This document provides details for a federal contract solicitation from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 23. The solicitation number is 36C26323R0023 and is for project 618-22-102 to renovate a private patient bed ward (3D) at a cost of $36C263-23-AP-0055. Responses are due by unspecified dates and the contract is to be awarded at an unspecified future date. The scope of work involves renovating an existing facility to add additional private patient beds. No other terms or conditions are specified in the provided files.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
on e-ei gh th in ch o ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in es ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A/E:
TRIPLE C - The A/E Group
(612) 355-1251
Mat Perkins
B
IM
/6
-2
-1
R e n o v a te
D
B e d W in g -B
-M
P L S
V A
M C
/6 -2
-7
.M
P L S
.3 D
.B e d .W in g .M
E P
.B .L
.r v t
/1
/2
:4
:5
A
M
09/12/2022 K. Luke N.Harper
618-22-102
1391 - M-702
MECHANICAL SCHEDULES
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATION OF BUILDING 70 3D
BED WING
100% CONSTRUCTION
DOCUMENTS
1 ADDENDUM 1 4/6/23
PUMP SCHEDULE NOTES:
1. PROVIDE WITH SUCTION GUIDE
2. PROVIDE WITH "FLO-TREX" VALVE.
3. MOTOR ENCLOSURE SHALL BE TYPE TEFC.
4. CONTRACTOR SHALL PHASE PUMP REPLACEMENT TO MAINTAIN 100% EXISTING UTILITY SERVICE
5. BASIS OF DESIGN: BELL & GOSSET VSX MODEL.
SEE NOTES 1,2,3,4,5
12/17/2021
MUST BE
STEAM COILS
on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A/E:
TRIPLE C - The A/E Group
(520) 481-8548
Mat Perkins
As indicated
B
IM
/6
-2
-1
R e n o v a te
D
B e d W in g -B
-M
P L S
V A
M C
/6 -2
-7
.M
P L S
.3 D
.B e d .W in g .M
E P
.G e n e ra l.
S h e e ts
.r v t
/1
/2
:1 :4
P
M
09/12/2022 K. Luke N. Harper
618-22-102
1391 - M-802
MECHANICAL CONTROL DIAGRAMS
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATION OF BUILDING 70 3D
BED WING100% CONSTRUCTION
DOCUMENTS
NTS
F5
JACKETED STEAM HUMIDIFER CONTROLS
1 ADDENDUM #1 4/10/23
STEAM HUMIDIFIER SEQUENCE OF OPERATION
RETURN AIR HUMIDITY SHALL BE MONITORED. ON A CALL FOR HUMIDIFICATION, HUMIDIFIER VALVE V-1 SHALL MODULATE TO MAINTAIN THE RETURN AIR HUMIDITY SET POINT TO 40% MINIMUM. PRIOR TO ACTIVATION OF V-1, THE ON-OFF CONTROL VALVE V-2 SHALL BE ENABLED THROUGH ECC AND JACKET TEMPERATURE SENSED BY TSH SHALL BE WARM ENOUGH TO PREVENT CONDENSATION. THE HIGH LIMIT HUMIDITY SENSOR, LOCATED IN THE SUPPLY AIR DUCT 10 FT AWAY FROM THE HUMIDIFIER SHALL DISABLE THE HUMIDIFIER AND GIVE AN ALARM SIGNAL TO THE ECC, IF THE SUPPLY AIR HUMIDITY EXCEEDS 55%. THE
AIRFLOW SWITCH SHALL PROVE AIRFLOW BEFORE HUMIDITY CONTROLS ARE ACTIVATED.
1 2
120 VAC
NH
H N
120 VAC
C
B
A ALL RELAYS, WIRING, AND RACEWAY SHALL BE INSTALLED BY DIV. 26.
SMOKE DETECTORS LOCATED IN THE MAIN SUPPLY AND EXHAUST AIR
STREAMS SHALL BE MONITORED AND INTERLOCKED TO THE
BUILDING FIRE ALARM SYSTEM BY THE DIVISION 26 CONTRACTOR.
