S06 Revised Drawings MP103i M-501 and M-502 - 3 pages.pdf
PDF 9 MB Posted
- Solicitation number
- 36C26323R0023
About this file
This document package includes mechanical drawings and details for a federal construction project to renovate a private patient bed ward at a Department of Veterans Affairs medical center. The drawings show proposed mechanical system upgrades including new terminal units, control valves, piping, fittings, and connections for heating water supply and return systems. Details provide specifications for pipe sleeves, vibration isolation, securing hangers, and terminal unit and ductwork installations. The solicitation is for project 618-22-102 to renovate ward 3D at the Minneapolis VA Medical Center for approximately $36 million. Proposals are due by January 2023 with award planned for April 2023.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR 3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
2 1/2" HWR
2 1/2" HWS
1 1/2" HWR
1 1/2" HWS
1 1/2" HWR
1 1/2" HWS
1 1/4" HWR
1 1/4" HWS
1 1/4" HWS
1 1/4" HWR
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
70.VAV.21.3D-128
70.VAV.21.C3-18
70.VAV.21.3D-111
70.VAV.21.C3-25.3
70.VAV.21.3D-107
70.VAV.21.3D-126
70.VAV.21.3D-104
70.VVE.21.3D-101.2
70.VAV.21.3D-122
70.VVS.21.3D-101
70.VAV.21.3D-102
70.VAV.21.3D-119
70.VAV.21.3D-138
70.VVS.21.3D-118
70.VAV.21.3D-116
70.VAV.21.C3-19.3
70.VAV.21.3D-114
70.VAV.21.3D-113
70.VAV.21.3D-112
70.VAV.21.C3-19.2
70.VVE.21.3D-109.1
70.VVE.21.3D-109.2
70.VVS.21.3D-109
70.VVE.21.3D-110.1
70.VVE.21.3D-110.2
70.VVS.21.3D-110
70.VVE.21.3D-101.1
70.VVE.21.3D-118.2
70.VVE.21.3D-118.1
70.VAV.21.3D-103
70.VAV.21.3D-121
70.VAV.21.3D-117
70.VAV.21.3D-136
70.VAV.21.3D-115
70.VAV.21.3D-123
70.VAV.21.3D-105
70.VAV.21.3D-133
70.VAV.21.3D-106
70.VAV.21.3D-108
70.VAV.21.C3-25.2
70.VAV.21.3D-135
70.VAV.21.C3-24
70.VAV.21.C3-25.1
70.VAV.21.3D-125
NOT IN PROJECT
SCOPE
TYP.
TYP.
TYP.
TYP.
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWS
3/4" HWR
/F3 MP103i /F3 MP103i
2 1/2" HWR
2 1/2" HWS
3/4" HWS
3/4" HWR
/F6 MP103i /F6 MP103i on e-ei gh th in ch o ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in es ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLAN
A/E:
TRIPLE C - The A/E Group
(612) 355-1251
Mat Perkins
A
B D
EF
G
H
J
K
L
M
C
GENERAL NOTES
KEYNOTES
1/8" = 1'-0"
B
IM
/6
-2
-1
R e n o v a te
D
B e d W in g -B
-M
P L S
V A
M C
/6 -2
-7
.M
P L S
.3 D
.B e d .W in g .M
E P
.B .L
.r v t
/1
/2
:4
:0
A
M
09/12/2022 M. Perkins N.Harper
618-22-102
1391 - MP103i
THIRD LEVEL MECHANICAL PIPING PLANS -
THIRD LEVEL INTERSTITIAL - 3D - NEW
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATION OF BUILDING 70 3D
BED WING
100% CONSTRUCTION
DOCUMENTS
SCALE: 1/8" = 1'-0"
F6
THIRD LEVEL MECHANICAL PIPING
PLANS - THIRD LEVEL INTERSTITIAL -
3D - NEW
A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
B. COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH
OTHER TRADES IN ADVANCE OF INSTALLATION.
C. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-
CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED
SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE
ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND
BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION
AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP
THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING
EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND
TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO
NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE
CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS
AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.
REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.
D. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED
TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA
FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT
ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE
DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY
RENOVATION.
E. THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING
CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO
COMPLETE THIS PROJECT.
F. ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 54” ABOVE
FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.
G. REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND
ELEVATIONS.
1. CONNECT NEW MAINS SERVING 3D TO EXISTING RISERS 2 1/2" HEATING WATER
SUPPLY AND 2 1/2" HEATING WATER RETURN. PROVIDE WELDED TEE
CONNECTIONS AT EACH POINT OF CONNECTION. PROVIDE NEW SHUT OFF
VALVES TO REPLACE THE CURRENT VALVES ON SUPPLY AND RETURN. THEY
ARE 40 YEARS OLD.
2. PROVIDE NEW DDC TERMINAL UNIT, CONNECT TO EXISTING BUILDING
AUTOMATION SYSTEM. PROVIDE NEW THERMOSTAT TO MATCH BUILDING
STANDARDS, COORDINATE FINAL LOCATION WITH COR. REFER TO SHEET M-501
FOR DETAILS AND M-803 FOR CONTROLS.
3. PROVIDE NEW VENTURI SUPPLY AND EXHAUST VALVES. BALANCE ISOLATION
ROOMS AS REQUIRED BY DETAIL F1/M-504.
4. PROVIDE NEW HWS/R PIPING TO NEW TERMINAL UNIT AND PROVIDE NEW HOSE
AND VALVE KIT, SEE DETAILS ON SHEET M-501. INSULATE PIPING PER
SPECIFICATION SECTION 23 00 11, COORDINATE ALL ROUTING WITH EXISTING
TRADES PRIOR TO INSTALLATION.
SCALE: 1/8" = 1'-0"
F3
THIRD LEVEL MECHANICAL PIPING
PLANS - THIRD LEVEL INTERSTITIAL -
3D - NEW
1 ADDENDUM 1 4/6/23
12/17/2021
PREPOSITIONED SLEEVE PREPOSITIONED SLEEVE
CORE DRILLED SLEEVE CORE DRILLED SLEEVE
FOR 1-1/4" AND LARGER
6 7
CONCRETE STRUCTURE
PIPE SLEEVE SIZED FOR PIPE WITH INSULATION
WATERSTOP
EXTEND SLEEVE 4" ABOVE FINISHED FLOOR LEVEL
MINIMUM 18" LONG ALUMINUM
INSULATION JACKET
INSULATION - SEE SPECS FOR
THICKNESS
PIPE
SEAL WITH WATERPROOF
CAULKING
MINIMUM 3/4" POURED LEAD
MULTI-COMPONENT PLASTIC CEMENT
PIPE SLEEVE (I.D. MIN. 1" LARGER THAN O.D. OF PIPE)
WATERPROOF GROUT
CORE DRILL MIN. 1" LARGER
HOLE THAN O.D. OF PIPE SLEEVE
(12" MAXIMUM CORE DRILL SIZE)
13NOTES:
1. SEAL SLEEVE WITH UL RATED SEALANT TO MATCH
RATING OF WALL OR CEILING. MAINTAIN REQUIRED
MINIMUM CONTACT OF SEALANT AND CLEARANCES OF
PIPE IN PENETRATION.
2. PROVIDE ESCUTCHEON PLATES AT ALL EXPOSED
PENETRATIONS.
TRAP MONITOR
NTS
F6
PIPE PENETRATION DETAIL
on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A/E:
TRIPLE C - The A/E Group
(520) 481-8548
Mat Perkins
As indicated
B
IM
/6
-2
-1
R e n o v a te
D
B e d W in g -B
-M
P L S
V A
M C
/6 -2
-7
.M
P L S
.3 D
.B e d .W in g .M
E P
.G e n e ra l.
