Attachment 03 MRPT Processing Procedures.pdf

PDF 41 KB Posted

Attached to
FACILITIES OPERATIONS AND MAINTENANCE (O&M) SERVICES Federal contract opportunity
Solicitation number
19AQMM25R0151
Issued by
Department of State Office of Acquisition Management

About this file

This document is an attachment detailing Moderate Risk Public Trust Processing Procedures for contractor personnel. The procedures outline comprehensive background investigation requirements for US, Third Country National (TCN), and Local National (LN) personnel performing on a contract. Key requirements include:

Contractors must submit Public Trust certification requests at least 80 calendar days before contract performance, with all personnel requiring vetting through the Electronic Questionnaires for Investigations Processing (e-QIP) system. Specific requirements vary by personnel type: Third Country Nationals must be investigated and favorably adjudicated by the Bureau of Diplomatic Security, Local Nationals must be vetted by the local Embassy Regional Security Office, and only US citizens can access the OPM portal. The document specifies multiple required forms for submission, including Standard Form 85P/PS, digital fingerprints, proof of citizenship, and various additional documentation like military discharge papers, biographical sketches, and overseas contact information. Contractors must immediately report and remove personnel with adverse information or who fail to obtain Public Trust certification.

View the file

Other files for this federal contract opportunity

Other files attached to FACILITIES OPERATIONS AND MAINTENANCE (O&M) SERVICES, newest first.
File Type Posted
19AQMM25R0151 0003.pdf PDF
19AQMM25R0151-QA-7-11.pdf PDF
Attachment 23 Pricing Sheet-Updated 7-8.xlsx XLSX spreadsheet
19AQMM25R0151 P0002.pdf PDF
19AQMM25R0151-Q_A-7-1.pdf PDF
Attachment 23 Pricing Sheet-Updated 7-1.xlsx XLSX spreadsheet
19AQMM25R0151_QA_6-25.docx DOCX document
Attachment 23 Pricing Sheet-Updated 6-25.xlsx XLSX spreadsheet
19AQMM25R0151 P00001.pdf PDF
Attachment 30B SA-42 NFATC site data sheet.pdf PDF
Attachment 30A SA-42 NFATC Facilities and Structures Data.xlsx XLSX spreadsheet
Attachment 24 DDForm254.pdf PDF
Attachment 29 IDIQ Performance Work Statement.pdf PDF
Attachment 02 Acronyms_Abbreviations.pdf PDF
Attachment 04 List of Properties.pdf PDF
Attachment 16 Environmental Health and Safety.pdf PDF
Attachment 18 Vertical Transportation Equipment.pdf PDF
Attachment 24 DD254 Security Guidance Questionnaire.docx DOCX document
Attachment 25 Past Performance Questionnaire.pdf PDF
19AQMM25R0151.pdf PDF
Attachment 0 Table_of_Contents.pdf PDF
Attachment 01 Definitions Glossary.pdf PDF
Attachment 06 List of Codes and Regulations.pdf PDF
Attachment 07 List_of_Key_Personnel_and_Qualifications.pdf PDF
Attachment 09 Program Management Plan Template.pdf PDF
Attachment 12A QASP AQL Matrix - PgMO.xlsx XLSX spreadsheet
Attachment 17 Fire Protection and Life Safety Equipment and Systems.pdf PDF
Attachment 21 RCM Testing.pdf PDF
Attachment 28 On-Off Ramp process.pdf PDF
Attachment 05 Reliability_Centered_Maintenance_Manual.pdf PDF
Attachment 08 Escalation_and_Remediation_Process.pdf PDF
Attachment 10 CFS Plan Template.pdf PDF
Attachment 12 QASP AQL Matrix - CFS.xlsx XLSX spreadsheet
Attachment 22 Reporting Form for Adhesives Sealants and Primers.xlsx XLSX spreadsheet
Attachment 23 Pricing Sheet.xlsx XLSX spreadsheet
Attachment 26 Transition Plan.pdf PDF
Attachment 27 Proposed TO site groupings.pdf PDF
Attachment 11 QASP Assurance Surveillance Matrix (1).xlsx XLSX spreadsheet
Attachment 13 Qualification of Contractor Employees.pdf PDF
Attachment 14 Deliverables Matrix.pdf PDF
Attachment 15 CFS Services Matrix.pdf PDF
Attachment 19 Building Automation.pdf PDF
Attachment 20 Boiler Pressure Vessel Operation and Inspection.pdf PDF
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION J – Attachment 3

Moderate Risk Public Trust Processing Procedures

1. Requirements and Procedures for processing Public Trust Certifications

a. The Bureau of Diplomatic Security shall conduct background investigations on those personnel, US and Third Country Nationals, requiring a Public Trust Certification for contract performance. Prior to contract performance

b. The contractor shall coordinate with the Regional Security Officer for vetting of Local National personnel performing on this contract.

c. Contractor personnel may not perform on contract until a Public Trust certification has been issued by Personnel Security and Suitability.

d. A preliminary background check will be conducted in conjunction with Public Trust certification processing and, if possible, an interim Public Trust certification will be issued. An Interim Public Trust certification is acceptable for initial contract performance.

