This performance work statement outlines requirements for a fire safety officer to support ship repair activities at the Ship Repair Facility - Japan Regional Maintenance Center in Yokosuka, Japan. The contractor shall serve as a fire safety officer providing prerequisite qualifications and knowledge of shipboard engineering systems. Specific tasks include participating in availability planning, conducting inspections and oversight of hot work, monitoring pier conditions, responding to casualties, and maintaining lesson learned logs. The contractor must deliver various plans, briefings, reports and updates on a daily, weekly or as-needed basis. The performance will be monitored by a quality assurance surveillance plan with incentives or disincentives based on meeting qualification timelines, deliverable quality and timeliness, overall performance ratings, and invoice accuracy. The government will provide office space and IT resources while the work requires a secret clearance and involves industrial and shipboard hazards.
This federal contract opportunity is a competitive solicitation limited to eligible 8(a) participants seeking temporary contract labor support services at the Ship Repair Facility and Japan Regional Maintenance Center in Yokosuka and Sasebo, Japan. Services include various administrative, logistics, facilities, environmental, and technical specialties. Proposals are due by a specified date with award of an indefinite delivery/indefinite quantity contract anticipated. The Naval Supply Systems Command is the contracting agency.
View the file
Other files for this federal contract opportunity
Show all 50
Japan Support Services has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 25
PERFORMANCE WORK STATEMENT
TITLE: Ship Repair Facility Japan Regional Maintenance Center (SRF-JRMC) Yokosuka C300 Fire Safety Officer
REFERENCES:
(a) NAVSEA S9AAO-AB-OJO/GSO "General Specifications for Overhaul of Surface Ships"
(b) NAVSEAPUB S0570-AC-CCM-010/0810 REV 00 ACN 2/A
TECHNICAL SPECIFICATIONS
1. SCOPE: The objective of this Performance Work Statement (PWS) is to provide Fire Safety Officer support to the Waterfront Operations Department (Code 300) in support of Ship Repair Facility – Japan Regional Maintenance Center (SRF-JRMC), Yokosuka missions.
2. PLACE OF PERFORMANCE:
a. Applicable Ships: SEVENTH FLEET Forward Deployed Naval Force (FDNF) ships, Sasebo and Yokosuka, Japan
b. Location of Majority of Work: SRF areas and aboard ships berthed or dry docked at Yokosuka Naval Base, Japan.
c. Alternate work location: SRF areas and aboard ships berthed or dry docked at Sasebo Naval Base, Japan; and support repair availability work at private shipyards in Yokohama, Japan.
3. SPECIFIC TASKS:
Task 1 - Fire Safety Officer. The Contractor shall serve in Code 380 as a Fire Safety Officer. The Contractor is responsible for supporting and communicating all aspects of the Industrial Ship Fire Safety Prevention and Response program in accordance with reference (a) and (b) for their assigned schedule ship repair availability (SRA) under SRF-JRMC’s cognizance, including, but not limited to:
a. Prerequisite experience and knowledge
1. Demonstrate knowledge of shipboard engineering systems, including, but not limited to machinery, electrical, and firefighting systems.
2. Possess prior Ship/Fire Safety Officer qualifications/skills, or completed the Code C380 Fire Safety officer qualification within 6 months of being in the position.
3. Maintain knowledge of shipboard engineering systems used on naval vessels and ship/fire safety equipment.
4. Demonstrate effective oral and written communication skills.
b. Participate in the availability advance planning process.
1. Review availability work package and Job Work Summary products and identify and resolve major ship and fire safety issues.
2. Develop pier lay-down plans, temporary fire main layout plan, Ship/Fire Safety Strategy, and Pre-fire Incident Action plans. Review availability Memorandum of Agreements (MOA) for accuracy.
3. Support training for Ship’s force and matrix Project team members on emergency response procedures and ship/fire safety prevention program.
c. Support and communicate Ship/Fire Safety during project execution
1. Attend daily project team meetings. Chair Ship/Fire Safety Council meetings; identify potential conflicts and coordinate mitigation plans to minimize and/or remove risks.
