Attachment 16 - FINAL PWS SRF Attachment 2.docx

DOCX document 28 KB Posted

Attached to
Japan Support Services Federal contract opportunity
Solicitation number
N0040620R0034
Issued by
Department of the Navy Naval Supply Systems Command

About this file

This performance work statement outlines information technology support services required at the Ship Repair Facility Japan Regional Maintenance Center in Yokosuka, Japan. The contractor shall provide integrated logistics support including relocating IT equipment, electronic technical support such as hardware installation and maintenance, database management and inventory services, and project management assistance. Specific tasks include asset movement, hardware setup, database entry, regular inventories, report generation, and acting as a project coordinator. The contractor must be able to work overtime when required, hold a secret clearance, and comply with all safety procedures. The performance goals include providing qualified staff on time, submitting timely and accurate deliverables and invoices, and receiving satisfactory ratings on the annual performance report. The government will provide workspaces and consumable supplies while the contractor must certify in CompTIA A+ and Security+ and have a valid driver's license.

This federal contract opportunity involves providing various support services at the Ship Repair Facility Japan Regional Maintenance Center in Yokosuka and Sasebo, Japan on an indefinite delivery/indefinite quantity basis. Services include solid waste support, warehouse support, integrated logistics, secretarial support, computer, supply and logistics specialists, program management, linen supply, IT, truck driving, accounting, materials management, facilities support, janitorial services, and travel coordination. The solicitation is set aside for eligible 8(a) participants and offers a firm-fixed price contract. No phone, fax, or electronic submissions are allowed and facsimile proposals will not be accepted. Detailed requirements are in the solicitation and Attachment 37. The soliciting agency is the Department of the Navy Naval Supply Systems Command.

View the file

Other files for this federal contract opportunity

Other files attached to Japan Support Services, newest first.
File Type Posted
N0040620R0034 Amend 0005.pdf PDF
N0040620R0034 Conformed through Amend 0004.pdf PDF
N0040620R0034 Amend 0004.pdf PDF
Attachment 38 - FINAL PWS.docx DOCX document
Attachment 42 - FINAL PWS.docx DOCX document
Attachment 43 - FINAL PWS.docx DOCX document
Attachment 44 - FINAL PWS.docx DOCX document
Attachment 45 - FINAL PWS.docx DOCX document
Attachment 49 - FINAL PWS.docx DOCX document
N0040620R0034 Amend 0001.docx DOCX document
Attachment 7 - FINAL PSNS_TASK2.docx DOCX document
Attachment 8 - FINAL PSNS_TASK3.docx DOCX document
Attachment 11 - FINAL PSNS_TASK6.docx DOCX document
Attachment 14 - Warehouse SOW_2020_NIWC-PHE.docx DOCX document
Attachment 19 - FINAL PWS SRF Attachment 5.docx DOCX document
Attachment 28 - FINAL PWS SRF Attachment 17.docx DOCX document
Attachment 38 - FINAL PWS.docx DOCX document
Attachment 47 - FINAL PWS.docx DOCX document
Attachment 48 - FINAL PWS.docx DOCX document
Attachment 53 - 004-PWS-ProgramAnalyst.docx DOCX document
Attachment 55 - 006. PWS_ComputerProgrammer.docx DOCX document
Attachment 56 - 007.PWS Programmatic Support.docx DOCX document
Attachment 60 - 011. PWS.docx DOCX document
20R0034 - Attachment 66 - Billing Rate Table.xlsx XLSX spreadsheet
Attachment 29 - FINAL PWS SRF Attachment 18.docx DOCX document
Attachment 43 - FINAL PWS.docx DOCX document
Attachment 58 - 009.PWS Travel Clerical Services.docx DOCX document
Attachment 61 - 012-PWS_DBC SECRETARY III.docx DOCX document
Attachment 2 - FINAL PWS CNRJ Dispatch Services.docx DOCX document
Attachment 3 - FINAL PWS jantioral Support.doc DOC document
Attachment 4 - FINAL PWS for Inventory Management.doc DOC document
Attachment 10 - FINAL PSNS_TASK5.docx DOCX document
Attachment 13 - FINAL PSNS_TASK8.docx DOCX document
Attachment 18 - FINAL PWS SRF Attachment 4.docx DOCX document
Attachment 20 - FINAL PWS SRF Attachment 6.docx DOCX document
Attachment 23 - FINAL PWS SRF Attachment 9.docx DOCX document
Attachment 24 - FINAL PWS SRF Attachment 10.docx DOCX document
Attachment 26 - FINAL PWS SRF Attachment 12.docx DOCX document
Attachment 31 - FINAL PWS SRF Attachment 20.docx DOCX document
Attachment 34 - FINAL PWS SRF Attachment 23.docx DOCX document
Attachment 35 - FINAL PWS SRF Attachment 24.docx DOCX document
Attachment 40 - FINAL PWS.docx DOCX document
Attachment 44 - FINAL PWS.docx DOCX document
Attachment 49 - FINAL PWS.docx DOCX document
Attachment 51 - 002-PWS Supply Tech.docx DOCX document
Attachment 52 - 003. PWS Material Manag.docx DOCX document
Attachment 57 - 008.PWS Travel Clerical Services.docx DOCX document
Attachment 59 -010 PWS.docx DOCX document
20R0034 - Attachment 63 - COR Monthly Report to Contracting Officer.pdf PDF
20R0034 - Attachment 65 - Previous Contracting Efforts.docx DOCX document
Show all 50

