9_AE111 - REFERENCE PLAN -SEVENTH FLOOR.pdf

PDF 615 KB Posted

Attached to
Y1AZ--Design Build, Construct SICU and Renovate Operating Rooms
Solicitation number
36C10F22R0036
Issued by

View the file

Other files

File Type Posted
Award Notice 36C10F24C0002.pdf PDF
36C10F22R0036 0004.pdf PDF
36C10F22R0036 0003.pdf PDF
36C10F22R0036 0002.pdf PDF
36C10F22R0036 0001.pdf PDF
36C10F22R0036.pdf PDF
45_PL102 - EIGHTH FLOOR -PLUMBING WASTE AND VENT PLAN.pdf PDF
40_PPD101 - SEVENTH FLOOR -PLUMBING DOMESTIC WATER DEMOLITION PLAN.pdf PDF
61_MHP100 - MECHANICAL DUCT and PIPING PLAN -ROOF LEVEL.pdf PDF
17_AF702 - FINISH PLAN -EIGHTH FLOOR.pdf PDF
07_ELEVATOR NARRATIVE.pdf PDF
52_MDH100 - MECHANICAL DUCT DEMOLITION PLAN -SEVENTH FLOOR.pdf PDF
100 percent RFP PLUMBING CALCS.pdf PDF
48_PJ101 - SEVENTH FLOOR -PLUMBING MEDICAL GAS PLAN.pdf PDF
55_MDP100 - MECHANICAL PIPING DEMOLTION PLAN -SEVENTH FLOOR.pdf PDF
44_PL101 - SEVENTH FLOOR -PLUMBING WASTE AND VENT PLAN.pdf PDF
24_QH105 - EQUIPMENT PLAN -EIGHTH FLOOR -AREA 1.pdf PDF
04_FIRE PROTECTION.pdf PDF
OR-SICU 100 percent Digital Material Board.pdf PDF
28_QH109 - INTERIOR EQUIPMENT ELEVATIONS.pdf PDF
27_QH108 - INTERIOR EQUIPMENT ELEVATIONS.pdf PDF
84_EY301 - SEVENTH FLOOR ELECTRICAL LOW VOLTAGE PLAN.pdf PDF
4_GI102 - LIFE SAFETY PLAN -EIGHTH FLOOR.pdf PDF
86_EP401 - ELECTRICAL LIGHTNING PROTECTION PLAN.pdf PDF
21_QH102 - EQUIPMENT PLAN -SEVENTH FLOOR -AREA 2.pdf PDF
13_AE115 - DIMENSION PLAN -EIGHTH FLOOR.pdf PDF
90_EP504 - ELECTRICAL DETAILS.pdf PDF
88_EP502 - SCHEDULES AND DETAILS.pdf PDF
26_QH107 - EQUIPMENT PLAN -EIGHTH FLOOR -AREA 3 and INTERIOR EQUIPMENT ELEVATIONS.pdf PDF
39_PLD102 - EIGHTH FLOOR -PLUMBING WASTE AND VENT DEMOLITION PLAN.pdf PDF
12_AE114 - DIMENSION PLAN -SEVENTH FLOOR.pdf PDF
14_AE211 - REFLECTED CEILING PLAN -SEVENTH FLOOR.pdf PDF
01_Mold Report.pdf PDF
Floor 7 Inventory OKC VAMC.pdf PDF
71_M-704 - MECHANICAL CONTROLS.pdf PDF
30_FA001 - FIRE ALARM_MASS NOTIFICATION GENERAL NOTES.pdf PDF
56_MDP101 - MECHANICAL PIPING DEMOLTION PLAN -EIGHTH FLOOR.pdf PDF
02_ARCHITECTURAL.pdf PDF
1_GI000 - COVER SHEET.pdf PDF
50_P-600 - PLUMBING SCHEDULES.pdf PDF
82_EL201 - SEVENTH FLOOR ELECTRICAL LIGHTING PLAN.pdf PDF
66_M-502 - MECHANICAL DETAILS.pdf PDF
60_MH103 - MECHANICAL ZONING and CONTROLS PLAN -EIGHTH FLOOR.pdf PDF
06_ELECTRICAL NARRATIVE.pdf PDF
02_STRUCTURAL NARRATIVE.pdf PDF
20_QH101 - EQUIPMENT PLAN -SEVENTH FLOOR -AREA 1.pdf PDF
38_PLD101 - SEVENTH FLOOR -PLUMBING WASTE AND VENT DEMOLITION PLAN.pdf PDF
Floor 8 Inventory OKC VAMC.pdf PDF
63_MP101 - MECHANICAL HVAC PIPING PLAN -EIGHTH FLOOR.pdf PDF
03_EQUIPMENT.pdf PDF
Show 40 more

