Attachment 14 Deliverables Matrix.pdf
PDF 230 KB Posted
- Attached to
- FACILITIES OPERATIONS AND MAINTENANCE (O&M) SERVICES Federal contract opportunity
- Solicitation number
- 19AQMM25R0151
About this file
The Attachment 14 Deliverables Matrix is a comprehensive document detailing the reporting and submission requirements for a Department of State Facilities Operations and Maintenance (O&M) contract. The matrix outlines numerous deliverables across multiple contract sections, including monthly reports on program management, quality control, health and safety, environmental stewardship, and various operational plans such as Program Management Plan (PMP), Operations and Maintenance Plan, and Quality Control Plan.
Key submission requirements include draft and final plan submissions within specific timeframes after contract award, typically ranging from 10 to 60 calendar days. Vendors are required to provide monthly, quarterly, and annual reports to multiple points of contact, including the Contracting Officer, Contracting Officer's Representative, Building Manager, and Safety branch. Specific reporting areas include OSHA injury logs, green purchasing, energy audits, water and energy quarterly reports, tenant satisfaction surveys, equipment inventories, and detailed plans for areas like waste management, pest control, landscape maintenance, and water sampling. The matrix emphasizes regular reporting, plan updates, and comprehensive documentation across facility management operational domains.
View the file
Other files for this federal contract opportunity
Show all 43
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section J Attachment 14 Deliverables Matrix
Section J - Attachment 14
Deliverables Matrix
Contract Section
Name Responsible Vendor
Include in bid
Due Frequency Point of Contact(s)
C.3
PgMO Monthly report
PgMO Vendor
Monthly contract status update to include efficiency analysis
Monthly • Contracting Officer
• Contracting Officer’s
Representative
• FMS Leadership
• Building Manager
C.3.1
PgMO QA/QC Report
PgMO
QASP, KPI/AQL report, Data Management Plan
Monthly • Contracting Officer’s Representative
• FMS Leadership
C.3.5
PgMO monthly Health and Safety Report Attachment 16
PgMO Vendor
Contractor shall provide a monthly report including all actions taken, in progress or planned, involving health and safety
Monthly • Contracting Officer’s Representative
• Safety branch
C.3.6 and C.4
PgMO monthly Environmental Stewardship Report
PgMO Vendor
Contractor shall provide a monthly report including all actions taken, in progress or planned, involving environmental stewardship
Monthly • Contracting Officer’s Representative
C.4.2.1 Attachment 09 Program Management Plan Template
Program Management Plan (PMP)
CFS
Vendor
X Contractor shall provide a DRAFT to the CO, ten (10) calendar days after Contract award for review and shall submit a final plan sixty (60) calendar days after Contract Award for USG approval.
Annual review
• Contracting Officer
• Contracting Officer’s
Representative
C.4.2.2 Attachment 10 CFS Plan Template
Operations and Maintenance (CFS) Plan
CFS Vendor X A DRAFT CFS plan shall be delivered to the CO, COR and Building/Facility Manager (BM/FM) for review thirty (30) calendar days after task order award for approval
Reviewed and audited monthly
• Contracting Officer
• Contracting Officer’s
Representative forty-five (45) calendar days after task order award.
C.4.1.1 Operations & Maintenance Service
CFS Vendor Defined at the task order level. DRAFT due thirty (30) days after task order award for approval. Final due forty-five (45) days after task order award.
Annual review and within thirty (30) days of task order modification or notable change.
• Contracting Officer
• Contracting Officer’s
C.4.2.3
CFS Plan in
ERPS
CFS Vendor Details of the CFS plan shall be incorporated in the ERPS system within 60 days of CO approval of the final plan.
• Contracting Officer
• Contracting Officer’s
C.4.2.4
Quality Control Plan (QCP)
CFS
Vendor
X Contractor shall provide a DRAFT to the CO, ten (10) calendar days after task order award and the final QCP shall be submitted for approval thirty (30) calendar days after task order award.
30 calendar days after task order award
Annual review
• Contracting Officer
C.4.2.5
Cost Control Plan (CCP)
CFS Vendor X Thirty (30) calendar days after task order award.
Annual review • Contracting Officer
• Contracting Officer’s
Representative C.4.2.6 Attachment 06 List of Codes and Regulations
Occupational Safety and Health Plan
CFS Vendor DRAFT Safety Plan submitted to the CO and the COR thirty (30) calendar days after task order award for review and acceptance. The Contractor shall submit the final plan ninety
(90) calendar days after the task order award.
Random system audits
Annual review
• Contracting Officer
• Contracting Officer’s
Representative
C.4.5 Initial Inspection and Deficiency List
CFS Vendor Thirty (30) calendar days after Task Order Start
Annually • Contracting Officer
• Contracting Officer’s
Representative
• Building Manager
C.4.6.1 Transition Plan CFS Vendor X The Contractor shall submit a Phased Transition Plan to the CO for approval within ten (10) calendar days after Task Order Award.
