6-Sec 01 71 13 Mobilization.pdf

PDF 87 KB Posted

Attached to
2400754 – Fanny Chapman Memorial Pool – Main Pool Repairs
Solicitation number
Not on record
Issued by
Bucks County, Pennsylvania

About this file

This is a Mobilization section specification document for the Borough of Doylestown's Contract 2400754 for Fanny Chapman Memorial Pool Main Pool Repairs. The specification outlines the assembly and setup of general plant required to comply with contract obligations and local and state laws, including contractor offices, shops, storage areas, and sanitary facilities. The work encompasses obtaining required permits, insurance, bonds, and other initial items necessary to commence the project. A non-mandatory pre-bid meeting is scheduled for September 4, 2025, at 10:00 AM at the pool location, with sealed bids due September 22, 2025, at 2:00 PM via the PennBid Program. The base project involves repairing approximately 2,900 square feet of the main pool through concrete removal and polymer-modified concrete resurfacing, with alternate bids available for an additional 1,960 square feet. Project completion is scheduled for April 1, 2026.

Mobilization costs are structured as follows: Payment 1 equals 50% of the contract bid amount minus final payment, paid at the first estimate; Payment 2 equals 50% of the contract bid amount minus final payment, paid after 10% of the original contract amount is reached (excluding mobilization); Final Payment equals 10% of the contract bid amount (not to exceed $10,000) and is paid upon completion and acceptance of all physical work. No additional mobilization compensation will be awarded for scheduling conflicts, holidays, weather, or other circumstances. The project is subject to Pennsylvania's Prevailing Wage Act (Act 422) and Public Works Employment Verification requirements (Act 127). A PennBid fee of 0.33% of the bid amount (minimum $150, maximum $6,000) applies only to awarded contractors. Payment is structured on a monthly basis with initial 10% retainage, potentially reducing to 5% upon 50% project completion, with liquidated damages assessed at $500 per day for delays beyond the completion deadline.

View the file

Other files

File Type Posted
11-Sec 01 50 00 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS.pdf PDF
44-Doc 00 72 00 GENERAL CONDITIONS.pdf PDF
36-Doc 00 65 19.13 ContractorsAffidavit.pdf PDF
39-Doc 00 61 19 MAINTENANCE BOND.pdf PDF
31-Doc 00 73 00.00 SUPPLEMENTARY CONDITIONS - revised.pdf PDF
18-Sec 01 40 00 QUALITY CONTROL.pdf PDF
16-X Sketch-Pool Repair Areas.pdf PDF
42-Doc 00 73 00.10 Attach A.pdf PDF
15-Sec 03 25 00 Waterstops and Waterproofing.pdf PDF
22-Doc 00 62 76 Appl Payment.pdf PDF
23-Doc 00 11 13 Advertisement PennBid FC Concrete 2026.pdf PDF
35-Doc 00 45 19 NON-COLLUSION AFFIDAVIT.pdf PDF
46-Doc 00 73 00.30 Attach C.pdf PDF
28-Doc 00 61 13.16 Payment Bond.pdf PDF
38-Doc 00 62 16 CERTIFICATE INSURANCE.pdf PDF
5-Sec 01 11 13 Summary Work.pdf PDF
1-Doc 00 73 00.33 Attach C-RCO Subcontractor Certification Form.pdf PDF
13-Sec 13 11 13.1 Concrete Pool Repairs.pdf PDF
47-Doc 00 73 00.20 Attach B.pdf PDF
32-Doc 00 01 01 TITLE SHEET AND COVER.pdf PDF
20-Doc 00 45 53 AGREEMENT SURETY COMPANY.pdf PDF
37-Doc 00 65 19.19 Consent Surety Final.pdf PDF
27-Sec 01 70 00 CONTRACT CLOSEOUT.pdf PDF
2-Doc 00 73 00.31 Attach C-Responsible Contrator Ordinance.pdf PDF
7-Sec 02 41 19 Selective Demolition.pdf PDF
19-Doc 00 21 13 INSTRUCTIONS TO BIDDERS EBID 2026.pdf PDF
8-Sec 07 92 13 Thermal and Moisture Protection at Pool Expansion Joints.pdf PDF
45-X Product Data Sheets.pdf PDF
30-Doc 00 73 00.21 Attach B-Public Works Employment Verification Form.pdf PDF
41-Doc 00 45 13 BIDDER QUALIFICATION STATEMENT.pdf PDF
9-Sec 01 31 00 COORDINATION AND MEETINGS.pdf PDF
17-Doc 00 43 13 BID BOND.pdf PDF
29-Doc 00 73 00.32 Attach C-RCO Contractor Certification Form.pdf PDF
24-Sec 01 22 00 MEASUREMENT AND PAYMENT - 2025-09-16.pdf PDF
12-Sec 03 62 13 Grouting.pdf PDF
43-Doc 00 41 00 BID FORM-EBID.pdf PDF
40-Doc 00 73 00.11 Attach A-prevailing wage rates 26-02618.pdf PDF
21-Doc 00 61 13.13 Peformance Bond.pdf PDF
14-Doc 00 01 10-Table Contents.pdf PDF
34-Doc 00 65 19.16 ContractorsRelease.pdf PDF
4-Doc 00 91 13 ADDENDA.pdf PDF
33-Doc 00 52 00 AGREEMENT.pdf PDF
26-Doc 00 45 10 BIDDERS ACKNOWLEDGEMENT.pdf PDF
25-Doc 00 63 63 ChangeOrder.pdf PDF
3-Sec 01 29 00 CONTRACT CONSIDERATIONS.pdf PDF
10-Sec 01 60 00 MATERIAL AND EQUIPMENT.pdf PDF
35-Doc 00 65 19.13 ContractorsAffidavit.pdf PDF
7-Doc 00 73 00.11 Attach A-prevailing wage rates 25-08056.pdf PDF
32-Doc 00 65 19.16 ContractorsRelease.pdf PDF
1-Doc 00 61 13.13 Peformance Bond.pdf PDF
Show 40 more

Latest 50 of 93 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Borough of Doylestown Section 01 71 13 Mobilization 2400754 - Fanny Chapman - Main Pool Repairs Page 1 of 1

PART 1 - GENERAL

1.01 Description of Work

A. This work is the assembly and set-up of the general plant required to comply with the contract and with local and State laws and regulations. General plant includes Contractor's offices, shops, plants, storage areas, and sanitary or other facilities. This work includes obtaining the required permits, insurance, bonds, and any other initial items required for the start of the work.

PART 2 - PRODUCTS

2.01 Material

A. Furnish adequate material, equipment, and furnishings required. These material and furnishings will not be considered a part of the other completed contract items.

PART 3 - EXECUTION

3.01 Construction

A. Construct the necessary facilities to maintain proper site conditions.

3.02 Measurement and Payment

A. Mobilization will be paid as follows:

Final Payment = 10% of contract bid amount (not to exceed $10,000) to be paid after all physical work is complete

Payment 1 = 50% of contract bid amount minus the final payment to be paid at first estimate

Payment 2 = 50% of contract bid amount minus the final payment to be paid after 10% of the original contract amount, including payments for deliverable materials but excluding mobilization.

Final payment will be paid after all physical work is complete and accepted.

B. No additional mobilization will be awarded for any reason including but not limited to scheduling conflicts, holidays, weather, etc.

END OF SECTION