT 11 280 SF 238 SF 42 SF

IMS21 PATIENT 12 280 SF 260 SF 20 SF

IMS21 PATIENT 13 280 SF 245 SF 35 SF

IMS21 PATIENT 14 280 SF 280 SF 0 SF

IMS21 PATIENT 15 280 SF 252 SF 28 SF

SB147 RR 2 60 SF 69 SF -9 SF

SB147 RR 3 60 SF 70 SF -10 SF

SB147 RR 4 60 SF 69 SF -9 SF

SB147 RR 5 60 SF 72 SF -12 SF

SB147 RR 6 60 SF 72 SF -12 SF

SB147 RR 7 60 SF 69 SF -9 SF

SB147 RR 8 60 SF 69 SF -9 SF

SB147 RR 11 60 SF 67 SF -7 SF

SB147 RR 12 60 SF 67 SF -7 SF

SB147 RR 13 60 SF 71 SF -11 SF

SB147 RR 14 60 SF 71 SF -11 SF

SB147 RR 15 60 SF 67 SF -7 SF

PATIENT SPACES: 24 4000 SF 4129 SF -129 SF

SB147 RR 16 60 SF 67 SF -7 SF

SB147 RR 17 60 SF 68 SF -8 SF

IMS21 SAFER PATIENT 16 280 SF 292 SF -12 SF

IMS21 SAFER PATIENT 17 280 SF 268 SF 12 SF

SAFER PATIENT ROOM: 4 680 SF 695 SF -15 SF

1 ADDENDUM 1 04/06/23

S S

1 1 1 1 1

21 21

22 22

23 23

24 24

25 25

26 26

27 27

28 28

29 29

HJKLM

11 11 11

7 13

2 2 2

2 14

1 2 3

1 2 3

LIMIT OF FLOORING

REMOVAL TO ALIGN

WITH WALL

LIMIT OF FLOORING

REMOVAL TO ALIGN

WITH WALL

186 SF

CORRIDOR

C3-27

49 SF

TOILET

3C-105

49 SF

TOILET

3C-104

282 SF

CORRIDOR

C3-28

245 SF

CORRIDOR

C3-26

FEC

FEC

A-401

ARCHITECTURAL SYMBOL LEGEND

GENERAL DEMOLITION SHEET NOTES

KEYNOTES

A. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE

RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.

PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT

WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY

MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL. SEE

MECHANICAL AND PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.

B. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT

PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND

SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN

REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

C. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD

VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM

THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE LOCATION

AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR

REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD CONDITIONS BE

FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION DOCUMENTS.

D. VA TO SALVAGE DOORS AND DOOR HARDWARE. COORDINATE WITH COR TO

ENSURE ALL SALVAGE COMPLETED PRIOR TO BEGINNING CONSTRUCTION

DEMOLITION.

E. ANY FREESTANDING EQUIPMENT OR FURNITURE REMAINING IN THE

CONSTRUCTION AREA IS TO BE BROUGHT TO THE ATTENTION OF THE COR

FOR OPTION OF SALVAGE PRIOR TO BEING DISPOSED OF.

F. GENERAL CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS

WITH ALL TRADES PRIOR TO INSTALLATION.

G. GENERAL CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED

AT CONNECTIONS BETWEEN ALL DISSIMILAR METALS.

H. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO

COMPLETE THIS PROJECT, THE GENERAL CONTRACTOR SHALL PATCH AND

PAINT AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.

I. GENERAL CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED

EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.

J. GENERAL CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE

MODIFYING SUBFLOORING.

K. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR

PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE

PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY RELOCATED AS

NECESSARY FOR CONTINUED UNINTERRUPTED OPERATION, ACCESS,

MAINTENANCE AND / OR VISIBILITY.

L. STAIRS AND ELEVATORS TO REMAIN OPERATIONAL AT ALL TIMES.

M. REFER TO MEP DRAWINGS FOR DEMOLITION SCOPE OF MECHANICAL,

ELECTRICAL AND PLUMBING COMPONENTS.

N. GENERAL CONTRACTOR TO FILL OUT ATTACHMENT C OF 138-022HV LOCATED

IN SPEC SECTION 01 35 26.19 FOR ALL DEMOLISHED EQUIPMENT INSTALLED IN

THIS SCOPE OF WORK.