THE DIVISION 26 CONTRACTOR SHALL SUPPLY A CONTACT TO THE
AIR HANDLING UNIT WHICH WILL ACTIVATE UPON A FIRE/SMOKE
CONDITION OF THE DUCT DETECTORS, BUILDING TOTAL AREA
COVERAGE FIRE ALARM AREA DETECTORS. (ASSOCIATED WITHIN
THAT PORTION OF THE BUILDING SUPPLIED BY THE AHU), OR MANUAL
FIRE ALARM PULL STATIONS (LOCATED WITHIN THE BUILDING AREA
SUPPLIED BY THE AHU).
THE DIV. 23 CONTRACTOR SHALL USE THE CONTACT TO SHUT OFF
THE UNIT SUPPLY AND EXHAUST FANS AND RETURN THE UNIT
DAMPERS TO THEIR NORMAL POSITION.
WITH THE ACTIVITION OF A FIRE/SMOKE CONDITION THE FIRE ALARM
RELAY SHALL DEACTIVATE ELECTRICAL POWER TO THE SMOKE
DAMPER RELAY WHICH SHALL CAUSE ALL THE FIRE/SMOKE DAMPERS
ASSOCIATED WITH THE AIR HANDLING UNIT TO CLOSE. THE
FIRE/SMOKE DAMPERS SHALL CLOSE ONLY ON ACTIVATION OF THE
FIRE/SMOKE RELAY AND NOT ANY OTHER AIR HANDLER FUNCTION.
GENERAL NOTES
KEYED NOTES
CONTROL MODULE OR OUTPUT CONTACT FROM FIRE ALARM SYSTEM,
ACTIVATED AS NOTED BELOW.
AUXILARY CONTROL RELAY SUPPLIED BY FIRE ALARM SYSTEM, (DIV.
26). MORE THAN ONE OUTPUT CONTACT CAN BE USED FOR MULTIPLE
CIRCUITS. INSTALL NEAR FIRE ALARM PANEL OR SUB PANEL AS
REQUIRED.
SMOKE DAMPER ACTUATOR (NORMALLY CLOSED/FAIL CLOSED).
FURNISHED AND INSTALLED BY DIVISION 23.
DMDM
CR
FIRE/SMOKE CONTROL:
SMOKE DETECTORS LOCATED IN SUPPLY AIR AND EXHAUST AIR
STREAMS SHALL BE MONITORED AND INTERLOCKED WITH BUILDING
FIRE ALARM SYSTEM. UPON ACTIVATION OF EITHER AHU SMOKE
DETECTOR OR BUILDING SMOKE/FIRE ALARM SYSTEM, THE AIR
HANDLING UNIT SHALL AUTOMATICALLY BE DEACTIVATED BY MEANS OF
THE FIRE ALARM RELAY INTERLOCK AND SUPPLY FAN SHALL BE SHUT
OFF.
D
~FCV
SMK-01
ZS
SMK-01
SMK-01
ZIO
SMK-01
ZIC
FAS RELAY
O P
E N
S T
A T
U S
(DI) C
L O
S E
S T
A T
U S
(DI)
MS
EF-1-01
II
EF-1-01
HS
ES
EF-1-01
IS
EF-1-01
CONTROL DIAGRAM EF-1 AND EF-ED
S T
A T
U S
(DI) (DO)S
T
A R
T /S
T O
P
E .A
E
.A
MUST BE
STEAM COIL
NTS
D4
STEAM HUMIDIFIER CONTROLS - VA STANDARD DETAIL
NTS
C3
DUCT SMOKE DETECTOR CONTROL
NTS
F8
F/S DAMPER LADDER DIAGRAM
NTS
F7
EXHAUST FAN CONTROL DIAGRAM
on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A/E:
TRIPLE C - The A/E Group
(520) 481-8548
Mat Perkins
As indicated
B
IM
/6
-2
-1
R e n o v a te
D
B e d W in g -B
-M
P L S
V A
M C
/6 -2
-7
.M
P L S
.3 D
.B e d .W in g .M
E P
.G e n e ra l.
S h e e ts
.r v t
/1
/2
:1 :4
P
M
09/12/2022 K. Luke N. Harper
618-22-102
1391 - M-804
MECHANICAL CONTROL DIAGRAMS
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATION OF BUILDING 70 3D
BED WING100% CONSTRUCTION
DOCUMENTS
1 ADDENDUM #1 4/10/23
12" = 1'-0" D7
SEQUENCE OF OPERATION FOR VARIABLE AIR VOLUME AIR HANDLING UNIT WITH MINIMUM OUTSIDE AIR
File details come from the government source that posted it. Updated .