63_MP101 - MECHANICAL HVAC PIPING PLAN -EIGHTH FLOOR.pdf

PDF 290 KB Posted

Attached to
Y1AZ--Design Build, Construct SICU and Renovate Operating Rooms
Solicitation number
36C10F22R0036
Issued by

View the file

Other files

File Type Posted
Award Notice 36C10F24C0002.pdf PDF
36C10F22R0036 0004.pdf PDF
36C10F22R0036 0003.pdf PDF
36C10F22R0036 0002.pdf PDF
36C10F22R0036 0001.pdf PDF
36C10F22R0036.pdf PDF
45_PL102 - EIGHTH FLOOR -PLUMBING WASTE AND VENT PLAN.pdf PDF
40_PPD101 - SEVENTH FLOOR -PLUMBING DOMESTIC WATER DEMOLITION PLAN.pdf PDF
61_MHP100 - MECHANICAL DUCT and PIPING PLAN -ROOF LEVEL.pdf PDF
17_AF702 - FINISH PLAN -EIGHTH FLOOR.pdf PDF
07_ELEVATOR NARRATIVE.pdf PDF
52_MDH100 - MECHANICAL DUCT DEMOLITION PLAN -SEVENTH FLOOR.pdf PDF
100 percent RFP PLUMBING CALCS.pdf PDF
48_PJ101 - SEVENTH FLOOR -PLUMBING MEDICAL GAS PLAN.pdf PDF
55_MDP100 - MECHANICAL PIPING DEMOLTION PLAN -SEVENTH FLOOR.pdf PDF
44_PL101 - SEVENTH FLOOR -PLUMBING WASTE AND VENT PLAN.pdf PDF
24_QH105 - EQUIPMENT PLAN -EIGHTH FLOOR -AREA 1.pdf PDF
04_FIRE PROTECTION.pdf PDF
OR-SICU 100 percent Digital Material Board.pdf PDF
28_QH109 - INTERIOR EQUIPMENT ELEVATIONS.pdf PDF
27_QH108 - INTERIOR EQUIPMENT ELEVATIONS.pdf PDF
84_EY301 - SEVENTH FLOOR ELECTRICAL LOW VOLTAGE PLAN.pdf PDF
4_GI102 - LIFE SAFETY PLAN -EIGHTH FLOOR.pdf PDF
86_EP401 - ELECTRICAL LIGHTNING PROTECTION PLAN.pdf PDF
21_QH102 - EQUIPMENT PLAN -SEVENTH FLOOR -AREA 2.pdf PDF
13_AE115 - DIMENSION PLAN -EIGHTH FLOOR.pdf PDF
90_EP504 - ELECTRICAL DETAILS.pdf PDF
88_EP502 - SCHEDULES AND DETAILS.pdf PDF
26_QH107 - EQUIPMENT PLAN -EIGHTH FLOOR -AREA 3 and INTERIOR EQUIPMENT ELEVATIONS.pdf PDF
39_PLD102 - EIGHTH FLOOR -PLUMBING WASTE AND VENT DEMOLITION PLAN.pdf PDF
9_AE111 - REFERENCE PLAN -SEVENTH FLOOR.pdf PDF
12_AE114 - DIMENSION PLAN -SEVENTH FLOOR.pdf PDF
14_AE211 - REFLECTED CEILING PLAN -SEVENTH FLOOR.pdf PDF
01_Mold Report.pdf PDF
Floor 7 Inventory OKC VAMC.pdf PDF
71_M-704 - MECHANICAL CONTROLS.pdf PDF
30_FA001 - FIRE ALARM_MASS NOTIFICATION GENERAL NOTES.pdf PDF
56_MDP101 - MECHANICAL PIPING DEMOLTION PLAN -EIGHTH FLOOR.pdf PDF
02_ARCHITECTURAL.pdf PDF
1_GI000 - COVER SHEET.pdf PDF
50_P-600 - PLUMBING SCHEDULES.pdf PDF
82_EL201 - SEVENTH FLOOR ELECTRICAL LIGHTING PLAN.pdf PDF
66_M-502 - MECHANICAL DETAILS.pdf PDF
60_MH103 - MECHANICAL ZONING and CONTROLS PLAN -EIGHTH FLOOR.pdf PDF
06_ELECTRICAL NARRATIVE.pdf PDF
02_STRUCTURAL NARRATIVE.pdf PDF
20_QH101 - EQUIPMENT PLAN -SEVENTH FLOOR -AREA 1.pdf PDF
38_PLD101 - SEVENTH FLOOR -PLUMBING WASTE AND VENT DEMOLITION PLAN.pdf PDF
Floor 8 Inventory OKC VAMC.pdf PDF
03_EQUIPMENT.pdf PDF
Show 40 more