PROPOSED EXTERIOR WALL. SEE WALL SECTIONS

1 HR FIRE AND SMOKE BARRIER

2 HR FIRE AND SMOKE BARRIER (SHAFT)

SMOKE BARRIER PARTITION

DEMOLISHED WALL, FIXTURE OR FURNISHING

EXISTING WALL, FIXTURE OR FURNISHING TO REMAIN

NOT IN CONTRACT - NO WORK SCHEDULED

EXISTING GRID

EXISTING DOOR TO REMAIN

DEMOLISHED DOOR

CORRIDOR

C3-12C3-12

CORRIDOR

C3-17C3-17

CORRIDOR

C3-18C3-18

CORRIDOR

C3-19C3-19

CORRIDOR

C3-22C3-22

CORRIDOR

C3-23C3-23

CORRIDOR

C3-24C3-24

EXAM

3D-119B3D-119B

TREATMENT

3D-1193D-119

EXAM

3D-119C3D-119C

EXAM

3D-1203D-120

BREAK

3D-123A3D-123A

ANTE

3D-1163D-116

OFFICE

3D-1253D-125

EXAM

3D-1183D-118

EXAM

3D-1173D-117

STOR

3D-127A3D-127A

EXAM

3D-1273D-127

TLT

3D-124A3D-124A

OFFICE

3D-1093D-109

HAC

3D-1103D-110

TLT

3D-1113D-111

STORAGE

3D-1303D-130

NURSING

RM

3D-109A3D-109A

OFFICE

3D-1063D-106

3D-105 3D-1053D-105

OFFICE

3D-1313D-131

STORAGE

3D-134B3D-134B

EXAM

3D-1213D-121

EXAM

3D-119A3D-119A

PATIENT

3D-116C3D-116C

PATIENT

3D-116B3D-116B

PATIENT

3D-114C3D-114C

TLT

3D-126A3D-126A

EXAM

3D-1123D-112

TLT

3D-116A3D-116A

PATIENT

3D-114B3D-114B TLT

3D-114A3D-114A

PATIENT

3D-1083D-108 TLT

3D-108A3D-108A

PATIENT

3D-1073D-107

ANTE

3D-107A3D-107A

TLT

3D-107B3D-107B

TLT

3D-128A3D-128A

PATIENT

3D-1043D-104

ANTE

3D-104A3D-104A

ANTE

3D-103A3D-103A

PATIENT

3D-1033D-103

PATIENT

3D-1023D-102

EXAM

3D-1013D-101

OFFICE

3C-1033C-103

TLT

3D-101A3D-101A

EXAM

3D-1363D-136

TLT

3D-104B3D-104B

TLT

3D-103B3D-103B

TLT

3D-102B3D-102B

ANTE

ROOM

3D-102A3D-102A

TLT

3D-135A3D-135A

BREAK

ROOM

3D-1233D-123

PATIENT

3D-1243D-124

PATIENT

3D-1263D-126

PATIENT

3D-128C3D-128C

PATIENT

3D-128B3D-128B

PATIENT

3D-1293D-129

EXAM

3D-1353D-135

WORK

ROOM

3D-134A3D-134A

CHECK-IN

3D-1343D-134

ANTE

3D-1283D-128

ANTE

3D-1143D-114

LINEN

CHUTE

3D-112A3D-112A

IT CLOSET

3D-122B3D-122B

ELECTRICAL

ROOM

3D-122A3D-122A

1 1 1 1 1

WORK

ROOM

3D-1153D-115

STAIR

F1

A-101

F1

A-101

21 21

22 22

23 23

24 24

25 25

26 26

27 27

28 28

29 29

HJKLM

RECESSED LUMINAIRE (24x24)

SMOKE DETECTOR

SPEAKER

EXISTING HVAC SUPPLY DIFFUSER

HVAC RETURN DIFFUSER

EXIT LIGHT

HEAT DETECTOR

HVAC EXHAUST DIFFUSER

LINEAR UPLIGHT LUMINAIRE, WALL

MOUNTED

RECESSED ROUND DOWNLIGHT

LUMINAIRE

RECESSED LUMINAIRE (24x48)

ACOUSTICAL TILE CEILING (24x24)

ACOUSTICAL TILE CEILING (24x48)

