9-Sec 01 31 00 COORDINATION AND MEETINGS.pdf

PDF 96 KB Posted

Attached to
2400754 – Fanny Chapman Memorial Pool – Main Pool Repairs
Solicitation number
Not on record
Issued by
Bucks County, Pennsylvania

About this file

This is a Coordination and Meetings section specification document from the Borough of Doylestown for Contract 2400754 – Fanny Chapman Memorial Pool Main Pool Repairs. The document establishes the framework for project coordination and communication between the Owner (Borough), Engineer, Contractor, and Subcontractors throughout the construction phase. The specification requires the Contractor to provide comprehensive coordination of scheduling, submittals, and work sequencing to ensure efficient installation of interdependent construction elements, as well as field engineering services including stakeout verification, elevation establishment, and confirmation of drawing dimensions. A mandatory preconstruction meeting must be held after the Effective Date of the Agreement and prior to commencement of work, with required attendance from the Owner, Engineer, Resident Project Representative, Contractor, Contractor's Superintendent, and major Subcontractors. The preconstruction meeting agenda shall address personnel designation, contract document distribution, scheduling, subcontractor and product lists, and procedures for processing field decisions, submittals, change orders, and contract closeout. Additionally, progress meetings shall be scheduled on an as-needed basis throughout the work period, with the Resident Project Representative responsible for arranging meetings, preparing agendas, and recording minutes for distribution to all participants within five working days.

The specification does not establish pricing terms, set-asides, or funding requirements, as these are administrative and financial provisions addressed in other contract documents. The coordination and meetings requirements are applicable to all contractors and subcontractors engaged on the project regardless of contract amount or award basis. The document emphasizes maintenance of quality standards, schedule adherence, and effective communication channels between all parties to ensure orderly project execution and timely completion of the pool repair work scheduled for completion by April 1, 2026.

View the file

Other files

File Type Posted
11-Sec 01 50 00 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS.pdf PDF
44-Doc 00 72 00 GENERAL CONDITIONS.pdf PDF
36-Doc 00 65 19.13 ContractorsAffidavit.pdf PDF
39-Doc 00 61 19 MAINTENANCE BOND.pdf PDF
31-Doc 00 73 00.00 SUPPLEMENTARY CONDITIONS - revised.pdf PDF
18-Sec 01 40 00 QUALITY CONTROL.pdf PDF
16-X Sketch-Pool Repair Areas.pdf PDF
42-Doc 00 73 00.10 Attach A.pdf PDF
15-Sec 03 25 00 Waterstops and Waterproofing.pdf PDF
22-Doc 00 62 76 Appl Payment.pdf PDF
23-Doc 00 11 13 Advertisement PennBid FC Concrete 2026.pdf PDF
35-Doc 00 45 19 NON-COLLUSION AFFIDAVIT.pdf PDF
46-Doc 00 73 00.30 Attach C.pdf PDF
28-Doc 00 61 13.16 Payment Bond.pdf PDF
38-Doc 00 62 16 CERTIFICATE INSURANCE.pdf PDF
5-Sec 01 11 13 Summary Work.pdf PDF
1-Doc 00 73 00.33 Attach C-RCO Subcontractor Certification Form.pdf PDF
13-Sec 13 11 13.1 Concrete Pool Repairs.pdf PDF
47-Doc 00 73 00.20 Attach B.pdf PDF
32-Doc 00 01 01 TITLE SHEET AND COVER.pdf PDF
20-Doc 00 45 53 AGREEMENT SURETY COMPANY.pdf PDF
37-Doc 00 65 19.19 Consent Surety Final.pdf PDF
27-Sec 01 70 00 CONTRACT CLOSEOUT.pdf PDF
2-Doc 00 73 00.31 Attach C-Responsible Contrator Ordinance.pdf PDF
7-Sec 02 41 19 Selective Demolition.pdf PDF
19-Doc 00 21 13 INSTRUCTIONS TO BIDDERS EBID 2026.pdf PDF
8-Sec 07 92 13 Thermal and Moisture Protection at Pool Expansion Joints.pdf PDF
45-X Product Data Sheets.pdf PDF
30-Doc 00 73 00.21 Attach B-Public Works Employment Verification Form.pdf PDF
41-Doc 00 45 13 BIDDER QUALIFICATION STATEMENT.pdf PDF
17-Doc 00 43 13 BID BOND.pdf PDF
29-Doc 00 73 00.32 Attach C-RCO Contractor Certification Form.pdf PDF
24-Sec 01 22 00 MEASUREMENT AND PAYMENT - 2025-09-16.pdf PDF
6-Sec 01 71 13 Mobilization.pdf PDF
12-Sec 03 62 13 Grouting.pdf PDF
43-Doc 00 41 00 BID FORM-EBID.pdf PDF
40-Doc 00 73 00.11 Attach A-prevailing wage rates 26-02618.pdf PDF
21-Doc 00 61 13.13 Peformance Bond.pdf PDF
14-Doc 00 01 10-Table Contents.pdf PDF
34-Doc 00 65 19.16 ContractorsRelease.pdf PDF
4-Doc 00 91 13 ADDENDA.pdf PDF
33-Doc 00 52 00 AGREEMENT.pdf PDF
26-Doc 00 45 10 BIDDERS ACKNOWLEDGEMENT.pdf PDF
25-Doc 00 63 63 ChangeOrder.pdf PDF
3-Sec 01 29 00 CONTRACT CONSIDERATIONS.pdf PDF
10-Sec 01 60 00 MATERIAL AND EQUIPMENT.pdf PDF
35-Doc 00 65 19.13 ContractorsAffidavit.pdf PDF
7-Doc 00 73 00.11 Attach A-prevailing wage rates 25-08056.pdf PDF
32-Doc 00 65 19.16 ContractorsRelease.pdf PDF
1-Doc 00 61 13.13 Peformance Bond.pdf PDF
Show 40 more

Latest 50 of 93 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Borough of Doylestown Section 01 31 00 Coordination & Meetings 2400754 - Fanny Chapman - Main Pool Repairs Page 1 of 2

PART 1 GENERAL

1.01 SECTION DESCRIPTION

A. The Work of this Section Includes:

1. Coordination and Project conditions.

2. Field engineering.

3. Preconstruction meeting.

4. Progress meetings.

1.02 RELATED SECTIONS

A. This section not used.

1.03 COORDINATION AND PROJECT CONDITIONS

A. Coordinate scheduling, submittals, and Work of the various sections of the Project Manual to ensure efficient and orderly sequence of installation of interdependent construction elements.

B. Coordinate completion and clean-up of Work of separate sections in preparation for Substantial Completion and for portions of Work.

C. After Owner occupancy of premises, coordinate access to site for correction of defective Work and Work not in accordance with Contract Documents, to minimize disruption of Owner’s activities.

1.04 FIELD ENGINEERING

A. Contractor shall provide stakeout as required for construction activities.

B. Verify set-backs and easements; confirm drawing dimensions and elevations.

C. Provide field engineering services. Establish elevations, lines, and levels, utilizing recognized engineering survey practices.

D. Construct Work based on elevations, lines and locations as established, utilizing stakeout.

1.05 PRECONSTRUCTION MEETING

A. Engineer will schedule a meeting at the Project site after the Effective Date of the Agreement and prior to commencement of Work and Contractor occupancy, prepare an agenda with copies for participants, and preside at the meeting.

B. Attendance Required: Owner, Engineer, Resident Project Representative, Contractor, Contractor’s Superintendent, and major Subcontractors.

C. Agenda:

1. Designation of personnel representing the parties in Contract, and the Engineer.

2. Distribution of Contract Documents.

3. Scheduling.

4. Submission of list of Subcontractors, list of Products, schedule of values, and progress schedule.

5. Procedures and processing of field decisions, submittals, substitutions, applications for payments, Change Orders, and Contract closeout procedures.

6. Use of premises by Owner and Contractor.

D. Engineer shall record minutes and distribute copies within five (5) working days after meeting to Owner and all other participants.

1.06 PROGRESS MEETINGS

Borough of Doylestown Section 01 31 00 Coordination & Meetings 2400754 - Fanny Chapman - Main Pool Repairs Page 2 of 2

A. Meetings shall be scheduled throughout progress of the Work on an as-needed basis.

B. Resident Project Representative will make arrangements for meetings, prepare agenda with copies for participants, and preside at meetings.

C. Attendance Required: Contractor's superintendent, major Subcontractors and suppliers, Owner, Engineer, as appropriate to agenda topics for each meeting.

D. Agenda:

1. Review minutes of previous meetings.

2. Review of Work progress.

3. Field observations, problems, and decisions.

4. Identification of problems which impede planned progress.

5. Review of submittals schedule and status of submittals.

6. Review of off-site fabrication and delivery schedules.

7. Maintenance of progress schedule.

8. Corrective measures to regain projected schedules.

9. Planned progress during succeeding work period.

10. Coordination of projected progress.

11. Maintenance of quality and work standards.

12. Effect of proposed changes on progress schedule and coordination.

13. Other business relating to Work.

E. Resident Project Representative shall record minutes and distribute copies within five (5) working days after meeting to Owner, Engineer and all other participants.

PART 2- PRODUCTS

Not Used

PART 3 - EXECUTION

Not Used

END OF SECTION