This is a prevailing wage rate document issued by the Commonwealth of Pennsylvania Department of Labor & Industry for the Fanny Chapman Memorial Pool – Main Pool Bottom Concrete Repair project (Serial Number 26-02618) in Doylestown Borough, Bucks County, Pennsylvania. The project involves removing surface concrete from approximately 2,900 square feet of the main pool bottom to competent substrate and resurfacing with polymer-modified concrete, with alternate bid items to expand the scope to an additional 1,960 square feet. Sealed bids are due April 14, 2026, at 2:00 PM via the PennBid Program, with a non-mandatory pre-bid meeting scheduled for March 31, 2026, at 10:00 AM at the pool location (10 McKinstry Drive, Doylestown, PA 18901). The contract award date is May 18, 2026, and project completion is scheduled for April 1, 2026. The project is classified as Highway work under the Pennsylvania Prevailing Wage Act (Act 422) and is subject to Public Works Employment Verification requirements (Act 127).

The prevailing wage rates document, effective March 17, 2026, establishes hourly rates and fringe benefits for all worker classifications required on the project, with rates varying by trade, effective date, and classification. Key trades identified include Cement Masons ($46.55–$79.21 total hourly compensation for Heavy/Highway work), Carpenters ($57.36–$97.96), Laborers (Class 01–14, ranging from $62.80–$72.13), and various Operators classifications ($79.50–$108.21). All contractors must comply with prevailing wage requirements and demonstrate participation in formal apprenticeship training programs, with at least 70% of craft employees being registered apprenticeship program graduates. The contract includes a PennBid administrative fee of 0.33% of the bid amount (minimum $150, maximum $6,000) for awarded bidders, monthly payment with initial 10% retainage reducing to 5% at 50% completion, and liquidated damages of $500 per day for delays beyond the completion deadline. Funding is provided through municipal sources.

View the file

Other files

File Type Posted
11-Sec 01 50 00 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS.pdf PDF
44-Doc 00 72 00 GENERAL CONDITIONS.pdf PDF
36-Doc 00 65 19.13 ContractorsAffidavit.pdf PDF
39-Doc 00 61 19 MAINTENANCE BOND.pdf PDF
31-Doc 00 73 00.00 SUPPLEMENTARY CONDITIONS - revised.pdf PDF
18-Sec 01 40 00 QUALITY CONTROL.pdf PDF
16-X Sketch-Pool Repair Areas.pdf PDF
42-Doc 00 73 00.10 Attach A.pdf PDF
15-Sec 03 25 00 Waterstops and Waterproofing.pdf PDF
22-Doc 00 62 76 Appl Payment.pdf PDF
23-Doc 00 11 13 Advertisement PennBid FC Concrete 2026.pdf PDF
35-Doc 00 45 19 NON-COLLUSION AFFIDAVIT.pdf PDF
46-Doc 00 73 00.30 Attach C.pdf PDF
28-Doc 00 61 13.16 Payment Bond.pdf PDF
38-Doc 00 62 16 CERTIFICATE INSURANCE.pdf PDF
5-Sec 01 11 13 Summary Work.pdf PDF
1-Doc 00 73 00.33 Attach C-RCO Subcontractor Certification Form.pdf PDF
13-Sec 13 11 13.1 Concrete Pool Repairs.pdf PDF
47-Doc 00 73 00.20 Attach B.pdf PDF
32-Doc 00 01 01 TITLE SHEET AND COVER.pdf PDF
20-Doc 00 45 53 AGREEMENT SURETY COMPANY.pdf PDF
37-Doc 00 65 19.19 Consent Surety Final.pdf PDF
27-Sec 01 70 00 CONTRACT CLOSEOUT.pdf PDF
2-Doc 00 73 00.31 Attach C-Responsible Contrator Ordinance.pdf PDF
7-Sec 02 41 19 Selective Demolition.pdf PDF
19-Doc 00 21 13 INSTRUCTIONS TO BIDDERS EBID 2026.pdf PDF
8-Sec 07 92 13 Thermal and Moisture Protection at Pool Expansion Joints.pdf PDF
45-X Product Data Sheets.pdf PDF
30-Doc 00 73 00.21 Attach B-Public Works Employment Verification Form.pdf PDF
41-Doc 00 45 13 BIDDER QUALIFICATION STATEMENT.pdf PDF
9-Sec 01 31 00 COORDINATION AND MEETINGS.pdf PDF
17-Doc 00 43 13 BID BOND.pdf PDF
29-Doc 00 73 00.32 Attach C-RCO Contractor Certification Form.pdf PDF
24-Sec 01 22 00 MEASUREMENT AND PAYMENT - 2025-09-16.pdf PDF
6-Sec 01 71 13 Mobilization.pdf PDF
12-Sec 03 62 13 Grouting.pdf PDF
43-Doc 00 41 00 BID FORM-EBID.pdf PDF
21-Doc 00 61 13.13 Peformance Bond.pdf PDF
14-Doc 00 01 10-Table Contents.pdf PDF
34-Doc 00 65 19.16 ContractorsRelease.pdf PDF
4-Doc 00 91 13 ADDENDA.pdf PDF
33-Doc 00 52 00 AGREEMENT.pdf PDF
26-Doc 00 45 10 BIDDERS ACKNOWLEDGEMENT.pdf PDF
25-Doc 00 63 63 ChangeOrder.pdf PDF
3-Sec 01 29 00 CONTRACT CONSIDERATIONS.pdf PDF
10-Sec 01 60 00 MATERIAL AND EQUIPMENT.pdf PDF
35-Doc 00 65 19.13 ContractorsAffidavit.pdf PDF
7-Doc 00 73 00.11 Attach A-prevailing wage rates 25-08056.pdf PDF
32-Doc 00 65 19.16 ContractorsRelease.pdf PDF
1-Doc 00 61 13.13 Peformance Bond.pdf PDF
Show 40 more

