This document provides details for a federal contract opportunity with the Department of Veterans Affairs to renovate a private patient bed ward. The solicitation number is 36C26323R0023 and seeks to award a contract for project Z1DA--618-22-102 to renovate a 3D private patient bed ward at a cost of approximately $500,000. Responses are due by August 15th, 2022 and the contract is expected to be awarded by September 30th, 2022. The scope of work involves demolishing existing walls and installing new private rooms, bathrooms, and associated mechanical, electrical and plumbing systems. The project is to be completed within 180 calendar days of the award date. The contracting office is located in Veterans Integrated Service Network 23.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LIFE SAFETY SYMBOLS
PATH OF EXIT ACCESS TRAVEL
PATH LENGTH
FIRE EXTINGUISHER CABINET (FEC)
REQUIRED DOOR CLEARANCES
FEC
PATH TO POINT OF COMMON TRAVEL
PATH LENGTH###' - ##"
BOLD LINE REPRESENTS
LONGEST PATH DISTANCE
EXIT LIGHTING
REQUIRED TOILET CLEARANCE
72" D X 66" W (BARRIER FREE)
REQUIRED TURNING RADIUS
66" DIAMETER (TYPICAL - BARRIER FREE)
72" DIAMETER (BARIATRIC - BARRIER FREE)
7" TOE / KNEE CLEARANCE OVERLAP
UNRATED PARTITION
SMOKE PARTITION
1 HOUR RATED PARTITION
2 HOUR RATED PARTITION
EXISTING WALL TO REMAIN
EXISTING AREA NOT IN CONTRACT (NIC)
BUILDING CODE:
MIXED BUILDING OCCUPANCY TYPE:
The entire building 1 is comprised of:
Primary: Healthcare (NFPA 101, Chapter 19) Secondary: Ambulatory Health Care (NFPA 101, Chapter 21)
This project is modifying ward C on Level 3, and is keeping the existing health care occupancy. The following data is from NFPA 101, Chapter 19.
PROJECT AREA:
AREA IN SCOPE: 13,461 GSF
CHANGE TO BUILDING SF: NO CHANGE
OCCUPANT LOAD:
EXISTING OCCUPANT LOAD: 113
PROPOSED OCCUPANT LOAD: 113 (NO CHANGE)
120 GSF PER OCCUPANT - Healthcare Sleeping Department (7.3.1.2)
CONSTRUCTION TYPE:
CONSTRUCTION: Type 1 (332) per NFPA 220, Chapter 4
FIRE RATED REQUIREMENTS FOR BUILDING ELEMENTS:
PRIMARY STRUCTURAL FRAME: 3 HOURS
BEARING WALLS (EXT & INT): 3 HOURS
FLOOR CONSTRUCTION: 2 HOURS
ROOF CONSTRUCTION: 1.5 HOURS
NON BEARING WALLS: 0 HOURS
OTHER REQUIRED RATINGS & SEPARATIONS:
VERTICAL SHAFTS: 2 HOURS
EXIT STAIRS: 2 HOURS
SOILED UTILITY: 1 HOUR
HAZARDOUS STORAGE: 1 HOUR
MEANS OF EGRESS:
MAXIMUM PATH OF TRAVEL: 200' (185'-0" MAX ACTUAL)
MAXIMUM COMMON PATH: 50' (41'-3" MAX ACTUAL)
DEAD-END CORRIDORS: 30' (NONE PRESENT)
MINIMUM EGRESS COMPONENT WIDTH: 48 INCHES
OTHER EGRESS WIDTH REQUIRED: 0.2 INCHES PER OCCUPANT
APPLICABLE BUILDING CODES:
• 2021 NFPA 101 LIFE SAFETY CODE
• 2022 NFPA 13 SPRINKLER SYSTEMS CODE
• 2018 INTERNATIONAL BUILDING CODE (IBC)
• 2018 INTERNATIONAL MECHANICAL CODE (IPC)
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA)
STANDARDS.
• VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• 2020 NATIONAL ELECTRICAL CODE (NEC)
• 2018 INTERNATIONAL PLUMBING CODE (IPC)
• ASME CODE FOR PRESSURE PIPING
• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS
(ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN
GUIDE (PG-18-13)
• BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE,
AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318)
• ENERGY POLICY ACT OF 2005 (EPACT)
• DOE INTERIM FINAL RULE: ENERGY CONSERVATION
STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-
FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-RISE
RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434, AND 435
• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND
SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING
(MOU)
• EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL
ENVIRONMENTAL, ENERGY, AND TRANSPORTATION
MANAGEMENT
• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS
STATED IN THE GENERAL REQUIREMENTS SECTION 01 00 00
AND 01 35 26 OF THE VA MASTER CONSTRUCTION
SPECIFICATIONS.
• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY - ASHRAE
STANDARD 62.1-2016: MEDICAL SPACES - ASHRAE 170-2013,
NON-MEDICAL SPACES - ASHRAE 62.1-2016
• SAFETY STANDARD FOR REFRIGERATION SYSTEMS - ASHRAE
STANDARD 15-2013
• VA FIRE PROTECTION DESIGN GUIDE, 8TH EDITION (2021)
66"W
"D
66"DIAM
"D
FLOOR SLOPE / FLOOR DRAIN
HJKLM
GI101
F4
CORRIDOR
C3-26C3-26
CORRIDOR
C3-27C3-27
CORRIDOR
C3-28C3-28
STAIR
ROOM
3C-1063C-106
CORRIDOR
C3-12C3-12
STAIR
213 SF
PATIENT 9
3D-109
79 SF
RR 9
3D-109A
69 SF
RR 8
3D-108A
256 SF
PATIENT 8
3D-108
285 SF
PATIENT 7
3D-107 69 SF
RR 7
3D-107A
297 SF
PATIENT 6
3D-106
72 SF
RR 6
3D-106A
289 SF
PATIENT 5
3D-105
72 SF
RR 5
3D-105A
300 SF
PATIENT 4
3D-104
69 SF
RR 4
3D-104A
298 SF
PATIENT 3
3D-103
70 SF
RR 3
3D-103A
69 SF
RR 2
3D-102A
296 SF
PATIENT 2
3D-102
299 SF
BARIATRIC 1
3D-101
90 SF
RR 1
3D-101A
269 SF
PATIENT 18
3D-133
78 SF
RR 18
3D-133A
68 SF
RR 17
3D-132A
268 SF
SAFER PATIENT 17
3D-132
299 SF
STAFF WORK
3D-136
245 SF
MSA'S
3D-100
190 SF
CLEAN LINENS
3D-138
98 SF
ASST. NURSE MNGR
3D-110
93 SF
NURSE MNGR OFFICE
3D-111
127 SF
MED ROOM
3D-112
106 SF
NUTRITION
3D-135
292 SF
SAFER PATIENT 16
3D-131
67 SF
RR 16
3D-131A
67 SF
RR 15
3D-129A
252 SF
PATIENT 15
3D-129
280 SF
PATIENT 14
3D-128
71 SF
RR 14
3D-128A
71 SF
RR 13
3D-126A
102 SF
PHARM OFFICE
3D-120
108 SF
SOILED UTILITY
3D-134
49 SF
STAFF TOILET
3D-117
131 SF
SPS STORAGE
3D-114
315 SF
EQUIPMENT ROOM
3D-115
16 SF
EQUIP. ALCOVE
3D-140
245 SF
PATIENT 13
3D-126
260 SF
PATIENT 12
3D-12567 SF
RR 12
3D-125A
67 SF
RR 11
3D-123A
61 SF
HAC
3D-119
259 SF
STAFF BREAK ROOM
3D-116
238 SF
PATIENT 11
3D-123
206 SF
PATIENT 10
3D-121
74 SF
RR 10
3D-121A
54 SF
ANTE ROOM
3D-133B
74 SF
CLEAN UTILITY
3D-113
30 SF
OXYGEN STOR.
3D-118
262 SF
CIRCULATION
C3-18
C
LE
A R
6' -0
129' - 8"
136' - 4"
110' - 2"
27' - 1"
8' -1
C
LE
A
R
8' -0
C
LE
A
R
8'-0" CLEAR
CLEAR
8'-0"
8'-0"
C
LE
A R
8' -0
8'-0" CLEAR
55 SF
ANTE ROOM
3D-101B
GI101
E3
TOILET
3C-1043C-104
TOILET
3C-1053C-105
FEC
FEC
FEC
95' - 3"
84' - 6"
GI101
D2
48"D
72"D
"W 30
"W
"D
"D
IA
M
48"D
"W
1/ 4"
TYPICAL
CLEARANCES:
TYPICAL
FLOOR SLOPES:
LINEAR FLOOR DRAIN
1/4" / 12"1/4" / 12"
1' -6
299 SF
BARIATRIC 1
3D-101
3' -0
/2
C
LE
A R
72"D
"W
72"DIAM.