Japan Support Services has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 16

PERFORMANCE WORK STATEMENT

TITLE: Ship Repair Facility Japan Regional Maintenance Center (SRF-JRMC) Yokosuka Code 109 Information Technology

TECHNICAL SPECIFICATIONS

1. SCOPE: The objective of this Performance Work Statement (PWS) is to provide Information Technology (IT) support in the form of an Integrated Logistics Specialist to the IT and Cyber Security Department (Code 109) in support of Ship Repair Facility – Japan Regional Maintenance Center (SRF-JRMC), Yokosuka missions.

2. PLACE OF PERFORMANCE:

a. Applicable Ships: SEVENTH FLEET Forward Deployed Naval Force (FDNF) ships, Yokosuka, Japan

b. Location of Majority of Work: SRF areas and aboard ships berthed or dry docked at Yokosuka Naval Base, Japan.

3. SPECIFIC TASKS:

Task 1 - Integrated Logistics Support

a. Contractor shall relocate/move Information and Communications Technology/Audio Visual (ICT/AV) equipment to include new installation, asset replacement, refresh, and removal.

b. Contractor will research and conduct analysis of the customer’s request needs and perform technical research to identify and recommend required replacement.

c. Contractor will provide all necessary asset movement data to appropriate personnel for update and tracking purposes.

d. Contractor will respond to customer requests/schedule to relocate within one hour of notification. Contractor will make regular trips, government provided vehicle, between storage warehouses for restock, inventory, or long term storage of equipment, which will include driving between bases within 100 miles.

e. Contractor will provide necessary inventory and accounting data for any space categorized as asset storage.

f. Contractor will perform documentation and disposal of equipment to include hard drive destruction, scrap metal disposal, and HAZMAT disposal (i.e. Printer ink/toner and laptop/desktop batteries).

g. Contractor will pack, stack, and wrap all ICT/AV equipment being processed for disposal, shipping, or transfer to limit the possibility of any damage occurring to ICT/AV Assets while in transit.

h. Contractor will unpack, tag, and store all newly received ICT/AV equipment with the appropriate Property Tag(s) and SF 710(1-87) stickers.

i. Contractor will ensure that all equipment unpacked and shifted to Ready Stock will have all the necessary parts required for normal operation and security, per Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC) Receiving New IT Equipment Standard Operating Procedures (SOP).

j. Contractor will attend meetings to review procedures or resolve discrepancies in processes.

Task 2 – Electronic Technical Support

a. Contractor shall assemble and connect all hardware and peripheral components of Communication Technology/Audio Visual (ICT/AV) equipment at various Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC) locations and Sasebo detachment.

b. Contractor shall perform basic configuration of ICT/AV equipment to facilitate installation and/or replacement.

c. Contractor shall check for missing or damaged parts and replace with available spares to bring equipment to an operating condition. Work will be conducted in accordance with SRF-JRMC promulgated ICT/AV installation/maintenance scheduled and published Telecom Asset Management SOP.

d. Contractor will diagnose ICT/AV hardware issues, contact coordinate with support vendors, in order to ensure ICT/AV equipment is being repaired by the vendor. If the repair is outside of warranty, contractor will be followed SRF-JRMC Life Cycle Management SOP.

Task 3 - Database Management, Inventory, and Life Cycle Management

a. Contractor shall enter and maintain data within the asset databases managed and/or mandated by Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC) DoD/DoN. Contractor will receive, track, and tag all equipment per SRF-JRMC IT Asset Tagging SOP and ensure 95% accurate accounting data.

b. Contractor will conduct regular inventory of all SRF-JRMC owned Information and Communications Technology/Audio Visual (ICT/AV) equipment to maintain a 100% yearly accountability.

c. Contractor will coordinate regular and emergent inventory requirements and conduct additional inventories per DoD/DoN requirements.

d. Contractor will generate and issue Custody Sheets to all SRF-JRMC employed personnel for accountability.

e. Contractor will provide a monthly report of all deployed hardware and asset inventory. Contractor will use SRF-JRMC IT Asset Inventory SOP to ensure that ICT/AV equipment meet current DoD/DoN and SRF-JRMC IT security requirements and are capable of supporting SRF-JRMC’s mission.

f. Contractor will predict future ICT/AV asset need based on SRF-JRMC promulgated Life Cycle Management program and recommend procurement to maintain appropriate levels of ready service spare equipment.

g. Contractor will generate and maintain all applicable documentation for the receipt, disposal, and transfer of all SRF-JRMC owned and controlled ICT/AV equipment.

h. Contractor will assist in the unpacking, deployment, transfer, disposal, and receipt of all equipment.

