1 2 3 4 5 6 7 8 9 9A 10 12
C
C1
D
E
F
G
G2
H
I
J
K
1/2" DCW
3/4" DCW
1 1/4" DCW
1 1/4" DHW
3/4" DHWR
2 1/2" DCW
2" DHW
1" DHWR
1" DCW 1" DCW
1 1/4"
1 1/4"
2" DCW
1" DHW
3/4" DHWR
3/4" DHWR
1" DHW
3" DCW
1" DHWR
2 1/2" DHW
3" DCW
ELEC CLOSET
7F-133
HAC
7F-131
X-RAY STORAGE
7F-130
STORAGE
7F-129
HOUSEKEEPING
7F-127
BLOOD GAS
7F-126
SUB-STER
7F-113f
CARDIAC OR 4
7F-128
SCRUB
7F-132 SUB-STER
7F-113c
GENERAL OR 6
7F-140
CORRIDOR
C7-11F
CORRIDOR
C7-15F
STORAGE CLOSET
7F-154h
CORRIDOR
C7-12F
CORRIDOR
C7-16F
SUB-STER
7F-113a
HAC
7F-114
ELEC CLOSET
7F-116a
GENERAL OR 1
7F-118
GENERAL OR 2
7F-122
SUB-STER
7F-113b
STORAGE
7F-123
STORAGE
7F-121
SCRUB
7F-120
ELEC CLOSET
7F-116
CORRIDOR
7F-152
CLEAN
7F-108a
SOIL
7F-108d
TOILET
7F-108c
TOILET
7F-108b
ISOLATION
7F-108e
CONSULT
7F-103 OR COUNTER
7F-155
SURGICAL WAITING
7F-102
CORRIDOR
C7 17F
ELEVATOR LOBBY
C7-1F
RECOVERY
7F-108 CORRIDOR
C7 18F
ELEVATOR
P-8
ELEVATOR
P-7
ELEVATOR
P-12
CORRIDOR
C7 6F
IT CLOSET
7F-112
PUMP ROOM
7F-109a
EQUIP STORAGE
7F-113h
ALCOVE
7F-107
CARDIAC OR 3
7F-109
SUB-STER
7F-113d
SCRUB
7F-107a
CORRIDOR
C7-3F
NEUROSURGERY OR 9
7F-124
SCRUB
7F-107c
ANESTH GAS
STORAGE
7F-125
ANGIO EQUIPMENT
7F-111
CORRIDOR
C7-5F
CONTROL ROOM
7F-110a
ANGIO EQUIPMENT
7F-111
HAC
7F-107b
TOILET
7F-106 TOILET
7F-105
GAS STORAGE
7F-107h
CORRIDOR
C7 4F
STORAGE
7F-107i
STAIR 10
NA
D4
D9
D9
D9
D5
D5
D12
1 1/4" DCW
3/4" DHW
1/2" DHW
1/2" DCW
1" DHW
1/ 2"
D H
W
1/ 2"
D C
W 1/
2" D
H W
3/4" DHWR
1" DHW
3" DCW
1/ 2"
D H
W 1/
2" D
C W
2 1/2" DCW
1 1/2" DHW
3/4" DHWR
NOT IN SCOPE
N
RECOVERY &
SURGICAL WAITING
7TH FLOOR KEY PLAN
PHASE-TWO
POST- OP
OPERATING ROOMS
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing #
VA Office Of Construction & Facilities Management Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
OK ARCH REG. NO. CA02295, EXP. 06/30/2023
OK ENGR REG. NO. CA7127, EXP. 06/30/2023
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
FULLY SPRINKLERED
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
STRUCTURAL ENGINEER
H2B, INC.
1225 N. LOOP WEST, SUITE 800
HOUSTON, TX 77008
(713) 864-2900
MECH / ELEC / PLUMB / TECH ENGINEER
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION, INC.
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
HEALTHCARE PLANNER
OCULUS INC.
1 S. MEMORIAL DR., SUITE 1500
ST. LOUIS, MO 63102
(314) 367-6100
SPUR PROJECT NUMBER: 1791.08
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(913) 369-7200
SEE FRONT COVER SHEET
FOR APPROVAL SIGNATURE
VERTICAL TRANSPORTATION
ENVIRONMENTAL HYGIENIST
TEC-AN, INC.
2517 S. PURDUE AVE.
OKLAHOMA CITY, OK 73128
(405) 681-7076
LERCH BATES
2001 BRYAN ST., SUITE 1930
DALLAS, TX 75201
(972) 294-5221
/2
/2
:5
:4
A
M
PPD101
SEVENTH FLOOR - PLUMBING
DOMESTIC WATER DEMOLITION PLAN
GH
40 OF 92JRM
100% RFP DOCUMENTS
CONSTRUCT SURGICAL INTENSIVE
CARE UNIT & RENOVATE
OPERATING ROOMS
08/02/2021
635-436
OKLAHOMA CITY VA HEALTHCARE SYSTEM
921 NE 13TH ST, OKLAHOMA CITY, OK 73104
N
1/8" = 1'-0"
SEVENTH FLOOR - PLUMBING DOMESTIC WATER DEMOLITION PLAN
DEMOLITION KEYNOTES
D4 EXISTING WATER RISERS TO REMAIN IN SERVICE. CONTRACTOR TO MAKE FINAL COORDINATION WITH OWNER FOR
DOWN TIME PERIODS WHEN DEMOLITION STARTS.
D5 CONTRACTOR TO REMOVE PIPING TO THIS POINT ONLY. CAP EXISTING WATER BRANCHES AND INSTALL NEW FULL PORT BALL VALVES. MEANS AND METHODS OF REMOVAL OF EXISTING WATER PIPE SHALL PROTECT THE REMAINING PIPING
FOR FUTURE USE.
D9 REMOVE PLUMBING FIXTURES AND ALL ASSOCIATED PIPING BACK TO MAIN.
D12 CAP EXISTING WATER BRANCHES AND INSTALL NEW FULL PORT BALL VALVES.
No. REVISION DESCRIPTION DATE
PLUMBING GENERAL NOTE:
1. DESIGN BUILD TEAM AND A/E OF RECORD MUST FOLLOW ALL CURRENT VA NATIONAL TIL
STANDARDS, INCLUDING VA NATIONAL CAD STANDARDS, THROUGHOUT DESIGN AND
CONSTRUCTION.