Attachment 12 QASP AQL Matrix - CFS.xlsx

XLSX spreadsheet 548 KB Posted

Attached to
FACILITIES OPERATIONS AND MAINTENANCE (O&M) SERVICES Federal contract opportunity
Solicitation number
19AQMM25R0151
Issued by
Department of State Office of Acquisition Management

About this file

This document is an Acceptable Quality Level (AQL) Matrix Template for Facilities Operations and Maintenance (O&M) Services, specifically for the Harry S. Truman (HST) Building. The comprehensive matrix details 41 distinct quality assurance metrics across multiple operational domains, including daily log reporting, water analysis, equipment inspections, maintenance tracking, safety protocols, staffing, and critical system monitoring. Key areas of focus include building management oversight, provider performance monitoring, equipment maintenance tracking, electrical and mechanical system inspections, safety and training documentation, thermal imaging, and critical infrastructure assessments.

The AQL matrix provides granular tracking mechanisms for various facility management functions, with specific acceptable quality levels for each metric. Notable requirements include 100% performance reviews for providers, 95% compliance with inspection checklists, 98% communication documentation, and comprehensive tracking of maintenance issues, equipment alarms, and system performance. The document includes detailed templates for logging information across domains such as water analysis, fuel usage, equipment maintenance, staffing levels, thermal imaging, and safety inspections, demonstrating a rigorous approach to facilities management quality control and performance monitoring.

View the file

Other files for this federal contract opportunity

Other files attached to FACILITIES OPERATIONS AND MAINTENANCE (O&M) SERVICES, newest first.
File Type Posted
Attachment 23 Pricing Sheet-Updated 7-8.xlsx XLSX spreadsheet
19AQMM25R0151-QA-7-11.pdf PDF
19AQMM25R0151 0003.pdf PDF
19AQMM25R0151 P0002.pdf PDF
19AQMM25R0151-Q_A-7-1.pdf PDF
Attachment 23 Pricing Sheet-Updated 7-1.xlsx XLSX spreadsheet
19AQMM25R0151_QA_6-25.docx DOCX document
Attachment 23 Pricing Sheet-Updated 6-25.xlsx XLSX spreadsheet
Attachment 30A SA-42 NFATC Facilities and Structures Data.xlsx XLSX spreadsheet
19AQMM25R0151 P00001.pdf PDF
Attachment 30B SA-42 NFATC site data sheet.pdf PDF
Attachment 24 DDForm254.pdf PDF
Attachment 29 IDIQ Performance Work Statement.pdf PDF
Attachment 11 QASP Assurance Surveillance Matrix (1).xlsx XLSX spreadsheet
Attachment 13 Qualification of Contractor Employees.pdf PDF
Attachment 14 Deliverables Matrix.pdf PDF
Attachment 15 CFS Services Matrix.pdf PDF
Attachment 19 Building Automation.pdf PDF
Attachment 20 Boiler Pressure Vessel Operation and Inspection.pdf PDF
Attachment 02 Acronyms_Abbreviations.pdf PDF
Attachment 03 MRPT Processing Procedures.pdf PDF
Attachment 04 List of Properties.pdf PDF
Attachment 16 Environmental Health and Safety.pdf PDF
Attachment 18 Vertical Transportation Equipment.pdf PDF
Attachment 24 DD254 Security Guidance Questionnaire.docx DOCX document
Attachment 25 Past Performance Questionnaire.pdf PDF
Attachment 05 Reliability_Centered_Maintenance_Manual.pdf PDF
Attachment 08 Escalation_and_Remediation_Process.pdf PDF
Attachment 10 CFS Plan Template.pdf PDF
Attachment 22 Reporting Form for Adhesives Sealants and Primers.xlsx XLSX spreadsheet
Attachment 23 Pricing Sheet.xlsx XLSX spreadsheet
Attachment 26 Transition Plan.pdf PDF
Attachment 27 Proposed TO site groupings.pdf PDF
19AQMM25R0151.pdf PDF
Attachment 0 Table_of_Contents.pdf PDF
Attachment 01 Definitions Glossary.pdf PDF
Attachment 06 List of Codes and Regulations.pdf PDF
Attachment 07 List_of_Key_Personnel_and_Qualifications.pdf PDF
Attachment 09 Program Management Plan Template.pdf PDF
Attachment 12A QASP AQL Matrix - PgMO.xlsx XLSX spreadsheet
Attachment 17 Fire Protection and Life Safety Equipment and Systems.pdf PDF
Attachment 21 RCM Testing.pdf PDF
Attachment 28 On-Off Ramp process.pdf PDF
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AQL