Latest 50 of 122 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FD

FD

FD

FD

FD

FD

FD

1. ALL DOOR FRAMES TO BE LOCATED 4" FROM OUTSIDE OF FRAME TO FINISH FACE OF ADJACENT

WALL UNLESS NOTED OTHERWISE.

2. ALL WALLS TO BE PARTITION TYPE F1 UNLESS NOTED OTHERWISE.

3. ALL WALLS TO EXTEND TO UNDERSIDE OF STRUCTURE ABOVE, UNLESS NOTED OTHERWISE.

4. ALL WALLS ARE DIMENSIONED TO CENTERLINE OF METAL STUD, UNLESS NOTED OTHERWISE.

5. BLOCK OUT SLAB FOR PENETRATIONS SHALL BE 2" LARGER THAN DUCT SIZE TO ALLOW

TOLERANCE FOR DUCT PASSAGE AND FIRE SAFING. COORDINATE WITH MEP FOR DUCT SIZES.

6. FURR AROUND ALL COLUMN PROTRUSIONS AS NEEDED UNLESS NOTED OTHERWISE.

7. DESIGN-BUILD CONTRACTOR TO DEVELOP PHASING OF DEMOLITION AND NEW CONSTRUCTION.

COORDINATE ALL REQUIRED PHASING WITH VA AND COR. PROVIDE AT LEAST 1 WEEK NOTICE

PRIOR TO ANY REQUIRED DOWN TIME.

