6_AD012 - DEMOLITION PLAN -EIGHTH FLOOR.pdf

PDF 422 KB Posted

Attached to
Y1AZ--Design Build, Construct SICU and Renovate Operating Rooms
Solicitation number
36C10F22R0036
Issued by

View the file

Other files

File Type Posted
Award Notice 36C10F24C0002.pdf PDF
36C10F22R0036 0004.pdf PDF
36C10F22R0036 0003.pdf PDF
36C10F22R0036 0002.pdf PDF
36C10F22R0036 0001.pdf PDF
36C10F22R0036.pdf PDF
45_PL102 - EIGHTH FLOOR -PLUMBING WASTE AND VENT PLAN.pdf PDF
40_PPD101 - SEVENTH FLOOR -PLUMBING DOMESTIC WATER DEMOLITION PLAN.pdf PDF
61_MHP100 - MECHANICAL DUCT and PIPING PLAN -ROOF LEVEL.pdf PDF
17_AF702 - FINISH PLAN -EIGHTH FLOOR.pdf PDF
07_ELEVATOR NARRATIVE.pdf PDF
52_MDH100 - MECHANICAL DUCT DEMOLITION PLAN -SEVENTH FLOOR.pdf PDF
100 percent RFP PLUMBING CALCS.pdf PDF
48_PJ101 - SEVENTH FLOOR -PLUMBING MEDICAL GAS PLAN.pdf PDF
55_MDP100 - MECHANICAL PIPING DEMOLTION PLAN -SEVENTH FLOOR.pdf PDF
44_PL101 - SEVENTH FLOOR -PLUMBING WASTE AND VENT PLAN.pdf PDF
24_QH105 - EQUIPMENT PLAN -EIGHTH FLOOR -AREA 1.pdf PDF
04_FIRE PROTECTION.pdf PDF
OR-SICU 100 percent Digital Material Board.pdf PDF
28_QH109 - INTERIOR EQUIPMENT ELEVATIONS.pdf PDF
27_QH108 - INTERIOR EQUIPMENT ELEVATIONS.pdf PDF
84_EY301 - SEVENTH FLOOR ELECTRICAL LOW VOLTAGE PLAN.pdf PDF
4_GI102 - LIFE SAFETY PLAN -EIGHTH FLOOR.pdf PDF
86_EP401 - ELECTRICAL LIGHTNING PROTECTION PLAN.pdf PDF
21_QH102 - EQUIPMENT PLAN -SEVENTH FLOOR -AREA 2.pdf PDF
13_AE115 - DIMENSION PLAN -EIGHTH FLOOR.pdf PDF
90_EP504 - ELECTRICAL DETAILS.pdf PDF
88_EP502 - SCHEDULES AND DETAILS.pdf PDF
26_QH107 - EQUIPMENT PLAN -EIGHTH FLOOR -AREA 3 and INTERIOR EQUIPMENT ELEVATIONS.pdf PDF
39_PLD102 - EIGHTH FLOOR -PLUMBING WASTE AND VENT DEMOLITION PLAN.pdf PDF
9_AE111 - REFERENCE PLAN -SEVENTH FLOOR.pdf PDF
12_AE114 - DIMENSION PLAN -SEVENTH FLOOR.pdf PDF
14_AE211 - REFLECTED CEILING PLAN -SEVENTH FLOOR.pdf PDF
01_Mold Report.pdf PDF
Floor 7 Inventory OKC VAMC.pdf PDF
71_M-704 - MECHANICAL CONTROLS.pdf PDF
30_FA001 - FIRE ALARM_MASS NOTIFICATION GENERAL NOTES.pdf PDF
56_MDP101 - MECHANICAL PIPING DEMOLTION PLAN -EIGHTH FLOOR.pdf PDF
02_ARCHITECTURAL.pdf PDF
1_GI000 - COVER SHEET.pdf PDF
50_P-600 - PLUMBING SCHEDULES.pdf PDF
82_EL201 - SEVENTH FLOOR ELECTRICAL LIGHTING PLAN.pdf PDF
66_M-502 - MECHANICAL DETAILS.pdf PDF
60_MH103 - MECHANICAL ZONING and CONTROLS PLAN -EIGHTH FLOOR.pdf PDF
06_ELECTRICAL NARRATIVE.pdf PDF
02_STRUCTURAL NARRATIVE.pdf PDF
20_QH101 - EQUIPMENT PLAN -SEVENTH FLOOR -AREA 1.pdf PDF
38_PLD101 - SEVENTH FLOOR -PLUMBING WASTE AND VENT DEMOLITION PLAN.pdf PDF
Floor 8 Inventory OKC VAMC.pdf PDF
63_MP101 - MECHANICAL HVAC PIPING PLAN -EIGHTH FLOOR.pdf PDF
Show 40 more