90 SF
RR 1
3D-101A
55 SF
ANTE ROOM
3D-101B
5' -6
5'-0"
1'-6" 1'-6"
48"W
66"DIA
5' -0
"D
66"W on e-ei gh th in ch o ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in es ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLAN
A/E:
TRIPLE C - The A/E Group
(520) 481-8548
Mat Perkins
A
B D
EF
G
H
J
K
L
M
C
As indicated
B
IM
/6
-2
-1
R e n o v a te
D
B e d W in g -B
-M
P L S
V A
M C
/6 -2
-7
.M
P L S
.3 D
B e d W in g .A
R C
H .B
.L
.r v t
/4
/2
:4 :3
P
M
09/12/2022 M.PERKINS C.LOWERY
618-22-102
1391 - GI101
LIFE SAFETY
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATION OF BUILDING 70 3D
BED WING100% CONSTRUCTION
DOCUMENTS
1/8" = 1'-0" F6
LIFE SAFETY PLAN
ARCHITECTURAL BARRIERS ACT (ABA)
404.2 Manual Doors, Doorways, and Manual Gates. Manual doors and doorways and manual gates intended for user passage shall comply with 404.2.
404.2.2 Double-Leaf Door and Gates. At least one of the active leaves of doorways with two leaves shall comply with 404.2.3 and 404.2.4
404.2.4 Maneuvering Clearances. Minimum maneuvering clearances at doors and gates shall comply with 404.2.4. maneuvering clearances shall extend the full width of the doorway and the required latch side or hinge side clearance.
EXCEPTION: Entry doors to hospital patient rooms shall not be required to provide clearance beyond the latch side of the door
1/4" = 1'-0" F4
TYPICAL PATIENT RESTROOM
1/4" = 1'-0" E3
BARIATRIC PATIENT ROOM
1 ADDENDUM 1 04/06/23
2 ADDENDUM 2 05/03/23
1/4" = 1'-0" D2
TYPICAL PATIENT ROOM
TYPE D
A. IMPLEMENT INFECTION CONTROL RISK ASSESSMENT (ICRA)
PROCEDURES AS PER THE ICRA PLAN AND AS DIRECTED BY THE
CONTRACTING OFFICER REPRESENTATIVE (COR).
B. COORDINATE ALL DEMOLITION/ CONSTRUCTION DEBRIS PATH OF
TRAVEL AND INTERIM LIFE SAFETY MEASURES (ILSM) WITH THE COR.
ALL INTERIOR DOORS THAT LEAD TO THE CONSTRUCTION SITE
SHALL BE POSTED AS PER THE ISLM PLAN.
C. OBTAIN INFECTION CONTROL PERMIT PRIOR TO BEGINNING WORK.
D. THE ONE HOUR FIRE RATED CONSTRUCTION BARRIERS SHALL BE
CONSTRUCTED PRIOR TO BEGINNING OTHER WORK.
E. CONSTRUCT ANTEROOM AT ENTRANCES TO CONSTRUCTION AREAS
AND REQUIRE ALL CONSTRUCTION PERSONNEL TO PASS THROUGH
THIS ROOM TO BE VACUUMED WITH HEPA VACUUM CLEANER PRIOR
TO LEAVING THE SITE.
F. FIRE PROTECTION SYSTEMS SHALL REMAIN FUNCTIONAL FOR
OCCUPIED AREAS ON THE FLOOR.
G. PROVIDE FIRE EXTINGUISHERS IN CONSTRUCTION AREAS; REVIEW
WITH COR AND VA SAFETY GROUP.
H. MAINTAIN EXIT LIGHTS IN CONSTRUCTION AREA.
I. MAINTAIN NEGATIVE AIR PRESSURE IN CONSTRUCTION AREA AT ALL
TIMES (24/7). WHETHER OCCUPIED OR NOT, THROUGHOUT
DURATION OF PROJECT USING HEPA EQUIPPED AIR FILTRATION
UNITS.
J. CONSTRUCTION AREA SHALL REMAIN ISOLATED FROM THE OTHER
AREAS OF THE MEDICAL CENTER; NO RETURN AIR OR EXHAUST
SHALL PASS INTO THE AREAS OUTSIDE THE CONSTRUCTION AREA.
ISOLATE HVAC SYSTEM WITHIN CONSTRUCTION AREA TO PREVENT
CONTAMINATION OF EXISTING DUCT SYSTEM.
K. PROVIDE SIGNS ON DOORS INTO THE CONSTRUCTION AREA THAT
READS: "CONSTRUCTION AREA-DO NOT ENTER".
L. TACKY MATS SHALL BE PLACED AT ALL DOORS INTO THE
CONSTRUCTION AREA AND SHALL BE MONITORED TO MAKE SURE
THEY REMAIN EFFECTIVE.
M. MAINTAIN A CLEAN AND ORDERLY CONSTRUCTION AREA. ALL
DEBRIS REMOVAL SHALL BE IN COVERED CARTS AND/OR
CONTAINERS.
N. SEAL ALL HOLES, PUNCTURES, AND PENETRATIONS FROM PIPES AND
CONDUITS APPROPRIATELY AND IMMEDIATELY TO MAINTAIN DUST
PROTECTION AND NEGATIVE AIR PRESSURE.
O. AFTER COMPLETION OF WORK: VACUUM CONSTRUCTION AREA WITH
HEPA FILTERED VACUUMS, WET MOP WITH DISINFECTANT, REMOVE
CONSTRUCTION BARRIERS (UPON APPROVAL). PATCH OR REPAIR
ANY DAMAGE FROM CONSTRUCTION BARRIER REMOVAL AND
REMOVE ISOLATION OF HVAC SYSTEM.
P. CONSTRUCTION BARRIERS SHALL NOT BE REMOVE UNTIL PROJECT
IS COMPLETED AND INSPECTED BY VA SAFETY PERSONNEL,
INFECTION CONTROL GROUP, AND COR.
ICRA NOTES:
INFECTION CONTROL RISK
ASSESSMENT:
STEP 1: TYPE D
IDENTIFY THE TYPE OF CONSTRUCTION PROJECT
ACTIVITY (TYPE A–D)
TYPE A: INSPECTION AND NONINVASIVE ACTIVITIES.
TYPE B: SMALL-SCALE, SHORT-DURATION ACTIVITIES
THAT CREATE MINIMAL DUST.
TYPE C: WORK THAT GENERATES A MODERATE TO
HIGH LEVEL OF DUST OR REQUIRES DEMOLITION OR
REMOVAL OF ANY FIXED BUILDING COMPONENTS OR
ASSEMBLIES.
TYPE D: MAJOR DEMOLITION AND CONSTRUCTION
PROJECTS.
STEP 2: HIGH RISK
IDENTIFY THE PATIENT RISK GROUPS THAT WILL BE
AFFECTED.
IF MORE THAN ONE RISK GROUP WILL BE AFFECTED,
SELECT THE HIGHER RISK GROUP.
STEP 3: CLASS IV
MATCH THE PATIENT RISK GROUP (LOW, MEDIUM,
HIGH, HIGHEST) WITH THE PLANNED CONSTRUCTION
PROJECT TYPE (A, B, C, D) ON THE FOLLOWING MATRIX,
TO FIND THE CLASS OF PRECAUTIONS (I, II, III OR IV) OR
LEVEL OF INFECTION CONTROL ACTIVITIES REQUIRED.
STEP 4: IDENTIFY THE AREAS SURROUNDING THE PROJECT
AREA, ASSESSING POTENTIAL IMPACT.
BELOW ABOVE NORTH SOUTH EAST WEST
_______________________RISK GROUP_____________________
LOW LOW N/A N/A N/A N/A
STEP 5:
IDENTIFY SPECIFIC SITE OF ACTIVITY, FOR EXAMPLE, PATIENT
ROOMS, MEDICATION ROOM, AND SO ON.
STEP 6:
IDENTIFY ISSUES RELATED TO: VENTILATION, PLUMBING, AND
ELECTRICAL IN TERMS OF THE OCCURRENCE OF PROBABLE
OUTAGES.
STEP 7.
IDENTIFY CONTAINMENT MEASURES, USING PRIOR
ASSESSMENT. WHAT TYPES OF BARRIERS (FOR EXAMPLE,
SOLIDS WALLS)? WILL HEPA FILTRATION BE REQUIRED?
STEP 8.
CONSIDER POTENTIAL RISK OF WATER DAMAGE. IS THERE A
RISK DUE TO COMPROMISING STRUCTURAL INTEGRITY (FOR
EXAMPLE, WALL, CEILING, ROOF)?
NOTE: RENOVATION/CONSTRUCTION AREA SHALL BE
ISOLATED FROM THE OCCUPIED AREAS DURING
CONSTRUCTION AND SHALL BE NEGATIVE WITH RESPECT TO
SURROUNDING AREAS.
STEP 9.
WORK HOURS: CAN OR WILL THE WORK BE DONE DURING
NON-PATIENT-CARE HOURS?
STEP 10.
DO PLANS ALLOW FOR ADEQUATE NUMBER OF
ISOLATION/NEGATIVE AIRFLOW ROOMS?
STEP 11.
DO THE PLANS ALLOW FOR THE REQUIRED NUMBER AND TYPE
OF HAND-WASHING SINKS?
STEP 12.
DOES THE INFECTION PREVENTION AND CONTROL STAFF
AGREE WITH THE MINIMUM NUMBER OF SINKS FOR THIS
PROJECT? (VERIFY AGAINST FACILITY GUIDELINES INSTITUTE
(FGI) DESIGN AND CONSTRUCTION GUIDELINES FOR TYPES
AND AREA.)