Section J - Attachment 12 Acceptable Quality Level (AQL) Matrix Template - CFS

21 Sept. 2022Section "C"Section "J"Daily ReadingsWeeklyMonthly ReportQuarterly ReportAnnual ReportNew HireUpdate upon change
AQL-1BAS Daily Log ReportC.3.21.3XX
AQL-2RCM Airstack Closed LoopC.3.8XX
AQL-3Clean SpacesC.1.21X
AQL-4Enterprise Resource Planning SystemC.1.14X
AQL-5Critical Equipment Alarm recordX
AQL-6Critical Equipment ListXX
AQL-7Electrical System GFPEXX
AQL-8Electrical System WO repairsX
AQL-9Fire Alarm recordX
AQL-10Fuel Usage daily reportX
AQL-11a-jWater Analysis C.3.32.6C.3.8J-13X
AQL-12-12aCorrosion CouponC.3.32.4
AQL-13Logs and RecordsC.3.5.3X
AQL-14Meter calibrationX
AQL-15NSF-ANSI Chemicals usedC.3X
AQL-16One line DiagramsXX
AQL-17Physical Security - Guard ShacksX
AQL-18RCM - AHU - Filter & VFD daily inspection C.3.21.2C.1.76XX
AQL-19RCM Electrical inspectionC.1.76X
AQL-20RCM Plumbing daily inspectionsC.1.76X
AQL-21RCM Building Inspection ExteriorX
AQL-22RCM Building Inspection InteriorX
AQL-23RCM Make up water usageC.1.76X
AQL-24RCM Monthly ActivityReviewC.1.76X
AQL-25Safety and TrainingC.3XX
AQL-26Staffing C.3.20.1c C.3.1.IC.1.63X
AQL-27Thermal Imaging Electrical Panels Low Voltage need to add
AQL-28Thermal Imaging Electrical Switch Gear
AQL-29Vibration Analysis need to add to contractX
AQL-30Fire and Life Safety Inspection 15 FAM 813.3C.1.34X
AQL-31Building Assessement of all support systems (AIS)C.3.2.1X
AQL-32Blank
AQL-33Preventive Maintenance Service Contracts (PMSC) budgetX
AQL-34Workplace Hazard Identification and Assessment (OSHA)J-15X
AQL-35Monthly Fuel System Inspection (using Gov. Check Lit)J-18X
AQL-36Veeder-Root System TestingJ-18X
AQL-37Annual Leak Monitoring and Overfill Protection Test FormJ-18X
AQL-38Annual Walkthrough Inspection ChecklistJ-18X
AQL-39On Shelf Replacement and Expendable Parts List C.3.20.1aC.3.7J-06X
AQL-40Customer Quality Assurance C.3.11C.3.20.10X
AQL-00PSV valve testing
ReferenceLast tab is reference only: Critical equipment list by Tatitlek
The Quality Assurance Surveillance Plan (QASP) is the document government personnel use to assess contractor performance. Using the Requirements Roadmap ensures that each performance objective is linked to a method of inspection incorporated in the QASP
AQL-1Multi-Provider, Multi-Building Mgmt
AQL-01.1Provider-Level Management Oversight
AQL: Provider Performance Monitoring:
oAQL: 100% of CFS providers receive regular performance reviews based on agreed-upon KPIs.
oAQL: 95% of identified performance issues with individual CFS providers are addressed with corrective action plans within [specified timeframe].
oAQL: 100% of scheduled meetings with each CFS provider are held.
•AQL: Provider Communication:
oAQL: 98% of communication from the PGMO to CFS providers is documented and tracked.
oAQL: 100% of CFS provider escalations are responded to within the required time frame.
•AQL: Provider Compliance Tracking:
oAQL: 100% of CFS providers' compliance with contract requirements, safety regulations, and environmental standards is monitored and documented.
AQL 22. Building-Level Management Oversight:
AQL 2.1•AQL: Building Inspection Coverage:
AQL 2.1.1oAQL: 100% of buildings assigned to CFS providers receive scheduled inspections according to the established frequency.
AQL 2.1.2oAQL: 95% of building inspections are performed according to the inspection checklist.
•AQL: Building Issue Tracking:
oAQL: 100% of identified building maintenance issues are tracked and resolved within the defined service level agreements (SLAs).
oAQL: 90% of preventative maintenance schedules are followed for each building.
oAQL: 90% of preventative maintenance schedules are followed for each building.
•AQL: Building Performance Reporting:
oAQL: 100% of building-level performance reports are generated and provided to the COR as required.
oAQL: 100% of building specific data is entered into the ERP system.
•AQL: Building SLA Compliance:
oAQL: 98% of building SLA compliance is maintained.
AQL 3Provider and Building Cross-Referencing:
AQL 3.1•AQL: Data Correlation:
AQL 3.1.1oAQL: 95% of data across providers and buildings is accurately correlated and analyzed to identify trends and potential issues.
AQL 3.1.2oAQL: 100% of building to provider assignments are accurately tracked.
AQL 3.2•AQL: Issue Escalation:
AQL 3.2.1oAQL: 100% of issues that effect multiple buildings or providers are escalated to the COR.

DRAFT

AQL 1 BAS Daily Log

AQL - 1RCMBAS Daily Log Report
Honeywell / Tridium Niagara N4 Month:Time inspectedTime alarm is reportedService Company contacted / what timeTime Service Company arrived on siteDiscription of Problem Software / HardwareDiscription of repairTime system is restored
Inspection 1
Inspection 2
Inspection 3
Inspection 4
Inspection 5
Inspection 6
Inspection 7
Inspection 8
C.3.21.5 b.Checking all operating equipment in the watch area every two (2) hours.
c. Recording operating data in appropriate logs or records every two (2) hours.
Siemens Apogee 3.15 / not supported as of January 2022Time inspectedTime alarm is reportedService Company contacted / what timeTime Service Company arrived on siteDiscription of Problem Software / HardwareDiscription of repairTime system is restored
Inspection 1
Inspection 2
Inspection 3
Inspection 4
Inspection 5
Inspection 6
Inspection 7
Inspection 8

COMMENTS

AQL 2 Airstack Water Anaylsis

AQL-2RCM Airstack System Daily Inspections
Month________________
Make up tank pump control panel/ power on or off
Glycol Make up tank tank level
DAY123456789101112131415
Make up tank pump control panel/ power on or off
Glycol Make up tank tank level
DAY16171819202122232425262728293031
Pump P-04-230
Pressure reading on system123456789101112131415
this is the back-up pump for
heat exchanger H-4A-00516171819202122232425262728293031
on the house side
this pump works on differential pressure / most of the time it will be off
Pump P-04-231 / pressure
pump On or Off
123456789101112131415
Pressure reading
pump On or Off
16171819202122232425262728293031
Pump P-04-232 / pressure
pump On or Off
123456789101112131415
Pressure reading
pump On or Off
16171819202122232425262728293031
Pump P-04-09 / pressure
pump On or Off
123456789101112131415
Pressure reading
pump On or Off
16171819202122232425262728293031
Pump P-04-010 / pressure
pump On or Off
123456789101112131415
Pressure reading
pump On or Off
16171819202122232425262728293031

AQL 3 Clean Spaces AQL-3 Date:XX/XX/XX RCM CLEAN SPACES

Total square footage of common area, cleaned daily 1,500,000Scheduled WOUnscheduled WO% of Unscheduled WO to Scheduled
Total number of Work orders requesting cleaning due to area missed00ERROR:#DIV/0!
Total number of Work Orders for cleaning because of a spillScheduled WOUnscheduled WO% of Unscheduled WO to Scheduled
00ERROR:#DIV/0!
Total number of bathrooms, cleaned dailyScheduled WOUnscheduled WO% of Unscheduled WO to Scheduled
Total number of Work orders requesting cleaning due to area missed.00ERROR:#DIV/0!
Glass doors to be cleanedScheduled WOUnscheduled WO% of Unscheduled WO to Scheduled
Total number of Work orders requesting cleaning per month00ERROR:#DIV/0!
Special Projects this MonthScheduled WOUnscheduled WO% of Unscheduled WO to Scheduled
Total number of Work orders requesting cleaning per month00ERROR:#DIV/0!