Task 4 - Project Management Support

a. Contractor will act as a project coordinator for SRF Code 109, and will be responsible for supportingprojects from initiation to closure.

b. Contractor will meet with Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC) stakeholders to take detailed requests and clarify specific requirements.

c. Contractor will track project performance, and coordinate with all stakeholders, including customers and SRF-JRMC 109 staff, to overcome operational and technical obstacles, ensuring that work is completed within budget and deadlines.

d. Contractor will review, validate and scope all work requests; assist engineers in assignment of work order priorities, identify project funding timelines, evaluate requests for urgency, and refer plan and professional judgment to management with recommended level of priority for project development.

e. Contractor will produce meeting agenda, supporting documents, minutes, and archive/distribute as necessary.

4. OVERTIME: The Contractor should anticipate working more than 40 hours per week 3% of the time during the period of performance (overtime hours nor anticipated to exceed 10 per week). Authorization must be obtained from the PCO, COR or ACOR prior to any hours worked over 40 hours per week.

5. SECURITY: The highest level of security required for this PWS is SECRET IT-II. Access to classified information and spaces onboard the Forward Deployed Naval Forces (FDNF) ships may be required. Due to the nature of data handling requirements personnel must be US citizens and possess at a minimum Secret clearance.

6. SAFETY PROCEDURES/ REGULATIONS: There are rare instances where work will be performed in an industrial environment as well as on board a US Navy vessel in which industrial work in ongoing. The industrial environment work regularly involves use of personal protective equipment (PPE), frequent exposure to hazardous electrical voltages, large rotating machinery elements, and electromagnetic radiation from high powered transmitters, explosives, flammable or incendiary materials, potentially hazardous material, work inside enclosed spaces, In Danger to Life and Health (IDLH) spaces, and work on masts and antenna platforms. The contractor is responsible for the safety of their employees.

7. SERVICES/DELIVERABLES: The contractor shall submit the following products/ deliverables as stated below and confer with ACOR on format of reports.).

Task
Insp Code
Accept Code
Delivery Location
Delivery Method
Service Brief
Due Date
Notes
All
SRF-JRMC Code 109
C109
SRF-JRMC
Email
Certification to CompTIA A+ or CompTIA Security+
Upon Award
Required Certification for the tasks
1
SRF-JRMC Code 109
C109
SRF-JRMC
Email
Valid Government Vehicle License
Upon Award
Required for Tasks
1
SRF-JRMC Code 109
C109
SRF-JRMC Shared computer drive
Excel Spreadsheet
Documentation of disposed equipment to include hard drive destruction, scrap metal disposal, and HAZMAT disposal
Within 24 hours of disposal
Per Task 1
3
SRF-JRMC Code 109
C109
SRF-JRMC Shared computer drive
Excel Spreadsheet
All deployed hardware and asset inventory
Monthly
Per task 3

8. PERFORMANCE GOALS:

Contractor performance objectives are summarized in the following table. Additional performance requirements may be added for individual PWS.

PERFORMANCE ELEMENT
PERFORMANCE REQUIREMENT
SURVEILLANCE

METHOD

ACCEPTABLE QUALITY LEVEL
INCENTIVES/ DISINCENTIVES
Personnel
Qualified staff provided within the timeframes specified in the PWS.
Verification by the ACOR
Greater than 95% of the task order start dates are met by staff qualified to meet the specified task objectives.
Past performance will be considered in determining future awards.
Contract Deliverables
Contract deliverables furnished as prescribed in the PWS.
Verification by the ACOR
Greater than 95% of deliverables submitted timely and without rework required.
Past performance will be considered in determining future awards.
Overall Contract Performance
Overall contract performance of sufficient quality to earn a Satisfactory (or higher) rating in the ACOR's annual performance report.
Assessment by the ACOR
All performance elements rated Satisfactory (or higher).
Past performance will be considered in determining future awards.
Invoices
Invoices in accordance with contract procedures are timely and accurate.
Review and acceptance of the invoice
100% of the invoices are timely and accurate.
Past performance will be considered in determining future awards.

GOVERNMENT FURNISHED EQUIPMENT: The government shall provide a computer station, all consumable supplies required for the tasks listed above, and work spaces at SRF buildings on Yokosuka Naval Base.

File details come from the government source that posted it. Updated .