Attachment D.4 Drawings 4 of 7 - 24 pages.pdf
PDF 14 MB Posted
- Solicitation number
- 36C26323R0023
About this file
This document provides details for a federal contract opportunity with the Department of Veterans Affairs to renovate a private patient bed ward. The solicitation number is 36C26323R0023 and seeks proposals to complete project number 618-22-102, which involves renovating an existing facility at a Veterans Health Administration medical center to add additional private patient beds. Responses are due by the date listed on the solicitation, and the contract is expected to be awarded shortly thereafter. The opportunity is set aside for verified service-disabled veteran-owned small businesses. The drawings appendix included provides additional technical specifications for the renovation work required.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRE PROTECTION SYMBOL LEGEND
DRAWING NUMBER WHERE DETAILED
SECTION LETTER
DRAWING NUMBER WHERE DETAILED
DETAIL NUMBER
DRAWING NUMBER WHERE DETAILED
ELEVATION LETTER
SECTION, ELEVATION, AND DETAIL TITLES
FX200
FX500
FX300
ELEVATION
DETAIL
SECTION
FX-100
A
FX500
A
C.P.
DISCHARGE NOZZLE
CONTROL PANEL
CLEAN AGENT FIRE SUPPRESSION
FIRE HOSE VALVE CABINET
FIRE HOSE CABINET
ALARM BELL
WATER MOTOR GONG
PENETRATION
TEST PLUG (PRESS/TEMP)
WH
PRESSURE GAUGE AND GAUGE COCK
NEW PIPE CONNECTION TO EXISTING PIPING
EXISTING PIPE TO BE REMOVED
EXISTING PIPING TO REMAIN
NEW PIPING
FLEXIBLE CONNECTION
ORIFICE UNION
FLANGED UNION
UNION
RISE IN PIPE
DROP IN PIPE
CAPPED OUTLET
SIDE CONNECTION
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
ECCENTRIC REDUCER
REDUCER OR INCREASER
DIRECTION OF FLOW
MAV MANUAL AIR VENT (MAV)
AAV AUTOMATIC AIR VENT (AAV)
AG AIR GAP FITTING
WALL HYDRANT
POINT OF CONNECTION TO EXISTING
KEYED NOTE
SCHEMATIC SYMBOLS
ABBREVIATIONSYMBOL DESCRIPTION
XX
STANDPIPE VALVE
INSPECTOR'S TEST CONNECTION (VERTICAL)DFP
D
FP INSPECTOR'S TEST CONNECTION (HORIZONTAL)
FP WET PIPE FIRE RISERFP
(E)FDC
FDC
FLOW SWITCH
FDC (E) EXISTING FIRE DEPARTMENT INLET CONNECTION
FIRE DEPARTMENT INLET CONNECTIONFDC
FLOW CONTROL VALVE
ATMOSPHERIC VACUUM BREAKER
PRESSURE STYLE VACUUM BREAKER
DIAPHRAGM (PROCESS SYSTEMS)
OS&Y VALVE
GATE VALVE
GLOBE VALVE
BUTTERFLY VALVE
BALL VALVE
CHECK VALVE
WATER PRESSURE REDUCING VALVE
PRESSURE RELIEF VALVE
TEMPERATURE AND PRESSURE RELIEF VALVE
VALVE IN VERTICAL
REDUCED PRESSURE BACKFLOW PREVENTER (RPBP)
DRAIN VALVE
FP ROOF MANIFOLD
AUTO BALL DRIP VALVE
OR OR
OR
ABBREVIATION DESCRIPTIONSYMBOL
VALVE SYMBOLS
ABBREVIATIONS
SYMBOL DESCRIPTION
NEW PENDANT STYLE SPRINKLER HEAD
FP
SP STANDPIPE; WETSP
FP FIRE PROTECTION; WET PIPE
ABBREVIATIONSYMBOL DESCRIPTION
PIPING SYMBOLS
FIRE PROTECTION-INTERIOR
ORDINARY GROUP 1 HAZARD
ORDINARY GROUP 2 HAZARD
OH1
OH2
DEMO PENDANT STYLE SPRINKLER HEAD
UPRIGHT STYLE SPRINKLER HEAD
DEMO UPRIGHT STYLE SPRINKLER HEAD
F.D.C.(E)FIRE DEPARTMENT INLET CONNECTION F.D.C.
REDUCED PRESSURE BACKFLOW PREVENTER
F.H.(E)F.H.
CONSTRUCTION
FIRE HYDRANT
VALVE WITH VALVE BOX
FIRE PROTECTION
POST INDICATOR VALVE
PIV PIV(E)
F F(E)
EXISTINGNEWDESCRIPTION
SITE UTILITY SYMBOLS
DRAWING NUMBER WHERE DETAILED
SECTION LETTER
DRAWING NUMBER WHERE DETAILED
DETAIL NUMBER
SECTION, ELEVATION, AND DETAIL SYMBOLS
FX-100
A
DRAWING NUMBER WHERE DETAILED
ELEVATION LETTER
GENERAL NOTES:
NOTE: NOT ALL ABBREVIATIONS AND
SYMBOLS APPLY TO THIS PROJECT.
1. ALL NEW PIPING FOR SPRINKLER HEADS SHALL BE HARD PIPED, NO FLEXIBLE CONNECTIONS ARE PERMISSIBLE.
2. ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN FURRED CHASES OR SUSPENDED CEILINGS, UNLESS
OTHERWISE NOTED.
3. PROVIDE ACCESS PANELS OR DOORS IN INACCESSIBLE CEILINGS AND/OR CHASES FOR ALL VALVES. THEY SHALL BE FURNISHED UNDER DIVISION 23 AND INSTALLED UNDER THE ARCHITECTURAL SPECIFICATION. ACCESS DOOR RATING SHALL MATCH
CLASSIFICATION OF WALL AND CEILING FIRE RATING.
COORDINATE THE LOCATION OF SPRINKLER HEADS AND ACCESS DOORS WITH THE ARCHITECTURAL REFLECTED CEILING PLAN(S).
4. REFER TO THE ARCHITECTURAL DRAWINGS FOR EXACT LOCATION OF ALL FIRE RATED AND/OR SMOKE RATED WALLS AND ASSEMBLIES. ALL PIPE PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT
STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL.
5. CONTRACTOR SHALL COORDINATE ALL FIRE PROTECTION PIPING WITH DUCTWORK, PIPING, PLUMBING, STRUCTURAL AND ELECTRICAL SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN EQUIPMENT ACCESS
AND SERVICEABILITY.
6. CONTRACTOR SHALL FURNISH ALL NECESSARY STRUCTURES, INSERTS, SLEEVES, AND HANGING DEVICES FOR INSTALLATION
PIPING.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL NECESSARY MISCELLANEOUS ANGLES, CHANNELS, UNISTRUT, ETC., AS MAY BE REQUIRED TO ADEQUATELY SUPPORT FIRE PROTECTION PIPING AND EQUIPMENT IN A MANNER APPROVED BY THE
ARCHITECT, WHICH WILL NOT OVERLOAD THE BUILDING STRUCTURAL SYSTEM.
8. IT IS CRITICAL THAT THE CONTRACTOR PERFORM A COMPLETE REVIEW OF ALL SUBMITTALS PRIOR TO SUBMISSION TO THE AE/COR. INCOMPLETE, INCORRECT AND UNCLEAR SUBMITTALS WILL BE REJECTED AND MARKED AS "REVISE AND RESUBMIT". ALL SUBMITTALS MUST CLEARLY INDICATE THE EQUIPMENT SELECTIONS FOR THE PROJECT. TECHNICAL DRAWINGS OF COMPLETE ASSEMBLIES, REFLECTING ACCURATE PROJECT CONDITIONS, SHALL BE SUBMITTED WITH EQUIPMENT SELECTIONS TO ENSURE SPACE ALLOWANCES ARE REFLECTED IN THE ACTUAL SPACE AVAILABLE. WHERE SIZE DEVIATIONS DIFFER FROM THE BASIS OF DESIGN CONTRACTOR SHALL HIGHLIGHT THE DIFFERENCES FOR AE.COR REVIEW WITHIN THE SUBMITTAL. CONTRACTOR SHALL PROVIDE INSTALLATION ROUTE AND VERIFICATION THAT ACCESS POINTS, PLACEMENT ROUTE, SUPPORTS, AND REQUIRED EQUIPMENT CLEARANCES ARE IDENTIFIED ON THE ROUTE DRAWING. SAFETY PROTOCOLS FOR SUBJECT STATION SHALL BE REFLECTED ON EQUIPMENT CLEARANCES. PLATFORMS AND INTERFACE AREAS (FILTER, GAUGES, MONITORS, VALVES, ETC.)