AQL 4 ERPS

AQL-04 General requirements
Maintenance Program ProceduresDate
Routine Preventative and Emergency Work Orders shall be completed and closed weekly (7days)MAXIMO systems utilized to schedule, track and close routine and emergency work orders.
Tatitlek Work Order Report
PlumbingApplianceHVACJanitorElectricalFireGeneratorElevatorG-MaintenanceInsulatorWaterFuelQAQCCarpentryTotal
Scheduled0
Unscheduled (Routine)0
Standing0
TOTAL0
High Priority0
Emergency0
Urgent0
On Hold0
Canceled0
Approved0
Completed0
Closed0

AQL 5 Critical Equipment Alarms

AQL-05 General requirements, Critical Equipment Alarm Report
Maintenance Program ProceduresDate
Routine Preventative and Emergency Work Orders shall be completed and closed weekly (7days)Critical Equipment Alarm Report MAXIMO systems utilized to schedule, track and close routine and emergency work orders.
O&M Contractor Work Order
ChillersBoilersLift StationsStandby GeneratorsFuel TanksFuel Transfer pumpsAirstack chillerElectrical Switch GearFire PumpsFire Alarm SystemsTotal
Total number of Alarms for the month0
Number of unscheduled work orders issued0
Down time is recorded in hours0000000000
Percent of down time0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
Up time100.00%100.00%100.00%100.00%100.00%100.00%100.00%100.00%100.00%100.00%
coarticulations
Number of days x 24 hours divided by hours equipment is down = percentageDays in MonthHoursTotal hours for the monthUp Time
Down time is recorded in 1/10th of an hour3024720100.00%

Comments

AQL 6 Critical Equipment List

AQL-06 General requirements, Critical Equipment
Maintenance Program ProceduresMonth:
Routine Preventative and Emergency Work Orders shall be completed and closed weekly (7days)Critical Equipment List Not protected by GFPE The total number of pieces of equipment in HST #_______ MAXIMO systems utilized to schedule, track and close routine and emergency work orders.
O&M Contractor Work Order Report
ChillersBoilersLift StationsStandby GeneratorsFuel TanksFuel Transfer pumpsAirstack chillerElectrical Switch GearFire PumpsFire Alarm SystemsTotal
Scheduled0
Unscheduled (Routine)0
Standing (PM's)0
TOTAL0
High Priority0
Emergency0
Urgent0
On Hold0
Canceled0
Approved0
Completed0
Closed0

AQL 7 Electrical GFPE system

AQL-07 General requirements, (GFPE)
Maintenance Program ProceduresMonth:
Routine Preventative and Emergency Work Orders shall be completed and closed weekly (7days)Ground Fault Protection of Equipment (GFPE) The total number of pieces of equipment in HST #_______ MAXIMO systems utilized to schedule, track and close routine and emergency work orders.
O&M Contractor Work Order Report
GFPE protected equipment electrical issuesChillersBoilersLift StationsStandby GeneratorsFuel TanksFuel Transfer pumpsAirstack chillerElectrical Switch GearFire PumpsFire Alarm SystemsTotal
Scheduled0
Unscheduled (Routine)0
Standing (PM's)0
TOTAL0
High Priority0
Emergency0
Urgent0
On Hold0
Canceled0
Approved0
Completed0
Closed0
GFPE protects equipment from damaging line-to-ground faults and is not intended for the protection of people.

AQL 8 Electrical WO repairs

AQL-08 General requirements, Electrical Distribution Critical Equipment
Maintenance Program ProceduresDate
Routine Preventative and Emergency Work Orders shall be completed and closed weekly (7days)Electrical Distribution Critical Equipment The total number of pieces of equipment in HST #_______ MAXIMO systems utilized to schedule, track and close routine and emergency work orders.
O&M Contractor Work Order Report
Distribution PanelsSwitch GearInvertersTransformersATS for generatorsUPS gearTotal
Total number:0
Scheduled0
Unscheduled (Routine)0
Standing (PM's)0
TOTAL0
High Priority0
Emergency0
Urgent0
On Hold0
Canceled0
Approved0
Completed0
Closed0

AQL 9 Fire Alarm record

AQL-09 Fire Alarm Report
Maintenance Program ProceduresMonth:
Routine Preventative and Emergency Work Orders shall be completed and closed weekly (7days)Fire Alarm Report MAXIMO systems utilized to schedule, track and close routine and emergency work orders.
O&M Contractor Work Order Report
Panel - 1Panel - 2Panel - 3Panel - 4Panel - 5Panel - 6Panel - 7Panel - 8Panel - 9Panel - 10Total
Total number of Alarms for the month0
Number of unscheduled work orders issued0
PM'S0
Fire Alarm Test conducted for the month0
0
TOTAL0
Locations in HSTParking Gurage1st Floor2nd Floor3rd Floor4th Floor5th Floor6th Floor7th Floor8th Floor
Device Types
Ansul / Kidde Hood System
Audible Circuits - CSM-4
Beam Detector
Duct Detector
Heat Detector
Monitor Points
NET 7 Cards
NIM 1 Cards
PSR-1 Boards
Pull Stations
Relays
Smoke Det with Sounder Bases
Smoke Detectors
Spare Point on Module
Tamper Switches
Water Flow Switches
MXL-IQ Panel
MXL - MMB-3 Panel
Fire Pump Rooms
AA Smoke Detectors
9V Smoke Detectors
Battery Main
Batteries for PSR
Total Devices - Siemens

