27-Sec 01 70 00 CONTRACT CLOSEOUT.pdf
PDF 96 KB Posted
- Solicitation number
- Not on record
- Issued by
- Bucks County, Pennsylvania
About this file
This is a contract closeout specification document prepared by the Borough of Doylestown for Contract 2400754 – Fanny Chapman Memorial Pool Main Pool Repairs. The document outlines comprehensive closeout procedures required upon substantial completion of the main pool concrete repair project. The work includes final cleaning of equipment and fixtures, adjustment of operating products and equipment, removal of construction debris and waste materials from the site, and execution of all punch list items identified during final inspection. The contractor must maintain on-site project record documents including marked-up drawings, specifications, addenda, change orders, reviewed shop drawings, and manufacturer's instructions throughout construction. Final inspection and punch list preparation will be conducted by the Engineer, with all remaining items to be completed within the original contract time. The contractor must submit a written certification that the work is complete and ready for Engineer review prior to final payment consideration.
The contractor is required to submit comprehensive documentation prior to final payment, including payroll certification forms (if the contract price exceeds $25,000), waivers of liens from all subcontractors and suppliers, a maintenance bond, any outstanding change orders with supporting documentation, and test or sample results as applicable. Record documents must legibly identify actual products installed with manufacturer names and model numbers, document all product substitutions or alternates utilized, and record measured locations of underground utilities and field changes to dimensions and details. Final payment will only be issued upon final completion and acceptance of all work, with the contractor responsible for maintaining accurate and complete entries in record documents concurrent with construction progress to enable future reference by the owner.
View the file
Other files
Show 40 more
Latest 50 of 93 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Borough of Doylestown Section 01 70 00 Contract Closeout 2400754 - Fanny Chapman - Main Pool Repairs Page 1 of 2
PART 1 GENERAL
1.01 SECTION DESCRIPTION
A. The Work of This Section Includes:
1. Closeout procedures.
2. Final cleaning.
3. Adjusting.
4. Project record documents.
5. Operation and maintenance manual.
6. Spare parts and maintenance Products.
7. Other documentation.
1.02 RELATED SECTIONS
A. Related Work Specified Elsewhere:
1. Section 01 50 00: Construction Facilities and Temporary Controls: Progress cleaning.
1.03 CLOSEOUT PROCEDURES
A. Submit written certification that Contract Documents have been reviewed, Work has been inspected, and that Work is complete in accordance with Contract Documents and ready for Engineer's review.
B. Engineer shall make a final inspection and prepare a punch list of items remaining to be completed or corrected prior to final acceptance in accordance with Article 14, paragraph
14.06 of the General Conditions.
C. Complete all items on the punch list, plus any new items that may be subsequently added, as soon as possible and within the Contract Time.
D. Provide submittals to Engineer that are required by governing or other authorities.
E. Submit final Application for Payment identifying total adjusted Contract Price, previous payments, and remaining amount due.
F. Final Payment will not be made until final completion and acceptance of the Work.
1.04 FINAL CLEANING
A. Execute final cleaning prior to final Project inspection.
B. Clean equipment and fixtures to a sanitary condition with cleaning materials appropriate to the surface and material being cleaned.
C. Clean or replace filters of operating equipment.
D. Clean debris from gutters and drainage systems.
E. Clean site; sweep paved areas, rake clean landscaped surfaces.
F. Remove waste and surplus materials, rubbish, and construction facilities from the site.
1.05 ADJUSTING
A. Adjust operating Products and equipment to ensure smooth and unhindered operation.
Borough of Doylestown Section 01 70 00 Contract Closeout 2400754 - Fanny Chapman - Main Pool Repairs Page 2 of 2
1.06 PROJECT RECORD DOCUMENTS
A. Maintain on-site one set of the following record documents; record actual revisions to the Work:
1. Drawings and Specifications.
2. Addenda.
3. Change Orders and other modifications to the Contract.
4. Reviewed Shop Drawings, Product data, and samples.
5. Manufacturer’s instructions for assembly, installation and adjusting.
B. Ensure entries are complete and accurate, enabling future reference by Owner.
C. Store record documents separate from documents used for construction.
D. Record information concurrent with construction progress.
E. Specifications: Legibly mark and record at each Product section description of actual Products installed, including the following:
1. Manufacturer's name and product model and number.
2. Product substitutions or alternates utilized.
3. Changes made by Addenda and modifications.
F. Record Drawings and Shop Drawings: Legibly mark each item to record actual construction including:
1. Measured horizontal and vertical locations of underground utilities and appurtenances, referenced to permanent surface improvements.
2. Field changes of dimension and detail.
3. Details not on original Contract Drawings.
G. Submit documents to Engineer with claim for final Application for Payment.
1.07 OTHER DOCUMENTATION
A. Provide data and documentation properly completed and executed prior to final Application for Payment as Engineer may reasonably require including:
1. Payroll Certification forms by Contractor and all Subcontractors (if price exceeds $25,000).
2. Waiver of Liens by all Subcontractors and Suppliers or Contractor's Affidavit, Contractor's Release of Liens and Consent of Surety to Final Payment.
3. Maintenance Bond.
4. Any Change Orders with supporting documentation which remain to be submitted.
5. Test and/or sample results.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
END OF SECTION