STEP 13.
DOES THE INFECTION PREVENTION AND CONTROL STAFF
AGREE WITH THE PLANS RELATIVE TO CLEAN AND SOILED
UTILITY ROOMS?
STEP 14.
PLAN TO DISCUSS THE FOLLOWING CONTAINMENT ISSUES
WITH THE PROJECT TEAM, FOR EXAMPLE, TRAFFIC FLOW,
HOUSEKEEPING, DEBRIS REMOVAL (HOW AND WHEN).
C
LA
S S
IV
DURING CONSTRUCTION
PROJECT
UPON COMPLETION OF
PROJECT
1. Remove or isolate HVAC system in area where work is being done, to prevent contamination of duct system.
2. Complete all critical barriers— i.e., drywall, plywood, plastic—to seal area from non-work area before construction begins. Or, implement control cube method with HEPA-fiItered vacuum for vacuuming prior to exit.
3. Maintain negative air pressure within worksite utilizing HEPA-equipped air filtration units.
4. Contain construction waste in tightly covered containers before transport.
5. Cover transport receptacles or carts. Tape down covering unless cart has a solid lid.
1. Do not remove barriers from work area until completed project is inspected by the owner’s Safety Department and Infection Control Department and thoroughly cleaned by the owner’s Environmental Services Department.
2. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
3. Vacuum work area with HEPA-filtered vacuum.
4. Wet mop area with disinfectant.
5. Upon completion, restore HVAC system where work was performed.
Construction Project Type
Patient Risk Group
LOW Risk Group MEDIUM Risk Group
HIGH Risk Group
HIGHEST Risk Group
I II II III/IV
I II III IV
I II III/IV IV
II III/IV III/IV IV
TYPE A TYPE B TYPE C TYPE D
WEEKLY CHANGED OR MORE
AS NEEDED PRE-FILTER
FLEX DUCT
MONTHLY CHANGED HEPA FILTER
HEPA NEGATIVE AIR UNIT
PROVIDE STICKY MATS (CHANGED END OF
EVERY SHIFT OR MORE IF NECESSARY TO
MAINTAIN CLEANLINESS).
STATIC PRESSURE WATER GAUGE INDICATOR
SHALL -0.03" W.G. MINIMUM TO MAINTAIN NEGATIVE
PRESSURE IN CONSTRUCTION AREA (VERIFY DAILY). IF
NOT VERIFY ALL OPENING SUCH AS DOOR ARE CLOSED
AND/OR CHANGE NEGATIVE AIR PRE-FILTER.
SUPPLY DUCTS EITHER
KEEP RUNNING OR
COVER WHEN NOT
RUNNING TO KEEP
DUST OUT.
A
V
O
TAPE ALL WALL, FLOOR, AND CEILING
SERVICES, TO PROTECT AGAINST
CONTAMINATION
E
FIRE EXTINGUISHER ON
PORTABLE FLOOR BRACKET
(SHALL REQUIRE MORE THAN
ONE.)
E4
GI201
PUBLIC AREA
CONSTRUCTION AREA
ANTE
ROOM
4' -0
M
IN
IM
U M
S E
E
F L O
O R
P
L A
N
TEMPORARY WALL
FLOOR LINE
CEILING SYSTEM AS
SCHEDULED
EXISTING STRUCTURE
FIRE RATED PLASTIC TO
PREVENT DUST INSTALL
PRIOR TO CONSTRUCTION
F
IN
IS
H E
D F
LO
O
R T
O U
N D
E R
S
ID
E O
F S
T R
U C
T U
R E
V E
R
IF
Y F
LO
O
R T
O F
LO
O
R H
E
IG
H T
RENOVATED SPRINKLER
SYSTEM
HJKLM
PROVIDE ICRA BARRIERS TO
CREATE ANTE-ROOM OUTSIDE OF
CONSTRUCTION ENTRY
PROVIDE ICRA BARRIERS TO
CREATE ANTE-ROOM OUTSIDE OF
CONSTRUCTION ENTRY - THIS SIDE
FOR EMERGENCY EGRESS ONLY
PATH OF TRAVEL FOR MATERIAL /
WASTE TRANSPORTATION -
VERIFY WITH COR - SEE
CONSTRUCTION MATERIALS PLAN
THIS SHEET
5' -8
213 SF
PATIENT 9
3D-109
79 SF
RR 9
3D-109A
69 SF
RR 8
3D-108A
256 SF
PATIENT 8
3D-108
285 SF
PATIENT 7
3D-107
69 SF
RR 7
3D-107A
297 SF
PATIENT 6
3D-106
72 SF
RR 6
3D-106A
289 SF
PATIENT 5
3D-105
72 SF
RR 5
3D-105A
300 SF
PATIENT 4
3D-104
69 SF
RR 4
3D-104A
298 SF
PATIENT 3
3D-103
70 SF
RR 3
3D-103A
69 SF
RR 2
3D-102A
296 SF
PATIENT 2
3D-102
299 SF
BARIATRIC 1
3D-101
90 SF
RR 1
3D-101A
269 SF
PATIENT 18
3D-133
78 SF
RR 18
3D-133A
68 SF
RR 17
3D-132A
268 SF
SAFER PATIENT 17
3D-132
299 SF
STAFF WORK
3D-136
245 SF
MSA'S
3D-100
190 SF
CLEAN LINENS
3D-138
98 SF
ASST. NURSE MNGR
3D-110
93 SF
NURSE MNGR OFFICE
3D-111
127 SF
MED ROOM
3D-112
106 SF
NUTRITION
3D-135
292 SF
SAFER PATIENT 16
3D-131
67 SF
RR 16
3D-131A
67 SF
RR 15
3D-129A
252 SF
PATIENT 15
3D-129
280 SF
PATIENT 14
3D-128
71 SF
RR 14
3D-128A
71 SF
RR 13
3D-126A
102 SF
PHARM OFFICE
3D-120
108 SF
SOILED UTILITY
3D-134
49 SF
STAFF TOILET
3D-117
131 SF
SPS STORAGE
3D-114
315 SF
EQUIPMENT ROOM
3D-115 16 SF
EQUIP. ALCOVE
3D-140
245 SF
PATIENT 13
3D-126
260 SF
PATIENT 12
3D-12567 SF
RR 12
3D-125A
67 SF
RR 11
3D-123A
61 SF
HAC
3D-119
259 SF
STAFF BREAK ROOM
3D-116
238 SF
PATIENT 11
3D-123
206 SF
PATIENT 10
3D-121
74 SF
RR 10
3D-121A
54 SF
ANTE ROOM
3D-133B
74 SF
CLEAN UTILITY
3D-113
30 SF
OXYGEN STOR.
3D-118
262 SF
CIRCULATION
C3-18
55 SF
ANTE ROOM
3D-101B
186 SF
CORRIDOR
C3-27
49 SF
TOILET
3C-104
49 SF
TOILET
3C-105
RE-FINISH ONLY, NO
DESTRUCTIVE DEMOLITION
TAKING PLACE
CONSTRUCT NEW
CORRIDOR WALLS
AS ICRA BARRIERS
PRIOR TO COMMENCEMENT
OF REST OF CONSTRUCTION.
CONSTRUCT NEW
CORRIDOR WALLS
AS ICRA BARRIERS
PRIOR TO COMMENCEMENT
OF REST OF CONSTRUCTION.
4' -0
PROVIDE ANTE-ROOM FOR
MECHANICAL ROOM AND TELECOM
ROOM SCOPE OF WORK
ELEVATORS
ELE
VA
TO
R
S
FREIGHT
ELEVATOR
ELEVATORS
ELEVATORS
ELEVATORS
PATH OF TRAVEL FOR MATERIAL / WASTE
TRANSPORTATION - VERIFY WITH COR
PROJECT SCOPE AREA
on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLAN
A/E:
TRIPLE C - The A/E Group
(520) 481-8548
Mat Perkins
A
B D
EF
G
H
J
K
L
M
C
As indicated
B
IM
/6
-2
-1
R e n o v a te
D
B e d W in g -B
-M
P L S
V A
M C
/6 -2
-7
.M
P L S
.3 D
B e d W in g .A
R C
H .B
.L
.r v t
/4
/2
:4 :5
P
M
09/12/2022 M.PERKINS C.LOWERY
618-22-102
1391 - GI201
INFECTION CONTROL PLAN & INTERIM LIFE
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATION OF BUILDING 70 3D
BED WING100% CONSTRUCTION
DOCUMENTS
1/4" = 1'-0" F4
TYPICAL CONSTRUCTION LAYOUT- CLASS IV
1/2" = 1'-0" E4
CROSS SECTION A'-A'- CLASS IV
NTS
F1
TYPICAL ICRA PRODUCTS
1/8" = 1'-0"
F6
ICRA PLAN
1" = 60'-0" C3
CONSTRUCTION MATERIALS PLAN
NOTE: PROJECT WING WILL NOT
BE OCCUPIED DURING CONSTRUCTION.
CONTRACTOR TO UTILIZE SPACE IN
WING FOR TEMPORARY MATERIAL
STORAGE AS NEEDED DURING
CONSTRUCTION
1 ADDENDUM 1 04/06/23
2 ADDENDUM 2 05/03/23
DEPARTMENT LEGEND
ANTE ROOM PATIENT SPACES
BARIATRIC PATIENT ROOM
STAFF SPACES
PATIENT SPACES
UTILITY SPACES
CIRCULATION
SAFER PATIENT ROOM
615 SF
CORRIDOR
C3-12
160 SF
STAIR
169 SF
STAIR
302 SF
ROOM
3C-106
282 SF
CORRIDOR
C3-28
186 SF
CORRIDOR
C3-27
245 SF
CORRIDOR
C3-26
ICE/
H2O
213 SF
PATIENT 9
3D-109
79 SF
RR 9
3D-109A
69 SF
RR 8
3D-108A
256 SF
PATIENT 8
3D-108
285 SF
PATIENT 7
3D-107
69 SF
RR 7
3D-107A
297 SF
PATIENT 6
3D-106
72 SF
RR 6
3D-106A
289 SF
PATIENT 5
3D-105
72 SF
RR 5
3D-105A
300 SF
PATIENT 4
3D-104
69 SF
RR 4
3D-104A
298 SF
PATIENT 3
3D-103
70 SF
RR 3
3D-103A
69 SF
RR 2
3D-102A
296 SF
PATIENT 2
3D-102
299 SF
BARIATRIC 1
3D-101
90 SF
RR 1
3D-101A
269 SF
PATIENT 18
3D-133
78 SF
RR 18
3D-133A
68 SF
RR 17
3D-132A
268 SF
SAFER PATIENT 17
3D-132
299 SF
STAFF WORK
3D-136
245 SF
MSA'S
3D-100
190 SF
CLEAN LINENS
3D-138
98 SF
ASST. NURSE MNGR
3D-110
93 SF
NURSE MNGR OFFICE
3D-111
127 SF
MED ROOM
3D-112
106 SF
NUTRITION
3D-135
292 SF
SAFER PATIENT 16
3D-131
67 SF
RR 16
3D-131A
67 SF
RR 15
3D-129A
252 SF
PATIENT 15
3D-129
280 SF
PATIENT 14
3D-128
71 SF
RR 14
3D-128A
71 SF
RR 13
3D-126A
102 SF
PHARM OFFICE
3D-120
108 SF
SOILED UTILITY
3D-134
49 SF
STAFF TOILET
3D-117
131 SF
SPS STORAGE
3D-114
315 SF
EQUIPMENT ROOM
3D-115 16 SF
EQUIP. ALCOVE
3D-140
245 SF
PATIENT 13
3D-126
260 SF
PATIENT 12
3D-12567 SF
RR 12
3D-125A
67 SF
RR 11
3D-123A
61 SF
HAC
3D-119
259 SF
STAFF BREAK ROOM
3D-116
238 SF
PATIENT 11
3D-123
206 SF
PATIENT 10
3D-121
74 SF
RR 10
3D-121A
54 SF
ANTE ROOM
3D-133B
74 SF
CLEAN UTILITY
3D-113
30 SF
OXYGEN STOR.
3D-118
262 SF
CIRCULATION
C3-18
55 SF
ANTE ROOM
3D-101B
19 SF
EQUIP. ALCOVE
3D-127
17 SF
CHARTING
3D-142
16 SF
EQUIP. ALCOVE
3D-140
16 SF
CHARTING
C3-19B
17 SF
CHARTING
3D-141
18 SF
CHARTING
C3-25A 17 SF
CHARTING
C3-19A
11 SF
EQUIP ALCOVE
3D-137
15 SF
CHARTING
C3-19C
49 SF
TOILET
3C-104
49 SF
TOILET
3C-105
50 SF
ANTE ROOM
3D-121B on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLAN
A/E:
TRIPLE C - The A/E Group
(520) 481-8548
Mat Perkins
A
B D
EF
G
H
J
K
L
M
C
1/8" = 1'-0"
B
IM
/6
-2
-1
R e n o v a te
D
B e d W in g -B
-M
P L S
V A
M C
/6 -2
-7
.M
P L S
.3 D
B e d W in g .A
R C
H .B
.L
.r v t
/4
/2
:4 :0
P
M
09/12/2022 M.PERKINS K.MACAULAY
618-22-102
1391 - A-002
ARCHITECTURAL ROOM PROGRAM PLAN -
3D
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATION OF BUILDING 70 3D
BED WING100% CONSTRUCTION
DOCUMENTS
1/8" = 1'-0" F4
ARCHITECTURAL ROOM PROGRAM PLAN - 3D
ROOM PROGRAM SCHEDULE_3D
LEGEND
ROOM
PROGRAM
CODE NAME
PROGRAM
AREA
ACTUAL
AREA
AREA
DIFFERENCE
SS204 ASST. NURSE MNGR 80 SF 98 SF -18 SF
SV583 CHARTING 100 SF 18 SF 82 SF
SV583 CHARTING 100 SF 17 SF 83 SF
SV583 CHARTING 100 SF 17 SF 83 SF
SV583 CHARTING 100 SF 17 SF 83 SF
SV583 CHARTING 100 SF 16 SF 84 SF
SV583 CHARTING 100 SF 15 SF 85 SF
CIRC EQUIP ALCOVE 11 SF
SC052 EQUIP. ALCOVE 16 SF
SC052 EQUIP. ALCOVE 30 SF
IMS81 EQUIP. ALCOVE 120 SF 19 SF 101 SF
SV583 MED ROOM 100 SF 127 SF -27 SF
SC152 MSA'S 245 SF
SS204 NURSE MNGR OFFICE 80 SF 93 SF -13 SF
SV272 NUTRITION 80 SF 106 SF -26 SF
SS218 PHARM OFFICE 80 SF 102 SF -22 SF
SS262 STAFF BREAK ROOM 100 SF 259 SF -159 SF
SB191 STAFF TOILET 85 SF 49 SF 36 SF
SC231 STAFF WORK 240 SF 299 SF -59 SF
STAFF SPACES: 19 1565 SF 1552 SF 314 SF
SC471 CLEAN LINENS 60 SF 190 SF -130 SF
SB737 CLEAN UTILITY 100 SF 74 SF 26 SF
IMS81 EQUIPMENT ROOM 120 SF 315 SF -195 SF
SB244 HAC 60 SF 61 SF -1 SF
IMS83 OXYGEN STOR. 100 SF 30 SF 70 SF
SB743 SOILED UTILITY 60 SF 108 SF -48 SF
SRSP1 SPS STORAGE 60 SF 131 SF -71 SF
UTILITY SPACES: 7 560 SF 909 SF -349 SF
Grand total: 75 8330 SF 12546
SF
-3915 SF
ROOM PROGRAM SCHEDULE_3D
LEGEND
ROOM
PROGRAM
CODE NAME
PROGRAM
AREA
ACTUAL
AREA
AREA
DIFFERENCE
LEVEL 3
IMS24 ANTE ROOM 65 SF 54 SF 11 SF
IMS24 ANTE ROOM 65 SF 64 SF 1 SF
IMS24 ANTE ROOM 65 SF 50 SF 15 SF
IMS23 PATIENT 9 240 SF 213 SF 27 SF
IMS23 PATIENT 10 240 SF 206 SF 34 SF
IMS23 PATIENT 18 240 SF 269 SF -29 SF
SB147 RR 9 60 SF 79 SF -19 SF
SB147 RR 10 60 SF 74 SF -14 SF
SB147 RR 18 60 SF 78 SF -18 SF
ANTE ROOM PATIENT SPACES: 9 1095 SF 1085 SF 10 SF
IMS24 ANTE ROOM 65 SF 55 SF 10 SF
IMS27 BARIATRIC 1 280 SF 299 SF -19 SF
SB161 RR 1 85 SF 90 SF -5 SF
BARIATRIC PATIENT ROOM: 3 430 SF 444 SF -14 SF
CIRC CIRCULATION 0 SF 137 SF -137 SF
CIRC CIRCULATION 0 SF 505 SF -505 SF
CIRC CIRCULATION 0 SF 1012 SF -1012 SF
CIRC CIRCULATION 0 SF 917 SF -917 SF
CIRC CIRCULATION 0 SF 262 SF -262 SF
CIRC CORRIDOR 0 SF 615 SF -615 SF
CIRC CORRIDOR 0 SF 186 SF -186 SF
CIRC TOILET 0 SF 49 SF -49 SF
CIRC TOILET 0 SF 49 SF -49 SF
CIRCULATION: 9 0 SF 3731 SF -3731 SF
IMS21 PATIENT 2 280 SF 296 SF -16 SF
IMS21 PATIENT 3 240 SF 298 SF -58 SF
IMS21 PATIENT 4 280 SF 300 SF -20 SF
IMS21 PATIENT 5 240 SF 289 SF -49 SF
IMS21 PATIENT 6 280 SF 297 SF -17 SF
IMS21 PATIENT 7 280 SF 285 SF -5 SF
IMS21 PATIENT 8 280 SF 256 SF 24 SF
IMS21 PATIENT 11 280 SF 238 SF 42 SF
IMS21 PATIENT 12 280 SF 260 SF 20 SF
IMS21 PATIENT 13 280 SF 245 SF 35 SF
IMS21 PATIENT 14 280 SF 280 SF 0 SF
IMS21 PATIENT 15 280 SF 252 SF 28 SF
SB147 RR 2 60 SF 69 SF -9 SF
SB147 RR 3 60 SF 70 SF -10 SF
SB147 RR 4 60 SF 69 SF -9 SF
SB147 RR 5 60 SF 72 SF -12 SF
SB147 RR 6 60 SF 72 SF -12 SF
SB147 RR 7 60 SF 69 SF -9 SF
SB147 RR 8 60 SF 69 SF -9 SF
SB147 RR 11 60 SF 67 SF -7 SF
SB147 RR 12 60 SF 67 SF -7 SF
SB147 RR 13 60 SF 71 SF -11 SF
SB147 RR 14 60 SF 71 SF -11 SF
SB147 RR 15 60 SF 67 SF -7 SF
PATIENT SPACES: 24 4000 SF 4129 SF -129 SF
SB147 RR 16 60 SF 67 SF -7 SF
SB147 RR 17 60 SF 68 SF -8 SF
IMS21 SAFER PATIENT 16 280 SF 292 SF -12 SF
IMS21 SAFER PATIENT 17 280 SF 268 SF 12 SF
SAFER PATIENT ROOM: 4 680 SF 695 SF -15 SF
1 ADDENDUM 1 04/06/23
S S
1 1 1 1 1
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
HJKLM
11 11 11
7 13
2 2 2
2 14
1 2 3
1 2 3
LIMIT OF FLOORING
REMOVAL TO ALIGN
WITH WALL
LIMIT OF FLOORING
REMOVAL TO ALIGN
WITH WALL
186 SF
CORRIDOR
C3-27
49 SF
TOILET
3C-105
49 SF
TOILET
3C-104
282 SF
CORRIDOR
C3-28
245 SF
CORRIDOR
C3-26
FEC
FEC
A-401
ARCHITECTURAL SYMBOL LEGEND
GENERAL DEMOLITION SHEET NOTES
KEYNOTES
A. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE
RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.
PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT
WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY
MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL. SEE
MECHANICAL AND PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.
B. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT
PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND
SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
C. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM
THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE LOCATION
AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR
REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD CONDITIONS BE
FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION DOCUMENTS.
D. VA TO SALVAGE DOORS AND DOOR HARDWARE. COORDINATE WITH COR TO
ENSURE ALL SALVAGE COMPLETED PRIOR TO BEGINNING CONSTRUCTION
DEMOLITION.
E. ANY FREESTANDING EQUIPMENT OR FURNITURE REMAINING IN THE
CONSTRUCTION AREA IS TO BE BROUGHT TO THE ATTENTION OF THE COR
FOR OPTION OF SALVAGE PRIOR TO BEING DISPOSED OF.
F. GENERAL CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS
WITH ALL TRADES PRIOR TO INSTALLATION.
G. GENERAL CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED
AT CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
H. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE GENERAL CONTRACTOR SHALL PATCH AND
PAINT AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
I. GENERAL CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
J. GENERAL CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE
MODIFYING SUBFLOORING.
K. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR
PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE
PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY RELOCATED AS
NECESSARY FOR CONTINUED UNINTERRUPTED OPERATION, ACCESS,
MAINTENANCE AND / OR VISIBILITY.
L. STAIRS AND ELEVATORS TO REMAIN OPERATIONAL AT ALL TIMES.
M. REFER TO MEP DRAWINGS FOR DEMOLITION SCOPE OF MECHANICAL,
ELECTRICAL AND PLUMBING COMPONENTS.
N. GENERAL CONTRACTOR TO FILL OUT ATTACHMENT C OF 138-022HV LOCATED
IN SPEC SECTION 01 35 26.19 FOR ALL DEMOLISHED EQUIPMENT INSTALLED IN
THIS SCOPE OF WORK.
PROPOSED EXTERIOR WALL. SEE WALL SECTIONS
1 HR FIRE AND SMOKE BARRIER
2 HR FIRE AND SMOKE BARRIER (SHAFT)
SMOKE BARRIER PARTITION
DEMOLISHED WALL, FIXTURE OR FURNISHING
EXISTING WALL, FIXTURE OR FURNISHING TO REMAIN
NOT IN CONTRACT - NO WORK SCHEDULED
EXISTING GRID
EXISTING DOOR TO REMAIN
DEMOLISHED DOOR
CORRIDOR
C3-12C3-12
CORRIDOR
C3-17C3-17
CORRIDOR
C3-18C3-18
CORRIDOR
C3-19C3-19
CORRIDOR
C3-22C3-22
CORRIDOR
C3-23C3-23
CORRIDOR
C3-24C3-24
EXAM
3D-119B3D-119B
TREATMENT
3D-1193D-119
EXAM
3D-119C3D-119C
EXAM
3D-1203D-120
BREAK
3D-123A3D-123A
ANTE
3D-1163D-116
OFFICE
3D-1253D-125
EXAM
3D-1183D-118
EXAM
3D-1173D-117
STOR
3D-127A3D-127A
EXAM
3D-1273D-127
TLT
3D-124A3D-124A
OFFICE
3D-1093D-109
HAC
3D-1103D-110
TLT
3D-1113D-111
STORAGE
3D-1303D-130
NURSING
RM
3D-109A3D-109A
OFFICE
3D-1063D-106
3D-105 3D-1053D-105
OFFICE
3D-1313D-131
STORAGE
3D-134B3D-134B
EXAM
3D-1213D-121
EXAM
3D-119A3D-119A
PATIENT
3D-116C3D-116C
PATIENT
3D-116B3D-116B
PATIENT
3D-114C3D-114C
TLT
3D-126A3D-126A
EXAM
3D-1123D-112
TLT
3D-116A3D-116A
PATIENT
3D-114B3D-114B TLT
3D-114A3D-114A
PATIENT
3D-1083D-108 TLT
3D-108A3D-108A
PATIENT
3D-1073D-107
ANTE
3D-107A3D-107A
TLT
3D-107B3D-107B
TLT
3D-128A3D-128A
PATIENT
3D-1043D-104
ANTE
3D-104A3D-104A
ANTE
3D-103A3D-103A
PATIENT
3D-1033D-103
PATIENT
3D-1023D-102
EXAM
3D-1013D-101
OFFICE
3C-1033C-103
TLT
3D-101A3D-101A
EXAM
3D-1363D-136
TLT
3D-104B3D-104B
TLT
3D-103B3D-103B
TLT
3D-102B3D-102B
ANTE
ROOM
3D-102A3D-102A
TLT
3D-135A3D-135A
BREAK
ROOM
3D-1233D-123
PATIENT
3D-1243D-124
PATIENT
3D-1263D-126
PATIENT
3D-128C3D-128C
PATIENT
3D-128B3D-128B
PATIENT
3D-1293D-129
EXAM
3D-1353D-135
WORK
ROOM
3D-134A3D-134A
CHECK-IN
3D-1343D-134
ANTE
3D-1283D-128
ANTE
3D-1143D-114
LINEN
CHUTE
3D-112A3D-112A
IT CLOSET
3D-122B3D-122B
ELECTRICAL
ROOM
3D-122A3D-122A
1 1 1 1 1
WORK
ROOM
3D-1153D-115
STAIR
F1
A-101
F1
A-101
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
HJKLM
RECESSED LUMINAIRE (24x24)
SMOKE DETECTOR
SPEAKER
EXISTING HVAC SUPPLY DIFFUSER
HVAC RETURN DIFFUSER
EXIT LIGHT
HEAT DETECTOR
HVAC EXHAUST DIFFUSER
LINEAR UPLIGHT LUMINAIRE, WALL
MOUNTED
RECESSED ROUND DOWNLIGHT
LUMINAIRE
RECESSED LUMINAIRE (24x48)
ACOUSTICAL TILE CEILING (24x24)
ACOUSTICAL TILE CEILING (24x48)
GYPSUM BOARD CEILING
REFLECTED CEILING SYMBOLS
ACCESS PANEL
HVAC SUPPLY DIFFUSER
EXISTING HVAC RETURN DIFFUSER
SPRINKLER
UNDERCABINET TASK LIGHT
EXISTING DEMO
TOILET
3C-1053C-105
CORRIDOR
C3-12C3-12
CORRIDOR
C3-17C3-17
CORRIDOR
C3-19C3-19
CORRIDOR
C3-22C3-22
CORRIDOR
C3-23C3-23
CORRIDOR
C3-24C3-24
EXAM
3D-119B3D-119B
TREATMENT
3D-1193D-119
EXAM
3D-119C3D-119C
EXAM
3D-1203D-120
BREAK
3D-123A3D-123A
ANTE
3D-1163D-116
OFFICE
3D-1253D-125
EXAM
3D-1183D-118
EXAM
3D-1173D-117
STOR
3D-127A3D-127A
EXAM
3D-1273D-127
TLT
3D-124A3D-124A
OFFICE
3D-1093D-109
HAC
3D-1103D-110
TLT
3D-1113D-111
STORAGE
3D-1303D-130
NURSING
RM
3D-109A3D-109A
OFFICE
3D-1063D-106
3D-105 3D-1053D-105
OFFICE
3D-1313D-131
STORAGE
3D-134B3D-134B
EXAM
3D-1213D-121
EXAM
3D-119A3D-119A
PATIENT
3D-116C3D-116C
PATIENT
3D-116B3D-116B
PATIENT
3D-114C3D-114C
TLT
3D-126A3D-126A
EXAM
3D-1123D-112
TLT
3D-116A3D-116A
PATIENT
3D-114B3D-114B
TLT
3D-114A3D-114A
PATIENT
3D-1083D-108
TLT
3D-108A3D-108A
PATIENT
3D-1073D-107
ANTE
3D-107A3D-107A
TLT
3D-107B3D-107B
TLT
3D-128A3D-128A
PATIENT
3D-1043D-104
ANTE
3D-104A3D-104A
ANTE
3D-103A3D-103APATIENT
3D-1033D-103
PATIENT
3D-1023D-102
EXAM
3D-1013D-101
OFFICE
3C-1033C-103
TLT
3D-101A3D-101A
EXAM
3D-1363D-136
TLT
3D-104B3D-104B
TLT
3D-103B3D-103B
TLT
3D-102B3D-102B
ANTE
ROOM
3D-102A3D-102A
TLT
3D-135A3D-135A
BREAK
ROOM
3D-1233D-123
PATIENT
3D-1243D-124
PATIENT
3D-1263D-126
PATIENT
3D-128C3D-128C
PATIENT
3D-128B3D-128B
PATIENT
3D-1293D-129
EXAM
3D-1353D-135
WORK
ROOM
3D-134A3D-134A
CHECK-IN
3D-1343D-134
ANTE
3D-1283D-128
ANTE
3D-1143D-114
LINEN
CHUTE
3D-112A3D-112A
IT CLOSET
3D-122B3D-122B ELECTRICAL
ROOM
3D-122A3D-122A
TOILET
CORRIDOR
C3-27C3-27
CORRIDOR
C3-18C3-18
WORK
ROOM
3D-1153D-115 on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLAN
A/E:
TRIPLE C - The A/E Group
(520) 481-8548
Mat Perkins
A
B D
EF
G
H
J
K
L
M
C
1/8" = 1'-0"
B
IM
/6
-2
-1
R e n o v a te
D
B e d W in g -B
-M
P L S
V A
M C
/6 -2
-7
.M
P L S
.3 D
B e d W in g .A
R C
H .B
.L
.r v t
/4
/2
:4 :2
P
M
09/12/2022 M.PERKINS K.MACAULAY
618-22-102
1391 - AD101
ARCHITECTURAL DEMOLITION PLAN AND
REFLECTED CEILING PLANS - THIRD LEVEL -
3D
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATION OF BUILDING 70 3D
BED WING100% CONSTRUCTION
DOCUMENTS
1/8" = 1'-0" F5
ARCHITECTURAL DEMOLITION PLAN - THIRD LEVEL - 3D
1 REMOVE ALL PLUMBING FIXTURES IN ENTIRE ROOM, REFER TO PLUMBING
DRAWINGS FOR MORE INFORMATION
2 REMOVE ALL TOILET ACCESSORIES, INCLUDING BUT NOT LIMITED TO
MIRRORS,GRAB BARS, TOILET PARTITIONS, PAPER TOWEL DISPENSERS, SOAP
DISPENSERS.
3 REMOVE AND PROPERLY DISPOSE OF ALL FINISH MATERIALS IN ENTIRE ROOM
4 REMOVE EXISTING ACT GRID AND TILE.
5 REMOVE AND DISPOSE OF ALL EXISTING LIGHT FIXTURES
6 REMOVE AND DISPOSE OF ALL EXISTING MECHANICAL REGISTERS AND DIFFUSERS
7 REMOVE AND DISPOSE OF EXISTING METAL LOCKERS.
8 REMOVE AND DISPOSE OF EXISTING DRAPERIES AND DRAPERY TRACK AT
EXTERIOR WINDOW.
9 REMOVE AND DISPOSE OF EXISTING CUBICLE CURTAIN TRACK.
10 REMOVE AND DISPOSE OF ALL CEILING MOUNTED SIGNAGE
11 EXISTING BUILDING EXPANSION JOINT AT FLOOR TO REMAIN. PROTECT IN PLACE.
12 REMOVE AND DISPOSE OF EXISTING WALL EXPANSION JOINT AT THIS LOCATION
13 REMOVE AND DISPOSE OF EXISTING CASEWORK
14 REMOVE AND DISPOSE OF EXISTING HEADWALL SYSTEM.
15 REMOVE AND PROPERLY DISPOSE OF SYSTEMS FURNITURE RECEPTION/NURSES
STATION.
16 REMOVE AND DISPOSE OF EXISTING BULLETIN BOARDS, WHITEBOARDS &
LITERATURE RACKS.
17 REMOVE EXISTING CEILING MOUNTED BARIATRIC LIFT SYSTEM AND COORDINATE
WITH COR FOR PROPER STORAGE.
18 REMOVE AND DISPOSE OF EXISTING WALL MOUNTED BRACKETS, STANDARDS AND
SHELVES
19 REMOVE ANY WALL MOUNTED ITEMS IN THIS AREA. PATCH WALLS AS REQUIRED
AND PREPARE FOR NEW FINISHES.
20 REMOVE EXISTING FLOORING WITHIN SCOPE AREA AND PREPARE SUBFLOOR FOR
NEW FLOORING. PROTECT ADJACENT FINISH FLOORING TO REMAIN.
21 EXISTING CEILING AND LIGHT FIXTURES TO REMAIN, PROTECT IN PLACE.
22 REMOVE EXISTING SIGNAGE, RETAIN FOR REINSTALLATION AFTER WALL IS
FINISHED.
23 REPLACE ALL DRYWALL IN ROOM AFTER REMOVAL OF EXISTING WALL TILE.
REPLACE OR MODIFY FRAMING AS REQUIRED.
24 REMOVE AND PROPERLY DISPOSE OF PNEUMATIC TUBE STATION AND
SURROUNDING PARTITION WALLS. REMOVE INSULATED TUBING UP TO
INTERSTITIAL SPACE ABOVE AND AS REQUIRED TO CONNECT TO NEW PNEUMATIC
TUBE STATION LOCATION. SEE A-101 FOR LOCATION.
25 PNEUMATIC TUBING IN INTERSTITIAL SPACE ABOVE - REMOVE TO EXTENTS
REQUIRED TO ATTACH TO NEW WORK.
26 EXISTING MED GAS ALARM PANEL TO BE RELOCATED.
27 REMOVE AND DISPOSE OF EXISTING WALL HEATER.
1/8" = 1'-0" F1
ARCHITECTURAL REFLECTED CEILING PLAN DEMOLITION - THIRD LEVEL - 3D
SCHEDULE OF EXISTING FINISHES
FINISH # FLOOR BASE
WALL
MATL
WALL
FINISH CEILING MATL
1 VCT RB GYP P ACT
2 VCT RB GYP P/PT ACT
3 PT PT GYP P/PT ACT/GWB
4 CPT RB GYP P ACT
EXISTING FINISHES ABBREVIATION LIST:
CPT CARPET
VCT VINYL COMPOSITE TILE
PT PORCELAIN TILE
GYP GYPSUM
GWB GYPSUM WALLBOARD
P PAINT
ACT ACOUSTICAL CEILING TILE
PATIENT 9
3D-109
213 SF
RR 9
3D-109A
79 SF
RR 8
3D-108A
69 SF
PATIENT 8
3D-108
256 SF
PATIENT 7
3D-107
285 SF
RR 7
3D-107A
69 SF
PATIENT 6
3D-106
297 SF
RR 6
3D-106A
72 SF
PATIENT 5
3D-105
289 SF
RR 5
3D-105A
72 SF
PATIENT 4
3D-104
300 SF
RR 4
3D-104A
69 SF
PATIENT 3
3D-103
298 SF
RR 3
3D-103A
70 SF
RR 2
3D-102A
69 SF
PATIENT 2
3D-102
296 SF
BARIATRIC
3D-101
299 SF
RR 1
3D-101A
90 SF
CIRCULATION
C3-24
505 SF
PATIENT
3D-133
269 SF
RR 18
3D-133A
78 SF
RR 17
3D-132A
68 SF
SAFER
PATIENT
3D-132
268 SF
STAFF
WORK
3D-136
299 SF
MSA'S
3D-100
245 SF
CLEAN
LINENS
3D-138
190 SF
ASST.
NURSE
MNGR
3D-110
98 SF
NURSE
MNGR
OFFICE
3D-111
93 SF
MED
ROOM
3D-112
127 SF
NUTRITION
3D-135
106 SF
EQUIP.
ALCOVE
3D-139
30 SF
SAFER
PATIENT
3D-131
292 SF
RR 16
3D-131A
67 SF
RR 15
3D-129A
67 SF
PATIENT
3D-129
252 SF
PATIENT
3D-128
280 SF
RR 14
3D-128A
71 SF
RR 13
3D-126A
71 SF
PHARM
OFFICE
3D-120
102 SF
SOILED
UTILITY
3D-134
108 SF
CIRCULATION
C3-20
137 SF
STAFF
TOILET
3D-117
49 SF
SPS
STORAGE
3D-114
131 SF
EQUIPMENT
ROOM
3D-115
315 SF
PATIENT
3D-126
245 SF
PATIENT
3D-125
260 SF
RR 12
3D-125A
67 SF
RR 11
3D-123A
67 SF
HAC
3D-119
61 SF
STAFF
BREAK
ROOM
3D-116
259 SF
PATIENT
3D-123
238 SF
PATIENT
3D-121
206 SF
RR 10
3D-121A
74 SFA-401
E8
A-401
C8
A-402
D7
F1
A-101
F1
A-101
A-403
F7
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
HJKLM
CORRIDOR
C3-12C3-12
STAIR
ROOM
3C-1063C-106
CORRIDOR
C3-27C3-27
CORRIDOR
C3-26C3-26
CORRIDOR
C3-28C3-28
STAIR
ANTE
ROOM
3D-133B
54 SF
CLEAN
UTILITY
3D-113
74 SF
OXYGEN
STOR.
3D-118
30 SF
8'-0"
CIRCULATION
C3-25
1012 SF
CIRCULATION
C3-19
917 SF
CIRCULATION
C3-18
262 SF
9A
115A 115B
3A
6A
5A
9A
8A
121 12 1A
1A
2A
6B
136A
3A
1B
8A
7A
1A
2A
4A
3A
6A
5A
109 11
121B
109B
133B 101B
EQUIP.
ALCOVE
3D-127
19 SF
CHARTING
3D-142
17 SF
EQUIP.
ALCOVE
3D-140
16 SF
CHARTING
C3-19B
16 SF
CHARTING
3D-141
17 SF
CHARTING
C3-25A
18 SF
CHARTING
C3-19A
17 SF
EQUIP
ALCOVE
3D-137
11 SF
CHARTING
C3-19C
15 SF
A
A
C
C
C
A
A
A
A
A
A
A
A
A
A
A
A
B
A-404
F7
132B
116B
Q-101
F4
TOILET
3C-1043C-104
TOILET
3C-1053C-105
55 SF
ANTE
ROOM
64 SF
ANTE
ROOM
9 SF
CHUTE
4A
38 QTY OF
LOCKERS
50 SF
ANTE
ROOM
14 QTY OF
LOCKERS
SINK
ALCOVE
3C-134B
3 SF
A-401
E6
FEC
FEC
FEC
2A
MECHANICAL
ROOM
3D-1223D-122
3'-8"
ARCHITECTURAL SYMBOL LEGEND
GENERAL SHEET NOTES
DEMOLISHED WALL, FIXTURE OR FURNISHING
EXISTING WALL, FIXTURE OR FURNISHING
VA/VA ITEM - VA SUPPLIED & INSTALLED
VA/CC OR VC ITEM - VA SUPPLIED & CONTRACTOR
INSTALLED
CC/CC ITEM - CONTRACTOR SUPPLIED & INSTALLED
MATCHLINE
A. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE
RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.
PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT
WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY
MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL. SEE
MECHANICAL AND PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.
B. C.CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND
CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL
SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID
CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND
SERVICEABILITY.
C. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM
THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE
LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE
MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD
CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION
DOCUMENTS.
D. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH
ALL TRADES PRIOR TO INSTALLATION.
E. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
F. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT
AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
G. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
H. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE MODIFYING
SUBFLOORING.
I. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR
PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE
PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY RELOCATED
AS NECESSARY FOR CONTINUED UNINTERRUPTED OPERATION,
ACCESS, MAINTENANCE AND / OR VISIBILITY.
J. INFILL & FLOAT FLOORS AT DEMO WALL LOCATIONS, TYPICAL ALL
INTERIOR WALLS.
KEYNOTES-
UNRATED PARTITION
SMOKE PARTITION
1 HOUR RATED PARTITION
2 HOUR RATED PARTITION
EXISTING WALL TO REMAIN
EXISTING AREA NOT IN CONTRACT (NIC)
WINDOW TYPE TAG
# NEW DOOR AND TAG
## WALL TAG
LEVEL 2
INTERSTITIAL
869' - 3 1/2"
LEVEL 3
INTERSTITIAL
887' - 11 1/2"
LEVEL 2
859' - 0"
LEVEL 3
877' - 8"
LEVEL 4
896' - 4"
HJKLM
PATIENT 14
3D-128
IMS21
280 SF
PHARM
OFFICE
3D-120
SS218
102 SF
SPS
STORAGE
3D-114
SRSP1
131 SF
INTERSTITIAL
SPACE
ABOVE
INTERSTITIAL
SPACE
BELOW
RR 14
3D-128A
SB147
71 SF
2' -4
/2
6' -0
'-3
/2
2' -4
/2
6' -0
CIRCULATION
C3-25
CIRC
1012 SF
RR 5
3D-105A
SB147
72 SF
PATIENT 5
3D-105
IMS21
289 SF
CIRCULATION
C3-19
CIRC
917 SF
LEVEL 3
INTERSTITIAL
887' - 11 1/2"
LEVEL 3
877' - 8"
LEVEL 4
896' - 4"
R 5'-6"
7 5
22 22
23 23
K
K
R 6'-0" V
E R
T
IC
A L
B E
N D
5' -6
1'
-0
R 6'-0"
E1
A-101
E1
A-101 on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLAN
A/E:
TRIPLE C - The A/E Group
(520) 481-8548
Mat Perkins
A
B D
EF
G
H
J
K
L
M
C
As indicated
B
IM
/6
-2
-1
R e n o v a te
D
B e d W in g -B
-M
P L S
V A
M C
/6 -2
-7
.M
P L S
.3 D
B e d W in g .A
R C
H .B
.L
.r v t
/4
/2
:4 :2
P
M
09/12/2022 M.PERKINS K.MACAULAY
618-22-102
1391 - A-101
ARCHITECTURAL FLOOR PLAN - THIRD
LEVEL - 3D NEW
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATION OF BUILDING 70 3D
BED WING100% CONSTRUCTION
DOCUMENTS
1/8" = 1'-0" F6
ARCHITECTURAL FLOOR PLAN - THIRD LEVEL - 3D NEW
1 NO WORK IN THIS AREA.
2 FURNITURE IS NOT IN CONTRACT; SHOWN FOR REFERENCE ONLY
3 NEW LOCATION FOR PNUEMATIC TUBE SYSTEM END STATION
4 NEW MOTORIZED ROLLING SECURITY SHUTTER AT HEAD WALL.
5 NEW PNEUMATIC TUBE IN INTERSTITIAL SPACE ABOVE.
6 CONNECT NEW PNEUMATIC TUBE TO EXISTING TUBING.
7 EXISTING PNEUMATIC TUBING TO BE DEMOLISHED IN INTERSTITIAL SPACE
ABOVE - SEE AD101.
8 WHERE EXISTING DOOR REMOVED, INFILL WALL TO MATCH ADJACENT WALL
CONSTRUCTION AND 2HR FIRE RATING.
1/8" = 1'-0" F1
ARCHITECTURAL BUILDING SECTION - 3D NEW
3/16" = 1'-0" E1
PNEUMATIC TUBE SECTION
1/4" = 1'-0" C1
PNEUMATIC TUBE FLOOR PLAN
1 ADDENDUM 1 04/06/23
2 ADDENDUM 2 05/03/23
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
HJKLM
9A
115A 115B
123A
126A
125A
129A
128A
121 12 1A
131A
132A
6B
136A
3A
111B
108A
107A
1A
102A
104A
103A
106A
105A
1B
9B
3B
1B
213 SF
PATIENT 9
3D-109
79 SF
RR 9
3D-109A
69 SF
RR 8
3D-108A
256 SF
PATIENT 8
3D-108
285 SF
PATIENT 7
3D-107
69 SF
RR 7
3D-107A
297 SF
PATIENT 6
3D-106
72 SF
RR 6
3D-106A
289 SF
PATIENT 5
3D-105
72 SF
RR 5
3D-105A
300 SF
PATIENT 4
3D-104
69 SF
RR 4
3D-104A
298 SF
PATIENT 3
3D-103
70 SF
RR 3
3D-103A
69 SF
RR 2
3D-102A
296 SF
PATIENT 2
3D-102
299 SF
BARIATRIC 1
3D-101
90 SF
RR 1
3D-101A
269 SF
PATIENT 18
3D-133
78 SF
RR 18
3D-133A
68 SF
RR 17
3D-132A
268 SF
SAFER PATIENT 17
3D-132
299 SF
STAFF WORK
3D-136
245 SF
MSA'S
3D-100
190 SF
CLEAN LINENS
3D-138
98 SF
ASST. NURSE MNGR
3D-110
93 SF
NURSE MNGR OFFICE
3D-111
127 SF
MED ROOM
3D-112
106 SF
NUTRITION
3D-135
292 SF
SAFER PATIENT 16
3D-131
67 SF
RR 16
3D-131A
67 SF
RR 15
3D-129A
252 SF
PATIENT 15
3D-129
280 SF
PATIENT 14
3D-128
71 SF
RR 14
3D-128A
71 SF
RR 13
3D-126A
102 SF
PHARM OFFICE
3D-120
108 SF
SOILED UTILITY
3D-134
49 SF
STAFF TOILET
3D-117
131 SF
SPS STORAGE
3D-114
315 SF
EQUIPMENT ROOM
3D-115
16 SF
EQUIP. ALCOVE
3D-140
245 SF
PATIENT 13
3D-126
260 SF
PATIENT 12
3D-125
67 SF
RR 12
3D-125A
67 SF
RR 11
3D-123A
61 SF
HAC
3D-119
259 SF
STAFF BREAK ROOM
3D-116
238 SF
PATIENT 11
3D-123
206 SF
PATIENT 10
3D-121
74 SF
RR 10
3D-121A
54 SF
ANTE ROOM
3D-133B
74 SF
CLEAN UTILITY
3D-113
30 SF
OXYGEN STOR.
3D-118
262 SF
CIRCULATION
C3-18
55 SF
ANTE ROOM
3D-101B
J8
S
S6 6
± 10'-0 7/8" 2'-8 1/4" 4'-10 1/4"
U6
4'-3 1/4" 8'-1"
1'-7"
± 9'-5 1/2"
7 1/2"
S6
S 3S
S6
E
E
E3
3' -8
3'
-2
E
E
E3E3 U
S
E3
S6
S
7' -9
5'
-1
/4
2' -0
5'
-1
/4
7' -3
4'
-6
7' -5
5'
-1
/4
2' -0
5'
-1
/4
7' -4
4'
-9
7' -6
5'
-1
/4
2' -0
5'
-1
/4
7' -2
/4
5'
-0
/4
7' -8
5'
-1
/4
2' -0
5'
-1
/4
9' -7
7' -5
/8
A U
1' -0
S
" 3' -2
1' -1
3/
4" 3'
-1
A
S
S
S
1/
4"
4'-3 1/4"
6'-7 3/4"
3'-6"
1/
4"
6'-10 1/4"
1'-6"
3' -2
3'
-6
3' -2
3'
-6
S
S
U
1'-0"
S6
E3E3
E
E
S6
S
S
E
E
S
3'-6"
U
U
2"
S
S
S6
4'-0 3/4" 8'-4 1/4"
1'-0"
S 3 S6S6
S
± 11'-7 1/4"
3'-1" 4'-8"
S 6 E
E
(8 '-0
C
LE
A
R M
IN
8'
-0
/8
5' -7
'-4
/4
7' -9
/4
5'
-1
/4
2' -0
5'
-1
/4
7' -2
/2
4'
-8
/2
7' -4
5'
-1
/4
2' -0
5' -1
/4
7'
-2
/2
4' -8
/2
7'
-3
5' -1
/4
2'
-0
5' -1
/4
7'
-5
/4
5' -0
7'
-4
5' -1
/4
2'
-0
5' -7
/4
9'
-7
/4
2'
-1
3/ 8"
H W
-S H
-3 HW-1A
H W
-S
LI
-2
H W
-2 H
HW-SLI-2
HW-SLI-1
HW-SLI-1
HW-SLI-1
HW-SLI-1
HW-SLI-1
HW-SLI-1
H W
-S
LI
-2
H W
-S
LI
-2
HW-SLI-1
HW-SLI-1
HW-SLI-1
HW-SLI-1
HW-SLI-1
HW-SLI-1
HW-SLI-1
H W
-S
LI
-2
HW-SLI-3
4'-0 3/4"
1/
2"
/2
4'-0 3/4"
8'-4 1/4" ± 11'-7 1/4"
3' -2
3'
-6
3' -6
3'
-2
9"
1/ 2"
U
S
E
E
S
U
2"
1'-0" 3'-0"
3'-0"
S
1' -7
"1'-0 1/8"
1/
2"
U
U
2' -6
/2
1'-6"
S6
E
E
S3
S
E
E
S
S
CLEAR
8'-1" 8'-11" 7'-7 1/4" 6'-1" ± 10'-4"
HW-1A
HW-1A
HW-1A
HW-1A
HW-1A
HW-1A
HW-1A
HW-1A
S
U
U
1' -1
1"
3' -1
0" 1'
-7
/4
8' -0
/4
9'
-1
1/ 4"
S6
S
S 6J3S
E
S
U6
S6
6'-9" 5'-7" 1'-7"
H W
-2 H 2'
-8
4'-0 3/4"
S3
S
7'-3"
2'
-3
/4
C
LE
A R
8' -4
/8
5' -6
/8
2'
-0
'-3
8'
-3
/2
8' -3
'-1
7' -4
/4
3'
-1
C
LE
A R
6' -0
'-6
'-1
0"
'-3
5' -3
/4
1'
-9
3' -6
8'
-0
/4
(8 '-0
C
LE
A
R M
IN
8'
-1
'-3
/4
6'
-5
/2
'-0
/2
'-3
/4
(V
IF
3' -1
1/
4"
8' -4
/4
C
LE
A
R 6'
-0
1' -1
0"
'-1
1"
'-4
/4
2' -6
'-0
/8
8'-0 3/4" 1'-4" 8'-6 3/4" 3'-1 1/2" 8'-0"9'-9"
(8'-0 MIN)
8'-0 3/4"
± 22'-9 1/4"
3'-10"
2'-0" 7'-9 1/4"
1'-6"
11'-7 3/4" 11'-1 1/2"
2'-2" 14'-2 1/4" 3'-7 1/4"
2'-9 3/4"
7'-7 1/2" 6'-1 3/4"
32°
4'-1 5/8"
S
S
S6
S
S
S6
S
S
S3
S3
S
S3 S
S
S3
J3
S3
S
J3 J3
J3
S3
S3
S
S
S
S3S
S
S
S3
S3S3 S3
E
E
S
S6 S3
S3
S
S
J3
J3
S3
S
S3
S
S3
S
S3
S
S3
S3
S3
S
S6 S6
HW-1A
H W
-4 K
HW-4K
HW-3E
HW-3E
H W
-4 E
H W
-S H
-3 D
H W
-2
H W
-S H
-3
HW-SH-3
HW-3E
HW-4F HW-4F
HW-5D
HW-SH-3
H W
-S H
-3
H W
-S H
-3
2'-2 1/4" 7'-1" 5'-7 1/4"
E
E
E6
U6
S
E
E
S
1' -9
7'-0 1/2"
U
S
E
E3 E3
S6
1/
2"
2'-1"
2' -0
3'
-0
S 6S
S
S6
S
S6
E3
S
4'-6"
2'-1 1/4" 6'-7" 4'-8"
S 3 S
61' -0
/2
T
Y P
3'
-2
T Y
P
3' -6
1/
2"
E
E
S
S
S
S6
1' -1
1" U
S6
U
S
5'-3 1/4" 3'-5" 4'-8"
/2
1' -0
/4
J3
U
/4
S
S6
S
E
S 6E
E
S
S
5 1' -1
1" S
S6
S 6U
S
S
/2
2'-2" 6'-6 1/4" 4'-8"
U
J3
S
S
3' -2
3'
-6
3' -2
3/
4"
E
E
S
E3
E
E
S6 S
U
S
U6
S6
S
S
± 9'-10 3/4"
2'-2"
7'-3" 5'-6"
3' -2
3'
-1
1/ 2"
H W
-2 H
HW-1A
HW-1A
HW-1A
HW-1A
HW-1A
HW-1A
HW-1A
HW-1A
H W
-2 H
E3
S3
S3
/4
C
C
C4' -0
6"
4' -0
6"
4' -0
5'
-0
B
8"
E
E3
S
S3
U8
S3
S6
E3
E3
S
S6
S6
S3
E3E3
S6
S3
E3
S
S6
E
E3
E
S6
S
S
S3
J3
J3
J3
J3
S3
S
S3
S3
S3
E3
E
S
S
S
S
S
M
S3
J3
S
S
S6 S 3 S3
S
S3
S6
E3
S3
S
S3 E3
E
E3
S6
S3
E3
E3
E
E
S6
S6
U
S6
E3 E3
E
E3
E
E3
S6
S
A-401
E6
CORRIDOR
C3-27C3-27
TOILET
3C-1043C-104
TOILET
3C-1053C-105
A
A
A
A
A
A
A
A
A
A
A
A
E Q
E Q
S6
S
1'-4 1/4"
H W
-1 0A
2A
H W
-S H
-3
116B
132B
H W
-8 C
U
3' -0
ARCHITECTURAL SYMBOL LEGEND
GENERAL SHEET NOTES
DEMOLISHED WALL, FIXTURE OR FURNISHING
EXISTING WALL, FIXTURE OR FURNISHING
VA/VA ITEM - VA SUPPLIED & INSTALLED
VA/CC OR VC ITEM - VA SUPPLIED & CONTRACTOR
INSTALLED
CC/CC ITEM - CONTRACTOR SUPPLIED & INSTALLED
MATCHLINE
A. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE
RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.
PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT
WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY
MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL. SEE
MECHANICAL AND PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.
B. C.CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND
CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL
SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID
CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND
SERVICEABILITY.
C. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM
THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE
LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE
MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD
CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION
DOCUMENTS.
D. CONTRACTOR TO COORDINATE…