GYPSUM BOARD CEILING

REFLECTED CEILING SYMBOLS

ACCESS PANEL

HVAC SUPPLY DIFFUSER

EXISTING HVAC RETURN DIFFUSER

SPRINKLER

UNDERCABINET TASK LIGHT

EXISTING DEMO

TOILET

3C-1053C-105

CORRIDOR

C3-12C3-12

CORRIDOR

C3-17C3-17

CORRIDOR

C3-19C3-19

CORRIDOR

C3-22C3-22

CORRIDOR

C3-23C3-23

CORRIDOR

C3-24C3-24

EXAM

3D-119B3D-119B

TREATMENT

3D-1193D-119

EXAM

3D-119C3D-119C

EXAM

3D-1203D-120

BREAK

3D-123A3D-123A

ANTE

3D-1163D-116

OFFICE

3D-1253D-125

EXAM

3D-1183D-118

EXAM

3D-1173D-117

STOR

3D-127A3D-127A

EXAM

3D-1273D-127

TLT

3D-124A3D-124A

OFFICE

3D-1093D-109

HAC

3D-1103D-110

TLT

3D-1113D-111

STORAGE

3D-1303D-130

NURSING

RM

3D-109A3D-109A

OFFICE

3D-1063D-106

3D-105 3D-1053D-105

OFFICE

3D-1313D-131

STORAGE

3D-134B3D-134B

EXAM

3D-1213D-121

EXAM

3D-119A3D-119A

PATIENT

3D-116C3D-116C

PATIENT

3D-116B3D-116B

PATIENT

3D-114C3D-114C

TLT

3D-126A3D-126A

EXAM

3D-1123D-112

TLT

3D-116A3D-116A

PATIENT

3D-114B3D-114B

TLT

3D-114A3D-114A

PATIENT

3D-1083D-108

TLT

3D-108A3D-108A

PATIENT

3D-1073D-107

ANTE

3D-107A3D-107A

TLT

3D-107B3D-107B

TLT

3D-128A3D-128A

PATIENT

3D-1043D-104

ANTE

3D-104A3D-104A

ANTE

3D-103A3D-103APATIENT

3D-1033D-103

PATIENT

3D-1023D-102

EXAM

3D-1013D-101

OFFICE

3C-1033C-103

TLT

3D-101A3D-101A

EXAM

3D-1363D-136

TLT

3D-104B3D-104B

TLT

3D-103B3D-103B

TLT

3D-102B3D-102B

ANTE

ROOM

3D-102A3D-102A

TLT

3D-135A3D-135A

BREAK

ROOM

3D-1233D-123

PATIENT

3D-1243D-124

PATIENT

3D-1263D-126

PATIENT

3D-128C3D-128C

PATIENT

3D-128B3D-128B

PATIENT

3D-1293D-129

EXAM

3D-1353D-135

WORK

ROOM

3D-134A3D-134A

CHECK-IN

3D-1343D-134

ANTE

3D-1283D-128

ANTE

3D-1143D-114

LINEN

CHUTE

3D-112A3D-112A

IT CLOSET

3D-122B3D-122B ELECTRICAL

ROOM

3D-122A3D-122A

TOILET

CORRIDOR

C3-27C3-27

CORRIDOR

C3-18C3-18

WORK

ROOM

3D-1153D-115 on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

TRUE NORTH

PLAN NORTH

KEYPLAN

A/E:

TRIPLE C - The A/E Group

(520) 481-8548

Mat Perkins

A

B D

EF

G

H

J

K

L

M

C

1/8" = 1'-0"

B

IM

/6

-2

-1

R e n o v a te

D

B e d W in g -B

-M

P L S

V A

M C

/6 -2

-7

.M

P L S

.3 D

B e d W in g .A

R C

H .B

.L

.r v t

/4

/2

:4 :2

P

M

09/12/2022 M.PERKINS K.MACAULAY

618-22-102

1391 - AD101

ARCHITECTURAL DEMOLITION PLAN AND

REFLECTED CEILING PLANS - THIRD LEVEL -

3D

1 Veterans Drive, Minneapolis, MN 55417

B70

RENOVATION OF BUILDING 70 3D

BED WING100% CONSTRUCTION

DOCUMENTS

1/8" = 1'-0" F5

ARCHITECTURAL DEMOLITION PLAN - THIRD LEVEL - 3D

1 REMOVE ALL PLUMBING FIXTURES IN ENTIRE ROOM, REFER TO PLUMBING

DRAWINGS FOR MORE INFORMATION

2 REMOVE ALL TOILET ACCESSORIES, INCLUDING BUT NOT LIMITED TO

MIRRORS,GRAB BARS, TOILET PARTITIONS, PAPER TOWEL DISPENSERS, SOAP

DISPENSERS.

3 REMOVE AND PROPERLY DISPOSE OF ALL FINISH MATERIALS IN ENTIRE ROOM

4 REMOVE EXISTING ACT GRID AND TILE.

5 REMOVE AND DISPOSE OF ALL EXISTING LIGHT FIXTURES

6 REMOVE AND DISPOSE OF ALL EXISTING MECHANICAL REGISTERS AND DIFFUSERS

7 REMOVE AND DISPOSE OF EXISTING METAL LOCKERS.

8 REMOVE AND DISPOSE OF EXISTING DRAPERIES AND DRAPERY TRACK AT

EXTERIOR WINDOW.

9 REMOVE AND DISPOSE OF EXISTING CUBICLE CURTAIN TRACK.

10 REMOVE AND DISPOSE OF ALL CEILING MOUNTED SIGNAGE

11 EXISTING BUILDING EXPANSION JOINT AT FLOOR TO REMAIN. PROTECT IN PLACE.

12 REMOVE AND DISPOSE OF EXISTING WALL EXPANSION JOINT AT THIS LOCATION

13 REMOVE AND DISPOSE OF EXISTING CASEWORK

14 REMOVE AND DISPOSE OF EXISTING HEADWALL SYSTEM.

15 REMOVE AND PROPERLY DISPOSE OF SYSTEMS FURNITURE RECEPTION/NURSES

STATION.