AQL 10 Daily Fuel Report O&M Sample Fuel Report AQL-10 Daily Fuel Report: HST Building - Sample (Date) Harry S Truman Building

TANKActual Cap. (USG)****forward from last month1-Aug2-Aug3-Aug4-Aug5-Aug6-Aug7-Aug8-Aug9-Aug10-Aug11-Aug12-Aug13-Aug14-Aug15-Aug16-Aug
21 Street North Tank (gal)10,8007,9757,9757,9757,9757,9757,9827,9827,9827,9827,9827,9827,9877,9877,9877,9877,9877,987
21 Street South Tank (gal)10,8005,6685,6685,6685,6685,6685,6715,6715,6715,6715,6715,6715,6735,6735,6735,6735,6735,673
C Street Tank (gal)5,4494,4394,4394,4394,4394,4394,4384,4384,4384,4384,4384,4384,4354,4354,4354,4354,4354,435
Total on Hand (gal)27,04918,08218,08218,08218,08218,08218,09118,09118,09118,09118,09118,09118,09518,09518,09518,09518,09518,095
Ullage* (gal)8,9678,9678,9678,9678,9588,9588,9588,9588,9588,9588,9548,9548,9548,9548,9548,954
Fuel Consumed (gal)0000-900000-400000
21st tanks est run time (Hours)**21212121212121212121212121212121
C Street est run time (hours)34343434343434343434343434343434
Qty. Received (gal)
TANKActual Cap. (USG)****17-Aug18-Aug19-Aug20-Aug21-Aug22-Aug23-Aug24-Aug25-Aug26-Aug27-Aug28-Aug29-Aug30-Aug31-Aug
21 Street North Tank (gal)7,9877,9917,9917,9917,9917,9917,9917,9917,9917,9917,9917,9917,9917,9917,991
21 Street South Tank (gal)5,6735,5015,5015,5015,5015,5015,5015,5015,5015,5015,5015,5015,5015,5015,501
C Street Tank (gal)4,4354,4324,4324,4324,4324,4324,4324,4324,4324,4324,4324,4324,4324,4324,432
Total on Hand (gal)18,09517,92417,92417,92417,92417,92417,92417,92417,92417,92417,92417,92417,92417,92417,924
Ullage* (gal)8,9549,1259,1259,1259,1259,1259,1259,1259,1259,1259,1259,1259,1259,1259,125
Fuel Consumed (gal)01710000000000000
21st tanks est run time (Hours)**212121212121212121212121212121
C Street est run time (hours)343434343434343434343434343434
Qty. Received (gal)
*Total Ullage greater than or equal to 7499 will output red cell fill with red number, this indicates promt for refill order of 7500 gallons fuel. Ullage represents the gallons required to fill the empty space in the tank to 90% capacity.
21st Street North and South are combined use tanks, Run time (in hours) is the total of Gallons on hand divided by the full load estimated consuption for all generators served by 21st Street North and South tanks. Based on FL consuption 658.8 per hour
***C Steet tank run time (in hours) is a full load fuel consuption estimate for all the generators served by the C street fuel tank. Based on FL consumption 132.20 GPH.
****Actual Capacity is 90% of tank volume.
*****Small increase/decrease in fuel consumed are expansion/contraction due to temperature variation.
****** Planned generator test are the third Wednesday of every month.
******* Veeder root readings are taken one a week and entered into this spreadsheet.

AQL 11 Main Tower

Co logoAQL - 11RCMMain Cooling Tower Water Analysis C.3.32.7
MonthCONDUCTIVITY 500-7000 uohmpH 8.5 - 11.5 PPMTraxstar what is the chem. 100-500 PPBChlorine 0-2 PPMBromine 0-2 PPMMolybdate 60 - 200 PPMNitrite 400 - 2000 PPM
Date12268.71200.07N/AN/AN/A
Date12398.71340.08N/AN/AN/A
Date12898.81320.08N/AN/AN/A
Date13408.81470.08N/AN/AN/A
N/AN/AN/A
N/AN/AN/A
N/AN/AN/A
N/AN/AN/A
N/AN/AN/A
N/AN/AN/A
N/AN/AN/A
N/AN/AN/A
N/AN/AN/A
N/AN/AN/A
N/AN/AN/A
N/AN/AN/A
N/AN/AN/A
N/AN/AN/A
N/AN/AN/A
N/AN/AN/A
N/AN/AN/A
N/AN/AN/A

Note: Traxstar, is a reagent dye used to perform the test

AQL 11a Main Chilled Loop

Co logoAQL - 11aRCMMain Chill Water Loop
MonthCONDUCTIVITY 500-7000 uohmpH 8.5 - 11.5 PPMTraxstar what is the chem. 100-500 PPBChlorineBromine 0-2 PPMMolybdate 60 - 200 PPMNitrite 400 - 2000 PPM
Date128410.3N/AN/AN/AN/A400
Date127910.3N/AN/AN/AN/A400
Date125010.5N/AN/AN/AN/A400
Date124910.5N/AN/AN/AN/A400
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
The unit of measurement for conductivity is expressed in either microSiemens (uS/cm) or micromhos (umho/cm) which is the reciprocal of the unit of resistance, the ohm. The prefix "micro" means that it is measured in millionths of a mho. MicroSiemens and micromhos are equivalent units.May 28, 2020

Note: Traxstar, is a reagent dye used to perform the test

AQL 11b 5440 Chilled Loop

Co logoAQL - 11bRCM5440 Chilled Water Loop Analysis
MonthCONDUCTIVITY 500-7000 uohmpH 8.5 - 11.5 PPMTraxstar what is the chem. 100-500 PPBChlorineBromine 0-2 PPMMolybdate 60 - 200 PPMNitrite 400 - 2000 PPM
Date125610.4N/AN/AN/AN/A400
Date127010.3N/AN/AN/AN/A400
Date124610.5N/AN/AN/AN/A400
Date125610.5N/AN/AN/AN/A400
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
The unit of measurement for conductivity is expressed in either microSiemens (uS/cm) or micromhos (umho/cm) which is the reciprocal of the unit of resistance, the ohm. The prefix "micro" means that it is measured in millionths of a mho. MicroSiemens and micromhos are equivalent units.May 28, 2020
Note: Traxstar, is a reagent dye used to perform the test