Latest 50 of 122 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FD FD

FD FD

1. EXISTING CONDITIONS ARE BASED ON INFORMATION OBTAINED FROM EXISTING DRAWINGS

AND FIELD SURVEY, AND SHALL NOT BE CONSTRUED "AS BUILT." THE CONTRACTOR SHALL

FIELD VERIFY EXISTING CONDITIONS PRIOR TO ONSET OF CONSTRUCTION.

2. THE CONTRACTOR SHALL COORDINATE WITH OWNER FOR ALL EXISTING EQUIPMENT AND

FURNITURE ITEMS THAT ARE TO BE SALVAGED OR REINSTALLED PRIOR TO THE

COMMENCEMENT OF DEMOLITION.

3. ALL WALL PARTITIONS SHOWN DASHED ARE TO BE REMOVED. THE CONTRACTOR SHALL

PATCH ALL PARTITIONS, CEILINGS, AND FLOORS AFFECTED BY DEMOLITION TO MATCH

ADJACENT CONSTRUCTION.

4. ALL DOORS SHOWN DASHED ARE TO BE REMOVED ALL ASSOCIATED DOOR FRAMES TO BE

REMOVED UNLESS NOTED.

5. THE OWNER SHALL HAVE THE FIRST RIGHT TO ALL MATERIALS AND EQUIPMENT THAT ARE

REMOVED BY THE CONTRACTOR. THE CONTRACTOR SHALL VERIFY WHEN REMOVAL OF ITEMS

ARE TO BE RETAINED BY THE OWNER AT THE PRE CONSTRUCTION MEETING.

6. CLEAN AND PREPARE ALL SURFACES AFFECTED BY DEMOLITION TO PRODUCE FLAT, EVEN

SURFACE TO RECEIVE NEW FINISHES.

7. CONTRACTOR SHALL PROTECT ALL EXISTING BUILDING SURFACES TO REMAIN.

8. PATCH AND REPAIR SURFACES AND FINISHES AFFECTED BY THE DEMOLITION OR THE

REMOVAL OF CONSTRUCTION AS NECESSARY TO MAINTAIN THE FINISH QUALITY OF NEW

SPACE.

9. FILL ALL DUCT AND PIPE PENETRATIONS IN AREA OF DEMOLITION WITH 1 HOUR RATED

ASSEMBLY. FILL WITH 2 - HOUR RATED ASSEMBLY ADJACENT AND WITHIN 2-HOUR

CONSTRUCTION.

10. COORDINATE SCHEDULING OF ANY DEMOLITION/PLACEMENT OF RATED WALL CONSTRUCTION

WITH FIRE/LIFE SAFETY A.H.J.

11. VERIFY CONDITION OF EXISTING CONSTRUCTION TO REMAIN. PROVIDE BOARD AND FINISH

WHERE REQUIRED.

12. EXISTING SPRAY-ON FIREPROOFING TO BE PROTECTED DURING DEMOLITION AND NEW

CONSTRUCTION. NEW FIRE PROOFING TO BE APPLIED BY CONTRACTOR AT NO EXPENSE IF

DAMAGED DURING CONSTRUCTION

13. REMOVE ALL EXISTING GYPSUM BOARD WITHIN SCOPE OF RENOVATED AREA AND PROVIDE

NEW GYPSUM BOARD PER DEFINED PARTITION TYPES.

GENERAL DEMOLITION FLOOR PLAN NOTES

1 2 3 4 5 6 7 8 9 10 11 11a

E

F

G

H

I

J

K

9A

G2

2.16

2.16

2.16

2.16

2.16

2.16

2.162.16

2.16 2.16

2.16

2.16 2.16

2.16

2.16

2.16

2.16 2.16 2.16 2.16 2.16 2.16

2.16 2.16 2.16 2.162.16

2.16 2.16 2.16 2.16

2.162.16 2.16 2.16 2.162.16 2.162.16 2.162.16

2.16 2.16

2.16

2.16

2.16

2.16

2.16

2.182.18

2.16

2.16 2.16 2.16 2.16 2.16 2.16

2.16

2.16

2.16

2.16

2.16

2.16

2.16

2.16

2.16

2.162.16

2.162.16

2.162.16

2.16

2.16

2.16

2.162.16

2.162.16 2.162.16

2.16

2.16

2.162.16

2.162.16

2.16

2.16 2.162.16

2.16

2.162.16

2.162.16

2.16

2.162.162.16

2.16

2.16

2.16

2.15

ISOLATION

ICU PAT. RM.

8F-111

ANTE RM

8F-110

ICU PAT. RM.

8F-109

ICU PAT. RM.

8F-108

ICU PAT. RM.

8F-107

ICU PAT. RM.

8F-106

ICU PAT. RM.

8F-105

ICU PAT. RM.

8F-104

ICU PAT. RM.

8F-103

ICU PAT. RM.

8F-102

WOMEN'S

8F-101

MEN'S

8F-100

CORRIDOR

C8-5

CORRIDOR

C8-6

CORRIDOR

C8-8

CORRIDOR

C8-7

CORRIDOR

C8-13

CORRIDOR

C8-10

CORRIDOR

C8-3

CORRIDOR

C8-1

ICU PAT. RM.

8F-112

ICU PAT. RM.

8F-113

ICU PAT. RM.

8F-114

TEAM ROOM

8F-115

ICU PAT. RM.

8F-117

ICU PAT. RM.

8F-118

ICU PAT. RM.

8F-119

ICU PAT. RM.

8F-120

NURSE

STATION

8F-148

MEDS

8F-147

CORRIDOR

C8-9

SIGNAL

CLOS.

8F-147

CLEAN

SUPPLIES

8F-147

H.A.C.

8F-144

SOILED

UTILITY

8F-139

CLEAN

UTILITY

8F-140

ELEC.

8F-135

NURSE'S

STATION

8F-130

ICU PAT. RM.

8F-121

ICU PAT. RM.

8F-122

ELEVATOR

P-8

ELEVATOR

P-7

STAFF

LOUNGE

8F-116

NOURISHMENT

8F-146

ELEVATOR

P-12

ELEVATOR

LOBBY

C8-11

GAS

8F-138

GAS

8F-137

TRASH

8F-136

'-9

F

V

7'-3 1/2" F.V.

7'-3 1/2" F.V.

'-1

/2

F

.V

4' -9

F

.V

9'-7 1/2"

'-4

/2

1' -5

/2

2'-2" 1' -1

/2

1' -5

/2

2'-1"

1' -1

/2

2'-1"

3'-7"

4' -4

5'

-8

1' -0

1'

-6

4' -4

1/ 2"

4'-4 1/2" 3'-4 1/2"

1'-10 1/2" 7'-9" 7'-3" 1'-7 1/2" 1'-6" 12'-1 1/2"

7'-10 1/2"

2' -2

/2

'-5

12'-2" FV

2.512.51

2.512.51 2.512.51

4'-0" 2'-1" 4'-0" 5'-4"

2.542.54

2.55

STAIR 8

STAIR 10

2.25

2.562.56 2.562.56 2.562.56 2.562.56 2.562.56

2.562.56 2.56

2.56 2.562.56

2.562.56

2.56 2.562.562.56

ELEVATOR

EQUIPMENT

ROOM

2.60

2.60 2.60

2.60

2.60

2.272.272.272.27

2.27

2.272.27

2.27

2.27

2.27

2.27

2.272.27

2.272.27

2.27

2.27

2.612.61

2.61

2.612.61

2.61

2.61

2.61

2.61

2.61

2.61

2.61

2.612.61

2.16

2.612.61 2.612.61 2.612.61 2.61

2.16

2.61 2.612.61

2.16

2.61

2.16

2.612.61

2.61

2.642.642.64 2.642.642.64

2.642.642.642.642.642.642.642.642.642.64

2.64

2.64

2.64

2.64

2.64

2.64

2.64 2.64

2.64 2.64

2.64

2.66

2.66

2.66

2.66

2.66 2.66

2.66 2.66 2.66 2.66 2.66

2.66

2.66 2.66 2.66

2.66

2.66

2.66

2.66 2.662.66

2.66

2.662.66

2.66

2.66 2.66

2.66

2.66

2.66

2.66

2.66

7TH FLOOR ROOF

N

8TH FLOOR SICU

8TH FLOOR KEY PLAN

EXISTING WALL CONSTRUCTION TO BE

DEMOLISHED IN ITS ENTIRETY

EXISTING DOOR AND FRAME TO BE

DEMOLISHED IN THEIR ENTIRETY

AREA OF NO WORK

EXISTING WALLS TO REMAIN

DEMOLITION PLAN LEGEND

EXISTING WINDOW AND FRAME TO BE

DEMOLISHED IN THEIR ENTIRETY

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS:

Drawing #

VA Office Of Construction & Facilities Management Approval:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

OK ARCH REG. NO. CA02295, EXP. 06/30/2023

OK ENGR REG. NO. CA7127, EXP. 06/30/2023

The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.

FULLY SPRINKLERED

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

STRUCTURAL ENGINEER

H2B, INC.

1225 N. LOOP WEST, SUITE 800

HOUSTON, TX 77008

(713) 864-2900

MECH / ELEC / PLUMB / TECH ENGINEER

FIRE PROTECTION ENGINEER

POOLE FIRE PROTECTION, INC.

19910 WEST 161ST STREET

OLATHE, KANSAS 66062

(913) 829-8690

HEALTHCARE PLANNER

OCULUS INC.

1 S. MEMORIAL DR., SUITE 1500

ST. LOUIS, MO 63102

(314) 367-6100

SPUR PROJECT NUMBER: 1791.08

SPUR DESIGN

11020 KING STREET, SUITE 350

OVERLAND PARK, KS 66210

(913) 369-7200

SEE FRONT COVER SHEET

FOR APPROVAL SIGNATURE

VERTICAL TRANSPORTATION

ENVIRONMENTAL HYGIENIST

TEC-AN, INC.

2517 S. PURDUE AVE.

OKLAHOMA CITY, OK 73128

(405) 681-7076

LERCH BATES

2001 BRYAN ST., SUITE 1930

DALLAS, TX 75201

(972) 294-5221

/2

/2

:1 :5

P

M

AD012

DEMOLITION PLAN - EIGHTH FLOOR

ZDL

6 OF 92JNK

100% RFP DOCUMENTS

CONSTRUCT SURGICAL INTENSIVE

CARE UNIT & RENOVATE

OPERATING ROOMS

08/02/2021

635-436

OKLAHOMA CITY VA HEALTHCARE SYSTEM

921 NE 13TH ST, OKLAHOMA CITY, OK 73104

N

1/8" = 1'-0"

EIGHTH FLOOR DEMOLITION PLAN

KEYNOTE LEGEND

2.15 DEMOLISH EXISTING MECHANICAL EQUIPMENT AND DUCTWORK TO EXTENT INDICATED.

REFERENCE MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.

2.16 DEMOLISH EXISTING WALL CONSTRUCTION TO EXTENT INDICATED

2.18 DEMOLISH EXISTING FLOORING IN ITS ENTIRETY; CLEAN & PREPARE SUB-FLOOR SURFACE

FOR NEW FLOORING PER RENOVATION PLANS.

2.25 DEMOLISH EXISTING MOP SINK - REFERENCE PLUMBING DRAWINGS FOR ADDITIONAL

INFORMATION

2.27 REMOVE AND RETAIN EXISTING DOOR AND FRAME - SALVAGED DOOR AND FRAME TO BE

RETURNED TO VA

2.51 EXISTING FLOOR TO BE LEVELED DOWN TO EXISTING CONCRETE SLAB - SLAB TO REMAIN

FREE OF DEBRIS, ADHESIVES, MORTAR, GROUT, OR ANY OTHER MATERIAL

2.54 EXISTING EQUIPMENT TO BE RELOCATED TO 9TH FLOOR PENTHOUSE ABOVE. CONTRACTOR

TO COORDINATE RELOCATION WITH VA.

2.55 EXISTING METAL STAIR AND LANDING TO BE DEMOLISHED.

2.56 EXISTING WINDOW BLINDS TO BE REMOVED.

2.60 DEMOLISH PORTION OF EXISTING WALL FOR INSTALLATION OF NEW WINDOW TO MATCH

EXISTING ADJACENT WINDOW SYSTEM.

2.61 REMOVE EXISTING GYPSUM BOARD AND INSULATION

2.64 REMOVE EXISTING WINDOW SYSTEM AND SALVAGE FOR REINSTALLATION.

2.66 CONTRACTOR TO CONFIRM AND PRESERVE EXISTING 1 HOUR FIRE PROOFING AT ALL

COLUMNS.

No. REVISION DESCRIPTION DATE

File details come from the government source that posted it. Updated .