16 REMOVE AND DISPOSE OF EXISTING BULLETIN BOARDS, WHITEBOARDS &

LITERATURE RACKS.

17 REMOVE EXISTING CEILING MOUNTED BARIATRIC LIFT SYSTEM AND COORDINATE

WITH COR FOR PROPER STORAGE.

18 REMOVE AND DISPOSE OF EXISTING WALL MOUNTED BRACKETS, STANDARDS AND

SHELVES

19 REMOVE ANY WALL MOUNTED ITEMS IN THIS AREA. PATCH WALLS AS REQUIRED

AND PREPARE FOR NEW FINISHES.

20 REMOVE EXISTING FLOORING WITHIN SCOPE AREA AND PREPARE SUBFLOOR FOR

NEW FLOORING. PROTECT ADJACENT FINISH FLOORING TO REMAIN.

21 EXISTING CEILING AND LIGHT FIXTURES TO REMAIN, PROTECT IN PLACE.

22 REMOVE EXISTING SIGNAGE, RETAIN FOR REINSTALLATION AFTER WALL IS

FINISHED.

23 REPLACE ALL DRYWALL IN ROOM AFTER REMOVAL OF EXISTING WALL TILE.

REPLACE OR MODIFY FRAMING AS REQUIRED.

24 REMOVE AND PROPERLY DISPOSE OF PNEUMATIC TUBE STATION AND

SURROUNDING PARTITION WALLS. REMOVE INSULATED TUBING UP TO

INTERSTITIAL SPACE ABOVE AND AS REQUIRED TO CONNECT TO NEW PNEUMATIC

TUBE STATION LOCATION. SEE A-101 FOR LOCATION.

25 PNEUMATIC TUBING IN INTERSTITIAL SPACE ABOVE - REMOVE TO EXTENTS

REQUIRED TO ATTACH TO NEW WORK.

26 EXISTING MED GAS ALARM PANEL TO BE RELOCATED.

27 REMOVE AND DISPOSE OF EXISTING WALL HEATER.

1/8" = 1'-0" F1

ARCHITECTURAL REFLECTED CEILING PLAN DEMOLITION - THIRD LEVEL - 3D

SCHEDULE OF EXISTING FINISHES

FINISH # FLOOR BASE

WALL

MATL

WALL

FINISH CEILING MATL

1 VCT RB GYP P ACT

2 VCT RB GYP P/PT ACT

3 PT PT GYP P/PT ACT/GWB

4 CPT RB GYP P ACT

EXISTING FINISHES ABBREVIATION LIST:

CPT CARPET

VCT VINYL COMPOSITE TILE

PT PORCELAIN TILE

GYP GYPSUM

GWB GYPSUM WALLBOARD

P PAINT

ACT ACOUSTICAL CEILING TILE

PATIENT 9

3D-109

213 SF

RR 9

3D-109A

79 SF

RR 8

3D-108A

69 SF

PATIENT 8

3D-108

256 SF

PATIENT 7

3D-107

285 SF

RR 7

3D-107A

69 SF

PATIENT 6

3D-106

297 SF

RR 6

3D-106A

72 SF

PATIENT 5

3D-105

289 SF

RR 5

3D-105A

72 SF

PATIENT 4

3D-104

300 SF

RR 4

3D-104A

69 SF

PATIENT 3

3D-103

298 SF

RR 3

3D-103A

70 SF

RR 2

3D-102A

69 SF

PATIENT 2

3D-102

296 SF

BARIATRIC

3D-101

299 SF

RR 1

3D-101A

90 SF

CIRCULATION

C3-24

505 SF

PATIENT

3D-133

269 SF

RR 18

3D-133A

78 SF

RR 17

3D-132A

68 SF

SAFER

PATIENT

3D-132

268 SF

STAFF

WORK

3D-136

299 SF

MSA'S

3D-100

245 SF

CLEAN

LINENS

3D-138

190 SF

ASST.

NURSE

MNGR

3D-110

98 SF

NURSE

MNGR

OFFICE

3D-111

93 SF

MED

ROOM

3D-112

127 SF

NUTRITION

3D-135

106 SF

EQUIP.