AQL 11c 7516 Hot Loop

Co logoAQL - 11cRCM7516 Hot Water Loop Analysis
MonthCONDUCTIVITY 500-7000 uohmpH 8.5 - 11.5 PPMTraxstar what is the chem. 100-500 PPBChlorineBromine 0-2 PPMMolybdate 60 - 200 PPMNitrite 520 - 2000 PPM
Date93010.1N/AN/AN/AN/A400
Date93010.3N/AN/AN/AN/A400
Date93710.3N/AN/AN/AN/A400
Date92910.3N/AN/AN/AN/A400
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
Note: Traxstar, is a reagent dye used to perform the test

AQL 11d LL Steam Vault

Co logoAQL - 11dRCMLL Steam Vault Hot Water Loop Analysis
MonthCONDUCTIVITY 500-7000 uohmpH 8.5 - 11.5 PPMTraxstar what is the chem. 100-500 PPBChlorineBromine 0-2 PPMMolybdate 60 - 200 PPMNitrite 520 - 2000 PPM
Date150010.1N/AN/AN/AN/A640
Date150110.1N/AN/AN/AN/A640
Date153110.2N/AN/AN/AN/A640
Date153310.2N/AN/AN/AN/A640
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
Note: Traxstar, is a reagent dye used to perform the test

AQL 11e 1239 UPS Hot loop

Co logoAQL - 11eRCM1239 UPS Hot Water Loop Analysis
MonthCONDUCTIVITY 500-7000 uohmpH 8.5 - 11.5 PPMTraxstar what is the chem. 100-500 PPBChlorineBromine 0-2 PPMMolybdate 60 - 200 PPMNitrite 520 - 2000 PPM
Date4368N/AN/AN/A0N/A
Date4528.1N/AN/AN/A0N/A
Date4408.1N/AN/AN/A0N/A
Date4448.2N/AN/AN/A0N/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
Comments

Note: Traxstar, is a reagent dye used to perform the test

AQL 11f War Bldg Hot loop

Co logoAQL-11fRCMWar Bldg Hot Water Loop Analysis
DATE: SeptemberCONDUCTIVITY 500-7000 uohmpH 8.5 - 11.5 PPMTraxstar what is the chem. 100-500 PPBChlorineBromine 0-2 PPMMolybdate 60 - 200 PPMNitrite 520 - 2000 PPM
Date18159.2N/AN/AN/AN/A720
Date17959.2N/AN/AN/AN/A720
Date17949.3N/AN/AN/AN/A720
Date18019.3N/AN/AN/AN/A720
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
Note: Traxstar, is a reagent dye used to perform the test

AQL 11g B2A61 Hot loop

Co logoAQL - 11gRCMB2A61 Hot Water Loop Analysis
MonthCONDUCTIVITY 500-7000 uohmpH 8.5 - 11.5 PPMTraxstar what is the chem. 100-500 PPBChlorineBromine 0-2 PPMMolybdate 60 - 200 PPMNitrite 520 - 2000 PPM
Date20119.3N/AN/AN/AN/A960
Date16259.3800
Date16119.4800
Date16129.4800

Note: Traxstar, is a reagent dye used to perform the test

AQL 11h B266 Hot Loop

Co logoAQL - 11hRCMB266 Hot Water Loop
MonthCONDUCTIVITY 500-7000 uohmpH 8.5 - 11.5 PPMTraxstar what is the chem. 100-500 PPBChlorineBromine 0-2 PPMMolybdate 60 - 200 PPMNitrite 520 - 2000 PPM
Date134010.1N/AN/AN/AN/A400
Date134410.2400
Date130810.3400
Date130910.3400

Note: Traxstar, is a reagent dye used to perform the test

AQL 11i Blair House

Co logoAQL - 11jRCMBlair House Chill Water Loop
MonthCONDUCTIVITY 500-7000 uohmpH 8.5 - 11.5 PPMTraxstar what is the chem. 100-500 PPBChlorineBromine 0-2 PPMMolybdate 60 - 200 PPMNitrite 400 - 2000 PPM
Date130010N/AN/AN/A200N/A
Date129810.1N/AN/AN/A200N/A
Date131110.3N/AN/AN/A200N/A
Date130710.3N/AN/AN/A200N/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
The unit of measurement for conductivity is expressed in either microSiemens (uS/cm) or micromhos (umho/cm) which is the reciprocal of the unit of resistance, the ohm. The prefix "micro" means that it is measured in millionths of a mho. MicroSiemens and micromhos are equivalent units.May 28, 2020

AQL 11j Blair Hot Loop

Co logoAQL - 11iRCMBlair House Hot Loop
MonthCONDUCTIVITY 500-7000 uohmpH 8.5 - 11.5 PPMTraxstar what is the chem. 100-500 PPBChlorineBromine 0-2 PPMMolybdate 60 - 200 PPMNitrite 520 - 2000 PPM
Date5069N/AN/AN/A80N/A
Date5008.9N/AN/AN/A80N/A
Date5018.9N/AN/AN/A80N/A
Date4799N/AN/AN/A50N/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A
N/AN/AN/AN/A

