N
RECOVERY &
SURGICAL WAITING
7TH FLOOR KEY PLAN
PHASE-TWO
POST- OP
OPERATING ROOMS
1. EXISTING CONDITIONS ARE BASED ON INFORMATION OBTAINED FROM EXISTING DRAWINGS AND
FIELD SURVEY, AND SHALL NOT BE CONSTRUED "AS BUILT." THE CONTRACTOR SHALL FIELD
VERIFY EXISTING CONDITIONS PRIOR TO ONSET OF CONSTRUCTION.
2. THE CONTRACTOR SHALL COORDINATE WITH OWNER FOR ALL EXISTING EQUIPMENT AND
FURNITURE ITEMS THAT ARE TO BE SALVAGED OR REINSTALLED PRIOR TO THE
COMMENCEMENT OF DEMOLITION.
3. THE OWNER SHALL HAVE THE FIRST RIGHT TO ALL MATERIALS AND EQUIPMENT THAT ARE
REMOVED BY THE CONTRACTOR. THE CONTRACTOR SHALL VERIFY WHEN REMOVAL OF ITEMS
ARE TO BE RETAINED BY THE OWNER AT THE PRE CONSTRUCTION MEETING.
4. PATCH AND REPAIR SURFACES AND FINISHES AFFECTED BY THE DEMOLITION OR THE REMOVAL
OF CONSTRUCTION AS NECESSARY TO MAINTAIN THE FINISH QUALITY OF NEW SPACE.
5. FILL ALL DUCT AND PIPE PENETRATIONS IN DEMO AREA WITH 2 - HOUR RATED ASSEMBLY.
6. CONTRACTOR TO DEMOLISH BACK TO AND CAP ALL TAPS OFF OF MAIN BRANCHES PER
KEYNOTES ABOVE.
7. CONTRACTOR SHALL PROTECT REMAINING DUCTWORK AND PIPING FROM DAMAGE
THROUGHOUT CONSTRUCTION.
8. DESIGN BUILD TEAM AND A/E OF RECORD MUST FOLLOW ALL CURRENT NATIONAL TIL
STANDARDS, THROUGHOUT DESIGN AND CONSTRUCTION.
GENERAL DEMOLITION FLOOR PLAN NOTES
K
J
I
H
G2
G
F
E
D
C1
21 3 4 5 6 7 8 9 9A 10 11 11a 12
D12
VAV-7-1
VAV-7-2
VAV-7-4
VAV-7-5
VAV-7-6
VAV-7-7
VAV-7-3
VAV42-1
FCU-2
VAV-7-15
VAV-7-10
VAV-7-9
VAV-7-11
VAV-7-8
VAV-7-13
VAV-7-14
VAV-7-12
FCU-1
VAV34-1
VAV-X VAV-X
VAV-X
VAV-X
VAV-X
VAV-X
VAV34-2
VAV-X
6" CHR
3" HHR
3" MPS 2" MPC 3" LPS
6" CHS
1 1/4" CHR 1 1/4" CHS
VAV-06
VAV-X
2" HHS
2" HHS
2 1/2" HHR
2 1/2" HHR
2" HHS
VAV-X
2 1/2" HHR
1 1/2" HHR
3/4" HHR1 1/2" HHS
1 1/2" HHS
1 1/2" HHS
1 1/2" HHR
1 1/4" HHR
1 1/4" 1 1/4"
VAV-X
3" HHS
D6
D6
PIPING DOWN TO
FLOOR BELOW
D6
PIPING UP TO
FLOOR ABOVE PIPING DOWN TO
FLOOR BELOW
NOT IN SCOPE
1 1/4" HHS
1 1/4" CHS
1 1/4" CHR
VAV-X
VAV-X
VAV-X
VAV-X
VAV-X
D6 D6
D6
D19
1"
1"
D21D21
DEMOLITION KEYNOTES
D6 CONTRACTOR TO DEMOLISH 3/4" HHS/HHR PIPING FROM AIR TERMINAL UNIT BACK TO MAIN
BRANCH AND CAP.
D12 CONTRACTOR TO DEMOLISH CORRODED PIPING IN LOCATION SHOWN.
D19 CONTRACTOR TO FIELD VERIFY AND DEMOLISH 3/4" HHS/HHR PIPING FROM AIR TERMINAL
UNIT BACK TO MAIN BRANCH AND CAP.
D21 CONTRACTOR TO DEMOLISH EXISTING CONDENSATE DRAIN PIPING AS SHOWN.
N
1/8" = 1'-0"
MECHANICAL PIPING DEMOLITION PLAN - SEVENTH FLOOR1
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing #
VA Office Of Construction & Facilities Management Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
OK ARCH REG. NO. CA02295, EXP. 06/30/2023
OK ENGR REG. NO. CA7127, EXP. 06/30/2023
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
FULLY SPRINKLERED
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
STRUCTURAL ENGINEER
H2B, INC.
1225 N. LOOP WEST, SUITE 800
HOUSTON, TX 77008
(713) 864-2900
MECH / ELEC / PLUMB / TECH ENGINEER
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION, INC.
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
HEALTHCARE PLANNER
OCULUS INC.
1 S. MEMORIAL DR., SUITE 1500
ST. LOUIS, MO 63102
(314) 367-6100
SPUR PROJECT NUMBER: 1791.08
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(913) 369-7200
SEE FRONT COVER SHEET
FOR APPROVAL SIGNATURE
VERTICAL TRANSPORTATION
ENVIRONMENTAL HYGIENIST
TEC-AN, INC.
2517 S. PURDUE AVE.
OKLAHOMA CITY, OK 73128
(405) 681-7076
LERCH BATES
2001 BRYAN ST., SUITE 1930
DALLAS, TX 75201
(972) 294-5221
/2
/2
:2 :3
P
M
MDP100
MECHANICAL PIPING DEMOLTION PLAN -
SEVENTH FLOOR
JLF
55 OF 92JRM
100% RFP DOCUMENTS
CONSTRUCT SURGICAL INTENSIVE
CARE UNIT & RENOVATE
OPERATING ROOMS
08/02/2021
635-436
OKLAHOMA CITY VA HEALTHCARE SYSTEM
921 NE 13TH ST, OKLAHOMA CITY, OK 73104
No. REVISION DESCRIPTION DATE
File details come from the government source that posted it. Updated .