Review 60 days after Task Order award.
• Contracting Officer
C.4.6.1 Transition Plan CFS Vendor X Initial transition shall consist of the first set of key personnel arriving on site within forty-five (45) calendar days after Task Order Award. Second set no later than sixty (60) calendar days after Task Order Award.
Review 60 days after Task Order award.
• Contracting Officer
C.4.6.3 Demobilization Plan
CFS Vendor X Within 45 days of termination of CFS Task Order
• Contracting Officer
• Contracting Officer’s
Representative C.4.8 Call Center
Management CFS Vendor Site specific playbook to be created in conjunction with USGOV within 90 days of task order award.
Review annually and within thirty (30) days of any noted change.
• Contracting Officer
• Contracting Officer’s
Representative
• Building Manager
C.4.9.2 Equipment Inventory
CFS Vendor Contractor shall provide an initial update and verification of the equipment inventory upon thirty (30) calendar days after task order award
Annually, the contractor must validate inventory.
Monthly reports of all equipment added into ERPS
• Contracting Officer
• Contracting Officer’s
C.4.10.2
Inventory of Hazardous Material
CFS Vendor The Contractor shall submit this plan to the CO and COR thirty (30) days after task order award.
Monthly reports • Contracting Officer
• Contracting Officer’s
Representative
C.4.12.5 Minimum Lead Time for Vetting
CFS Vendor and PgMO
Vendor
Contractor shall ensure contractor personnel submit MRPT packages eighty (80) days prior to expected performance at the site
All changes to the staffing plan must be approved by COR
• Contracting Officer
• Contracting Officer’s
Representative C.5.3.1 Water
Sampling and Flushing Plan
(WSFP)
CFS Vendor X Draft plan must be submitted for review and approval thirty (30) calendar days after task order award. The final plan must be submitted within sixty (60) calendar days after task order award. Must comply with GSA Order PBS 1000.7A
Updated plan must be provided annually or within thirty (30) days of any noted change.
• Contracting Officer
• Contracting Officer’s
Representative
• Building Manager
C.5.4.1 Backup Retention
CFS Vendor Contractor shall create two sets of backup data for each BAS at the facility on a biannual basis.
Bi-annually • Contracting Officer
C.5.4.2 Password Retention.
CFS Vendor Contractor shall create a listing of the BAS/PMS usernames and passwords that exist within the BAS Operator Workstation and/or Server that are used to access the
BAS/PMS.
Review bi-annually • Contracting Officer
• Contracting Officer’s
C.5.6.1 Condition Monitoring:
Vibration analysis inspection
CFS Vendor Contractor shall conduct the vibration analysis inspection on an annual basis to begin ninety (90) days after task order award and to complete within thirty (30) days
• Contracting Officer
• Contracting Officer’s
C.5.7.1
CFS Plan for Conveyance Systems
Attachment 20
CFS Vendor X A DRAFT plan shall be delivered for review ten (10) calendar days after Task Order Award for approval forty-five (45) calendar days after Task Order Award.
Review 45 days after contract award
Quarterly audits and updates
• Contracting Officer
• Contracting Officer’s
C.5.9 Cleaning & Janitorial Service
CFS Vendor X Due thirty (30) days after task order award.
Complete cleaning schedule based on the facility. In addition, QC/QA program for spot checking the janitorial program.
• Contracting Officer
• Contracting Officer’s
C.5.10
Spare Parts and Expendables Inventory Report
CFS Vendor Forty-five (45) calendar days after Task Order award.
Monthly report • Contracting Officer’s Representative
• Building Manager
C.5.11.6 Fuel Inventory report.
CFS Vendor Fuel inventory, including the estimated days or hours the supply will last at current consumption rates.
Weekly Contracting Officer’s
Building Manager
C.5.13
Landscape Management Plan
CFS Vendor X Thirty (30) days after contract award • Contracting Officer
C.5.14
Pest Management Plan
CFS Vendor X Forty-five (45) calendar days after the Task Order Award
• Contracting Officer
• Contracting Officer’s
C.5.16 Snow and Ice Removal Plan
CFS Vendor X Detailed snow and ice removal plan due forty-five (45) days after task order award.
• Contracting Officer
• Contracting Officer’s
Representative
• Building Manager
C.5.20.2 As Built drawings.