S h e e ts
.r v t
/1
/2
:1 :4
P
M
09/12/2022 K. Luke N. Harper
618-22-102
1391 - M-501
MECHANICAL DETAILS
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATION OF BUILDING 70 3D
BED WING100% CONSTRUCTION
DOCUMENTS
NTS
C6
VIBRATION ISOLATION BASE
NTS
E4
CONCRETE EQUIPMENT BASE
NTS
C4
SECURING HANGER RODS IN CONCRETE
NTS
B1
STEAM LINE DRIP POCKET AND STEAM TRAP ASSEMBLY
NTS
A4
TERMINAL UNIT WATER COILS - PIPING CONNECTIONS
NTS
D1
DUCTWORK RADIUS ELBOWS
NTS
E1
DUCTWORK TRANSITIONS (WITH EQUIPMENT MOUNTED IN DUCT)
NTS
F1
VOLUME DAMPER DETAIL
1 ADDENDUM #1 4/10/23
20 30
RISE
PLAN
NOTES
1. ANGLE A=30 MAXIMUM WHEN AIR FLOWS IN
DIRECTION OF ARROWS. (SUPPLY AIR)
2. ANGLE A=15 WHEN AIR FLOWS IN OPPOSITE
DIRECTION OF ARROWS (R.A. OR EXHAUST)
20°
A°
A°
A°
A°
3.73xH
FBFT
FT FB
A°A°
A°
A°
PLAN VIEW PLAN VIEW PLAN VIEW
TRANSITION
w/ EQUIPMENT
ELEVATION
PLAN
DUCT OFFSET
FT FB
FBFT
A°
A° A°
A°
ELEVATION ELEVATION ELEVATION BRANCH DUCT
PLAN
45° W
1/2 W
(4"MIN.)
PLAN A
A
B
C
(1) NECK DIA. MIN.
PROVIDE QUADRANT
LOCKING HAND DAMPER
WITH ACCESS DOOR
WHERE SHOWN ON PLANS
BRANCH
DUCT
BRANCH MAIN
FIXED CEILINGS
SECTION A
FLEX DUCT. DIAMETER
EQUALTO DIFFUSER NECK
SIZE (MAX. LENGTH 4'-0")
SPIN IN FITTING
W/HAND DAMPER
SECTION B
LAY-IN CEILINGS
PLAN B
RIGID DUCT WHERE
RUN-OUT EXCEEDS 4'-0"
PROVIDE HAND DAMPER
WITH ACCESS DOOR
SHEET METAL
PLENUM
RIGID DUCT WHERE
RUN-OUT EXCEEDS 4'-0"
FLEX. DUCT FOR LAY-IN
CEILING APPLICATION
EXHAUST / DUCTED RETURN
GRILLE. SEE FLOOR PLAN
FOR SIZE, TYPE, AND LOCATION
SECTION C
RETURN/EXHAUST REGISTER
FOR LAY-IN AND FIXED CEILINGS
PLAN C
NOTE:
1. ONLY COPPER PIPE MAY BE USED IF APPROVED BY THE
LOCAL VA, IS INDOORS, AND DOES NOT PASS THROUGH
RATED BARRIERS.
2. DIELECTRIC FITTING TO BE USED WHEN TWO DISSIMILAR
METALS ARE TO BE CONNECTED.
