Attachment 3 - FINAL PWS jantioral Support.doc

DOC document 45 KB Posted

Attached to
Japan Support Services
Solicitation number
N0040620R0034
Issued by

About this file

This performance work statement outlines janitorial and general labor services required at Commander Submarine Group Seven in Yokosuka, Japan. The contractor shall provide daily janitorial services for all carpeted, tiled, and other hard surfaced floors; clean and stock all restrooms and common areas; perform high and low dusting; and empty trash for the building. Additional tasks include general labor support such as uncrating materials, loading/unloading vehicles, furniture assembly/disassembly, and material disposal. Administrative duties encompass cleaning offices, collecting outdoor trash, and conducting minor repairs. The work will take place weekdays from 8:00 to 16:00, with occasional overtime allowed not exceeding 2% of hours. The contractor must have a secret clearance and furnish required personal protective equipment for the work environment.

This federal contract opportunity is a solicitation for various support services at the Ship Repair Facility-Japan Regional Maintenance Center in Yokosuka and Sasebo, Japan. Services include solid waste support, warehouse activities, logistics, secretarial functions, computer technician work, supply chain tasks, program management, linen distribution, IT assistance, truck driving, accounting, computer programming, material management, logistics specialists, analytic support, environmental services, and temporary labor. The indefinite delivery/indefinite quantity contract will be a firm-fixed price award under NAICS code 561320. Responses are due by the date listed in the solicitation. Only eligible 8(a) program participants may apply.

View the file

Other files

File Type Posted
N0040620R0034 Amend 0005.pdf PDF
20R0034 Attachment 66 Billing Rate Table.xlsx XLSX spreadsheet
Attachment 42 - FINAL PWS.docx DOCX document
Attachment 38 - FINAL PWS.docx DOCX document
N0040620R0034 Amend 0004.pdf PDF
Attachment 47 - FINAL PWS.docx DOCX document
Attachment 30 - FINAL PWS SRF Attachment 19.docx DOCX document
Attachment 43 - FINAL PWS.docx DOCX document
Attachment 40 - FINAL PWS.docx DOCX document
N0040620R0034 Conformed through Amend 0004.pdf PDF
Attachment 45 - FINAL PWS.docx DOCX document
Attachment 49 - FINAL PWS.docx DOCX document
20R0034 Attachment 66 Billing Rate Table.xlsx XLSX spreadsheet
Attachment 39 - FINAL PWS.docx DOCX document
Attachment 44 - FINAL PWS.docx DOCX document
Attachment 41 - FINAL PWS.docx DOCX document
Attachment 60 - 011. PWS.docx DOCX document
Attachment 48 - FINAL PWS.docx DOCX document
Attachment 46 - FINAL PWS.docx DOCX document
N0040620R0034 Conformed through Amend 0003.pdf PDF
N0040620R0034 Amend 0003.pdf PDF
20R0034 Attachment 66 Billing Rate Table.xlsx XLSX spreadsheet
N0040620R0034 Amend 0002.pdf PDF
20R0034 Attachement 64 Recent and Relevant Past Performance Questionnaire.docx DOCX document
20R0034 Attachment 66 Billing Rate Table.xlsx XLSX spreadsheet
20R0034 Attachment 67 Mission Essential Services.xlsx XLSX spreadsheet
N0040620R0034 Amend 0001.docx DOCX document
Attachment 37 - FINAL PWS Logistic Support Services Secretary III.docx DOCX document
20R0034 - Attachment 66 - Billing Rate Table.xlsx XLSX spreadsheet
Attachment 61 - 012-PWS_DBC SECRETARY III.docx DOCX document
Attachment 29 - FINAL PWS SRF Attachment 18.docx DOCX document
Attachment 58 - 009.PWS Travel Clerical Services.docx DOCX document
Attachment 43 - FINAL PWS.docx DOCX document
20R0034 - Attachment 63 - COR Monthly Report to Contracting Officer.pdf PDF
Attachment 48 - FINAL PWS.docx DOCX document
Attachment 60 - 011. PWS.docx DOCX document
Attachment 24 - FINAL PWS SRF Attachment 10.docx DOCX document
Attachment 26 - FINAL PWS SRF Attachment 12.docx DOCX document
Attachment 9 - FINAL PSNS_TASK4.docx DOCX document
Attachment 10 - FINAL PSNS_TASK5.docx DOCX document
20R0034 - Attachment 67 - Mission Essential Services.xlsx XLSX spreadsheet
Attachment 36 - FINAL PWS Logistic Support Services.docx DOCX document
Attachment 33 - FINAL PWS SRF Attachment 22.docx DOCX document
N0040620R0034 Solicitation.pdf PDF
Attachment 27 - FINAL PWS SRF Attachment 16.docx DOCX document
Attachment 57 - 008.PWS Travel Clerical Services.docx DOCX document
Attachment 23 - FINAL PWS SRF Attachment 9.docx DOCX document
Attachment 16 - FINAL PWS SRF Attachment 2.docx DOCX document
Attachment 38 - FINAL PWS.docx DOCX document
20R0034 - Attachment 65 - Previous Contracting Efforts.docx DOCX document
Show 40 more

Latest 50 of 94 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 3

Performance Work Statement for Janitorial Support COMSUBGRU-SEVEN Yokosuka (CSG7), Japan

1.0 SCOPE: Contractor shall provide janitorial support and minor repair at building 3128, Fluckey Hall, in bathrooms, common spaces, and offices in order to ensure that CSG7 is maintained in high standards.