2. Conduct a minimum of 2 Ship/Fire Safety walk throughs of the entire ship to verify compliance with standards, with emphasis on housekeeping, access/egress, temporary service routing, and ship/fire safety equipment. Document and communicate deficiencies found, identify responsible parties, and provide recommendations to resolve to the Fire Safety Manager.
3. Conduct surveillance of hot work operations. Identify deficiencies and notify responsible party; ensure deficiencies resolved prior to recommencing work.
4. Support waterfront hazardous evolutions (high/medium risk and controlled evolutions); identify potential concerns and provide recommendations to the Fire Safety Manager to reduce risk. Communicate and provide the Project teams with the required prerequisite safety checklists prior to work start.
5. Develop and ensure the Fire Safety Officer Status Sheets and Temporary Services Isolations lists are updated to reflect the ship’s current condition.
6. Monitor pier conditions to ensure fire lane discipline is maintained. Educate ship’s force and workforce on standards. Notify the Fire Safety Manager of any issues impacting emergency response access to the pier.
7. Assist in the development Hot Work Safety mitigation plans. Provide recommendations to the Fire Safety Manager to reduce hazards.
8. Respond to all reported ship casualties. Assist Ship’s Force and Project Team leadership with response efforts. Support follow-on investigation and identify shortfalls and provide improvement recommendations.
9. Maintain a Lesson’s learned log throughout the availability. Document items, as they arise, and provide Project Team leadership with these items to support post availability review.
10. Provide a daily brief to the Fire Safety Manager regarding the status of each availability. Provide Project team personnel, including ship’s force, with a daily summary and future events impacting ship/fire safety.
d. Miscellaneous
1. Provide assistance to the Fire Safety Division Chief including, but not limited to, requisitioning, maintaining, and inventory of divisional supplies; support and communicate divisional processes and procedures improvement, and participation in fire safety prevention and response process improvement working groups.
2. Support and communicate with key management personnel in all departments, offices and divisions, including US and MLC Project Superintendents, Deputy Project Superintendents, Type Desk Personnel, engineering supervisors, supply supervisors, surveyors and other personnel involved in shipboard engineering work as required to ensure effective execution of the Industrial Ship Fire Safety Prevention and Response program; this includes, but is not limited to, maintaining effective communication with Fire & Emergency Service Prevention and Response personnel.
Approximately 9,500 Task 1 transactions will require processing during the period of performance. Performance goals for TASK 1 are as follows:
| (1) | Effectively coordinate and conduct fire safety inspections from planning through execution on assigned ship availabilities. |
| (2) | Provide all Task 1 Deliverables within the specified frequency listed in paragraph 8. |
4. OVERTIME: The Contractor should anticipate working more than 40 hours per week 10% of the time during the period of performance (overtime hours not anticipated to exceed 10 per week). Authorization must be obtained from the PCO, COR or ACOR prior to any hours worked over 40 hours per week.
5. SECURITY: The highest level of security required for this task is SECRET. Access to classified information and spaces onboard the Forward Deployed Naval Force (FDNF) ships may be required. Due to the nature of data handling requirements, including unclassified Naval Nuclear Propulsion Information (NNPI), personnel must be US citizens and possess at a minimum Secret clearance.
6. SAFETY PROCEDURES/ REGULATIONS: Approximately 80 percent of this work will be performed in an industrial environment as well as on board a US Navy vessel in which industrial work in ongoing. The work regularly involves use of personal protective equipment (PPE), frequent exposure to hazardous electrical voltages, large rotating machinery elements, electromagnetic radiation from high powered transmitters, explosives, flammable or incendiary materials, potentially hazardous material, work inside enclosed spaces, inherently dangerous to life and health (IDLH) spaces, and work on masts and antenna platforms. Some work may need to be done with the ship at anchor or during short underway periods at sea.