ALCOVE

3D-139

30 SF

SAFER

PATIENT

3D-131

292 SF

RR 16

3D-131A

67 SF

RR 15

3D-129A

67 SF

PATIENT

3D-129

252 SF

PATIENT

3D-128

280 SF

RR 14

3D-128A

71 SF

RR 13

3D-126A

71 SF

PHARM

OFFICE

3D-120

102 SF

SOILED

UTILITY

3D-134

108 SF

CIRCULATION

C3-20

137 SF

STAFF

TOILET

3D-117

49 SF

SPS

STORAGE

3D-114

131 SF

EQUIPMENT

ROOM

3D-115

315 SF

PATIENT

3D-126

245 SF

PATIENT

3D-125

260 SF

RR 12

3D-125A

67 SF

RR 11

3D-123A

67 SF

HAC

3D-119

61 SF

STAFF

BREAK

ROOM

3D-116

259 SF

PATIENT

3D-123

238 SF

PATIENT

3D-121

206 SF

RR 10

3D-121A

74 SFA-401

E8

A-401

C8

A-402

D7

F1

A-101

F1

A-101

A-403

F7

21 21

22 22

23 23

24 24

25 25

26 26

27 27

28 28

29 29

HJKLM

CORRIDOR

C3-12C3-12

STAIR

ROOM

3C-1063C-106

CORRIDOR

C3-27C3-27

CORRIDOR

C3-26C3-26

CORRIDOR

C3-28C3-28

STAIR

ANTE

ROOM

3D-133B

54 SF

CLEAN

UTILITY

3D-113

74 SF

OXYGEN

STOR.

3D-118

30 SF

8'-0"

CIRCULATION

C3-25

1012 SF

CIRCULATION

C3-19

917 SF

CIRCULATION

C3-18

262 SF

9A

115A 115B

3A

6A

5A

9A

8A

121 12 1A

1A

2A

6B

136A

3A

1B

8A

7A

1A

2A

4A

3A

6A

5A

109 11

121B

109B

133B 101B

EQUIP.

ALCOVE

3D-127

19 SF

CHARTING

3D-142

17 SF

EQUIP.

ALCOVE

3D-140

16 SF

CHARTING

C3-19B

16 SF

CHARTING

3D-141

17 SF

CHARTING

C3-25A

18 SF

CHARTING

C3-19A

17 SF

EQUIP

ALCOVE

3D-137

11 SF

CHARTING

C3-19C

15 SF

A

A

C

C

C

A

A

A

A

A

A

A

A

A

A

A

A

B

A-404

F7

132B

116B

Q-101

F4

TOILET

3C-1043C-104

TOILET

3C-1053C-105

55 SF

ANTE

ROOM

64 SF

ANTE

ROOM

9 SF

CHUTE

4A

38 QTY OF

LOCKERS

50 SF

ANTE

ROOM

14 QTY OF

LOCKERS

SINK

ALCOVE

3C-134B

3 SF

A-401

E6

FEC

FEC

FEC

2A

MECHANICAL

ROOM

3D-1223D-122

3'-8"

ARCHITECTURAL SYMBOL LEGEND

GENERAL SHEET NOTES

DEMOLISHED WALL, FIXTURE OR FURNISHING

EXISTING WALL, FIXTURE OR FURNISHING

VA/VA ITEM - VA SUPPLIED & INSTALLED

VA/CC OR VC ITEM - VA SUPPLIED & CONTRACTOR

INSTALLED

CC/CC ITEM - CONTRACTOR SUPPLIED & INSTALLED

MATCHLINE

A. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE

RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.

PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT

WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY

MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL. SEE

MECHANICAL AND PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.

B. C.CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND

CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL

SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID

CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND

SERVICEABILITY.

C. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD

VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM

THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE

LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE

MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD

CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION

DOCUMENTS.

D. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH

ALL TRADES PRIOR TO INSTALLATION.

E. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT

CONNECTIONS BETWEEN ALL DISSIMILAR METALS.

F. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO

COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT

AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.

G. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED

EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.

H. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE MODIFYING

SUBFLOORING.

I. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR

PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE

PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY RELOCATED

AS NECESSARY FOR CONTINUED UNINTERRUPTED OPERATION,

ACCESS, MAINTENANCE AND / OR VISIBILITY.

J. INFILL & FLOAT FLOORS AT DEMO WALL LOCATIONS, TYPICAL ALL

INTERIOR WALLS.

