Attachment 21 RCM Testing.pdf

PDF 137 KB Posted

Attached to
FACILITIES OPERATIONS AND MAINTENANCE (O&M) SERVICES Federal contract opportunity
Solicitation number
19AQMM25R0151
Issued by
Department of State Office of Acquisition Management

About this file

Section J Attachment 21 is a detailed specification for Reliability Centered Maintenance (RCM) Testing for electrical system components. The document outlines comprehensive testing requirements for electrical equipment, mandating that all testing be performed according to manufacturer recommendations, IEEE standards, NETA standards, or other applicable industry standards, with the most stringent standard applied when multiple standards exist.

The attachment specifies that testing frequency shall be determined by the method used to identify required testing, and if test results fall outside acceptable limits, testing frequency must be increased until passing results are achieved. The RCM testing encompasses multiple diagnostic techniques including oil sampling, lubrication analysis, thermographic inspections, vibration testing, and ultra-sonic testing, with the goal of identifying potential equipment degradation trends before media breakdown or component failure occurs.

View the file

Other files for this federal contract opportunity

Other files attached to FACILITIES OPERATIONS AND MAINTENANCE (O&M) SERVICES, newest first.
File Type Posted
Attachment 23 Pricing Sheet-Updated 7-8.xlsx XLSX spreadsheet
19AQMM25R0151 0003.pdf PDF
19AQMM25R0151-QA-7-11.pdf PDF
19AQMM25R0151 P0002.pdf PDF
19AQMM25R0151-Q_A-7-1.pdf PDF
Attachment 23 Pricing Sheet-Updated 7-1.xlsx XLSX spreadsheet
19AQMM25R0151_QA_6-25.docx DOCX document
Attachment 23 Pricing Sheet-Updated 6-25.xlsx XLSX spreadsheet
19AQMM25R0151 P00001.pdf PDF
Attachment 30B SA-42 NFATC site data sheet.pdf PDF
Attachment 30A SA-42 NFATC Facilities and Structures Data.xlsx XLSX spreadsheet
Attachment 24 DDForm254.pdf PDF
Attachment 29 IDIQ Performance Work Statement.pdf PDF
Attachment 11 QASP Assurance Surveillance Matrix (1).xlsx XLSX spreadsheet
Attachment 13 Qualification of Contractor Employees.pdf PDF
Attachment 14 Deliverables Matrix.pdf PDF
Attachment 15 CFS Services Matrix.pdf PDF
Attachment 19 Building Automation.pdf PDF
Attachment 20 Boiler Pressure Vessel Operation and Inspection.pdf PDF
Attachment 02 Acronyms_Abbreviations.pdf PDF
Attachment 03 MRPT Processing Procedures.pdf PDF
Attachment 04 List of Properties.pdf PDF
Attachment 16 Environmental Health and Safety.pdf PDF
Attachment 18 Vertical Transportation Equipment.pdf PDF
Attachment 24 DD254 Security Guidance Questionnaire.docx DOCX document
Attachment 25 Past Performance Questionnaire.pdf PDF
19AQMM25R0151.pdf PDF
Attachment 0 Table_of_Contents.pdf PDF
Attachment 01 Definitions Glossary.pdf PDF
Attachment 06 List of Codes and Regulations.pdf PDF
Attachment 07 List_of_Key_Personnel_and_Qualifications.pdf PDF
Attachment 09 Program Management Plan Template.pdf PDF
Attachment 12A QASP AQL Matrix - PgMO.xlsx XLSX spreadsheet
Attachment 17 Fire Protection and Life Safety Equipment and Systems.pdf PDF
Attachment 28 On-Off Ramp process.pdf PDF
Attachment 05 Reliability_Centered_Maintenance_Manual.pdf PDF
Attachment 08 Escalation_and_Remediation_Process.pdf PDF
Attachment 10 CFS Plan Template.pdf PDF
Attachment 12 QASP AQL Matrix - CFS.xlsx XLSX spreadsheet
Attachment 22 Reporting Form for Adhesives Sealants and Primers.xlsx XLSX spreadsheet
Attachment 23 Pricing Sheet.xlsx XLSX spreadsheet
Attachment 26 Transition Plan.pdf PDF
Attachment 27 Proposed TO site groupings.pdf PDF
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section J Attachment 21 Testing as part of RCM

Section J - Attachment 21 Reliability Centered Maintenance (RCM) Testing

a. Perform testing of all electrical system components as required by the manufacturer’s recommendations, Institute of Electrical and Electronics Engineers (IEEE) standards, International Electrical Testing Association (NETA) or other applicable industry standards. When multiple standards are applicable, the most stringent will be applied.

b. The frequency of testing shall be determined using the same method used to identify the required testing.

c. If test results fall out of acceptable limits, increase testing frequency until passing results are achieved allowing for degradation trends to be identified prior to media breakdown or component failure.

d. Testing as part of RCM for all electrical equipment and systems. shall include but not be limited to:

• oil sampling,

• lubrication analysis,

• thermographic inspections,

• vibration and ultra-sonic testing

File details come from the government source that posted it. Updated .