7. PRODUCTS/DELIVERABLES: The contractor shall submit the following products/ deliverables as stated below and confer with Technical Advisor (TA) on format of reports. Upon submission the required deliverable products, the contractor shall submit a Task Action Memorandum (TAM) to the Primary TA, with email notification to the COR, who will document the contract performance and forward to the COR. Deliverables shall be labeled with task number (20-PIXX) and product number (01, 02, 03).
| Task |
| Insp Code |
| Accept Code |
| Delivery Location |
| Delivery Method |
| Product Brief |
| Due Date |
| Notes |
| 1.a.2 |
| SRF-JRMC C380 |
| C380 |
| N/A |
| Qualification |
| Qualify as a Fire Safety Officer |
| Within 6 months of reporting |
| Demonstrate standard knowledge |
| 1.b.2 |
| SRF-JRMC C380 |
| C380 |
| SRF-JRMC Shared computer drive |
| Word document/Excel Table |
| Prepare and deliver required pre-avail documents |
| Within 60 days of avail start |
| Coordination documents |
| 1.b.3 |
| SRF-JRMC C380 |
| C380 |
| SRF-JRMC Shared computer drive |
| Powerpoint Presentations |
| Prepare and deliver required pre-avail ship safety briefs to Project team personnel and ship’s force |
| No later than 14 days after avail start, and for ships force training every 6 months after avail start. |
| 1.c.1 |
| SRF-JRMC C380 |
| C380 |
| PSPO Conference room |
| Meetings |
| A minimum once a week during avail execution |
| Chair Fire Safety Council meeting and identify work impacting ship safety, including developing mitigation strategies. Monitor and maintain status of ship systems and production work impacting ship safety. Monitor proper routing and installation of temporary services and identify location of quick disconnect fittings. |
| 1.c.2 |
| SRF-JRMC C380 |
| C380 |
| SRF-JRMC Shared computer drive |
| Word document/Email |
| Prepare daily deficiency report and transmit to responsible parties. |
| Daily |
| 1.c.3 |
| SRF-JRMC C380 |
| C380 |
| SRF-JRMC Shared computer drive |
| Access database/Word Document |
| Random oversight of hot work operations |
| Daily |
| 1.c.5 |
| SRF-JRMC C380 |
| C380 |
| SRF-JRMC Shared computer drive |
| Access database/Word Document |
Weekly, at a minimum
| 1.c.8 |
| SRF-JRMC C380 |
| C380 |
| SRF-JRMC Shared computer drive |
| Word Document/Excel Spreadsheet |
| Fire investigation report |
| As required |
| 1.c.10 |
| SRF-JRMC C380 |
| C380 |
| SRF-JRMC Shared computer drive |
| End of day summary |
| Daily during project execution |
| Normal work week. |
8. QUALITY ASSURANCE SURVEILLANCE (QAS) PLAN, PERFORMANCE REQUIREMENTS SUMMARY: Contractor performance objectives are summarized in the following table.
| Performance Element |
| Performance Requirement |
| Surveillance Method |
| Acceptable Quality Level |
| Incentives/ Disincentives |
| Personnel |
| Qualifice staff provided within the timeframes specified in the PWS. |
| Verification by the COR or ACOR. |
| Greater than 80% of the task order start date are met by staff qualified to meet the specified task objectives. |
| Past performance will be considered in determining future awards. |
| Contract Deliverables |
| Contract deliverables furnished as prescribed in the PWS |
| Verification by the COR or ACOR. |
| Greater than 95% of deliverable submitted timely and without rework required. |
| Past performance will be considered in determining future awards. |
| Overall Contract Performance |
| Overall contract performance of sufficient quality to earn a Satisfactory (or higher) rating in the COR’s annual performance report. |
| Assessment by the COR or ACOR. |
| All performance element rated Satisfactory (or higher). |
| Past performance will be considered in determining future awards. |
| Invoices |
| Invoices in accordance with contract procedures are timely and accurate. |
| Review and acceptance of the invoice. |
| 100% of the invoices are timely and accurate. |
| Past performance will be considered in determining future awards. |
9. GOVERNMENT FURNISHED EQUIPMENT: SRF-JRMC Yokosuka will provide sufficient government office space and IT/communications to execute assigned tasks.