SHALL HAVE PROPER CLEARANCE AS DEFINED BY THE MANUFACTURER, VA SAFETY PERSONNEL AND SERVICE PERSONNEL.
ACCESS POINTS OF USE SHALL BE CLEARLY IDENTIFIED ON THE DRAWINGS.
1. THE DEMOLITION DRAWINGS REFLECT INFORMATION ON EXISTING BUILDING SERVICES GATHERED BY SITE INSPECTION, DISCUSSIONS WITH MAINTENANCE PERSONNEL AND PREVIOUS CONSTRUCTION DRAWINGS. THE EXACT LOCATION, ARRANGEMENT, AND SIZES OF PIPE LINES IN THE EXISTING BUILDING MAY BE DIFFERENT FROM THAT SHOWN ON THESE
DRAWINGS.
2. THE CONTRACTOR SHALL COORDINATE THE SHUTDOWN OF EXISTING BUILDING SERVICES FOR REMOVALS WITH OWNER
AUTHORIZED REPRESENTATIVE AND SHALL CONFORM TO THEIR REQUIREMENTS.
3. DISRUPTION OF NORMAL FACILITY ACTIVITIES ARE TO BE KEPT TO AN ABSOLUTE MINIMUM. DUST, DEBRIS, AND FUMES SHALL BE CONTROLLED SO AS NOT TO AFFECT THE HEALTH AND SAFETY OF OCCUPIED AREAS WITHIN THE FACILITY WHICH ARE OUTSIDE THE AREA OF WORK. COORDINATE WITH THE ARCHITECT AND THE OWNER'S REPRESENTATIVE WITH REGARD TO ALL ACTIVITIES TO BE CONDUCTED OUTSIDE OF THE SUITE REMODEL AREA WHICH MAY AFFECT THE OPERATION OF THE FACILITY. THE CONTRACTOR SHALL PROVIDE TEMPORARY VENTILATION (MAINTAIN WORK ZONE AT NEGATIVE PRESSURE), FILTRATION, AIR PURIFIERS, DUST SCREENS, ETC. FOR ALL WORK AREAS AFFECTED BY DEMOLITION FOR NEW INSTALLATION TO MINIMIZE DUST
AND FUMES.
4. THE CONTRACTOR SHALL PRESENT AN AREA BY AREA WORK PLAN WELL IN ADVANCE TO THE ARCHITECT AND THE OWNER'S AUTHORIZED REPRESENTATIVE FOR APPROVAL PRIOR TO BEGINNING WORK. THE WORK PLAN SHALL INCLUDE AN OUTLINE OF ALL ACTIVITIES OF ALL SUBCONTRACTORS. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER'S AUTHORIZED REPRESENTATIVE TO ESTABLISH ACCEPTABLE ROUTING AND ACCESS FOR MATERIALS REQUIRED FOR THE NEW INSTALLATION.
5. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL TRADES INCLUDING MECHANICAL, PLUMBING, ELECTRICAL, FURNITURE, AND ARCHITECTURAL. ANY DISCREPANCIES SHALL BE REPORTED IMMEDIATELY TO THE ARCHITECT
PRIOR TO START OF WORK.
6. ALL NEW TO EXISTING PIPE CONNECTIONS SHALL BE FIELD VERIFIED PRIOR TO ORDERING AND FABRICATING NEW PIPING OR
FITTINGS.
GENERAL DEMO NOTES:
• CONTRACTOR SHALL REPLACE AND RELOCATE EXISTING FIRE SPRINKLER HEAD DROPS TO SERVE THE NEW SPRINKLERS AT THE
NEW LOCATIONS.
• WHERE REQUIRED, CONTRACTOR SHALL REPLACE EXISTING FIRE PROTECTION BRANCH PIPING TO SERVE THE NEW LOCATIONS.
• CONTRACTOR SHALL PROVIDE COMPLETE FIRE PROTECTION SYSTEM COORDINATION DRAWINGS TO ENSURE ALL REQUIRED
CLEARANCES ARE MAINTAINED AND THAT NO CONFLICTS EXIST WITH ANY OTHER MECHANICAL, PLUMBING, ELECTRICAL, COMMUNICATIONS, OR STRUCTURAL SYSTEMS.
• CONTRACTOR SHALL MAINTAIN COMPLIANCE WITH THE 2022 NFPA 13 FOR ALL SPACES DURING AND AFTER RENOVATION.
FIRE PROTECTION SCOPE OF WORK:
DN DOWN
YH YARD HYDRANT
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
BOTTOM OF PIPE
ELEVATION
FINISHED FLOOR ELEVATION
FEET
GALLONS PER MINUTE
HORSEPOWER
HEAD
INCHES
INVERT
NOT APPLICABLE
NOT IN CONTRACT
NUMBER
NORMALLY CLOSED
NORMALLY OPEN
OUTSIDE SCREW AND YOKE
PHASE
POUNDS PER SQUARE INCH GAUGE
STATIC PRESSURE
TYPICAL
YARD BOX
AFF
AFG
BOP
EL
FFE
FT
GPM
HP
HD
IN
INV
NA
NIC
No. # N.C.
N.O.
OS&Y
PSIG
SP
TYP
YB
PH
QUICK RESPONSE SPRINKLERQRS
NOT TO SCALENTS
CONTRACTING OFFICER'S REPRESENTATIVECOR
FIRE ALARM STROBE/HORN WALL MOUNTED
FIRE ALARM STROBE/HORN CEILING MOUNTED
HEAT/SMOKE DETECTORH
PIPE RING HANGER
TOLCO FIG. 200
BAR JOIST OR STEEL
MEMBER BY
STRUCTURAL
1" MIN.
1" MIN.
SPRINKLER PIPE PER
PLAN
ALL THREAD ROD
TOLCO FIG. 100
REVERSIBLE BEAM CLAMP
(TYPICAL)
TOLCO FIG. 65
RESTRAINING STRAP
(TYPICAL)
TOLCO FIG. 69/69R
BASIS OF DESIGN IS TOLCO FIGURE
NUMBERS OR APPROVED EQUAL.
PIPE PER PLAN PIPE RING HANGER
TOLCO FIG. 200
ALL THREAD ROD
TOLCO FIG. 100
USE 3/8" CONCRETE INSERT FOR
UP TO 4" PIPE
USE 1/2" CONCRETE INSERT FOR
6" AND 8" PIPE
INSERT SHALL BE PLACED WITHIN
THICKEST PORTION OF
CONCRETE DECKING, TYPICAL
CONCRETE
DECKING
BASIS OF DESIGN IS TOLCO FIGURE
NUMBERS OR APPROVED EQUAL.
INSERT IS NOT
PERMITTED WITHIN
DECKING VALLEY,
TYPICAL
BASIS OF DESIGN IS TOLCO FIGURE
NUMBERS OR APPROVED EQUAL.
PIPE CLAMP
FOR SWAY
BRACING
TOLCO FIG. 4A
SPRINKLER PIPE PER PLAN
STEEL PIPE
LATERAL
BRACE
NO-THREAD SWIVEL
SWAY BRACE
ATTACHMENT TYP.
TOLCO FIG. 909
SWAY BRACE
ATTACHMENT
TO STEEL
TOLCO FIG. 800
BAR JOIST OR STEEL
MEMBER BY STRUCTURAL
BASIS OF DESIGN IS TOLCO FIGURE
NUMBERS OR APPROVED EQUAL.
SWAY BRACE
ATTACHMENT
TOLCO FIG.
SPRINKLER PIPE PER
PLAN
STEEL PIPE
LATERAL
BRACE
NO-THREAD SWIVEL
SWAY BRACE
ATTACHMENT
TOLCO FIG. 909
SWAY BRACE
ATTACHMENT
TO STEEL
TOLCO FIG. 800
BAR JOIST OR STEEL
MEMBER BY STRUCTURAL
NO-THREAD SWIVEL
SWAY BRACE
ATTACHMENT TYP.