Latest 50 of 122 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

7TH FLOOR ROOF

N

8TH FLOOR SICU

8TH FLOOR KEY PLAN

K

J

I

H

G2

G

F

E

21 3 4 5 6 7 8 9 9A 10 11 11a 12

VAV-8-2

VAV-8-1

VAV-8-3

SACV-8-1

VAV-8-4 VAV-8-6 VAV-8-8

VAV-8-7

VAV-8-5 VAV-8-9

VAV-8-10 VAV-8-11 VAV-8-13 VAV-8-14 VAV-8-15

SACV-8-2

VAV-8-16

VAV-8-12

VAV-8-20

VAV-8-19

VAV-8-17

VAV-8-18EACV-8-3

SACV-8-3

EACV-8-4

SACV-8-4VAV-8-21VAV-8-22VAV-8-23 1

1" HHS2" HHR

1 1/4" HHS

2" HHR

RHC-8-41

3/4" HHS

RHC-8-32

2" HHS

2" HHR

2" HHS

3/4" HHR

2" HHS

RHC-8-2 2

1" HHR 2" HHS

1 1/2" HHS1 1/4" HHR

1 1/2" HHR1 1/4" HHS

RHC-8-12

3/4" HHS

3/4" HHR

SICU PATIENT ISOLATION

ROOM (ACC.)

811B

ICU TOILET

810B

SICU PATIENT ROOM

810A

SICU PATIENT ROOM

809A

ICU TOILET

809B

ICU TOILET

808B

SICU PATIENT ROOM

808A

CORRIDOR

COR-8-9

ANTE ROOM

811A

TEAM WORK

CORRIDOR

COR-8-10

MED GAS

HAC

EQUIP. STORAGE

SINGLE OFFICE

NURSE STATION/ TEAM

COLLAB.

NOURISH.

MEDS

CLEAN UTILITY

SOILED UTILITY

CORRIDOR

COR-8-6

ALCOVE

ALC-8-4

ALCOVE

ALC-8-3

NURSE STATION/ TEAM

COLLAB.-2

839-2

NURSE STATION/ TEAM

COLLAB.-1

839-1

COMM

CLEAN SUPPLY / LINEN

ALCOVE, ICE

ALC-8-2

ALCOVE

ALC-8-1

ELEC

NURSE STATION

CORRIDOR

COR-8-5

CORRIDOR

COR-8-4

SICU PATIENT ROOM

(ACC.)

801A

TOILET

TOILET

SICU WAITING

ICU TOILET

801B

ANTE ROOM

802A

SICU PATIENT ISOLATION

ROOM (ACC.)

802B

ICU TOILET

802C

ICU TOILET

803B

SICU PATIENT ROOM

(ACC.)

803A

ICU TOILET

804B

SICU PATIENT ROOM

804A

SICU PATIENT ROOM

805A

ICU TOILET

805B

SICU PATIENT ROOM

806A

ICU TOILET

806B

ICU TOILET

807B

SICU PATIENT ROOM

807A

CORRIDOR

COR-8-2

STAIR 8

NA

COMM

ELEVATOR-2

P-9-2

ELEVATOR-2

P-10-2

ELEVATOR LOBBY

COR-8-1

ELEVATOR-1

P-8-1

COMM

ELEVATOR-1

P-7-1

ICU TOILET

825B

SICU PATIENT

825A

SICU PATIENT ISOLATION

ROOM (ACC.)

824B

ICU TOILET

824C

ANTE ROOM

824A

CORRIDOR

COR-8-3

ELEVATOR-1

P-12-1

ELEVATOR LOBBY

COR-8-7

ANTE ROOM

823A

ICU TOILET

823C

SICU PATIENT ISOLATION

ROOM (ACC.)

823B

CORRIDOR

COR-8-8

SICU PATIENT ROOM

822A

ICU TOILET

822B

ICU TOILET

821B

SICU PATIENT ROOM

821A

SICU PATIENT ROOM

820A

ICU TOILET

820B

CORRIDOR

COR-8-10

STAIR 10

NA

ON-CALL

ON-CALL

TOILET/SHOWER

STAFF TOILET

STAFF BREAK

SHARED OFFICE

VAV-8-24 1

VAV-8-25 1

3/4" HWS UP

2" MPS DOWN

1" MPC FROM BELOW

3/4" HWR FROM ABOVE

2" MPS FROM BELOW

3/4" HWR DN

3/4" HWS UP

1" CHS UP

1" CHR DN

CNV-108

CNV-110

3/4" HHR

3/4" HHS

3/4" HHR

1. EXISTING CONDITIONS ARE BASED ON INFORMATION OBTAINED FROM EXISTING DRAWINGS AND

FIELD SURVEY, AND SHALL NOT BE CONSTRUED "AS BUILT." THE CONTRACTOR SHALL FIELD

VERIFY EXISTING CONDITIONS PRIOR TO ONSET OF CONSTRUCTION.