e. Those contractor personnel whose preliminary background check is deemed unfavorable will not be issued an interim Public Trust certification. He/she will not be approved for initial contract assignment and will not be considered for contract assignment until his/her investigation has been favorably adjudicated. A personal interview may be conducted if deemed necessary by the Bureau of Diplomatic Security.

f. During the conduct of the investigation, if substantive issues are raised, or if the contractor employee does not pass the Public Trust investigation, an interim determination may be withdrawn and he/she shall be removed from the contract at no cost to the government.

g. All contractor personnel performing on this contract must possess, favorable adjudicative determination, either a Security Clearance issued by the Defense Industrial Security Clearance Office (DISCO), Public Trust certification issued by the Bureau of Diplomatic Security or be vetted by the local RSO, prior to contract performance.

h. All requests for Public Trust certifications shall be submitted at least 80 calendar days prior to the start of contract performance.

i. Contractor shall complete screening of all contractor personnel prior to submission to DS/IS/IND in accordance with J below. Contractor shall delete all applicants deemed unacceptable through their contractor screening process.

j. The screening accomplished by the Contractor is intended to determine whether or not the applicant can satisfy the following:

a. Ability to obtain a Public Trust certification.

b. Ability to meet the requirements for experience required for the Labor

Category for which the contractor is performing on the contract as.

2. Third Country Nationals

a. The Contractor shall submit all Third Country National (TCN) for a public trust certification, personnel performing on the contract/task order, utilizing the Electronic Questionnaires for Investigations Processing (e-QIP) to DS/IS/IND and shall be investigated and favorably adjudicated by the Bureau of Diplomatic Security prior to contract performance. TCN’s will not be approved for contract assignment until a minimum of an interim or final Public Trust certification is favorably adjudicated by DS/SI/PSS and the company notified. Note: If Ugandan applicants are to perform on contract, they will not be afforded an interim Public Trust certification. They will be processed but will only be granted a final Public Trust certification.

b. The contractor shall immediately remove TCN personnel from contract performance whose interim certification is withdrawn or final certification is denied, at no cost to the government.

3. Local Nationals

a. Local National (LN) personnel selected to perform on the contract/task order shall be vetted and approved by the local Embassy Regional Security Office (RSO) in accordance with the standards established by the RS. LN’s shall not perform under this contract until approved by the RSO. The contactor shall immediately remove those LN personnel subsequently determined by the RSO as unsuitable to perform under this contract at no cost to the government.

4. Adverse Information

a. The contractor shall reports any adverse information pertaining to contractors assigned to the contract, in any capacity, to the CO, COR, DS/IS/IND, and RSO immediately.

5. OPM portal Access

a. Only US citizens shall be granted OPM portal access.

b. Contractor personnel requiring access to the OPM portal for the purpose of submitting the Standard Forms through the Electronic Questionnaires for Investigation Processing (e-QIP) will require a minimum of a Moderate Risk Public Trust certification prior to the being granted OPM portal access. OPM portal access shall be granted through DS/IS/IND. All training for the OPM portal and e-QIP submissions shall be accomplished by DS/IS/IND.

c. If the contractor chooses to utilize Third Party Data Entry (3PDE) the individual doing the entry must have a favorable SSBI (Single Scope Background Investigation) that can be certified to DS/IS/IND prior to authorization being granted.

6. Standard Form 85P/PS Moderate Risk Public Trust Processing

a. The contractor shall ensure that all personnel requiring a Public Trust certification complete the SF 85P/PS and all related forms necessary to process the public trust certification. The contactor shall use the e-QIP system for all applicants. The paperwork shall be submitted in English and readable.

b. The following forms and documentation are required for submission of a Moderate Risk Public Trust certification packages. DS/IS/IND shall provide guidance and training for the submission of e-QIP and hard copy SF 85P/PS packets. Contractor personnel requiring Public Trust certifications should be initiated for processing as soon as possible

c. The Government reserves the right to require the use of different forms. The contractor will be advised if the use of different forms is required.

i. Standard From 85 P/PS (Questionnaire for Public Trust Positions)

ii. Electronic/Digital Fingerprints (FD 258)

iii. Signed DS-4002 Credit Release form

iv. Proof of citizenship

v. Applicant Itinerary

vi. Bio Approval Notification from Program Office (as applicable)

vii. DD Form 214 Certificate of Release or Discharge from Active Duty and/or

NGB-22 Report of Separation and Record of Service or equivalent (as appropriate)

viii. Family Biographical Sketch (as applicable)

ix. Completed foreign Relatives, Friends and Associates spreadsheet

x. Completed Overseas Activities Contact Data sheet

xi. Kuwaiti Ministry of Foreign Affairs (MFA Civil ID Number (as applicable)

xii. National ID Card (copy of front and back of card (as applicable)

xiii. Other Country Release of Information Forms (as applicable)

xiv. Police Certificate of Good Conduct or Police Clearance Certificate (Ugandan and Kenyan applicants only) (as applicable)

The contractor should submit the required forms the most expeditious manner possible (the forms will be able to be up loaded into eQIP) to:

Industrial Security Division Bureau of Diplomatic Security, DS/IS/IND, SA-20 1801 North Lynn Street Arlington, VA 22209

File details come from the government source that posted it. Updated .