KEYNOTES-

UNRATED PARTITION

SMOKE PARTITION

1 HOUR RATED PARTITION

2 HOUR RATED PARTITION

EXISTING WALL TO REMAIN

EXISTING AREA NOT IN CONTRACT (NIC)

WINDOW TYPE TAG

# NEW DOOR AND TAG

## WALL TAG

LEVEL 2

INTERSTITIAL

869' - 3 1/2"

LEVEL 3

INTERSTITIAL

887' - 11 1/2"

LEVEL 2

859' - 0"

LEVEL 3

877' - 8"

LEVEL 4

896' - 4"

HJKLM

PATIENT 14

3D-128

IMS21

280 SF

PHARM

OFFICE

3D-120

SS218

102 SF

SPS

STORAGE

3D-114

SRSP1

131 SF

INTERSTITIAL

SPACE

ABOVE

INTERSTITIAL

SPACE

BELOW

RR 14

3D-128A

SB147

71 SF

2' -4

/2

6' -0

'-3

/2

2' -4

/2

6' -0

CIRCULATION

C3-25

CIRC

1012 SF

RR 5

3D-105A

SB147

72 SF

PATIENT 5

3D-105

IMS21

289 SF

CIRCULATION

C3-19

CIRC

917 SF

LEVEL 3

INTERSTITIAL

887' - 11 1/2"

LEVEL 3

877' - 8"

LEVEL 4

896' - 4"

R 5'-6"

7 5

22 22

23 23

K

K

R 6'-0" V

E R

T

IC

A L

B E

N D

5' -6

1'

-0

R 6'-0"

E1

A-101

E1

A-101 on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

TRUE NORTH

PLAN NORTH

KEYPLAN

A/E:

TRIPLE C - The A/E Group

(520) 481-8548

Mat Perkins

A

B D

EF

G

H

J

K

L

M

C

As indicated

B

IM

/6

-2

-1

R e n o v a te

D

B e d W in g -B

-M

P L S

V A

M C

/6 -2

-7

.M

P L S

.3 D

B e d W in g .A

R C

H .B

.L

.r v t

/4

/2

:4 :2

P

M

09/12/2022 M.PERKINS K.MACAULAY

618-22-102

1391 - A-101

ARCHITECTURAL FLOOR PLAN - THIRD

LEVEL - 3D NEW

1 Veterans Drive, Minneapolis, MN 55417

B70

RENOVATION OF BUILDING 70 3D

BED WING100% CONSTRUCTION

DOCUMENTS

1/8" = 1'-0" F6

ARCHITECTURAL FLOOR PLAN - THIRD LEVEL - 3D NEW

1 NO WORK IN THIS AREA.

2 FURNITURE IS NOT IN CONTRACT; SHOWN FOR REFERENCE ONLY

3 NEW LOCATION FOR PNUEMATIC TUBE SYSTEM END STATION

4 NEW MOTORIZED ROLLING SECURITY SHUTTER AT HEAD WALL.

5 NEW PNEUMATIC TUBE IN INTERSTITIAL SPACE ABOVE.

6 CONNECT NEW PNEUMATIC TUBE TO EXISTING TUBING.

7 EXISTING PNEUMATIC TUBING TO BE DEMOLISHED IN INTERSTITIAL SPACE

ABOVE - SEE AD101.

8 WHERE EXISTING DOOR REMOVED, INFILL WALL TO MATCH ADJACENT WALL

CONSTRUCTION AND 2HR FIRE RATING.