TOLCO FIG. 909
BASIS OF DESIGN IS TOLCO FIGURE
NUMBERS OR APPROVED EQUAL.
"FAST CLAMP" BRANCH LINE
RESTRAINT ATTACHMENT
TYP.
TOLCO FIG. 909
BAR JOIST OR STEEL
MEMBER BY STRUCTURAL
SPRINKLER PIPE PER
PLAN
STEEL PIPE
LATERAL
BRACE
on e-ei gh th in ch o ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in es ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A/E:
TRIPLE C - The A/E Group
(520) 481-8548
Mat Perkins
As indicated
B
IM
/6
-2
-1
R e n o va te
D B e d W in g -B
-M
P L S
V A
M C
/6 -2
-7
.M
P L S
.3 D
.B e d .W in g .M
E P
.G e n e ra l.
S h e e ts
.r v t
/1
/2
:0 :2
P
M
09/12/2022 K. Luke N. Wicklund
618-22-102
1391 - FX001
FIRE PROTECTION ABBREVIATIONS,
SYMBOLS, AND DETAILS
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATION OF BUILDING 70 3D
BED WING100% CONSTRUCTION
DOCUMENTS
NTS
F2
WIDE FLANGE BEAM CLAMP
NTS
F4
DROP-IN ANCHOR
NTS
F5
LONGITUDINAL BRACE DETAIL
NTS
F7
LATERAL BRACE DETAIL
NTS
F9
4-WAY BRACE DETAIL
12/17/2021
EXAM
3D-119B
EXAM
3D-119C
EXAM
3D-120
EXAM
3D-121
BREAK ROOM
3D-123BREAK
3D-123A
CORRIDOR
C3-17
CORRIDOR
C3-12 STAIR
EXAM
3D-119B
EXAM
3D-119C
EXAM
3D-120
EXAM
3D-121
EXAM
3D-119A
TREATMENT
3D-119
PATIENT
3D-116C
ANTE
3D-116
PATIENT
3D-116B
TLT
3D-116A
PATIENT
3D-114C
ANTE
3D-114
PATIENT
3D-114B
TLT
3D-114A
TLT
3D-108A
PATIENT
3D-108
PATIENT
3D-107
ANTE
3D-107A
TLT
3D-107B
TLT
3D-104B
ANTE
3D-104A
PATIENT
3D-104
PATIENT
3D-103
TLT
3D-103B
ANTE
3D-103A
TLT
3D-102B
PATIENT
3D-102
ANTE ROOM
3D-102A
EXAM
3D-101
TLT
3D-101A
CORRIDOR
C3-22
CORRIDOR
C3-25
CORRIDOR
C3-24
CORRIDOR
C3-23
CORRIDOR
C3-19
EXAM
3D-135
EXAM
3D-136
TLT
3D-135A
CHECK-IN
3D-134
WORK ROOM
3D-134A
STORAGE
3D-134B
PATIENT
3D-129
HAC
3D-110
TLT
3D-111
OFFICE
3D-109
NURSING RM
3D-109A
OFFICE
3D-106
STORAGE
3D-130
OFFICE
3D-131
3D-105
3D-105
PATIENT
3D-128B
TLT
3D-128A
ANTE
3D-128
PATIENT
3D-128C
EXAM
3D-112WORK ROOM
3D-115
EXAM
3D-127
STOR
3D-127A
EXAM
3D-117
EXAM
3D-118
OFFICE
3D-125
CORRIDOR
C3-20
CORRIDOR
C3-18
CORRIDOR
C3-19
TLT
3D-126A
PATIENT
3D-126
TLT
3D-124A
PATIENT
3D-124
BREAK ROOM
3D-123BREAK
3D-123A
CORRIDOR
C3-17
CORRIDOR
C3-18
OFFICE
3C-103
LINEN CHUTE
3D-112A
CORRIDOR
C3-27
TOILET
TOILET
3C-105
CORRIDOR
C3-12 STAIR
AREA NOT IN PROJECT SCOPE -
SPRINKLERS ARE EXISTING TO REMAIN
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
3 4
TYP.
3 3
TYP.
TYP.
TYP.
TYP.
1 1 1
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
1 1
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
F A
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
/F2 FXD103 /F2 FXD103
AREA NOT IN PROJECT SCOPE -
SPRINKLERS ARE EXISTING TO REMAIN
TYP.
TYP.
TYP.
F A
6" EXISTING STAND
PIPE, FIRE
PROTECTION RISER
TO REMAIN
TYP.
/F6 P-103/F6 FXD103 /F6 FXD103
on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLAN
A/E:
TRIPLE C - The A/E Group
(612) 355-1251
Mat Perkins
A
B D
EF
G
H
J
K
L
M
C
GENERAL NOTES
KEYNOTES
As indicated
B
IM
/6
-2
-1
R e n o v a te
D
B e d W in g -B
-M
P L S
V A
M C
/6 -2
-7
.M
P L S
.3 D
.B e d .W in g .M
E P
.B .L
.r v t
/1
/2
:4
:0
A
M
09/12/2022 K. Luke K.Hutchinson
618-22-102
1391 -
FXD103
FIRE PROTECTION PLANS - THIRD LEVEL 3D
- DEMO
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATION OF BUILDING 70 3D
BED WING
100% CONSTRUCTION
DOCUMENTS
SPRINKLER HEAD LEGEND
SYM.
DEMO
TYPE
QUICK
RESPONSE
TEMP "K"
DEMO
QUANTITY
PENDENT
YES 170F 5.6UPRIGHT
YES 155F 5.6
NOTE: LEGEND INFORMATION IS SPECIFIC TO THIS SHEET ONLY
NEW
QUANTITY
SYM.
NEW
TBD
TBD
TBD
CONTRACTOR SHALL PROVIDE THE FOLLOWING PRIOR TO
COMMENCEMENT OF WORK FOR REVIEW AND APPROVAL:
A. SHOP DRAWING IDENTIFYING MAIN PIPE SIZES AND LOCATIONS,
LOCATION OF PIPE BRACING, HANGERS AND SPRINKLER HEADS
AND DETAILS
B. CUT SHEETS AND SUBMITTAL FOR ALL PIPING, FITTINGS,
SPRINKLER HEADS, HANGERS AND SUPPORT ATTACHMENTS
A. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION
WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.
CONTRACTOR SHALL FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION
OF THE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED.
CONTRACTOR TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER
SIGNIFICANTLY FROM THE CONSTRUCTION DOCUMENTS.
B. DETAILED SCHEDULE, INCLUDING PROJECTED SERVICE INTERRUPTION DATES
WITH DURATIONS, AND DETAILED PHASING PLAN IS TO BE PROVIDED TO THE COR
PRIOR TO THE START OF WORK. THIS SUBMITTAL MUST BE ACCEPTED BY THE
COR PRIOR TO THE START OF WORK.
C. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONAL DATA, CEILING
HEIGHTS, AND SQUARE FOOTAGE.
D. CONTRACTOR SHALL COORDINATE ALL WORK WITH BUILDING OWNER AND
OTHER TRADES PRIOR TO CONSTRUCTION.
E. ALL PIPING TO BE ROUTED WITHIN CEILING SPACE OR CONCEALED IN FURRED
CHASES UNLESS NOTED OTHERWISE.
F. ALL AREAS ARE DESIGNED AS LIGHT HAZARD OCCUPANCY UNLESS NOTED
OTHERWISE ON PLAN.
G. ALL SPRINKLERS SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH THE 2022
NFPA 13.
H. ALL MATERIALS, DEVICES, HANGERS AND SUPPORTS SHALL BE NEW AND UL
LISTED FOR USE IN FIRE PROTECTION SYSTEMS.
I. ALL NEW SPRINKLERS SHALL BE PROVIDED WITH NEW ESCUTCHEONS TO MATCH
EXISTING BUILDING STANDARDS.
J. INSTALL QUICK RESPONSE SPRINKLERS (QRS) IN ALL AREAS, EXCEPT WHERE
SPECIFICALLY PROHIBITED AS DEFINED BY 2022 NFPA 13.
K. PIPING TO BE SCHEDULE 40 BLACK STEEL WITH CAST IRON FITTINGS.
L. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND
RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
M. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
N. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED
WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL
PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE
CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED
FIRE PROOF CAULKING MATERIAL.
O. ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO COMMISSIONING.
P. THE SPRINKLER CONTRACTOR SHALL COORDINATE AND PERFORM ALL FIRE
PROTECTION WORK IN ACCORDANCE WITH VA REQUIREMENTS TO ENSURE THAT
CONTINUOUS SPRINKLER COVERAGE IS PROVIDED THROUGHOUT THE PROJECT.
THE SPRINKLER CONTRACTOR SHALL COORDINATE ALL FIRE PROTECTION
SYSTEM SHUTDOWNS, INCLUDING POINTS OF TIE IN, ETC. WITH THE VA PRIOR TO
PERFORMING WORK.
Q. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING COMPLIANCE WITH THE 2022
NFPA 13 FOR SURROUNDING SPACES DURING AND AFTER RENOVATION.
CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING SPRINKLER HEAD
LOCATIONS AND PIPING TO BE MODIFIED BY THE RENOVATION PRIOR TO
COMMENCING WORK.
1. EXISTING PENDENT SPRINKLER HEAD AND BRANCH PIPING TO BE REMOVED BACK
TO NEAREST BRANCH LINE OR MAIN. RECONFIGURE EXISTING SPRINKLER SYSTEM
AS REQUIRED FOR NEW SPRINKLER HEAD LOCATIONS.
2. EXISTING 6" STAND PIPE, FIRE PROTECTION RISER.
3. REMOVE EXISTING HEAT/SMOKE DETECTOR. COORDINATE WITH COR.
4. REMOVE EXISTING FIRE ALARM STROBE/HORN. COORDINATE WITH COR.
5. EXISTING FIRE SUPPRESSION CONTROL VALVE ASSEMBLY TO REMAIN,
CONTRACTOR TO COORDINATE SHUTDOWN WITH COR PRIOR TO
COMMENCEMENT OF WORK.
6. EXISTING PIPING DROP FROM INTERSTITIAL SPACE TO PLENUM SPACE BELOW TO
REMAIN, PROTECT IN PLACE.
NOTE: NOT ALL KEYNOTES
ARE USED ON EACH SHEET
SCALE: 1/8" = 1'-0"
F6
FIRE PROTECTION RCP - SOUTH -
DEMO
SCALE: 1/8" = 1'-0"
F2
FIRE PROTECTION RCP - NORTH -
DEMO
4" F
4" F
2" F
TYP.
#72
#71
/F2 FXD103i /F2 FXD103i
2" F
2" F
TYP.
4" F
4" F
4" F
C2
FXD103i
/F6 FXD103i /F6 FXD103i on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLAN
A/E:
TRIPLE C - The A/E Group
(612) 355-1251
Mat Perkins
A
B D
EF
G
H
J
K
L
M
C
GENERAL NOTES
KEYNOTES
1/8" = 1'-0"
B
IM
/6
-2
-1
R e n o v a te
D
B e d W in g -B
-M
P L S
V A
M C
/6 -2
-7
.M
P L S
.3 D
.B e d .W in g .M
E P
.B .L
.r v t
/1
/2
:4
:1
A
M
09/12/2022 K. Luke K.Hutchinson
618-22-102
1391 - FXD103i
FIRE PROTECTION PLANS - THIRD LEVEL
INTERSTITIAL 3D - DEMO
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATION OF BUILDING 70 3D
BED WING
100% CONSTRUCTION
DOCUMENTS
SPRINKLER HEAD LEGEND
SYM.
DEMO
TYPE
QUICK
RESPONSE
TEMP "K"
DEMO
QUANTITY
PENDENT
YES 170F 5.6UPRIGHT
YES 155F 5.6
NOTE: LEGEND INFORMATION IS SPECIFIC TO THIS SHEET ONLY
NEW
QUANTITY
SYM.
NEW
TBD
TBD
TBD
TBD
CONTRACTOR SHALL PROVIDE THE FOLLOWING PRIOR TO
COMMENCEMENT OF WORK FOR REVIEW AND APPROVAL:
A. SHOP DRAWING IDENTIFYING MAIN PIPE SIZES AND LOCATIONS,
LOCATION OF PIPE BRACING, HANGERS AND SPRINKLER HEADS
AND DETAILS
B. CUT SHEETS AND SUBMITTAL FOR ALL PIPING, FITTINGS,
SPRINKLER HEADS, HANGERS AND SUPPORT ATTACHMENTS
A. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION
WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.
CONTRACTOR SHALL FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION
OF THE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED.
CONTRACTOR TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER
SIGNIFICANTLY FROM THE CONSTRUCTION DOCUMENTS.
B. DETAILED SCHEDULE, INCLUDING PROJECTED SERVICE INTERRUPTION DATES
WITH DURATIONS, AND DETAILED PHASING PLAN IS TO BE PROVIDED TO THE COR
PRIOR TO THE START OF WORK. THIS SUBMITTAL MUST BE ACCEPTED BY THE
COR PRIOR TO THE START OF WORK.
C. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONAL DATA, CEILING
HEIGHTS, AND SQUARE FOOTAGE.
D. CONTRACTOR SHALL COORDINATE ALL WORK WITH BUILDING OWNER AND
OTHER TRADES PRIOR TO CONSTRUCTION.
E. ALL PIPING TO BE ROUTED WITHIN CEILING SPACE OR CONCEALED IN FURRED
CHASES UNLESS NOTED OTHERWISE.
F. ALL AREAS ARE DESIGNED AS LIGHT HAZARD OCCUPANCY UNLESS NOTED
OTHERWISE ON PLAN.
G. ALL SPRINKLERS SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH THE 2022
NFPA 13.
H. ALL MATERIALS, DEVICES, HANGERS AND SUPPORTS SHALL BE NEW AND UL
LISTED FOR USE IN FIRE PROTECTION SYSTEMS.
I. ALL NEW SPRINKLERS SHALL BE PROVIDED WITH NEW ESCUTCHEONS TO MATCH
EXISTING BUILDING STANDARDS.
J. INSTALL QUICK RESPONSE SPRINKLERS (QRS) IN ALL AREAS, EXCEPT WHERE
SPECIFICALLY PROHIBITED AS DEFINED BY 2022 NFPA 13.
K. PIPING TO BE SCHEDULE 40 BLACK STEEL WITH CAST IRON FITTINGS.
L. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND
RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
M. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
N. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED
WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL
PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE
CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED
FIRE PROOF CAULKING MATERIAL.
O. ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO COMMISSIONING.
P. THE SPRINKLER CONTRACTOR SHALL COORDINATE AND PERFORM ALL FIRE
PROTECTION WORK IN ACCORDANCE WITH VA REQUIREMENTS TO ENSURE THAT
CONTINUOUS SPRINKLER COVERAGE IS PROVIDED THROUGHOUT THE PROJECT.
THE SPRINKLER CONTRACTOR SHALL COORDINATE ALL FIRE PROTECTION
SYSTEM SHUTDOWNS, INCLUDING POINTS OF TIE IN, ETC. WITH THE VA PRIOR TO
PERFORMING WORK.
Q. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING COMPLIANCE WITH THE 2022
NFPA 13 FOR SURROUNDING SPACES DURING AND AFTER RENOVATION.
CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING SPRINKLER HEAD
LOCATIONS AND PIPING TO BE MODIFIED BY THE RENOVATION PRIOR TO
COMMENCING WORK.
1. EXISTING PENDENT SPRINKLER HEAD AND BRANCH PIPING TO BE REMOVED BACK
TO NEAREST BRANCH LINE OR MAIN. RECONFIGURE EXISTING SPRINKLER SYSTEM
AS REQUIRED FOR NEW SPRINKLER HEAD LOCATIONS.
2. EXISTING 6" STAND PIPE, FIRE PROTECTION RISER.
3. REMOVE EXISTING HEAT/SMOKE DETECTOR. COORDINATE WITH COR.
4. REMOVE EXISTING FIRE ALARM STROBE/HORN. COORDINATE WITH COR.
5. EXISTING FIRE SUPPRESSION CONTROL VALVE ASSEMBLY TO REMAIN,
CONTRACTOR TO COORDINATE SHUTDOWN WITH COR PRIOR TO
COMMENCEMENT OF WORK.
6. EXISTING PIPING DROP FROM INTERSTITIAL SPACE TO PLENUM SPACE BELOW TO
REMAIN, PROTECT IN PLACE.