Latest 50 of 93 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Name: Fanny Chapman Memorial Pool - Main Pool Bottom Concrete Repair

General Description: Voids under the pool bottom are to be injection-filled with grout and the pool bottom concrete is to be repaired. The concrete repair involves removal of surface concrete on the bottom of the pool to competent substrate (approximately 2 to 3 inches) and resurfacing the pool bottom with polymer modified concrete.

Project Locality Doylestown Borough, PA

Awarding Agency: Doylestown Borough

Contract Award Date: 5/18/2026

Serial Number: 26-02618

Project Classification: Highway

Determination Date: 3/17/2026

Assigned Field Office: Philadelphia

Field Office Phone Number: (215)560-1858

Toll Free Phone Number:

Project County: Bucks County

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Commonwealth of Pennsylvania Department of Labor & Industry Report Date: 3/17/2026 Page 1 of 6

Project: 26-02618 - Building Effective Date

Expiration Date

Hourly Rate Fringe Benefits

Total

Asbestos & Insulation Workers 5/1/2025 $60.84 $48.71 $109.55

Boilermaker (Commercial, Institutional, and Minor Repair Work)

3/1/2024 $36.71 $19.13 $55.84

Boilermakers 1/1/2024 $52.10 $35.72 $87.82

Bricklayer 5/1/2023 $47.50 $31.42 $78.92

Bricklayer 5/1/2025 $50.00 $32.57 $82.57

Carpenter - Chief of Party (Surveying & Layout) 5/1/2025 $54.59 $29.02 $83.61

Carpenter - Instrument Person (Surveying & Layout) 5/1/2025 $47.47 $29.02 $76.49

Carpenter - Rodman (Surveying & Layout) 5/1/2025 $23.74 $20.62 $44.36

Carpenters 5/1/2025 $47.47 $29.02 $76.49

Cement Masons 5/1/2024 $46.70 $32.46 $79.16

Cement Masons 5/1/2025 $48.70 $32.46 $81.16

Dockbuilder, Pile Drivers 5/1/2025 $55.23 $37.99 $93.22

Dockbuilder, Pile Drivers 5/1/2026 $56.98 $37.99 $94.97

Dockbuilder/Pile Driver Diver 5/1/2025 $64.35 $41.74 $106.09

Dockbuilder/Pile Driver Diver 5/1/2026 $66.54 $41.74 $108.28

Dockbuilder/pile driver tender 5/1/2025 $55.23 $37.99 $93.22

Dockbuilder/pile driver tender 5/1/2026 $56.98 $37.99 $94.97

Drywall Finisher 5/1/2025 $40.14 $32.35 $72.49

Electricians 5/1/2024 $69.58 $45.66 $115.24

Electricians 5/1/2025 $70.97 $47.27 $118.24

Elevator Constructor 1/1/2025 $71.85 $45.77 $117.62

Elevator Constructor 1/1/2026 $74.86 $46.86 $121.72

Floor Coverer 5/1/2025 $51.67 $31.69 $83.36

Floor Coverer 5/1/2026 $52.84 $32.86 $85.70

Glazier 5/1/2024 $48.00 $37.50 $85.50

Glazier 5/1/2025 $49.96 $38.34 $88.30

Interior Finish 5/1/2023 $34.60 $25.80 $60.40

Iron Workers (Bridge, Structural, Ornamental, Precast) 7/1/2024 $53.20 $45.01 $98.21