AQL 12 Corrosion Coupon

Co. logoAQL - 12RCMCorrosion Coupon Report for Chill and Hot Water Loops
DATEMain Tower Condenser water / openMain CW Loop / closed5440 CW Loop / closedB2A61HWL
SteelCopperSteelCopperSteelCopperSteelCopper
MarchCoupon Number433550432549431548430547
DateWeight Loss (g)0.04080.02670.00430.00510.00460.00630.00470.0088
StatusCorrosion Rate (mpy)0.4060.2350.0430.0450.0460.0560.0430.072
June (annual) 358Coupon NumberF38234B46048F38233B46049F38231B46043F38232B46045
DateWeight Loss (g)0.02230.02460.00410.01080.00560.00890.00360.0124
StatusCorrosion Rate (mpy)0.0520.0510.0100.0220.0130.0180.0080.026
June 91 daysCoupon Number300375295369298373297371
DateWeight Loss (g)0.03380.02270.00450.01130.00620.01380.00560.0150
StatusCorrosion Rate (mpy)0.31100.18500.04100.09200.05700.11200.05100.1220
SeptemberCoupon NumberF389249B46050F38248B46047F38247B46044F38246B46046
DateWeight Loss (g)0.01240.01740.00340.01190.00510.01020.00360.0109
StatusCorrosion Rate (mpy)0.1250.1550.0340.1080.0510.0910.0360.097
DateCoupon NumberF38399387F38398386F38397385F38396384
DateWeight Loss (g)0.01000.01420.00300.01130.00270.01080.00250.0103
StatusCorrosion Rate (mpy)0.0840.1050.0250.0840.0230.0800.0220.082
STATUSOpen SystemClosed System
CopperMild SteelCopperMild Steel
Excellent<0.1<.1<0.1<.02
Very Good0.11 - 0.251.01 - 30.11 - 0.150.21 - 0.3
Good0.26 - 0.353.01 - 50.16 - 0.20.31 - 0.5
Fair0.36 - 0.55.01 - 80.21 - 0.30.5 1- 0.8
Poor0.6 - 18.01 - 100.31 - 0.50.81 - 1
Severe>1.01>10.01>0.51>1.01

AQL 12a Corrosion Coupon

Co. logoAQL - 12aRCMCorrosion Coupon Report for Chill and Hot Water Loops
DATEOld War BldgUPS 1239LL Steam VaultB266 HW loop
SteelCopperSteelCopperSteelCopperSteelCopper
MarchCoupon Number427544545429546F38015B46485
DateWeight Loss (g)0.00330.00800.01920.00310.01050.00230.0059
StatusCorrosion Rate (mpy)0.03300.07100.15600.03100.09300.02100.0480
June (annual) 358Coupon NumberF38228B46037F38229B46039F38230B46041
DateWeight Loss (g)0.00620.01511.50470.09410.00550.0160
StatusCorrosion Rate (mpy)0.0140.0313.5160.1950.0130.033
June 91 daysCoupon Number293367368299374296370
DateWeight Loss (g)0.00530.01170.09150.00580.01380.00460.0108
StatusCorrosion Rate (mpy)0.0490.0950.7450.0530.1120.0420.088
SeptemberCoupon NumberF38243B46038B46040F38245B46042
DateWeight Loss (g)0.00320.01170.01510.00320.0167
StatusCorrosion Rate (mpy)0.0320.1040.1350.0320.149
December YearCoupon NumberF38395381382F38394383
DateWeight Loss (g)0.00190.00940.01290.00240.0119
StatusCorrosion Rate (mpy)0.01600.0700.1030.0200.088
STATUSOpen SystemClosed System
CopperMild SteelCopperMild Steel
Excellent<0.1<.1<0.1<.02
Very Good0.11 - 0.251.01 - 30.11 - 0.150.21 - 0.3
Good0.26 - 0.353.01 - 50.16 - 0.20.31 - 0.5
Fair0.36 - 0.55.01 - 80.21 - 0.30.5 1- 0.8
Poor0.6 - 18.01 - 100.31 - 0.50.81 - 1
Severe>1.01>10.01>0.51>1.01

AQL 13 Logs and Records

Co logoAQL - 13RCMLogs and Records QC/QA Verification
Daily Log Books / QCQA Weekly ReviewDate checkedBASMain ChillerBoilers 8th floorStandby Generators

AQL 14 Meter Calibration

Co logoAQL - 14RCMMeter Calibration
Meter TypeManufactorySerial NumberNew purchase Yes/NoCurrent calibration dateNext calibration datePurposeExpected Life cycle in yearsCost of meter

AQL 15 NSF-ANSI Chemicals

Co logoAQL - 15RCMChemicals used at HST in Water Treatment meet NSF and / or ANSI Standards
Name of ChemicalPurposeSystem it is used inChemical storage locationSDS on File at storage locationSDA folder inspection dateIs there a Safety Shower at storage locatingSafety Shower Inspection dateName of Personal authorized to use chemicalsDate of training on proper use of chemicalsSpill kit on site Yes/No

NSF certification ensures that your treatment chemicals meet globally accepted public health standards. If you manufacture, sell or distribute water treatment chemicals in North America, your products are required to comply with NSF/ANSI/CAN 60: Drinking Water Treatment Chemicals - Health Effects. ANSI Standards are Voluntary For example, OSHA 1910.145, “Specifications for Accident Prevention Signs and Tags” references ANSI Z53. 1-1967. That, in effect, makes the ANSI standard a part of the OSHA standard, and OSHA can issue a citation if your workplace safety signs are not in compliance with the Z53. ( American National Standards Institute)

AQL 16 One Line Digrams

Co logoAQL - 16RCMOne Line Diagrams of Systems
Diagrams for the following areasLocationProcessDate updatedPOC
Main Chiller Plant
Airstack Chiller loop with pumps
Main Steam in HST delivered from offsite
Boilers
Cooling Towers
Hot Water Loop
Chill water Loop
Electrical Switch Gear
Transformers in HST
Lift Stations
Fuel storage
Fuel distribution Piping
Hazards Chemical LockersNote
Storm Water Collection
All drawing will be done in CAD, framed behind glass, install in appropriate locations
Note: there maybe more than one location this information needs to be posted
C.1.69 Sequence of Operations A “sequence of operations” is the control logic used to operate a system normally put into effect through a control program.