NOTE: NOT ALL KEYNOTES
ARE USED ON EACH SHEET
SCALE: 1/8" = 1'-0"
F6
FIRE PROTECTION PLAN - THIRD
LEVEL INTERSTITIAL - SOUTH
SCALE: 1/8" = 1'-0"
F2
FIRE PROTECTION PLAN - THIRD
LEVEL INTERSTITIAL - NORTH
NOT TO SCALE
C2
SUPPRESSION CONTROL VALVE ASSEMBLY - REFERENCE PHOTOS
F A
C P
AREA NOT IN PROJECT SCOPE -
SPRINKLERS ARE EXISTING TO REMAIN
RR 9
3D-109A
PATIENT 9
3D-109
RR 10
3D-121A
CORRIDOR
C3-12 STAIR
IT CLOSET
3D-122B
CIRCULATION
C3-18
TYP.
TYP.
F A
TYP.
TYP.
TYP.
TYP.
6 FA- 1
FA- 2FA- 3
SP- 1
SP- 2SP- 3
SP- 4
SP- 11
" 3
/2
/2
6' - 3" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0"
7' - 6" 5' - 10"7' - 5"
ANTE ROOM
3D-121B
PATIENT 10
3D-121
/2
/F6 FX103/F6 FX103
FX401
F7
FX401
F5
AREA NOT IN PROJECT SCOPE -
SPRINKLERS ARE EXISTING TO REMAIN
D1
D2
D3
TOILET
3C-105
BARIATRIC 1
3D-101
RR 1
3D-101A
PATIENT 2
3D-102
RR 2
3D-102A
PATIENT 3
3D-103
RR 3
3D-103A
RR 4
3D-104A
PATIENT 4
3D-104
RR 5
3D-105A
PATIENT 5
3D-105
RR 6
3D-106A
PATIENT 6
3D-106
RR 7
3D-107A
PATIENT 8
3D-108
RR 8
3D-108A
PATIENT 7
3D-107
RR 9
3D-109A
PATIENT 9
3D-109
PHARM OFFICE
3D-120
EQUIPMENT ROOM
3D-115
NUTRITION
3D-135
SOILED UTILITY
3D-134
MED ROOM
3D-112
HAC
3D-119
NURSE MNGR OFFICE
3D-111
MSA'S
3D-100
CLEAN LINENS
3D-138
SPS STORAGE
3D-114
STAFF BREAK ROOM
3D-116
PATIENT 11
3D-123RR 11
3D-123A
PATIENT 12
3D-125
PATIENT 13
3D-126
RR 13
3D-126A
CIRCULATION
C3-20
STAFF WORK
3D-136
RR 12
3D-125A
PATIENT 14
3D-128
PATIENT 15
3D-129
RR 15
3D-129A
RR 14
3D-128A
RR 10
3D-121A
SAFER PATIENT 17
3D-132
SAFER PATIENT 16
3D-131RR 16
3D-131A
RR 17
3D-132A
PATIENT 18
3D-133
RR 18
3D-133A
EQUIP. ALCOVE
3D-140
ASST. NURSE MNGR
3D-110
EQUIP. ALCOVE
3D-139
CIRCULATION
C3-24
CORRIDOR
C3-12
CORRIDOR
C3-27
STAIR
STAIR
ANTE ROOM
3D-133B
IT CLOSET
3D-122B
OXYGEN STOR.
3D-118
ANTE ROOM
3D-101B
CIRCULATION
C3-25
CIRCULATION
C3-18
EQUIP ALCOVE
3D-137
CHARTING
C3-25A
CHARTING
3D-141
CHARTING
3D-142
EQUIP. ALCOVE
3D-127
CHARTING
C3-19A
CHARTING
C3-19B
CHARTING
C3-19C
CIRCULATION
C3-19
CIRCULATION
C3-19
TOILET
3C-104
TYP.
TYP.
TYP.
F A
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
6 FA- 1
FA- 2FA- 3
SP- 1
SP- 2SP- 3
SP- 10FA- 10
FA- 9 SP- 9
FA- 8 SP- 8
SP- 6
SP- 7
FA- 7
FA- 6
FA- 5
SP- 5
SP- 4FA- 4
FA- 11 SP- 11
SP- 12FA- 12
SP- 13
FA- 13
SP- 14
FA- 14
SP- 15
FA- 15
SP- 16FA- 16
SP- 17
FA- 17
FA- 18
FA- 19
FA- 20
FA- 21
FA- 22
FA- 24
FA- 23
FA- 25
FA- 27
FA- 28
FA- 30
FA- 29
FA- 31
FA- 32
FA- 33
FA- 34
FA- 35
FA- 36
FA- 37
FA- 38
FA- 39
FA- 40
FA- 41
FA- 42
FA- 43
FA- 44
FA- 45
FA- 46
FA- 47
FA- 48
FA- 49
FA- 50
FA- 51
FA- 52
CLEAN UTILITY
3D-113
STAFF TOILET
3D-117
/2
6' - 2"
6' - 0" 7' - 2 1/2"
/2
/2
4' - 11" 7' - 2"
3' - 6 1/2"
7' - 3" 6' - 8 1/2"
/2
/2
5' - 7 1/2" 6' - 6"
14' - 0" 5' - 6"
6' - 2 1/2"
/2
14' - 0" 5' - 6"
7' - 6" 12' - 0" 7' - 2 1/2"
6' - 11"
6' - 11"
/2
/2
7' - 6" 12' - 0" 7' - 2 1/2"
/2
8' - 0" 12' - 0"
6' - 0" 12' - 0"
/2
/2
6' - 2 1/2"
6' - 5 1/2"
/2
4' - 2"
5' - 4" 9' - 11 1/2"
/2
7' - 0 1/2"
" 3
/2
/2
6' - 3" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0"
7' - 6" 5' - 10"
3' - 7 1/2"
/2
5' - 1 1/2" 6' - 0 1/2"
4' - 1" 7' - 6"
6' - 5" 12' - 0"
/2
6' - 0"
5' - 11 1/2"
/2
5' - 11"
7' - 5" 10' - 0"
/2
/2
7' - 5" 5' - 0"
5' - 0" 7' - 0"
/2
/2
6' - 2 1/2"
/2
6' - 2 1/2"
5' - 11" 12' - 0" 5' - 6"
/2
3' - 11" 14' - 0" 6' - 6" 7
/2
6' - 3"
6' - 3"
7' - 5" 12' - 0" 5' - 0"
5' - 7" 14' - 0" 4' - 10"
/2
/2
7' - 2"
6' - 9"
3' - 3 1/2"
5' - 6 1/2" 4' - 11"
2' - 6" 10' - 0"
5' - 3"
/2
5' - 3"
/2
5' - 8 1/2"
4' - 7"
7' - 2 1/2"
/2
5' - 3"
/2
6' - 5 1/2" 8' - 0" 7' - 6"
/2
6' - 4" 6' - 0" 3' - 7"
6' - 4" 6' - 7"
4' - 3"
4' - 6"
5' - 11 1/2" 6' - 2 1/2"
/2
/2
4' - 6 1/2" 12' - 0" 5' - 5"
/2
FEC
FEC
FEC
12' - 0" 7' - 5 1/2"
/2
6' - 2 1/2"
7' - 5"
ANTE ROOM
3D-121B
PATIENT 10
3D-121
5' - 0" 7' - 0"
/2
5' - 5 1/2" 6' - 6"
5' - 6"
7' - 0"
6' - 1 1/2"
/2
2' - 7" 5' - 1"
/2
5' - 1 1/2" 8' - 0"
/2
/2
/2
4' - 0"
1' - 5"
7' - 2 1/2" 6' - 1"
6' - 6 1/2"
/2
2' - 9 1/2" 11' - 1 1/2" 12' - 0" 9' - 11 1/2" 2' - 11"
1' - 5" 6' - 4 1/2" 2' - 11"
/2
/2
7' - 5 1/2"
7' - 3 1/2"
2' - 3 1/2" 10' - 0" 8' - 0" 2' - 5 1/2"
/F3 FX103 /F3 FX103
on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLAN
A/E:
TRIPLE C - The A/E Group
(612) 355-1251
Mat Perkins
A
B D
EF
G
H
J
K
L
M
C
GENERAL NOTES
KEYNOTES
As indicated
B
IM
/6
-2
-1
R e n o v a te
D
B e d W in g -B
-M
P L S
V A
M C
/6 -2
-7
.M
P L S
.3 D
.B e d .W in g .M
E P
.B .L
.r v t
/1
/2
:3
:5
A
M
09/12/2022 K. Luke K.Hutchinson
618-22-102
1391 - FX103
FIRE PROTECTION PLANS - THIRD LEVEL 3D
- NEW
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATION OF BUILDING 70 3D
BED WING
100% CONSTRUCTION
DOCUMENTS
SCALE: 1/8" = 1'-0"
F3
FIRE PROTECTION PLANS - THIRD
LEVEL 3D - NEW
SCALE: 1/8" = 1'-0"
F6
FIRE PROTECTION PLANS - THIRD
LEVEL 3D - NEW
SPRINKLER HEAD LEGEND
SYM.