Iron Workers (Riggers) 7/1/2024 $44.64 $34.39 $79.03

Iron Workers (Riggers) 7/1/2025 $44.77 $36.27 $81.04

Iron Workers (Rodman/Reinforcing) 7/1/2024 $47.70 $34.77 $82.47

Iron Workers (Rodman/Reinforcing) 7/1/2025 $47.80 $36.65 $84.45

Laborers (Class 01 - See notes) 5/1/2025 $37.25 $26.10 $63.35

Laborers (Class 02 - See notes) 5/1/2025 $41.00 $27.70 $68.70

Laborers (Class 03 - See notes) 5/1/2025 $37.67 $26.28 $63.95

Laborers (Class 04 - See notes) 5/1/2025 $37.67 $26.28 $63.95

Laborers (Class 05 - See notes) 5/1/2025 $37.25 $26.10 $63.35

Landscape Laborer 5/1/2024 $30.70 $24.23 $54.93

Landscape Laborer 5/1/2025 $32.15 $24.30 $56.45

Marble Finisher 5/1/2025 $41.17 $30.75 $71.92

Marble Mason 5/1/2023 $47.20 $31.95 $79.15

Mason Tender, Cement 5/1/2023 $35.02 $25.98 $61.00

Millwright 5/1/2025 $57.39 $35.81 $93.20

Millwright 5/1/2026 $60.20 $35.81 $96.01

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 3/17/2026 Page 2 of 6

Expiration Date

Hourly Rate Fringe Benefits

Total

Operators (Building, Class 01 - See Notes) 5/1/2025 $54.52 $34.49 $89.01

Operators (Building, Class 01 - See Notes) 5/1/2026 $55.67 $35.34 $91.01

Operators (Building, Class 01A - See Notes) 5/1/2025 $57.52 $35.38 $92.90

Operators (Building, Class 01A - See Notes) 5/1/2026 $58.68 $36.22 $94.90

Operators (Building, Class 02 - See Notes) 5/1/2025 $54.27 $34.42 $88.69

Operators (Building, Class 02 - See Notes) 5/1/2026 $55.43 $35.26 $90.69

Operators (Building, Class 02A - See Notes) 5/1/2025 $57.29 $35.29 $92.58

Operators (Building, Class 02A - See Notes) 5/1/2026 $58.44 $36.14 $94.58

Operators (Building, Class 03 - See Notes) 5/1/2025 $50.18 $33.22 $83.40

Operators (Building, Class 03 - See Notes) 5/1/2026 $51.34 $34.06 $85.40

Operators (Building, Class 04 - See Notes) 5/1/2025 $49.88 $33.13 $83.01

Operators (Building, Class 04 - See Notes) 5/1/2026 $51.04 $33.97 $85.01

Operators (Building, Class 05 - See Notes) 5/1/2025 $48.16 $32.62 $80.78

Operators (Building, Class 05 - See Notes) 5/1/2026 $49.32 $33.46 $82.78

Operators (Building, Class 06 - See Notes) 5/1/2025 $47.17 $32.33 $79.50

Operators (Building, Class 06 - See Notes) 5/1/2026 $48.34 $33.16 $81.50

Operators (Building, Class 07A- See Notes) 5/1/2025 $66.26 $39.55 $105.81

Operators (Building, Class 07A- See Notes) 5/1/2026 $67.73 $40.48 $108.21

Operators (Building, Class 07B- See Notes) 5/1/2025 $65.97 $39.46 $105.43

Operators (Building, Class 07B- See Notes) 5/1/2026 $67.44 $40.39 $107.83

Painters Class 1 (see notes) 5/1/2024 $42.97 $34.11 $77.08

Painters Class 1 (see notes) 5/1/2025 $44.38 $34.55 $78.93

Painters - Line Stripping 12/1/2024 $44.12 $27.91 $72.03

Painters - Line Stripping 12/1/2025 $45.12 $29.41 $74.53

Painters Class 4 (see notes) 5/1/2024 $45.06 $34.11 $79.17

Painters Class 4 (see notes) 5/1/2025 $46.47 $34.55 $81.02

Plasterers 5/1/2024 $39.88 $33.08 $72.96 plumber 5/1/2024 $67.53 $38.31 $105.84 plumber 5/1/2025 $70.53 $39.46 $109.99