1.1 APPLICABLE DIRECTIVES: OPNAVINST 5100 series, Navy Occupational Safety and Health (NAVOSH) Program, CSG7 safety and security regulations.

1.2 ACRONYMS AND ABBREVIATIONS:

AQL

Acceptable Quality Level

CSG7

Commander Submarine Group Seven

NAVOSH

Navy Occupational Safety & Health

PPE

Personal Protective Equipment

2.0 REQUIREMENTS

2.1 SPECIFIC TASKS:

a. TASK 1: a. JANITORIAL SUPPORT. Contractor shall provide janitorial services necessary to vacuum all carpeted areas, spot clean all interior office and partition walls and windows/sills, sweep and mop all composition, tiled and hard surfaced flooring, clean and stock with necessary or applicable amenities all restrooms, lunch rooms and kitchen areas, provide high and low dusting of all horizontal surfaces, wipe off and clean countertops and sinks, remove cobwebs from building interiors, spot clean spots and spills from all carpeted areas, empty trash receptacles and recycle cardboard for offices and common areas in building B3128: Basement, First and Second Floors.

b. TASK 2: GENERAL LABORER. Contractor shall provide general labor support such as uncrating boxes, loading and unloading supplies from vehicles, assembling/disassembling and installing/removing furniture, hanging of material, removing material, shredding documents, etc. Contractor shall maintain and upkeep the command's spaces. Contractor maybe required using hand tools when performing these tasks. Additionally, contractor shall provide material disposal as required.

b. TASK 3: ADMINISTRATIVE DUTIES. Contractor shall provide general cleaning, removing of trash from offices, picking up trash around the outside of the building, and minor repair as in replacing light bulbs, unclogging sinks and toilets.

3.0 SKILLS AND KNOWLEDGE REQUIRED FOR THE POSITION:

SECRET Clearance

4.0 PERFORMANCE REQUIREMENTS SUMMARY:

Task or Deliverable
Performance Standard
Acceptable Quality Level (AQL)
Surveillance Method
Performance Measure
2.1
Adhere to requirements specified in paragraph 2.1 of the PWS
98% Compliance
Random Visual Inspections/

Customer Surveys or feedback/ Review of work requests Monday through Friday support/ Quality/Timeliness

5.0 GUIDELINES: Contractor personnel shall present a neat and clean appearance in accordance with his or her company policy. Contractor personnel shall comply with CSG7 safety and security regulations.

6.0 NORMAL WORK HOURS: NORMAL WORK HOURS: Work shall normally take place during 1st Shift (0800-1600), Monday - Friday.

6.1 OVERTIME: The Contractor should anticipate working more than 40 hours per week no more than 2% of the time during the period of performance. Authorization must be obtained from the PCO, COR or ACOR prior to any hours worked over 40 hours per week.

7.0 PLACE OF PERFORMANCE: The place of performance is in Supply Department, Commander

Submarine Group SEVEN, Building 3128, Commander, Fleet Activities Yokosuka Japan, 96349-0050.

8.0 WORK ENVIRONMENT AND PHYSICAL DEMANDS: Work is to be carried out both in climate controlled office spaces, outdoor, and in storerooms/warehouses, which may be dusty, poorly lit and lacking climate control. Contractor should be able to sit, stand and lift and carry materials weighing up to 40 pounds unaided.

9.0 GENERAL SAFETY AND HOUSEKEEPING: Contractor personnel shall keep his/her work area in a clean, presentable, safe, and condition at all times.

10.0 GOVERNMENT PROPERTY FURNISHED:

The work under this contract is located at a Government site or installation. Property that is incidental to the place of performance; such as when the contract requires contractor personnel to be located on a Government site or installation where the use of Government-provided office space and equipment, e.g., chairs, telephones, and computers, is standard practice will be made available and used by contractor personnel. The contractor shall maintain the assigned office space(s) in a neat and orderly manner. Contractor shall only use Government provided items to accomplish the tasks required under this contract. Personal or company use of phones, utilities, computers, printers, copiers, etc., not directly related to required services is strictly prohibited. Contractor shall not remove any Government provided items from the worksite without the express written permission of the Contracting Officer or his/her designated representative.

11.0 CONTRACTOR FURNISHED PROPERTY:

Contractor employee shall have the required PPE (Personal Protective Equipment) applicable for work environment PPE’s and shall comply with the NAVOSH regulations in support of this tasking such as: Hard hats, steel toed shoes, eye protection, hearing protection, working gloves and back braces or any other required PPE.

PWS-2

File details come from the government source that posted it. Updated .