DEMO
TYPE
QUICK
RESPONSE
TEMP "K"
DEMO
QUANTITY
PENDENT
YES 170F 5.6UPRIGHT
YES 155F 5.6
NOTE: LEGEND INFORMATION IS SPECIFIC TO THIS SHEET ONLY
NEW
QUANTITY
SYM.
NEW
TBD
TBD
TBD
TBD
DEDUCTIVE ALTERNATES
D1
DEDUCTIVE ALTERNATE #1: PROVIDE STORAGE ROOM IN
LIEU OF PATIENT ROOMS 10 AND 11 (3D-310/A & 3D-311/A).
REMOVE SCOPE OF WORK ASSOCIATED WITH NEW
HEADWALL, PLUMBING, SPECIALTY EQUIPMENT.
D2
D3
DEDUCTIVE ALTERNATE #2: PROVIDE STORAGE ROOM IN
LIEU OF PATIENT ROOMS 12 AND 13 (3D-312/A & 3D-313/A).
REMOVE SCOPE OF WORK ASSOCIATED WITH NEW
HEADWALL, PLUMBING, SPECIALTY EQUIPMENT.
DEDUCTIVE ALTERNATE #3: PROVIDE STORAGE ROOM IN
LIEU OF PATIENT ROOMS 14, 15, 16, AND 17 (3D-314/A,
3D-315/A, 3D-316/A & 3D-317/A). REMOVE SCOPE OF WORK
ASSOCIATED WITH NEW HEADWALL, PLUMBING, SPECIALTY
EQUIPMENT.
NOTE: DEDUCTIVE ALTERNATES ARE CASCADING AND MUST BE TAKEN IN
SEQUENTIAL ORDER.
CONTRACTOR SHALL PROVIDE THE FOLLOWING PRIOR TO
COMMENCEMENT OF WORK FOR REVIEW AND APPROVAL:
A. SHOP DRAWING IDENTIFYING MAIN PIPE SIZES AND LOCATIONS,
LOCATION OF PIPE BRACING, HANGERS AND SPRINKLER HEADS
AND DETAILS
B. CUT SHEETS AND SUBMITTAL FOR ALL PIPING, FITTINGS,
SPRINKLER HEADS, HANGERS AND SUPPORT ATTACHMENTS
A. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION
WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.
CONTRACTOR SHALL FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION
OF THE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED.
CONTRACTOR TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER
SIGNIFICANTLY FROM THE CONSTRUCTION DOCUMENTS.
B. DETAILED SCHEDULE, INCLUDING PROJECTED SERVICE INTERRUPTION DATES
WITH DURATIONS, AND DETAILED PHASING PLAN IS TO BE PROVIDED TO THE COR
PRIOR TO THE START OF WORK. THIS SUBMITTAL MUST BE ACCEPTED BY THE
COR PRIOR TO THE START OF WORK.
C. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONAL DATA, CEILING
HEIGHTS, AND SQUARE FOOTAGE.
D. CONTRACTOR SHALL COORDINATE ALL WORK WITH BUILDING OWNER AND
OTHER TRADES PRIOR TO CONSTRUCTION.
E. ALL PIPING TO BE ROUTED WITHIN CEILING SPACE OR CONCEALED IN FURRED
CHASES UNLESS NOTED OTHERWISE.
F. ALL AREAS ARE DESIGNED AS LIGHT HAZARD OCCUPANCY UNLESS NOTED
OTHERWISE ON PLAN.
G. ALL SPRINKLERS SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH THE 2022
NFPA 13.
H. ALL MATERIALS, DEVICES, HANGERS AND SUPPORTS SHALL BE NEW AND UL
LISTED FOR USE IN FIRE PROTECTION SYSTEMS.
I. ALL NEW SPRINKLERS SHALL BE PROVIDED WITH NEW ESCUTCHEONS TO MATCH
EXISTING BUILDING STANDARDS.
J. INSTALL QUICK RESPONSE SPRINKLERS (QRS) IN ALL AREAS, EXCEPT WHERE
SPECIFICALLY PROHIBITED AS DEFINED BY 2022 NFPA 13.
K. PIPING TO BE SCHEDULE 40 BLACK STEEL WITH CAST IRON FITTINGS.
L. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND
RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
M. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
N. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED
WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL
PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE
CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED
FIRE PROOF CAULKING MATERIAL.
O. ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO COMMISSIONING.
P. THE SPRINKLER CONTRACTOR SHALL COORDINATE AND PERFORM ALL FIRE
PROTECTION WORK IN ACCORDANCE WITH VA REQUIREMENTS TO ENSURE THAT
CONTINUOUS SPRINKLER COVERAGE IS PROVIDED THROUGHOUT THE PROJECT.
THE SPRINKLER CONTRACTOR SHALL COORDINATE ALL FIRE PROTECTION
SYSTEM SHUTDOWNS, INCLUDING POINTS OF TIE IN, ETC. WITH THE VA PRIOR TO
PERFORMING WORK.
Q. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING COMPLIANCE WITH THE 2022
NFPA 13 FOR SURROUNDING SPACES DURING AND AFTER RENOVATION.
CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING SPRINKLER HEAD
LOCATIONS AND PIPING TO BE MODIFIED BY THE RENOVATION PRIOR TO
COMMENCING WORK.
1. PROVIDE NEW FIRE SUPPRESSION SYSTEM FOR THE RENOVATED AREA. INSTALL
SPRINKLER HEADS AND PIPING HANGERS IN ACCORDANCE WITH THE 2022 NFPA
13. SEE SHEET FX001 FOR ADDITIONAL INFORMATION.
2. EXISTING 6" STAND PIPE, FIRE PROTECTION RISER.
3. EXISTING FIRE SUPPRESSION CONTROL VALVE ASSEMBLY, CONTRACTOR TO
COORDINATE SHUTDOWN WITH COR PRIOR TO COMMENCEMENT OF WORK.
4. EXISTING PIPING DROP FROM INTERSTITIAL SPACE TO PLENUM SPACE BELOW TO
REMAIN, PROTECT IN PLACE.
5. CONTRACTOR TO FIELD COORDINATE EXTENTS OF DEMO FOR EXISTING PIPING
RECONFIGURATION.
6. PROVIDE NEW CEILING MOUNTED SMOKE DETECTOR AS SHOWN.
7. PROVIDE NEW WALL MOUNTED COMBINATION SPEAKER STROBE AS SHOWN.
8. PROVIDE NEW SEMI RECESSED SPRINKLER HEADS.
NOTE: NOT ALL KEYNOTES
ARE USED ON EACH SHEET
RR 16
3D-131A
67 SF
RR 17
3D-132A
68 SF
SAFER PATIENT
3D-132
268 SF
SAFER PATIENT
3D-131
292 SF
/2
5' - 7" 14' - 0" 4' - 10"
/2
/2
7' - 0" 5' - 0"
7' - 5" 12' - 0" 5' - 0"
6' - 3" 5' - 7"
6' - 1 1/2" 5' - 8"
/2
/2
TYP.
TYP.
TYP.
TYP.
PATIENT 6
3D-106
297 SF
PATIENT 5
3D-105
289 SF
RR 5
3D-105A
72 SF
RR 6
3D-106A
72 SF
/2
7' - 6" 6' - 5 1/2"
7' - 6" 12' - 0" 7' - 2 1/2"
/2
5' - 2 1/2" 6' - 11"
5' - 2 1/2" 6' - 11"
/2
/2
/2
/2
7' - 6" 12' - 0" 7' - 2 1/2"
/2
/2
7' - 4" 6' - 7 1/2"
TYP.