Pointers, Caulkers, Cleaners 5/1/2025 $51.35 $31.80 $83.15

Roofers (Composition) 5/1/2024 $44.13 $34.77 $78.90

Roofers (Composition) 5/1/2025 $46.03 $34.77 $80.80

Roofers (Shingle) 5/1/2024 $34.35 $22.20 $56.55

Roofers (Slate & Tile) 5/1/2024 $37.35 $22.20 $59.55

Sheet Metal Workers 5/1/2024 $59.22 $50.56 $109.78

Sheet Metal Workers 5/1/2025 $62.62 $52.17 $114.79

Sign Makers and Hangars 7/15/2024 $32.32 $25.82 $58.14

Sign Makers and Hangars 7/15/2025 $33.48 $26.41 $59.89

Sprinklerfitters 1/1/2023 $62.23 $31.99 $94.22

Sprinklerfitters 5/1/2025 $70.37 $34.85 $105.22

Steamfitters 5/1/2024 $70.32 $43.09 $113.41

Steamfitters 5/1/2025 $72.52 $44.89 $117.41

Stone Masons 5/1/2023 $47.20 $31.95 $79.15

Stone Masons 5/1/2025 $50.00 $32.80 $82.80

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 3/17/2026 Page 3 of 6

Expiration Date

Hourly Rate Fringe Benefits

Total

Terrazzo Finisher 5/1/2023 $43.75 $27.86 $71.61

Terrazzo Finisher 5/1/2025 $45.61 $29.41 $75.02

Terrazzo Grinder 5/1/2023 $44.02 $27.86 $71.88

Terrazzo Grinder 5/1/2025 $45.88 $29.41 $75.29

Terrazzo Mechanics 5/1/2023 $50.26 $29.56 $79.82

Terrazzo Mechanics 5/1/2025 $52.21 $31.26 $83.47

Tile Finisher 5/1/2023 $39.52 $29.30 $68.82

Tile Finisher 5/1/2025 $41.17 $30.75 $71.92

Tile Setter 5/1/2023 $50.26 $29.56 $79.82

Tile Setter 5/1/2025 $52.21 $31.26 $83.47

Truckdriver class 1(see notes) 5/1/2024 $36.79 $22.54 $59.33

Truckdriver class 2 (see notes) 5/1/2024 $36.89 $22.54 $59.43

Window Film / Tint Installer 6/1/2024 $26.37 $14.83 $41.20

Window Film / Tint Installer 6/1/2025 $27.42 $15.13 $42.55

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 3/17/2026 Page 4 of 6

Project: 26-02618 - Heavy/Highway Effective

Expiration Date

Hourly Rate Fringe Benefits

Total

Bricklayer 5/1/2025 $50.00 $32.57 $82.57

Carpenter - Chief of Party (Surveying & Layout) 5/1/2025 $65.96 $30.09 $96.05

Carpenter - Chief of Party (Surveying & Layout) 5/1/2026 $67.52 $30.44 $97.96

Carpenter - Instrument Person (Surveying & Layout) 5/1/2025 $58.39 $29.06 $87.45

Carpenter - Instrument Person (Surveying & Layout) 5/1/2026 $60.09 $29.06 $89.15

Carpenter - Rodman (Surveying & Layout) 5/1/2025 $45.88 $23.19 $69.07