AQL 17 Security - Guard Post

Co logoAQL - 17RCMPhysical Security - Guard Post
Location on HST PropertySize of Guard Post Feet /InchesElectrical service Yes / NoAC & Heat Yes / NoWater Yes / NoO&M is there a schedule PM in MaximoPainting schedule Yes / NoCustodial schedule Yes / No

AQL 18 RCM AHU

AQL-18 RCM Daily Inspection AHU_____________________

Month____________________123456789101112131415
VFD Display Auto
Manual
motor load by %
Hz
Amps
Magnehelic Reading
HEGA
HEPA
Pre-Filters
Humidifier
On
Off
16171819202122232425262728293031
VFD Display Auto
Manual
motor load by %
Hz
Amps
Magnehelic Reading
HEGA
HEPA
Pre-Filters
Humidifier
On
Off

Notes:

AQL 19RCM Electrical Inspection

Co logoAQL - 19RCMElectrical Inspection - Low Voltage Distribution Panels
Panel LocationInside of panel cleanAll terminals tightTherminal Imaging on file Yes / NoPanel IdentificationDate of InspectionName of Qualified TechnicianQC/QA Inspector

AQL 20 RCM Plumbing inspection

Co logoAQL - 20RCMPlumbing Inspection
Daily InspectionsLocationOperational Yes / NoIssues
Hot water circulation pumps
Lift Stations
Grase Traps
Back Flow Preventers
Domestic water pumps
Water Purefication Filters

AQL 21 RCM Building inspection

Co logoAQL - 21RCMBuilding Exterior Inspection
Daily InspectionsIssue Yes / NoWO issuedDiscription
Doors
Windows
Façade
Planter Boxes
Land scape
Hand rails

AQL 22 RCM Building Inspection

Co logoAQL - 22RCMBuilding Interior Inspection
Daily InspectionsIssue Yes / NoWO issuedDiscription
Doors
Windows
Façade
Planter Boxes
Land scape
Hand rails
Court Yards

AQL 23 RCM Make up water

AQL-23RCMDomestic Make up Water - HST
Month____________________
123456789101112131415
Current Reading000000000000000
Previous reading000000000000000
Used000000000000000

Previous reading is done for the first day of the month only

16171819202122232425262728293031
Current Reading00
Previous reading0000000000000000
Used0000000000000000

AQL 23a Make Up Water

AQL-23aRCMChill Water Loop - Make up Water - HST
Month____________________
123456789101112131415
Current Reading000000000000000
Previous reading000000000000000
Used000000000000000

Previous reading is done for the first day of the month only

16171819202122232425262728293031
Current Reading00
Previous reading0000000000000000
0000000000000000

AQL 23b Hot Water Heating

AQL-23bRCMHot Water Heating - Make up Water - HST
Month____________________
123456789101112131415
Current Reading000000000000000
Previous reading000000000000000
Used000000000000000

Previous reading is done for the first day of the month only

16171819202122232425262728293031
Current Reading00
Previous reading0000000000000000
Used0000000000000000

AQL 24 RCM Monthly Activity

AQL-24 RCM Monthly Activity Review
Month: September 2022Total number of equipment or material failures discovered in the course of doing daily roundsWas a Work Order generate for the repair? Yes / No Work Order Number
Electrical

HVAC

Plumbing

Power

Building Interior & Exterior

This information dose not include scheduled PM's or service calls to the WO desk.

Comments

AQL 25 Safety & Training

Co logoAQL - 25RCMSafety Training
NameDiscription of TrainingClass HoursTraining Class LocationName of TrainerDate of TrainingCertificate of training issued Yes / No

AQL 26 Staffing

Co LogoAQL-26 Staffing September 2022
HST - Building
Labor Category

Department

PlannedFilledSubcontractedVacancies% Staffed
Total - Headcount39.6
Manpower Breakdown of Administration and Trades by Sites
Administration- All Sites
Labor Category

Department

PlannedFilledSubcontractedVacancies% Staffed
Administration30%
Tatitlek
Labor Category

Department

PlannedFilledSubcontractedVacancies% StaffedFTEAnnual hoursOT hours(FTE) Full Time Employee
1QC/QA / Safety0.60.6018560
2Chief Engineer11.00180090
3Lead HVAC Mechanic1010%1.00180090
4Mechanical Supervisor1010%1.00180090
5Electrical Lead1010%1.00180090
6Third Class Lead Engineer2020%2.00180090
7First Class Engineer2.502.50%2.50180090
8Third Class Engineer4040%4.00180090
9Journeymen Pipefitter1010%1.00180090
10Journeymen Plumber3030%3.00180090
11Master Electrician1010%1.00180090
12Journey Electrician3030%3.00180090
13Pneu/Elec. Controls Tech3030%3.00180090
14Maintenance Mechanic6.506.50%6.50180090
15Utility Maintenance Mechanic4040%4.00180090
16Maintenance Trades Helper2020%2.00180090
000%180090
000%
000%
000%
000%
000%
Total36.600320%36.60

AQL 27 Thermal Imaging

Co logoAQL - 27RCMThermal Imaging Electrical Panels - Low Voltage
Location of PanelsDate of InspectingPanel IdentificationIssues Yes / NoTemperature range set on Camera is 0 - 200 FahrenheitManufactory of cameraSerial NumberName of TechnicianCertification Date

Prefered Thermal Camera is: FLUKE FLK-TOX580 60HZ

AQL 28 Thermal Imaging

Co logoAQL - 28RCMThermal Imaging Electrical Panels - Switch Gear
Location of PanelsDate of InspectingPanel IdentificationIssues Yes / NoTemperature range set on Camera is 0 - 200 FahrenheitManufactory of cameraSerial NumberName of TechnicianCertification Date

Prefered Thermal Camera is: FLUKE FLK-TOX580 60HZ

AQL 29 Vibration Analysis

Co logoAQL - 29RCMVibration Analysis
Location of EquipmentDate of InspectingIdentification of EquipmentIssues Yes / No (note)Manufactory of Vibration TesterSerial NumberName of TechnicianCertification Date

Note: if issues are detected, a separate retesting schedule will be initiated for this piece of equipment. The O&M Operations Manager will be notified ASAP.