TYP.
on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLAN
A/E:
TRIPLE C - The A/E Group
(612) 355-1251
Mat Perkins
A
B D
EF
G
H
J
K
L
M
C
GENERAL NOTES
KEYNOTES
1/4" = 1'-0"
B
IM
/6
-2
-1
R e n o v a te
D
B e d W in g -B
-M
P L S
V A
M C
/6 -2
-7
.M
P L S
.3 D
.B e d .W in g .M
E P
.B .L
.r v t
/1
/2
:4
:0
A
M
09/12/2022 K. Luke G. Weaver
618-22-102
1391 - FX401
FIRE PROTECTION ENLARGED PLANS
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATION OF BUILDING 70 3D
BED WING
100% CONSTRUCTION
DOCUMENTS
SCALE: 1/4" = 1'-0"
F7
FIRE PROTECTION ENLARGED PLAN -
THIRD LEVEL 3D - TYPICAL PATIENT
ROOM TYPE 1 - NEW
SCALE: 1/4" = 1'-0"
F5
FIRE PROTECTION ENLARGED PLAN -
THIRD LEVEL 3D - TYPICAL PATIENT
ROOM TYPE 2 - NEW
SPRINKLER HEAD LEGEND
SYM.
DEMO
TYPE
QUICK
RESPONSE
TEMP "K"
DEMO
QUANTITY
PENDENT
YES 170F 5.6UPRIGHT
YES 155F 5.6
NOTE: LEGEND INFORMATION IS SPECIFIC TO THIS SHEET ONLY
NEW
QUANTITY
SYM.
NEW
TBD
TBD
TBD
TBD
CONTRACTOR SHALL PROVIDE THE FOLLOWING PRIOR TO
COMMENCEMENT OF WORK FOR REVIEW AND APPROVAL:
A. SHOP DRAWING IDENTIFYING MAIN PIPE SIZES AND LOCATIONS,
LOCATION OF PIPE BRACING, HANGERS AND SPRINKLER HEADS
AND DETAILS
B. CUT SHEETS AND SUBMITTAL FOR ALL PIPING, FITTINGS,
SPRINKLER HEADS, HANGERS AND SUPPORT ATTACHMENTS
A. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION
WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.
CONTRACTOR SHALL FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION
OF THE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED.
CONTRACTOR TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER
SIGNIFICANTLY FROM THE CONSTRUCTION DOCUMENTS.
B. DETAILED SCHEDULE, INCLUDING PROJECTED SERVICE INTERRUPTION DATES
WITH DURATIONS, AND DETAILED PHASING PLAN IS TO BE PROVIDED TO THE COR
PRIOR TO THE START OF WORK. THIS SUBMITTAL MUST BE ACCEPTED BY THE
COR PRIOR TO THE START OF WORK.
C. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONAL DATA, CEILING
HEIGHTS, AND SQUARE FOOTAGE.
D. CONTRACTOR SHALL COORDINATE ALL WORK WITH BUILDING OWNER AND
OTHER TRADES PRIOR TO CONSTRUCTION.
E. ALL PIPING TO BE ROUTED WITHIN CEILING SPACE OR CONCEALED IN FURRED
CHASES UNLESS NOTED OTHERWISE.
F. ALL AREAS ARE DESIGNED AS LIGHT HAZARD OCCUPANCY UNLESS NOTED
OTHERWISE ON PLAN.
G. ALL SPRINKLERS SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH THE 2022
NFPA 13.
H. ALL MATERIALS, DEVICES, HANGERS AND SUPPORTS SHALL BE NEW AND UL
LISTED FOR USE IN FIRE PROTECTION SYSTEMS.
I. ALL NEW SPRINKLERS SHALL BE PROVIDED WITH NEW ESCUTCHEONS TO MATCH
EXISTING BUILDING STANDARDS.
J. INSTALL QUICK RESPONSE SPRINKLERS (QRS) IN ALL AREAS, EXCEPT WHERE
SPECIFICALLY PROHIBITED AS DEFINED BY 2022 NFPA 13.
K. PIPING TO BE SCHEDULE 40 BLACK STEEL WITH CAST IRON FITTINGS.
L. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND
RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
M. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
N. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED
WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL
PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE
CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED
FIRE PROOF CAULKING MATERIAL.
O. ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO COMMISSIONING.
P. THE SPRINKLER CONTRACTOR SHALL COORDINATE AND PERFORM ALL FIRE
PROTECTION WORK IN ACCORDANCE WITH VA REQUIREMENTS TO ENSURE THAT
CONTINUOUS SPRINKLER COVERAGE IS PROVIDED THROUGHOUT THE PROJECT.
THE SPRINKLER CONTRACTOR SHALL COORDINATE ALL FIRE PROTECTION
SYSTEM SHUTDOWNS, INCLUDING POINTS OF TIE IN, ETC. WITH THE VA PRIOR TO
PERFORMING WORK.
Q. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING COMPLIANCE WITH THE 2022
NFPA 13 FOR SURROUNDING SPACES DURING AND AFTER RENOVATION.
CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING SPRINKLER HEAD
LOCATIONS AND PIPING TO BE MODIFIED BY THE RENOVATION PRIOR TO
COMMENCING WORK.
1. PROVIDE NEW FIRE SUPPRESSION SYSTEM FOR THE RENOVATED AREA. INSTALL
SPRINKLER HEADS AND PIPING HANGERS IN ACCORDANCE WITH THE 2022 NFPA
13. SEE SHEET FX001 FOR ADDITIONAL INFORMATION.
2. EXISTING 6" STAND PIPE, FIRE PROTECTION RISER.
3. EXISTING FIRE SUPPRESSION CONTROL VALVE ASSEMBLY, CONTRACTOR TO
COORDINATE SHUTDOWN WITH COR PRIOR TO COMMENCEMENT OF WORK.
4. EXISTING PIPING DROP FROM INTERSTITIAL SPACE TO PLENUM SPACE BELOW TO
REMAIN, PROTECT IN PLACE.
5. CONTRACTOR TO FIELD COORDINATE EXTENTS OF DEMO FOR EXISTING PIPING
RECONFIGURATION.
6. PROVIDE NEW CEILING MOUNTED SMOKE DETECTOR AS SHOWN.
7. PROVIDE NEW WALL MOUNTED COMBINATION SPEAKER STROBE AS SHOWN.
8. PROVIDE NEW SEMI RECESSED SPRINKLER HEADS.
NOTE: NOT ALL KEYNOTES
on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A/E:
TRIPLE C - The A/E Group
(520) 481-8548
Mat Perkins
B
IM
/6
-2
-1
R e n o va te
D B e d W in g -B
-M
P L S
V A
M C
/6 -2
-7
.M
P L S
.3 D
.B e d .W in g .M
E P
.G e n e ra l.
S h e e ts
.r v t
/1
/2
:0 :5
P
M
09/12/2022 K. Luke N. Wicklund
618-22-102
1391 - FX901
FIRE PROTECTION CUTSHEETS & BASIS OF
DESIGN
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATION OF BUILDING 70 3D
BED WING100% CONSTRUCTION
DOCUMENTS12/17/2021
DN DOWN
WC WATER CLOSET
FLUSH VALVEFV
YH YARD HYDRANT
TD TRENCH DRAIN
FOV
FOR
FOS
FUEL OIL VENT
FUEL OIL RETURN
FUEL OIL SUPPLY
ES
EEW
EMERGENCY SHOWER
EMERGENCY EYEWASH
CWV COMBINATION WASTE AND VENT
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
ACID NEUTRALIZING TANK
ACID RESISTANT VENT THROUGH ROOF
BALANCING COCK
BOTTOM OF PIPE
BRITISH THERMAL UNIT
BTU PER HOUR
CLOTHES WASHER BOX
CORROSION RESISTANT STEEL
CLEANOUT
CLEANOUT TO GRADE
CIRCULATION PUMP
DOUBLE CLEANOUT
DRINKING FOUNTAIN
ELEVATION
ELECTRIC WATER HEATER
ELECTRIC WATER COOLER
DEGREES FAHRENHEIT
FLOOR CLEANOUT
FINISHED FLOOR ELEVATION
FEET
GUTTER DRAIN
GREASE INTERCEPTOR
GALLONS PER HOUR
GALLONS PER MINUTE
GAS WATER HEATER
HORSEPOWER
HEAD
INCHES
INVERT
KILOWATT
1,000 BTUH
MIXING VALVE
NOT APPLICABLE
NOT IN CONTRACT
NUMBER
NORMALLY CLOSED
NORMALLY OPEN
OUTSIDE SCREW AND YOKE
PHASE
POUNDS PER SQUARE INCH GAUGE
STATIC PRESSURE
TYPICAL
YARD BOX
WALL CLEANOUT
AFF
AFG
ANT
AVTR
B.C.