2. THE CONTRACTOR SHALL COORDINATE WITH OWNER FOR ALL EXISTING EQUIPMENT THAT IS TO

BE SALVAGED OR REINSTALLED PRIOR TO THE ONSET OF CONSTRUCTION.

3. THE CONTRACTOR SHALL THROUROUGHLY CLEAN THE INTERIOR OF ALL EXISTING PIPING

BRANCHES AND REPAIR ANY DAMAGE PRIOR TO ONSET OF CONSTRUCTION.

4. THE CONTRACTOR SHALL ENSURE ALL PIPING RUNS THAT PENETRATE THE ROOF ARE

PROPERLY SEALED PER THE SPECIFICATIONS.

5. THE CONTRACTOR SHALL PROVIDE VALVES, FITTINGS, AND ACCESSORIES TO ENSURE A FULLY

FUNCTIONING SYSTEM PER THE DRAWINGS, DETAILS, AND SPECIFICATIONS.

6. DESIGN BUILD TEAM AND A/E OF RECORD MUST FOLLOW ALL CURRENT VA NATIONAL TIL

STANDARDS, INCLUDING VA NATIONAL CAD STANDARDS, THROUGHOUT DESIGN AND

CONSTRUCTION.

GENERAL MECHANICAL PIPING FLOOR PLAN NOTES

KEYNOTES

1 CONTRACTOR TO CONNECT AIR TERMINAL UNIT TO HHS/HHR BRANCH PIPING PER DETAIL 2, M-502.

SIZE OF PIPING TO BE DETERMINED PER FINAL SELECTIONS AND CODE.

2 CONTRACTOR TO CONNECT HOT WATER REHEAT COIL TO HHS/HHR BRANCH PIPING PER DETAIL 2, M-502. SIZE OF PIPING TO BE DETERMINED PER FINAL SELECTIONS AND CODE.

N

1/8" = 1'-0"

MECHANICAL HVAC PIPING PLAN -EIGHTH FLOOR1

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS:

Drawing #

VA Office Of Construction & Facilities Management Approval:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

OK ARCH REG. NO. CA02295, EXP. 06/30/2023

OK ENGR REG. NO. CA7127, EXP. 06/30/2023

The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.

FULLY SPRINKLERED

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

STRUCTURAL ENGINEER

H2B, INC.

1225 N. LOOP WEST, SUITE 800

HOUSTON, TX 77008

(713) 864-2900

MECH / ELEC / PLUMB / TECH ENGINEER

FIRE PROTECTION ENGINEER

POOLE FIRE PROTECTION, INC.

19910 WEST 161ST STREET

OLATHE, KANSAS 66062

(913) 829-8690

HEALTHCARE PLANNER

OCULUS INC.

1 S. MEMORIAL DR., SUITE 1500

ST. LOUIS, MO 63102

(314) 367-6100

SPUR PROJECT NUMBER: 1791.08

SPUR DESIGN

11020 KING STREET, SUITE 350

OVERLAND PARK, KS 66210

(913) 369-7200

SEE FRONT COVER SHEET

FOR APPROVAL SIGNATURE

VERTICAL TRANSPORTATION

ENVIRONMENTAL HYGIENIST

TEC-AN, INC.

2517 S. PURDUE AVE.

OKLAHOMA CITY, OK 73128

(405) 681-7076

LERCH BATES

2001 BRYAN ST., SUITE 1930

DALLAS, TX 75201

(972) 294-5221

/2

/2

:2 :1

P

M

MP101

MECHANICAL HVAC PIPING PLAN -

EIGHTH FLOOR

JLF

63 OF 92JRM

100% RFP DOCUMENTS

CONSTRUCT SURGICAL INTENSIVE

CARE UNIT & RENOVATE

OPERATING ROOMS

08/02/2021

635-436

OKLAHOMA CITY VA HEALTHCARE SYSTEM

921 NE 13TH ST, OKLAHOMA CITY, OK 73104

No. REVISION DESCRIPTION DATE

File details come from the government source that posted it. Updated .