STEAM TRAP MONITOR CONNECTED
TO BMS, SEE MECHANICAL
CONTROLS DRAWINGS
TEST TEE
AIR FLOW
HWS
1. METAL STRAP SUPPORT FROM STRUCTURE (TYPICAL)
2. MANUAL AIR VENT ON COIL OR HWR PIPING
3. FACTORY FABRICATED SOUND ATTENUATOR
4. HOT WATER COIL
5. VALVE ACTUATOR
6. HIGH VELOCITY FLEXIBLE SUPPLY DUCT 12" MIN., 24" MAX.
7. DRAIN
8. TEMPERATURE-PRESSURE FITTING (TYP.)
9. LOW VELOCITY DUCTWORK TO DISTRIBUTION
10. REFER TO PLANS FOR PIPE SIZES
11. 2-WAY CONTROL VALVE, NORMALLY CLOSED. FAIL TO COOL
12. BALL VALVE (TYP)
13. UNION (TYP)
14. REDUCER (TYP)
15. HIGH VELOCITY RIGID SUPPLY DUCT, 3 FT. MINIMUM STRAIGHT RUN PRIOR
TO TERMINAL UNIT CONNECTION. SEE SCHEDULE FOR VALVE AND DUCT SIZES
16. FLOW BALANCING VALVE, OR FLOW LIMITING VALVE, SEE SPECIFICATIONS
17. TRANSITION FROM 2" LARGER DUCT DIAMETER THAN VALVE CONNECTION SIZE
18. HOSE BIB
HWR
TYP.
TYP.
TYP.
22-1/2 2-PIECE
ELBOW
A
R R R
A A
30 2-PIECE
ELBOW
45 ELBOW
(3" THRU 8")
45 3-PIECE
ELBOW
60 3-PIECE
ELBOW
90 ELBOW
(3" THRU 8")
90 5-PIECE
ELBOW
CONCENTRIC REDUCER
RL=A-B (MIN)
ECCENTRIC REDUCER
RL=2(AB)
LATERAL TEE LATERAL CROSS REDUCING
LATERAL TEE
RL=A-B (MIN)
REDUCING
LATERAL CROSS
A
R
A
R
A
RL
B A
RL
B
A A
R R
A
L
C C
A L
D
A
C
RL B
L
A L
C
RL B
D
A
C
L L RL
A
C
B
C
A
L
A
C
B
L RL
COMBINATION TEE REDUCING
COMBINATION TEE
SPUN TEE REDUCING
SPUN TEE
CONICAL LATERAL REDUCING
CONICAL LATERAL
TANGENTIAL TEE
TYPE: ONE TAP
L=C+2"
TYPE: TWO TAPS
L=C+D+4"
CONICAL TEE
L=C+4"
REDUCING
CONICAL TEE
L=C+4" X=(C/2)+2"
5"MIN.
5"MIN.
L=LARGER OF
(C OR D)+4"
CONICAL CROSS
L=1.414 C+5"
(MAX)
Q=(A/2)+.707C+3"
(MAX)
H=.707A+.5C+3"
(MAX)
5"MIN.5"MIN.
NOTE: SEE SPECIFICATIONS FOR DUCT MATERIALS AND CONSTRUCTION
L
Q
A 1"
1" 4"
H C
L
Q
A 1"
4" H
C 1"
RL
B
1"
A
1" 1"
L
1"
C D
C
A
L
5"MIN.
C
A
L RL
B
C
A L
D
NTS
F8
LOW PRESSURE DUCT FITTINGS
NTS
C6
DIFFUSER AND REGISTER CONNECTION
NTS
F4
MECHANICAL EQUIPMENT - DRAIN CONNECTION
NTS
F1
STEAM HUMIDIFIER - PIPING CONNECTIONS
NTS
C1
SINGLE DUCT VAV TERMINAL UNIT WITH REHEAT COIL - 2 WAY VALVE
NTS
F6
MEDIUM PRESSURE AND ROUND DUCT FITTINGS
on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A/E:
TRIPLE C - The A/E Group
(520) 481-8548
Mat Perkins
As indicated
B
IM
/6
-2
-1
R e n o v a te
D
B e d W in g -B
-M
P L S
V A
M C
/6 -2
-7
.M
P L S
.3 D
.B e d .W in g .M
E P
.G e n e ra l.
S h e e ts
.r v t
/1
/2
:1 :4
P
M
09/12/2022 K. Luke N. Harper
618-22-102
1391 - M-502
MECHANICAL DETAILS
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATION OF BUILDING 70 3D
BED WING100% CONSTRUCTION
DOCUMENTS
NTS
C4
DUCT CONNECTIONS - AIR TERMINAL UNITS
NTS
C8
DOUBLE SUCTION FLOOR-MOUNTED PUMPS
1 ADDENDUM #1 4/10/23
File details come from the government source that posted it. Updated .