BOP
BTU
BTUH
CWB
CRS
CO
COTG
CP
DCO
DF
EL
EWH
EWC
°F
FCO
FFE
FT
GD
GI
GPH
GPM
GWH
HP
HD
IN
INV
kW MBh
MV
NA
NIC
No. # N.C.
N.O.
OS&Y
Ph
PSIG
SP
TYP
YB
WCO
DOUBLE CLEANOUT TO GRADEDCOTG
ESEW EMERGENCY SHOWER EYE WASH
POWERS OF HARDNESS
PH
HOSE BIBBHB
DS DOWNSPOUT
DSN DOWNSPOUT NOZZLE
PLUMBING SYMBOL LEGEND
NOTE: NOT ALL ABBREVIATIONS OR SYMBOLS APPLY TO THIS PROJECT
ABBREVIATIONS
A
PENETRATION
TEST PLUG (PRESS/TEMP)
(WH) (HB)
RD/OD/DD
DCOTG
FCO/COTG
FS/FD/AD
VTR
ROOF DRAIN/OVERFLOW DRAIN/DECK DRAIN
TWO WAY OR DOUBLE CLEANOUT TO GRADE
FLOOR CLEANOUT/CLEANOUT TO GRADE
FLOOR SINK , FLOOR DRAIN , AREA DRAIN
WATER HAMMER ARREST0R
FITTING (PETE'S PLUG)
POINT OF CONNECTION TO EXISTING
AQUASTAT
PRESSURE GAUGE AND GAUGE COCK
THERMOMETER
STRAINER WITH BLOWDOWN VALVE & HOSE BIBB
NEW PIPE CONNECTION TO EXISTING PIPING
EXISTING PIPE TO BE REMOVED
EXISTING PIPING TO REMAIN
NEW PIPING
FLEXIBLE CONNECTION
UNIVERSAL TEMPERATURE-PRESSURE
ORIFICE UNION
FLANGED UNION
UNION
RISE IN PIPE
DROP IN PIPE
CAPPED OUTLET
SIDE CONNECTION
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
ECCENTRIC REDUCER
REDUCER OR INCREASER
PIPE GUIDE
DIRECTION OF FLOW
MAV MANUAL AIR VENT (MAV)
AAV AUTOMATIC AIR VENT (AAV)
TRAP PRIMER WITH ACCESS PANELTP
SLOPE OF PIPE
VENT THROUGH ROOF
AG AIR GAP FITTING
WALL HYDRANT, HOSE BIBB
KEYED NOTE
OR
SCHEMATIC SYMBOLS
ABBREVIATIONSYMBOL DESCRIPTION
XX
CARBON DIOXIDECO2
H
HE
AC
AR
CDA
LOX
LN
DV
DA
WAGD
IA
MV
O
NO
N
MA
DENTAL VACUUM
WASTE ANESTHESIA GAS DISPOSAL
INSTRUMENT AIR
DENTAL AIR
EXISTING PIPING
LIQUID NITROGEN
LIQUID OXYGEN
HYDROGEN
HELIUM
ACETYLENE
ARGON
COMPRESSED DRY AIR
ALARM PANEL (IN WALL)
MEDICAL VALVE BOX
MEDICAL GAS DROP
MEDICAL VACUUM
OXYGEN
NITROUS OXIDE
NITROGEN
MEDICAL AIR
O OXYGEN
CDA
CO2
AR
AC
HE
H
LN
LOX
MA
N
NO
O
MV
IA
WAGD
DA
DV
O
SYMBOL ABBREVIATION DESCRIPTION
DESCRIPTIONABBREVIATIONSYMBOL
PROCESS GASES
MEDICAL GAS SYMBOLS
S
VACUUM BREAKER
ATMOSPHERIC VACUUM BREAKER
PRESSURE STYLE
FLOW SWITCH
SOLENOID VALVE
FUEL GAS PRESSURE REGULATOR
DIAPHRAGM (PROCESS SYSTEMS)
OS&Y VALVE
GATE VALVE
GLOBE VALVE
BUTTERFLY VALVE
BALL VALVE
CHECK VALVE
PLUG VALVE
WATER PRESSURE REDUCING VALVE
PRESSURE RELIEF VALVE
TEMPERATURE AND PRESSURE RELIEF VALVE
2-WAY CONTROL VALVE
3-WAY MODULATING CONTROL VALVE
VALVE IN VERTICAL
REDUCED PRESSURE BACKFLOW PREVENTER (RPBP)
DRAIN VALVE
BALANCING VALVE/CIRCUIT SETTER MEASURING DEVICE
OR OR
OR
OR
DESCRIPTIONSYMBOL
VALVE SYMBOLS
P##
DRAWING NUMBER WHERE DETAILED
SECTION LETTER
DRAWING NUMBER WHERE DETAILED
DETAIL NUMBER
DRAWING NUMBER WHERE DETAILED
SECTION LETTER
DRAWING NUMBER WHERE DETAILED
DETAIL NUMBER
DRAWING NUMBER WHERE DETAILED
ELEVATION LETTER
LETTER REFER TO EQUIPMENT TYPE
NUMBER REFERS TO SPECIFIC EQUIPMENT
SYMBOL INDICATES FIXTURE/EQUIPMENT
IDENTIFIED IN EQUIPMENT SCHEDULE
SECTION SYMBOL
DETAIL SYMBOL
SECTION, ELEVATION, AND DETAIL TITLES
FIXTURE & EQUIPMENT SYMBOL
P-100
A
P-500
P-200
A
P-500
P-300
A
SCALE
ELEVATION
SCALE
DETAIL
SCALE
SECTION
IRR
INDIRECT WASTEIW
TW
TWR
SAN
V
DHWR
DCW
DHW
LA
IA
INW
IHWR
IHW
ICW
PD
SCW
IRR
NGH
NGM
G
LPG
ORD
RD
DIR
DIS
NPW
MU
ROR
ROS
CD
CA
AW
AV
PUMPED DISCHARGE LINE
IRRIGATION
SOFT COLD WATER
TEMPERED WATER (TEMP °F)
TEMPERED WATER RETURN (TEMP °F)
NATURAL GAS-HIGH PRESSURE
NATURAL GAS-MEDIUM PRESSURE
LAB COMPRESSED AIR
INSTRUMENT COMPRESSED AIR
INDUSTRIAL WASTE
REVERSE OSMOSIS RETURN
INDUSTRIAL HOT WATER RETURN
INDUSTRIAL HOT WATER
INDUSTRIAL COLD WATER
NATURAL GAS-LOW PRESSURE
LIQUIFIED PETROLEUM GAS
OVERFLOW ROOF DRAIN
STORM/ROOF DRAIN
SANITARY SEWER
DEIONIZED WATER RETURN
DEIONIZED WATER SUPPLY
VENT
NON-POTABLE WATER
MAKE-UP WATER
REVERSE OSMOSIS SUPPLY
140° DOMESTIC HOT WATER
140° DOMESTIC HOT WATER RETURN
DOMESTIC HOT WATER RETURN
DOMESTIC HOT WATER
DOMESTIC COLD WATER
CONDENSATE DRAIN
COMPRESSED AIR
ACID WASTE
ACID VENT
SHW SOFT HOT WATER
SAN
AV
AW
CA
CD
ROS
ROR
NPW
V
DIS
DIR
RD
ORD
LPG
G
NGM
NGH
SCW
PD
INW
IA
IW
LA
SHW
GW GREASE WASTEGW
GV GREASE VENT
ABBREVIATIONSYMBOL DESCRIPTION
PIPING SYMBOLS
ICW
IHW
IHWR
TWR (_ _ _)
TW (_ _ _)
GV
DCW
DHW
DHWR
DHW 140ºF
DHWR 140ºF
MU
DHW 140ºF
DHWR 140ºF
CUBIC FEET PER HOURCFH
O OXYGENO
MA MEDICAL AIRMA
MV MEDICAL VACUUMMV
on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .