FD
FD
1 2 3 4 5 6 7 8 9 10 11 11a
E
F
G
H
I
J
K
9A
G2
STAIR 10
STAIR 10
STAIR 8
STAIR 8
P -T
U B
E
1'-6"
1' -6
SICU PATIENT
ISOLATION ROOM
(ACC.)
811B
SICU PATIENT
ISOLATION ROOM
(ACC.)
811B
ICU TOILET
811C
ICU TOILET
811C
ANTE ROOM
811A
ANTE ROOM
811A
ICU TOILET
810B
ICU TOILET
810B
SICU PATIENT
ROOM
810A
SICU PATIENT
ROOM
810A
SICU PATIENT
ROOM
809A
SICU PATIENT
ROOM
809A
SICU PATIENT
ROOM
808A
SICU PATIENT
ROOM
808A
SICU PATIENT
ROOM
807A
SICU PATIENT
ROOM
807A
ICU TOILET
807B
ICU TOILET
807B
SICU PATIENT
ROOM
806A
SICU PATIENT
ROOM
806A
ICU TOILET
806B
ICU TOILET
806B
ICU TOILET
805B
ICU TOILET
805B
SICU PATIENT
ROOM
805A
SICU PATIENT
ROOM
805A
SICU PATIENT
ROOM
804A
SICU PATIENT
ROOM
804A
SICU PATIENT
ROOM (ACC.)
803A
SICU PATIENT
ROOM (ACC.)
803A
ICU TOILET
803B
ICU TOILET
803B
ICU TOILET
802C
ICU TOILET
802C
SICU PATIENT
ISOLATION ROOM
(ACC.)
802B
SICU PATIENT
ISOLATION ROOM
(ACC.)
802B
ANTE ROOM
802A
ANTE ROOM
802A
ICU TOILET
801B
ICU TOILET
801B
SICU PATIENT
ROOM (ACC.)
801A
SICU PATIENT
ROOM (ACC.)
801A
TOILET
TOILET
TOILET
TOILET
SICU WAITING
SICU WAITING
SICU PATIENT
825A
SICU PATIENT
825A
SICU PATIENT
ISOLATION ROOM
(ACC.)
824B
SICU PATIENT
ISOLATION ROOM
(ACC.)
824B
ANTE ROOM
824A
ANTE ROOM
824A
ICU TOILET
824C
ICU TOILET
824C
ICU TOILET
825B
ICU TOILET
825B
ANTE ROOM
823A
ANTE ROOM
823A
ICU TOILET
823C
ICU TOILET
823C
SICU PATIENT
ISOLATION ROOM
(ACC.)
823B
SICU PATIENT
ISOLATION ROOM
(ACC.)
823B
SICU PATIENT
ROOM
822A
SICU PATIENT
ROOM
822A
ICU TOILET
822B
ICU TOILET
822B
ICU TOILET
821B
ICU TOILET
821B
SICU PATIENT
ROOM
821A
SICU PATIENT
ROOM
821A
SICU PATIENT
ROOM
820A
SICU PATIENT
ROOM
820A
ICU TOILET
820B
ICU TOILET
820B
ON-CALL
ON-CALL
ON-CALL
TOILET/SHOWER
ON-CALL
TOILET/SHOWER
STAFF TOILET
STAFF TOILET
STAFF BREAK
STAFF BREAK
SHARED OFFICE
SHARED OFFICE
SINGLE OFFICE
SINGLE OFFICE
TEAM WORK
TEAM WORK
813 MED GAS
MED GAS
HAC
HAC
EQUIP. STORAGE
EQUIP. STORAGE
NOURISH.
NOURISH.
COMM
COMM
ELEC
ELEC
CLEAN UTILITY
CLEAN UTILITY
SOILED UTILITY
SOILED UTILITY
ALCOVE
ALC-8-5
ALCOVE
ALC-8-5
MEDS
MEDS
CLEAN SUPPLY /
LINEN
CLEAN SUPPLY /
LINEN
ALCOVE
ALC-8-1
ALCOVE
ALC-8-1
NURSE STATION
NURSE STATION
ALCOVE
ALC-8-3
ALCOVE
ALC-8-3
ALCOVE
ALC-8-4
ALCOVE
ALC-8-4
NURSE STATION/
TEAM COLLAB.
NURSE STATION/
TEAM COLLAB.
ALCOVE, ICE
ALC-8-2
ALCOVE, ICE
ALC-8-2
ICU TOILET
809B
ICU TOILET
809B
ICU TOILET
804B
ICU TOILET
804B
ICU TOILET
808B
ICU TOILET
808B
COMM
COMM
ELEVATOR LOBBY
COR-8-1
ELEVATOR LOBBY
COR-8-1
CORRIDOR
COR-8-2
CORRIDOR
COR-8-2
COMM
COMM
ELEVATOR
P-9
ELEVATOR
P-9
ELEVATOR
P-10
ELEVATOR
P-10
ELEVATOR
P-8
ELEVATOR
P-8
ELEVATOR
P-7
ELEVATOR
P-7
ELEVATOR LOBBY
COR-8-7
ELEVATOR LOBBY
COR-8-7
ELEVATOR
P-12
ELEVATOR
P-12
CORRIDOR
COR-8-4
CORRIDOR
COR-8-4
CORRIDOR
COR-8-6
CORRIDOR
COR-8-6
CORRIDOR
COR-8-5
CORRIDOR
COR-8-5
CORRIDOR
COR-8-9
CORRIDOR
COR-8-9
CORRIDOR
COR-8-10
CORRIDOR
COR-8-10
CORRIDOR
COR-8-8
CORRIDOR
COR-8-8
CORRIDOR
COR-8-3
CORRIDOR
COR-8-3
ALCOVE
ALC-8-6
ALCOVE
ALC-8-6
ALCOVE
ALC-8-7
ALCOVE
ALC-8-7
ALCOVE
ALC-8-8
ALCOVE
ALC-8-8
1'-6"
1'-6" TYP 1'-6"
1'-6"
1'-6"TYP.
1' -6
1'
-6
1'-6"1'-6"
1' -6
1' -6
1'-6" 1'-6"
1' -6
1' -6
T
Y P
1' -6
1'-6"
1' -6
R 3 '-0
R 3'-0"
1'-0" TYP. 1'-0"TYP. 1'-0" TYP. 1'-0" TYP.
1'-0" TYP. 1'-0" TYP.
1' -0
T
Y P
1' -0
T
Y P
1' -0
T
Y P
1' -0
T
Y P
1' -0
T
Y P
1' -0
T
Y P
1'-0" TYP. 1'-0" TYP. 1'-0" TYP. 1'-0" TYP. 1'-0" TYP. 1'-0" TYP. 1'-0" TYP. 1'-0" TYP. 1'-0" TYP. 1'-0" TYP.1' -0
T
Y P
1' -0
T
Y P
1' -0
T
Y P
1' -0
T
Y P
1' -0
T
Y P
1' -0
T
Y P
1' -0
T
Y P
1' -0
T
Y P
1' -0
T
Y P
EXPANSION JOINT, REF.
SPECIFICATIONS
20'-9" 20'-9" 20'-9" 20'-9" 20'-9" 20'-9" 20'-9" 20'-9" 8'-6" 12'-3" 2'-6" 10'-9"
200'-0"
'-0
'-9
'-9
'-9
'-1
8' -8
'-9
'-9
'-0
1. ALL WALLS TO BE PAINTED P2, UNO.
2. ALL UPPER CABINETS TO HAVE 30° SLOPED TOP WHERE NOT RECEIVED BY CEILING ABOVE.
3. ALL RUBBER BASE TO BE RB1 UNO.
4. ALL STAIR LANDINGS TO RECEIVE RUBBER FLOOR TILE (RF1), UNO. ALL STAIR TREADS TO BE
(RF2), UNO.
5. ALL OUTSIDE CORNERS TO RECIEVE CORNER GUARDS. ALL GUARDS AT 90 DEGREE CORNERS
TO BE CG1 UNO, ALL GUARDS AT 135 DEGREE CORNERS TO BE CG2 UNO.
6. ELEVATOR WALL, CEILING AND BASE FINISHES TO BE CHOSEN FROM MANUFACTURERS LINE OF
STANDARD FINISHES.
7. REFEREENCE ROLLER SHADE (R1 & R2) FOR WINDOW TREATMENT BASIS OF DESIGN.
8. ALL OUTSIDE EDGES OF PORCELAIN WALL TILE TO RECEIVE METAL TRANSITION STRIP (TR1).
9. FLOOR TRANSITIONS BETWEEN PORCELAIN TILE AND OTHER FLOORING TYPES TO RECEICVE
METAL TRANSITION STRIP (TR2). CONTRACTOR TO VERIFY SIZE OF TRANSITION STRIP
REQUIRED TO PROVIDE ADA COMPLIANT TRANSITION IN FLOORING HEIGHT.
10. UNEVEN FLOOR TRANSITIONS BETWEEN RESILIENT FLOORING TYPES TO RECEIVE BUBBER
TRANSITION STRIP (TR3). CONTRACTOR TO VERIFY SIZE OF TRANSITION STRIP REQUIRED TO
PROVIDE ADA COMPLIANT TRANSITION IN FLOORING HEIGHT.
11. ASBESTOS OR ASBESTOS CONTAINING PRODUCTS ARE NOT ALLOWED IN ANY ASPECT OF THIS
CONSTRUCTION.
12. COORDINATE ALL DISCIPLINES AND ALL ASPECTS OF WORK. CONFLICTS AND DISCREPENCIES
SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT IMMEDIATELY.
13. ALL CONCRETE SURFACES WHICH RECEIVE A SPECIAL FINISH, FLOOR COVERING, COATINGS, HARDENERS, ETC. SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE SPECIFIC FINISH
MANUFACTURER'S SPECIFICATIONS AND INSTRUCTIONS. PRIOR TO APPLICATION OF A SPECIAL FINISH, A WRITTEN ACCEPTANCE OF THE SURFACE SHALL BE SUBMITTED TO THE ARCHITECT BY
THE GENERAL CONTRACTOR.
14. REMOVE ALL FLOOR FINISHES AND ADHESIVES AND STRIP FLOOR DOWN TO EXISTING
CONCRETE. LEVEL AND PREP FLOOR FOR INSTALLATION OF NEW FLOOR FINISHES AS NOTED.
15. DESIGN BUILD TEAM AND A/E OF RECORD MUST FOLLOW ALL CURRENT VA NATIONAL TIL
STANDARDS, INCLUDING VA NATIONAL CAD STANDARDS, THROUGHOUT DESIGN AND
CONSTRUCTION
GENERAL FINISH NOTES
7TH FLOOR ROOF
N
8TH FLOOR SICU
8TH FLOOR KEY PLAN
WSF1 (WELDED SHEET FLOORING)
WSF2 (WELDED SHEET FLOORING)
CPT1 (CARPET TILE)
LVT2 (LUXURY VINYL TILE)
RF1 (RUBBER FLOOR TILE)
SD1 (STATIC DISSAPATIVE TILE)
PT1 (PORCELAIN TILE MOSAIC)
FLOOR FINISH PATTERN LEGEND
RES1 (RESINOUS FLOORING)
RES2 (RESINOUS FLOORING)
LVT1 (LUXURY VINYL TILE)
INSTALLATION AT 45 DEGREE ANGLE
LVT1 (LUXURY VINYL TILE)
INSTALLATION AT 90 DEGREE ANGLE
RF2 (RUBBER STAIR TREAD)
HANDRAIL / WALL GUARD
FINISH: HR1 / WG1
WALL ACCESSORY LEGEND
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing #
VA Office Of Construction & Facilities Management Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
OK ARCH REG. NO. CA02295, EXP. 06/30/2023
OK ENGR REG. NO. CA7127, EXP. 06/30/2023
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
FULLY SPRINKLERED
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
STRUCTURAL ENGINEER
H2B, INC.
1225 N. LOOP WEST, SUITE 800
HOUSTON, TX 77008
(713) 864-2900
MECH / ELEC / PLUMB / TECH ENGINEER
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION, INC.
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
HEALTHCARE PLANNER
OCULUS INC.
1 S. MEMORIAL DR., SUITE 1500
ST. LOUIS, MO 63102
(314) 367-6100
SPUR PROJECT NUMBER: 1791.08
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(913) 369-7200
SEE FRONT COVER SHEET
FOR APPROVAL SIGNATURE
VERTICAL TRANSPORTATION
ENVIRONMENTAL HYGIENIST
TEC-AN, INC.
2517 S. PURDUE AVE.
OKLAHOMA CITY, OK 73128
(405) 681-7076
LERCH BATES
2001 BRYAN ST., SUITE 1930
DALLAS, TX 75201
(972) 294-5221
/2
/2
:1 :3
P
M
AF702
FINISH PLAN - EIGHTH FLOOR
SP
17 OF 92JNK
100% RFP DOCUMENTS
CONSTRUCT SURGICAL INTENSIVE
CARE UNIT & RENOVATE
OPERATING ROOMS
08/02/2021
635-436
OKLAHOMA CITY VA HEALTHCARE SYSTEM
921 NE 13TH ST, OKLAHOMA CITY, OK 73104
N
1/8" = 1'-0"
EIGHTH FLOOR FINISH FLOOR PLAN
No. REVISION DESCRIPTION DATE
File details come from the government source that posted it. Updated .