8. DESIGN BUILD TEAM AND A/E OF RECORD MUST FOLLOW ALL CURRENT VA NATIONAL TIL

STANDARDS, INCLUDING VA NATIONAL CAD STANDARDS, THROUGHOUT DESIGN AND

CONSTRUCTION

GENERAL FLOOR PLAN NOTES

1 2 3 4 5 6 7 8 9 10 11

11a

C1

D

E

F

G

H

I

J

K

9A

G2

STORAGE

STORAGE

SCRUB

SCRUB

GAS CYLINDERS

GAS CYLINDERS

IMAGE EQUIP

COMPONENT

ROOM

IMAGE EQUIP

COMPONENT

ROOM

CONTROL ROOM

723B

CONTROL ROOM

723B

HAC

HAC

NEURO EQUIP

NEURO EQUIP

NEUROSURGERY

OR 9

728A

NEUROSURGERY

OR 9

728A

HYBRID OR 10

723A

HYBRID OR 10

723A

SCRUB

SCRUB

HYBRID STORAGE

723C

HYBRID STORAGE

723C

CARDIAC OR 3

720A

CARDIAC OR 3

720A

STAIR 10

STAIR 10

STORAGE

STORAGE

GAS STORAGE

GAS STORAGE

TOILET

TOILET

CORRIDOR

COR-7-10

CORRIDOR

COR-7-10

CORRIDOR

COR-7-12

CORRIDOR

COR-7-12

CORRIDOR

COR-7-11

CORRIDOR

COR-7-11

CORRIDOR

COR-7-9

CORRIDOR

COR-7-9

CORRIDOR

COR-7-8

CORRIDOR

COR-7-8

BIOMED

COMMUNICATION

BIOMED

COMMUNICATION

EXISTING CLEAN

CORE

7F-113

EXISTING CLEAN

CORE

7F-113

CORRIDOR

COR-7-6

CORRIDOR

COR-7-6

CORRIDOR

COR-7-3

CORRIDOR

COR-7-3

POST-OP AREA

POST-OP AREA

MEDICATION

MEDICATION

TOILET

TOILET

STORAGE

STORAGE

CLEAN SUPPLY

CLEAN SUPPLY

EQUIPMENT

STORAGE

720C

EQUIPMENT

STORAGE

720C

IT CLOSET

IT CLOSET

ELEVATOR

P-12

ELEVATOR

P-12

EXIST. ELEC

CLOSET

7F-116a

EXIST. ELEC

CLOSET

7F-116a

EXIST. ELEC

CLOSET

7F-116

EXIST. ELEC

CLOSET

7F-116

SOILED UTILITY

SOILED UTILITY

MEDICATION

MEDICATION

STORAGE

STORAGE

RECOVERY

RECOVERY

ISOLATION BAY

ISOLATION BAY

CONSULT

CONSULT

OR COUNTER

702A

OR COUNTER

702A

ELEVATOR LOBBY

COR-7-1

ELEVATOR LOBBY

COR-7-1

ELEVATOR

P-8

ELEVATOR

P-8

ELEVATOR

P-7

ELEVATOR

P-7

ELEVATOR

P-9

ELEVATOR

P-9

ELEVATOR

P-10

ELEVATOR

P-10 STAIR 8

STAIR 8

TOILET

701C

TOILET

701C

TOILET

701B

TOILET

701B

CORRIDOR

COR-7-2

CORRIDOR

COR-7-2

SURGICAL

WAITING

701A

SURGICAL

WAITING

701A

EXIST. TELECOM

7F100

EXIST. TELECOM

7F100

ALCOVE

ALC-7-1

ALCOVE

ALC-7-1

PUMP ROOM &

ABG

720B

PUMP ROOM &

ABG

720B

SOILED UTILITY

SOILED UTILITY

CLEAN SUPPLY

CLEAN SUPPLY

STORAGE

STORAGE

TOILET

TOILET

ANTE ROOM

ANTE ROOM

CORRIDOR

COR-7-4

CORRIDOR

COR-7-4

ALIGN

ALIGN

ALIGN

ALIGN ALIGN

ALIGN

ALIGN

ALIGN

ALIGN ALIGN

CORRIDOR

COR-7-5

CORRIDOR

COR-7-5

PATIENT BAY

704B

PATIENT BAY

704B

PATIENT BAY

704A

PATIENT BAY

704A

PATIENT BAY

704C

PATIENT BAY

704C

PATIENT BAY

704D

PATIENT BAY

704D

PATIENT BAY

704E

PATIENT BAY

704E

PATIENT BAY

704F

PATIENT BAY

704F

PATIENT BAY

704G

PATIENT BAY

704G

PATIENT BAY

704H

PATIENT BAY

704H

PATIENT BAY

704J

PATIENT BAY

704J

RECOVERY BAY

711L

RECOVERY BAY

711L

RECOVERY BAY

711K

RECOVERY BAY

711K

RECOVERY BAY

711J

RECOVERY BAY

711J

RECOVERY BAY

711H

RECOVERY BAY

711H

RECOVERY BAY

711B

RECOVERY BAY

711B

RECOVERY BAY

711C

RECOVERY BAY

711C

RECOVERY BAY

711D