1/8" = 1'-0" F1

ARCHITECTURAL BUILDING SECTION - 3D NEW

3/16" = 1'-0" E1

PNEUMATIC TUBE SECTION

1/4" = 1'-0" C1

PNEUMATIC TUBE FLOOR PLAN

1 ADDENDUM 1 04/06/23

2 ADDENDUM 2 05/03/23

21 21

22 22

23 23

24 24

25 25

26 26

27 27

28 28

29 29

HJKLM

9A

115A 115B

123A

126A

125A

129A

128A

121 12 1A

131A

132A

6B

136A

3A

111B

108A

107A

1A

102A

104A

103A

106A

105A

1B

9B

3B

1B

213 SF

PATIENT 9

3D-109

79 SF

RR 9

3D-109A

69 SF

RR 8

3D-108A

256 SF

PATIENT 8

3D-108

285 SF

PATIENT 7

3D-107

69 SF

RR 7

3D-107A

297 SF

PATIENT 6

3D-106

72 SF

RR 6

3D-106A

289 SF

PATIENT 5

3D-105

72 SF

RR 5

3D-105A

300 SF

PATIENT 4

3D-104

69 SF

RR 4

3D-104A

298 SF

PATIENT 3

3D-103

70 SF

RR 3

3D-103A

69 SF

RR 2

3D-102A

296 SF

PATIENT 2

3D-102

299 SF

BARIATRIC 1

3D-101

90 SF

RR 1

3D-101A

269 SF

PATIENT 18

3D-133

78 SF

RR 18

3D-133A

68 SF

RR 17

3D-132A

268 SF

SAFER PATIENT 17

3D-132

299 SF

STAFF WORK

3D-136

245 SF

MSA'S

3D-100

190 SF

CLEAN LINENS

3D-138

98 SF

ASST. NURSE MNGR

3D-110

93 SF

NURSE MNGR OFFICE

3D-111

127 SF

MED ROOM

3D-112

106 SF

NUTRITION

3D-135

292 SF

SAFER PATIENT 16

3D-131

67 SF

RR 16

3D-131A

67 SF

RR 15

3D-129A

252 SF

PATIENT 15

3D-129

280 SF

PATIENT 14

3D-128

71 SF

RR 14

3D-128A

71 SF

RR 13

3D-126A

102 SF

PHARM OFFICE

3D-120

108 SF

SOILED UTILITY

3D-134

49 SF

STAFF TOILET

3D-117

131 SF

SPS STORAGE

3D-114

315 SF

EQUIPMENT ROOM

3D-115

16 SF

EQUIP. ALCOVE

3D-140

245 SF

PATIENT 13

3D-126

260 SF

PATIENT 12

3D-125

67 SF

RR 12

3D-125A

67 SF

RR 11

3D-123A

61 SF

HAC

3D-119

259 SF

STAFF BREAK ROOM

3D-116

238 SF

PATIENT 11

3D-123

206 SF

PATIENT 10

3D-121

74 SF

RR 10

3D-121A

54 SF

ANTE ROOM

3D-133B

74 SF

CLEAN UTILITY

3D-113

30 SF

OXYGEN STOR.

3D-118

262 SF

CIRCULATION

C3-18

55 SF

ANTE ROOM

3D-101B

J8

S

S6 6

± 10'-0 7/8" 2'-8 1/4" 4'-10 1/4"

U6

4'-3 1/4" 8'-1"

1'-7"

± 9'-5 1/2"

7 1/2"

S6

S 3S

S6

E

E

E3

3' -8

3'

-2

E

E

E3E3 U

S

E3

S6

S

7' -9

5'

-1

/4

2' -0

5'

-1

/4

7' -3

4'

-6

7' -5

5'

-1

/4

2' -0

5'

-1

/4

7' -4

4'

-9

7' -6

5'

-1

/4

2' -0

5'

-1

/4

7' -2

/4

5'

-0

/4

7' -8

5'

-1

/4

2' -0

5'

-1

/4

9' -7

7' -5

/8

A U

1' -0

S

" 3' -2

1' -1

3/

4" 3'

-1

A

S

S

S

1/

4"

4'-3 1/4"

6'-7 3/4"

3'-6"

1/

4"

6'-10 1/4"

1'-6"

3' -2

3'

-6

3' -2

3'

-6

S

S

U

1'-0"

S6

E3E3

E

E

S6

S

S

E

E

S

3'-6"

U

U

2"

S

S

S6

4'-0 3/4" 8'-4 1/4"

1'-0"

S 3 S6S6

S

± 11'-7 1/4"

3'-1" 4'-8"

S 6 E

E

(8 '-0

C

LE

A

R M

IN

8'

-0

/8

5' -7

'-4

/4

7' -9

/4

5'

-1

/4

2' -0

5'

-1

/4

7' -2

/2

4'

-8

/2

7' -4

5'

-1

/4

2' -0

5' -1

/4

7'

-2

/2

4' -8

/2

7'

-3

5' -1

/4

2'

-0

5' -1

/4

7'

-5

/4

5' -0

7'

-4

5' -1

/4

2'

-0

5' -7

/4

9'

-7

/4

2'

-1

3/ 8"

H W

-S H

-3 HW-1A

H W

-S

LI

-2

H W

-2 H

HW-SLI-2

HW-SLI-1

HW-SLI-1

HW-SLI-1

HW-SLI-1

HW-SLI-1

HW-SLI-1

H W

-S

LI

-2

H W

-S

LI

-2

HW-SLI-1

HW-SLI-1

HW-SLI-1

HW-SLI-1

HW-SLI-1

HW-SLI-1

HW-SLI-1

H W

-S

LI

-2

HW-SLI-3

4'-0 3/4"

1/

2"

/2

4'-0 3/4"

8'-4 1/4" ± 11'-7 1/4"

3' -2

3'

-6

3' -6

3'

-2

9"

1/ 2"

U

S

E

E

S

U

2"

1'-0" 3'-0"

3'-0"

S

1' -7

"1'-0 1/8"

1/

2"

U

U

2' -6

/2

1'-6"

S6

E

E

S3

S

E

E

S

S

CLEAR

8'-1" 8'-11" 7'-7 1/4" 6'-1" ± 10'-4"

HW-1A

HW-1A

HW-1A

HW-1A

HW-1A

HW-1A

HW-1A

HW-1A

S

U

U

1' -1

1"

3' -1

0" 1'

-7

/4

8' -0

/4

9'

-1

1/ 4"

S6

S

S 6J3S

E

S

U6

S6

6'-9" 5'-7" 1'-7"

H W

-2 H 2'

-8

4'-0 3/4"

S3

S

7'-3"

2'

-3

/4

C

LE

A R

8' -4

/8

5' -6

/8

2'

-0

'-3

8'