Carpenter - Rodman (Surveying & Layout) 5/1/2026 $46.97 $23.54 $70.51

Carpenter 5/1/2025 $57.36 $30.09 $87.45

Carpenter 5/1/2026 $58.71 $30.44 $89.15

Cement Masons 5/1/2023 $43.20 $32.91 $76.11

Cement Masons 5/1/2025 $46.55 $32.66 $79.21

Dockbuilder, Pile Drivers 5/1/2025 $55.23 $37.99 $93.22

Dockbuilder, Pile Drivers 5/1/2026 $56.98 $37.99 $94.97

Dockbuilder/Pile Driver Diver 5/1/2025 $60.31 $44.97 $105.28

Dockbuilder/Pile Driver Diver 5/1/2026 $61.88 $45.47 $107.35

Dockbuilder/pile driver tender 5/1/2025 $55.23 $37.99 $93.22

Dockbuilder/pile driver tender 5/1/2026 $56.98 $37.99 $94.97

Electric Lineman 6/3/2024 $62.07 $33.96 $96.03

Electric Lineman 6/2/2025 $65.10 $34.45 $99.55

Iron Workers (Bridge, Structural, Ornamental, Precast) 7/1/2024 $53.20 $45.01 $98.21

Iron Workers (Riggers) 7/1/2023 $42.53 $34.14 $76.67

Iron Workers (Rodman/Reinforcing) 7/1/2023 $45.70 $34.77 $80.47

Laborers (Class 01 - See notes) 5/1/2025 $40.20 $27.80 $68.00

Laborers (Class 02 - See notes) 5/1/2025 $40.40 $27.80 $68.20

Laborers (Class 03 - See notes) 5/1/2025 $40.40 $27.80 $68.20

Laborers (Class 04 - See notes) 5/1/2025 $35.00 $27.80 $62.80

Laborers (Class 05 - See notes) 5/1/2025 $41.05 $27.80 $68.85

Laborers (Class 06 - See notes) 5/1/2025 $41.10 $27.80 $68.90

Laborers (Class 07 - See notes) 5/1/2025 $40.95 $27.80 $68.75

Laborers (Class 08 - See notes) 5/1/2025 $40.70 $27.80 $68.50

Laborers (Class 09 - See notes) 5/1/2025 $40.55 $27.80 $68.35

Laborers (Class 10- See notes) 5/1/2025 $40.70 $27.80 $68.50

Laborers (Class 11 -See Notes) 5/1/2025 $40.60 $27.80 $68.40

Laborers (Class 12 -See Notes) 5/1/2025 $42.30 $27.80 $70.10

Laborers (Class 13 -See Notes) 5/1/2025 $44.33 $27.80 $72.13

Laborers (Class 14 -See Notes) 5/1/2025 $40.90 $27.80 $68.70

Laborers Utility (PGW ONLY) (Flagperson) 5/1/2025 $34.07 $19.73 $53.80

Laborers Utility (PGW ONLY) 5/1/2025 $41.10 $19.73 $60.83

Landscape Laborer 5/1/2024 $30.28 $24.05 $54.33

Landscape Laborer 5/1/2025 $31.73 $24.15 $55.88

Millwright 5/1/2025 $57.39 $35.81 $93.20

Millwright 5/1/2026 $60.20 $35.81 $96.01

Operators Class 01 - See Notes (Building, Heavy, Highway)