RECOVERY BAY

711D

RECOVERY BAY

711E

RECOVERY BAY

711E

RECOVERY BAY

711F

RECOVERY BAY

711F

RECOVERY BAY

711G

RECOVERY BAY

711G

REFRESHMENT

CENTER

701D

REFRESHMENT

CENTER

701D

HAC

HAC

CORRIDOR

COR-7-7

CORRIDOR

COR-7-7

DOC. STORAGE

702B

DOC. STORAGE

702B

ALIGNP

-T

U B

E

RECOVERY BAY

711A

RECOVERY BAY

711A

13.10

A1

K1

FEC

FEC

FEC

K1K1

A1G2

M1

M1

M1

M1

M1

N1

M1

A1

K1

M1

E2

G2

E2G2

G2

G2

N1

L2

G2

G2

G1 E2

K2

L2E2

R1

H1

R1

R1

A1A1

E2

K1

K1

A2G2

A1 A1

E2

A1

K1 C1

G2C1

C1

K1

K1K1 N1

G2

G2G2

B1 A1

A1

G1

K1

K1

N1

G1

G2

E1E1

A1A1

K1

S1

G2

E1

L1 E1

L1

G2 M1

K1

A1

K1

G2

A1

G2G2

A1

G1

A1

A1

G2A1

A1 G1

G1 G2

G1 G1

G2 G1

G1

2.52

2.532.53

2.53

2.53

2.53

2.53

2.52

2.53

2.53

2.53

2.532.53

2.52

2.522.52

2.522.52 2.52

2.53

2.532.53

2.532.53

2.53

2.53

2.53

2.53

2.53

2.53

2.52

2.52

2.53

2.52

2.52

2.53

2.52

2.532.53

2.53

2.52

2.52

2.53

2.53

2.53

2.53

2.52

2.522.522.53

2.532.53

2.53

2.522.52

2.53

2.52

2.52

2.53

2.522.52

2.52

2.52

2.532.532.53 2.53

K1

2.53

2.532.53

E1

G2G2

E2

G2G2 G2G2

SCRUB

7F120

GENERAL

O.R. #2

7F122

GENERAL

O.R. #1

7F118

SUB

STERILE

7F113b

SHAFT

SUB

STERILE

7F113a

H.A.C.

7F114CARDIAC

O.R. #4

7F128

CLEAN

UTILITY

7F129

X-RAY

STORAGE

7F130

H.A.C.

7F131 SCRUB

7F132

SUB

STERILE

7F133c

K1K1

A1

K1

E2

2.53

K1

L2

L2

P1

P1P1P1 P1P1 P1P1

K2

2.53

P1P1 P1P1 P1P1 P1P1

2.53

P1

P1

P1

A2

M1

M1

A2

13.1013.10

13.1013.10

P1

P1P1

P1

P1

P1P1

P1

P1

P1P1

A1

A1

K1K1

E2E2E2 E2

N1N1

E2

N1N1

13.10 13.1013.10

N1

G1N1

N1N1

L2

K1

L2

A2

K2

E2

N1

K1

M1

H1H1

R1

C1

G2

13.1013.1013.10

13.10

13.10

K1

R1

13.10

13.10

S1

S1

P1 P1

G1

G2

G1 K1

P1

G2

G2

G2G2

2.53

A1

P1P1 P1

N1

M1

G2

A1A1

A1

E1 G1

A1

A1A1

S1

NURSE STATION

711M

NURSE STATION

711M

8.13 8.50

P1

P1 G2

N1

9.87

2.65

2.65

8.94

8.94

8.94

8.94 8.94 8.94 8.94

8.94 8.94 8.94

8.94

8.94

8.94

8.94

9.88

9.87 9.88

L2

8.95

N

RECOVERY &

SURGICAL WAITING

7TH FLOOR KEY PLAN

POST- OP

OPERATING ROOMS

RATED PARTITIONS & BARRIERS

1 HR FIRE RATING

2 HR FIRE RATING

EXISTING CONSTRUCTION

NEW CONSTRUCTION

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS:

Drawing #

VA Office Of Construction & Facilities Management Approval:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

OK ARCH REG. NO. CA02295, EXP. 06/30/2023

OK ENGR REG. NO. CA7127, EXP. 06/30/2023

The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.

FULLY SPRINKLERED

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

STRUCTURAL ENGINEER

H2B, INC.

1225 N. LOOP WEST, SUITE 800

HOUSTON, TX 77008

(713) 864-2900

MECH / ELEC / PLUMB / TECH ENGINEER

FIRE PROTECTION ENGINEER

POOLE FIRE PROTECTION, INC.

19910 WEST 161ST STREET

OLATHE, KANSAS 66062

(913) 829-8690

HEALTHCARE PLANNER

OCULUS INC.