-3

/2

8' -3

'-1

7' -4

/4

3'

-1

C

LE

A R

6' -0

'-6

'-1

0"

'-3

5' -3

/4

1'

-9

3' -6

8'

-0

/4

(8 '-0

C

LE

A

R M

IN

8'

-1

'-3

/4

6'

-5

/2

'-0

/2

'-3

/4

(V

IF

3' -1

1/

4"

8' -4

/4

C

LE

A

R 6'

-0

1' -1

0"

'-1

1"

'-4

/4

2' -6

'-0

/8

8'-0 3/4" 1'-4" 8'-6 3/4" 3'-1 1/2" 8'-0"9'-9"

(8'-0 MIN)

8'-0 3/4"

± 22'-9 1/4"

3'-10"

2'-0" 7'-9 1/4"

1'-6"

11'-7 3/4" 11'-1 1/2"

2'-2" 14'-2 1/4" 3'-7 1/4"

2'-9 3/4"

7'-7 1/2" 6'-1 3/4"

32°

4'-1 5/8"

S

S

S6

S

S

S6

S

S

S3

S3

S

S3 S

S

S3

J3

S3

S

J3 J3

J3

S3

S3

S

S

S

S3S

S

S

S3

S3S3 S3

E

E

S

S6 S3

S3

S

S

J3

J3

S3

S

S3

S

S3

S

S3

S

S3

S3

S3

S

S6 S6

HW-1A

H W

-4 K

HW-4K

HW-3E

HW-3E

H W

-4 E

H W

-S H

-3 D

H W

-2

H W

-S H

-3

HW-SH-3

HW-3E

HW-4F HW-4F

HW-5D

HW-SH-3

H W

-S H

-3

H W

-S H

-3

2'-2 1/4" 7'-1" 5'-7 1/4"

E

E

E6

U6

S

E

E

S

1' -9

7'-0 1/2"

U

S

E

E3 E3

S6

1/

2"

2'-1"

2' -0

3'

-0

S 6S

S

S6

S

S6

E3

S

4'-6"

2'-1 1/4" 6'-7" 4'-8"

S 3 S

61' -0

/2

T

Y P

3'

-2

T Y

P

3' -6

1/

2"

E

E

S

S

S

S6

1' -1

1" U

S6

U

S

5'-3 1/4" 3'-5" 4'-8"

/2

1' -0

/4

J3

U

/4

S

S6

S

E

S 6E

E

S

S

5 1' -1

1" S

S6

S 6U

S

S

/2

2'-2" 6'-6 1/4" 4'-8"

U

J3

S

S

3' -2

3'

-6

3' -2

3/

4"

E

E

S

E3

E

E

S6 S

U

S

U6

S6

S

S

± 9'-10 3/4"

2'-2"

7'-3" 5'-6"

3' -2

3'

-1

1/ 2"

H W

-2 H

HW-1A

HW-1A

HW-1A

HW-1A

HW-1A

HW-1A

HW-1A

HW-1A

H W

-2 H

E3

S3

S3

/4

C

C

C4' -0

6"

4' -0

6"

4' -0

5'

-0

B

8"

E

E3

S

S3

U8

S3

S6

E3

E3

S

S6

S6

S3

E3E3

S6

S3

E3

S

S6

E

E3

E

S6

S

S

S3

J3

J3

J3

J3

S3

S

S3

S3

S3

E3

E

S

S

S

S

S

M

S3

J3

S

S

S6 S 3 S3

S

S3

S6

E3

S3

S

S3 E3

E

E3

S6

S3

E3

E3

E

E

S6

S6

U

S6

E3 E3

E

E3

E

E3

S6

S

A-401

E6

CORRIDOR

C3-27C3-27

TOILET

3C-1043C-104

TOILET

3C-1053C-105

A

A

A

A

A

A

A

A

A

A

A

A

E Q

E Q

S6

S

1'-4 1/4"

H W

-1 0A

2A

H W

-S H

-3

116B

132B

H W

-8 C

U

3' -0

ARCHITECTURAL SYMBOL LEGEND

GENERAL SHEET NOTES

DEMOLISHED WALL, FIXTURE OR FURNISHING

EXISTING WALL, FIXTURE OR FURNISHING

VA/VA ITEM - VA SUPPLIED & INSTALLED

VA/CC OR VC ITEM - VA SUPPLIED & CONTRACTOR

INSTALLED

CC/CC ITEM - CONTRACTOR SUPPLIED & INSTALLED

MATCHLINE

A. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE

RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.

PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT

WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY

MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL. SEE

MECHANICAL AND PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.

B. C.CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND

CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL

SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID

CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND

SERVICEABILITY.

C. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD

VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM

THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE

LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE

MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD

CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION

DOCUMENTS.

D. CONTRACTOR TO COORDINATE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .