Attachment 02-Blank Pricing Sheet-VLSB 24-0058 Well 4-12 Aug 26.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- Well 4 PFAS/PFOA Upgrade
- Solicitation number
- FA480326B0010
About this file
This is a blank pricing sheet template for the Well 4 PFAS/PFOA Filter and equipment installation project located at Shaw Air Force Base, 20th Civil Engineering Squadron. The template is structured to capture costs for demolition, removal, and installation of water treatment equipment and supporting infrastructure, with line items organized into two main categories: demolition/removal work and new construction work.
The pricing sheet includes 27 line items covering demolition of existing piping, electrical systems, and equipment; installation of new water piping, carbon filters, soda ash mixer, sanitary sewer line, concrete pad, metal building, electrical systems, PFAS/PFOA filter equipment, and raised platform; startup and commissioning; project management and superintendent labor by week; equipment rentals including cranes and storage units; temporary office facilities; design and as-built documentation; ground and soil testing; and per diem and mileage expenses. The template provides columns for units, quantity, material costs, labor costs, direct costs, and line totals, with summary sections for total material costs, total labor costs, direct costs, overhead calculation (defaulted to 0%), profit calculation (defaulted to 0%), bond costs (0.0%), and total contract price. This is a blank template with all cost fields showing $0.00, designed for contractors to populate pricing information in response to the solicitation.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Project: | Well 4 PFAS Filter and equipment | Christopher Smith | |
| Location: | 20 CES | ||
| Contractor: | 8/12/26 | ||
| Address: | Total | ||
| PR No.: |
Line No. Item Units Quantity Material Costs Labor Costs Direct Cost Line Total
| Unit Cost | Total | Total | |||
| B2004 Demo, Removal and return of equipment to the Govt | |||||
| 1 | Demo existing pipe and valves | LF | |||
| 2 | Demo existing electrical, motors, VFDs | EA | |||
| 3 | Existing conduit demo | LF | |||
| 4 | Existing Wire Demo | LF | |||
| 5 | Demo trees | EA | |||
| B2004 New work | |||||
| 6 | Install main water piping/valves/ | LS | |||
| 7 | Install prelube water line, Carbon filter, and PLC controls | LS | |||
| 8 | Install new Soda Ash slurry mixer and PLC controls | LS | |||
| 9 | Install main Sanitary Sewer line | LS | |||
| 10 | Install Concrete Pad | LS | |||
| 11 | Install Metal Building | LS | |||
| 12 | Install Building heater | LS | |||
| 13 | Install Electrical | LS | |||
| 14 | Install PFAS/PFOA Filter and equipment | LS | |||
| 15 | Install raised platform | LS | |||
| 16 | Startup and commissioning | LS |
| 17 | Project Manager | Wk |
| 18 | Superintendent | Wk |
| 19 | Dumpster | Wk |
| 20 | Crane 100 ton | Day |
| 21 | Conex Storage unit | LS |
| 22 | Temp Office trailer | Wk |
| 23 | Design and As Builts | Ea |
| 24 | Ground and soil testing | LS |
| 25 | ||
| 26 | Per Diem Food / Lodging | Wk |
| 27 | Mileage | Wk |
Total: $0.00
| Total Material Cost: | |
| Total Labor Cost: | $0.00 |
| Direct Cost: | |
| Total Line Item Cost: |
| Overhead: | 0% |
| Subtotal: |
| Profit: | 0% |
| Subtotal: |
| Bond: | 0.0% |
| Total Contract Price: |