5/1/2025 $54.52 $34.49 $89.01

Operators Class 01 - See Notes (Building, Heavy, 5/1/2026 $55.67 $35.34 $91.01

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 3/17/2026 Page 5 of 6

Project: 26-02618 - Heavy/Highway Effective

Expiration Date

Hourly Rate Fringe Benefits

Total

Highway)

Operators Class 01a - See Notes (Building, Heavy, Highway)

5/1/2025 $57.52 $35.38 $92.90

Operators Class 01a - See Notes (Building, Heavy, Highway)

5/1/2026 $58.68 $36.22 $94.90

Operators Class 02 - See Notes (Building, Heavy, Highway)

5/1/2025 $54.27 $34.42 $88.69

Operators Class 02 - See Notes (Building, Heavy, Highway)

5/1/2026 $55.43 $35.26 $90.69

Operators Class 02a - See Notes (Building, Heavy, Highway)

5/1/2025 $57.29 $35.29 $92.58

Operators Class 02a - See Notes (Building, Heavy, Highway)

5/1/2026 $58.44 $36.14 $94.58

Operators Class 03 - See Notes (Building, Heavy, Highway)

5/1/2025 $50.18 $33.22 $83.40

Operators Class 03 - See Notes (Building, Heavy, Highway)

5/1/2026 $51.34 $34.06 $85.40

Operators Class 04 - See Notes (Building, Heavy, Highway)

5/1/2025 $49.88 $33.13 $83.01

Operators Class 04 - See Notes (Building, Heavy, Highway)

5/1/2026 $51.04 $33.97 $85.01

Operators Class 05 - See Notes (Building, Heavy, Highway)

5/1/2025 $48.16 $32.62 $80.78

Operators Class 05 - See Notes (Building, Heavy, Highway)

5/1/2026 $49.32 $33.46 $82.78

Operators Class 06 - See Notes (Building, Heavy, Highway)

5/1/2025 $47.17 $32.33 $79.50

Operators Class 06 - See Notes (Building, Heavy, Highway)

5/1/2026 $48.34 $33.16 $81.50

Operators Class 07 (A) - See Notes (Building, Heavy, Highway)

5/1/2025 $66.26 $39.55 $105.81

Operators Class 07 (A) - See Notes (Building, Heavy, Highway)

5/1/2026 $67.73 $40.48 $108.21

Operators Class 07 (B) - See Notes (Building, Heavy, Highway)

5/1/2025 $65.97 $39.46 $105.43

Operators Class 07 (B) - See Notes (Building, Heavy, Highway)

5/1/2026 $67.44 $40.39 $107.83

Painters - Line Stripping 12/1/2024 $44.12 $27.91 $72.03

Painters - Line Stripping 12/1/2025 $45.12 $29.41 $74.53

Painters Class 2 (see notes) 2/1/2025 $50.85 $33.91 $84.76

Painters Class 2 (see notes) 2/1/2026 $51.61 $35.00 $86.61

Painters Class 3 (see notes) 2/1/2025 $61.81 $33.95 $95.76

Painters Class 3 (see notes) 2/1/2026 $62.57 $35.04 $97.61

Pointers, Caulkers, Cleaners 5/1/2025 $51.35 $31.80 $83.15

Steamfitters (Heavy and Highway - Gas Distribution) 5/1/2024 $66.80 $42.93 $109.73

Steamfitters (Heavy and Highway - Gas Distribution) 5/1/2025 $68.89 $44.73 $113.62

Truckdriver class 1(see notes) 5/1/2024 $36.64 $22.54 $59.18

Truckdriver class 2 (see notes) 5/1/2024 $36.74 $22.54 $59.28

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 3/17/2026 Page 6 of 6

File details come from the government source that posted it. Updated .