1 S. MEMORIAL DR., SUITE 1500

ST. LOUIS, MO 63102

(314) 367-6100

SPUR PROJECT NUMBER: 1791.08

SPUR DESIGN

11020 KING STREET, SUITE 350

OVERLAND PARK, KS 66210

(913) 369-7200

SEE FRONT COVER SHEET

FOR APPROVAL SIGNATURE

VERTICAL TRANSPORTATION

ENVIRONMENTAL HYGIENIST

TEC-AN, INC.

2517 S. PURDUE AVE.

OKLAHOMA CITY, OK 73128

(405) 681-7076

LERCH BATES

2001 BRYAN ST., SUITE 1930

DALLAS, TX 75201

(972) 294-5221

/2

/2

:1 :5

P

M

AE111

REFERENCE PLAN - SEVENTH FLOOR

ZDL

9 OF 92JNK

100% RFP DOCUMENTS

CONSTRUCT SURGICAL INTENSIVE

CARE UNIT & RENOVATE

OPERATING ROOMS

08/02/2021

635-436

OKLAHOMA CITY VA HEALTHCARE SYSTEM

921 NE 13TH ST, OKLAHOMA CITY, OK 73104

N

1/8" = 1'-0"

SEVENTH FLOOR REFERENCE PLAN

ROOM SCHEDULE - 7TH FLOOR

ROOM

NO.

ROOM NAME SEPS

CODE

PROGRAM

AREA

ACTUAL

AREA

COMMENTS

701A SURGICAL WAITING - - 377 SF NEUTRAL AIR

701B TOILET TLTU1 60 SF 51 SF NEGATIVE AIR

701C TOILET TLTU1 60 SF 51 SF NEGATIVE AIR

701D REFRESHMENT CENTER - - 51 SF NEUTRAL AIR

702A OR COUNTER - - 62 SF POSITIVE AIR

703 CONSULT - - 98 SF NEUTRAL AIR

704 POST-OP AREA - - 757 SF POSITIVE AIR

704A PATIENT BAY RRPR1 140 SF 124 SF POSITIVE AIR

704B PATIENT BAY RRPR1 140 SF 117 SF POSITIVE AIR

704C PATIENT BAY RRPR1 140 SF 115 SF POSITIVE AIR

704D PATIENT BAY RRPR1 140 SF 129 SF POSITIVE AIR

704E PATIENT BAY RRPR1 140 SF 123 SF POSITIVE AIR

704F PATIENT BAY RRPR1 140 SF 123 SF POSITIVE AIR

704G PATIENT BAY RRPR1 140 SF 136 SF POSITIVE AIR

704H PATIENT BAY RRPR1 140 SF 119 SF POSITIVE AIR

704J PATIENT BAY RRPR1 140 SF 111 SF POSITIVE AIR

705 TOILET TLTU1 60 SF 55 SF NEGATIVE AIR

706 CLEAN SUPPLY SRSE1 100 SF 51 SF POSITIVE AIR

707 SOILED UTILITY USCL1 80 SF 55 SF DOUBLE NEG. AIR

708 MEDICATION MEDP1 100 SF 68 SF NEUTRAL AIR

709 STORAGE - - 47 SF POSITIVE AIR

710 STORAGE - - 71 SF POSITIVE AIR

711 RECOVERY - - 795 SF POSITIVE AIR

711A RECOVERY BAY RRBP1 110 SF 89 SF POSITIVE AIR

711B RECOVERY BAY RRBP1 110 SF 90 SF POSITIVE AIR

711C RECOVERY BAY RRBP1 110 SF 90 SF POSITIVE AIR

711D RECOVERY BAY RRBP1 110 SF 90 SF POSITIVE AIR

711E RECOVERY BAY RRBP1 110 SF 88 SF POSITIVE AIR

711F RECOVERY BAY RRBP1 110 SF 101 SF POSITIVE AIR

711G RECOVERY BAY RRBP1 110 SF 99 SF POSITIVE AIR

711H RECOVERY BAY RRBP1 110 SF 81 SF POSITIVE AIR

711J RECOVERY BAY RRBP1 110 SF 92 SF POSITIVE AIR

711K RECOVERY BAY RRBP1 110 SF 92 SF POSITIVE AIR

711L RECOVERY BAY RRBP1 110 SF 86 SF POSITIVE AIR

712 MEDICATION MEDP1 100 SF 67 SF NEUTRAL AIR

713 ISOLATION BAY RRIR1 150 SF 118 SF DOUBLE NEG. AIR

714 TOILET TLTU1 60 SF 53 SF NEGATIVE AIR

715 ANTE ROOM RRIR1 45 SF 58 SF NEGATIVE AIR

716 SOILED UTILITY USCL1 80 SF 66 SF DOUBLE NEG. AIR

717 STORAGE - - 65 SF POSITIVE AIR

718 IT CLOSET TETR1 - 114 SF POSITIVE AIR

719 BIOMED COMMUNICATION - - 115 SF POSITIVE AIR

720A CARDIAC OR 3 ORCT1 750 SF 730 SF DOUBLE POS. AIR

720B PUMP ROOM & ABG ORHL1 260 SF 104 SF DOUBLE POS. AIR

720C EQUIPMENT STORAGE SRE01 120 SF 205 SF NEUTRAL AIR

721 CLEAN SUPPLY SRSE1 100 SF 167 SF POSITIVE AIR

722 SCRUB - - 59 SF POSITIVE AIR

723A HYBRID OR 10 ORHY2 900 SF 992 SF DOUBLE POS. AIR

723B CONTROL ROOM ORHC1 220 SF 151 SF NEUTRAL AIR

723C HYBRID STORAGE - - 183 SF NEUTRAL AIR

724 HAC JANC1 40 SF 34 SF DOUBLE NEG. AIR

725 TOILET TLTU1 60 SF 62 SF NEGATIVE AIR

726 GAS STORAGE SRGC1 60 SF 76 SF NEUTRAL AIR

727 STORAGE - - 100 SF NEUTRAL AIR

728 IMAGE EQUIP COMPONENT ROOM - - 116 SF NEUTRAL AIR

728A NEUROSURGERY OR 9 ORNS1 750 SF 683 SF DOUBLE POS. AIR

729 GAS CYLINDERS SRGC1 60 SF 77 SF NEUTRAL AIR

730 SCRUB - - 49 SF POSITIVE AIR

731 NEURO EQUIP - - 219 SF POSITIVE AIR

732 STORAGE - - 107 SF NEUTRAL AIR

ALC-7-1 ALCOVE RCA04 30 SF 21 SF POSITIVE AIR

TOTAL: 61 9476 SF

KEYNOTE LEGEND

2.52 EXISTING METAL STUD WALL WITH GYPSUM BOARD APPLIED. COMPLETE CONSTRUCTION

PER TAGGED PARTITION TYPE.

2.53 EXISTING METAL STUD WALL WITH NO GYPSUM BOARD. COMPLETE WALL CONSTRUCTION

PER TAGGED PARTITION TYPE.

2.65 CONTRACTOR TO PROVIDE CORRECTIONS TO EXISTING STAIR PER STRUCTURAL NARRATIVE

8.13 ALUMINUM DOOR & FRAME

8.50 ALUMINUM FRAMED STOREFRONT

8.94 CONTRACTOR TO CORRECT WALL FRAMING AND REINSTALL EXISTING WINDOW SYSTEM.

8.95 NEW ELEVATOR DOORS. CONTRACTOR TO COORDINATE SIZE AND LOCATION WITH

ELEVATOR MANUFACTURER.

9.87 CLEAN PAINT EXISTING CMU WALL CONSTRUCTION

9.88 CONTRACTOR TO COMPLETE EXISTING METAL STUD WALL ASSEMBLY AND APPLY GYPSUM

BOARD WHERE REQUIRED

13.10 PROVIDE SHIELDING AS REQUIRED. CONTRACTOR TO COORDINATE WITH VA.

No. REVISION DESCRIPTION DATE

File details come from the government source that posted it. Updated .