CFS Vendor and PgMO
Semi-annual
Semi-annual • Contracting Officer
Representative
• Building Manager
C.5.21.2 Staffing Plan CFS Vendor and PgMO
Vendor
X Initial Staffing Plan shall be submitted for review and approval thirty (30) calendar days after task order award. The Final Staffing Plan shall be submitted sixty (60) calendar days after task order award
COR must approve change in key personal
• Contracting Officer
• Contracting Officer’s
C.5.21.5 Minimum Staffing
CFS Vendor and PgMO
Vendor
X Contractor personal must be manned at 100% within 90 days from contract award
Review in 90 days from task order award
• Contracting Officer
• Contracting Officer’s
C.6.2 Reporting for Adhesives, Sealants and Primers
CFS Vendor Contractor shall report monthly all quantities of adhesives, sealants, adhesive primers, and sealant primers used on a site-by-site basis
Monthly • Contracting Officer’s Representative
C.5.21 Health and Safety Training for Employees
CFS Vendor and PgMO
Vendor
X Thirty (30) calendar days after Task Order Start.
Safety Training is reported Monthly
• Contracting Officer’s Representative
• Building Manager
• Safety branch
C.6.9 Workplace Safety and Health Program
CFS Vendor and PgMO
Vendor
Initial safety and health program for review and approval within forty-five (45) calendar days after the task order award for review and shall submit a final plan sixty (60) calendar days after the task order award
Reviewed Annually • Contracting Officer
• Contracting Officer’s
Representative
C.6.10
Attachment 16
Waste, Recycling and Hazardous Waste Removal Management Plan
CFS Vendor X DRAFT due thirty (30) days after task order award. Plan to be finalized in conjunction with Building/Facility Manager for site.
Updated plan must be provided annually and within thirty (30) days of any noted change.
• Contracting Officer
• Contracting Officer’s
Representative
• Building Manager
• Safety branch
C.16.2 Water Sampling Reports.
CFS Vendor Contractor shall provide a monthly operations report to the COR by the fifth (5th) business day of the following month
Monthly reports • Contracting Officer
• Contracting Officer’s
Representative
• Building Manager
• Safety branch
Attachment 16 Site Specific waste reports
CFS Vendor Some sites may require solid waste weight reporting.
Monthly reports • Contracting Officer’s Representative
• Building Manager
• Safety branch
Attachment 16 section 10 Environmental reports
Site Specific composting reports
CFS Vendor Monthly waste, composting and recycling data will be submitted to the COR and Safety branch. The data reporting will include precise measurements of actual weight and the classification of various recycling streams
Monthly reports • Contracting Officer’s
• Building Manager
• Safety branch
Attachment 16 section 10 Environmental reports
Site Specific recycling reports
CFS Vendor Monthly waste, composting and recycling data will be submitted to the COR and Safety branch. The data reporting will include
Monthly reports • Contracting Officer’s precise measurements of actual weight and the classification of various recycling streams
• Safety branch
C.6.13
Attachment 16
Green Cleaning Plan
CFS Vendor Initial plan shall be submitted for review and approval within thirty (30) calendar days after the task order award for review and Contractor shall submit a final plan sixty (60) calendar days after the task order award
Plan to be reviewed quarterly for the initial 3 quarters after task order award. Then reviewed annually and within thirty
(30) days of any noted change.
• Building Manager
• Safety branch
C.10.1 and C.16.4
Inventory of on-site supplies, materials, tools, and equipment
CFS Vendor Within forty-five (45) calendar days after the task order award
Annually • Contracting Officer’s Representative
• Building Manager
C.14.3 Monthly QC Report
CFS Vendor and PgMO
Vendor
Thirty (30) days after the start date of the task order with the first monthly payment request
Monthly • Contracting Officer’s Representative
• Building Manager C.16.2 Monthly
Operations Report
CFS Vendor Contractor shall provide a monthly operations report to the COR by the fifth (5th) business day of the following month
• Contracting Officer’s Representative
• Building Manager C.16.3 Tenant
Satisfaction Survey Report
CFS Vendor Contractor shall provide a monthly operations report to the COR by the fifth (5th) business day of the following month
Monthly • Contracting Officer’s Representative
• Building Manager C.16.4 Annual
Program Mgmt Meeting Report
CFS Vendor and PgMO
Vendor
Contractor shall provide annual reports on the current status of any contracts and warranties associated with the Contractor’s performance under the task order. To include a list of equipment/system warranties that will expire in the coming year.
Annually • Contracting Officer
• Contracting Officer’s
Attachment 16 OSHA Form 300 Log of Work-Related Injuries
CFS
Vendor and PgMO
Vendor
End of each quarter • Contracting Officer’s Representative
• Building Manager
• Safety branch
Attachment 16 OSHA Form 300, Log of Work-Related Injuries, and Illnesses
CFS
Vendor and PgMO
Vendor
Annually • Contracting Officer’s Representative
• Building Manager
• Safety branch
Attachment 16 Green Purchasing report
CFS
Vendor
Monthly • Contracting Officer’s Representative
• Building Manager
• Safety branch
Attachment 16 Energy Audit CFS Vendor
Annually • Contracting Officer’s Representative
• Building Manager
• Safety branch
Attachment 16 Energy and Water Quarterly Report
CFS
Vendor
Monthly • Contracting Officer’s Representative
File details come from the government source that posted it. Updated .