Preference for test is a FLUKE 810

AQL 30 Fire & Life Safety

Co logoAQL - 30RCMAnnual Fire & Life Safety Inspection Shops and Work areas 15 FAM 813.3
FloorHST InspectorsDate of InspectingPlumbingCarpenterHVACElectricalFire Extinguisher charged and inspectedFlammable cabinet storageFire-Doors & WindowsCondition of Paint by Floors
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8

COMMENTS

AQL 31 Building Assessment

Co logoAQL - 31RCMAnnual Inspection Summary (AIS) Bld. Assessement
FloorHST InspectorsDate of InspectingInterior FacadeExterior FaçadePlumbingElectricalHVACBASElevatorsDoors & WindowsCondition of Paint by Floors
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

The AIS is a list of findings resulting from the facility condition survey that must be validated annually. Posts must survey and inspect each building and its support systems and document the findings (15FAM 613). Referr to previous AIS reports, and instructions on how to validate.

AQL 32 Blank Co logo Year:_________ AQL - 32 RCM Blank

AQL 33 PMSC-post funding

Co logoAQL - 33RCMBudget Planning (PMSC) for Capital Improvements and Services (PMSC)
PROJECTS / ServicesBudget planning for year ________Monthly costCost from previous yearAnnual CostMark up %Total
$0.00

TOTAL Cost $0.00

Preventive Maintenance Service Contracts (PMSC) For PMSC post funding requests: Identify and request PMSC funding needs for post requirements. For funded requests, review PMSC records status' are set to "Obligated" once funds are used to acquire services. This would include major equipment replacements due to end of life cycle.

AQL 34 Hazard Identification

Co logoAQL - 34RCMWorkplace Hazard Identification and Assessment 15 FAM 962
FloorHST Inspectors NameDate of InspectingInterior FacadeExterior FaçadePlumbingElectricalHVACBASElevatorsDoors & Windows
1
2
3
4
5
6
7
8
9
Roof
COMMENTS

AQL 35 Fuel System Inspection

Co logoAQL - 35RCMMonthly Fuel System Inspection
DATEHST BuildingLocationInspectorGov. furnished check-list
Underground storage tank-1 piping
Underground storage tank-2 piping
Fuel Transfer Piping
Pumps
Pumps
Day Tank-1 piping
Day Tank-2 piping
Day Tank-3 piping

Note: tank inspections are annually

AQL 36 Veeder-Root testing

Co logoAQL - 36RCMAutomatic Tank Gauging System (Veeder-Root)
2024TestVeeder-Root Test ResultsInspector
JanuaryTest UST's at 0.2 GPH leak rate
FebruaryTest UST's at 0.2 GPH leak rate
MarchTest UST's at 0.2 GPH leak rate
AprilTest UST's at 0.2 GPH leak rate
MayTest UST's at 0.2 GPH leak rate
JuneTest UST's at 0.2 GPH leak rate
JulyTest UST's at 0.2 GPH leak rate
AugustTest UST's at 0.2 GPH leak rate
SeptemberTest UST's at 0.2 GPH leak rate
OctoberTest UST's at 0.2 GPH leak rate
NovemberTest UST's at 0.2 GPH leak rate
DecemberTest UST's at 0.2 GPH leak rate
December 31Test UST's at 0.1 leak rate annually
Veeder-Root test Results will be printed out and retained for thirty six (36) continuous months. This is in addition to filling out this report.
December 2025Inspect and Test all leak sensorsReport test results here /retain printed test results

AQL 37 Annual Leak & Overfill Co logo AQL - 37 RCM Annual Leak Monitoring and OverfillProtection Test Form for Underground or Aboveground Storage Tank System

AQL 38 Annual Inspection Co logo AQL - 38 RCM Annual Leak Monitoring and OverfillProtection Test Form for Underground or Aboveground Storage Tank System

AQL 39 Parts Inventory

Co logoAQL - 39RCMOn Shelf Replacement Parts and Expendable Lists Cover 80% of repairs J-06
DiscriptionMfg. Part NumberVendor Part NumberVendorShelf Stock on handMinimum stock levelStock level re-order pointQuanity orderedStorage locationShelf / bin number
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41

AQL 40 Customer QA

Co logoAQL - 40RCMCustomer Quality Assurance Sample 2% of Monthly Work Orders
Work Order NumberClientIssue DateResponse DateDate CompletedSatisfactoryUnsatisfactoryCall Back
C.3.20.10 Customer Quality Assurance
The tenant contact shall be entered into the work order in the CMMS [[[edit as necessary if CMMS exists]]] so as to generate an email notification to the customer or tenant point of contact upon the work order being placed in “complete” status. The Contractor shall create a customer satisfaction survey sheet, in electronic format if available, which must be approved by the COR in writing. Upon completion of work requests, the contractor shall provide a customer satisfaction survey to the requestor and routed from the customer directly to the COR. The Contractor shall perform re-work as necessary if the occupant is reasonably dissatisfied with the pre-vious effort. If the Contractor believes an occupant is unreasonable or requesting work outside the scope of the contract, the Contractor shall immediately notify the COR. Re-work shall be treated as a new Ser-vice Call.

AQL 41 PSV Test

Co logoYear:_________AQL - 41RCMPressure Safety Relief Valve Monthly Trip Test / Annual Pressure Test
MAXIMO Asset NumberJanuaryFebruaryMarchAprilMayJuneJulyAugustSeptemberOctoberNovemberDecember Annual Pressure TestTest Guage Tag # and certification Date
1V-02-0007
2V-02-0008
3V-02-0009
4V-02-0010
5V-02-0013
6V-02-0014
7V-02-0015
8V-02-0038
9V-02-0040
10V-02-0042
11V-02-0043
12V-02-0044
13V-02-0045
14V-02-0048
15V-02-0049
16V-02-0050
17V-02-0054
18V-02-0056
19V-02-0057
20V-02-0058
21V-02-0059
22V-02-0060
23V-02-0061
24V-02-0062
25V-02-0063
26V-02-0064
27V-02-0065

Reference: 5850/page 415 / line 24 image1.png image2.png image3.png

File details come from the government source that posted it. Updated .