100 percent RFP PLUMBING CALCS.pdf

PDF 783 KB Posted

Attached to
Y1AZ--Design Build, Construct SICU and Renovate Operating Rooms
Solicitation number
36C10F22R0036
Issued by

View the file

Other files

File Type Posted
Award Notice 36C10F24C0002.pdf PDF
36C10F22R0036 0004.pdf PDF
36C10F22R0036 0003.pdf PDF
36C10F22R0036 0002.pdf PDF
36C10F22R0036 0001.pdf PDF
36C10F22R0036.pdf PDF
45_PL102 - EIGHTH FLOOR -PLUMBING WASTE AND VENT PLAN.pdf PDF
40_PPD101 - SEVENTH FLOOR -PLUMBING DOMESTIC WATER DEMOLITION PLAN.pdf PDF
61_MHP100 - MECHANICAL DUCT and PIPING PLAN -ROOF LEVEL.pdf PDF
17_AF702 - FINISH PLAN -EIGHTH FLOOR.pdf PDF
07_ELEVATOR NARRATIVE.pdf PDF
52_MDH100 - MECHANICAL DUCT DEMOLITION PLAN -SEVENTH FLOOR.pdf PDF
48_PJ101 - SEVENTH FLOOR -PLUMBING MEDICAL GAS PLAN.pdf PDF
55_MDP100 - MECHANICAL PIPING DEMOLTION PLAN -SEVENTH FLOOR.pdf PDF
44_PL101 - SEVENTH FLOOR -PLUMBING WASTE AND VENT PLAN.pdf PDF
24_QH105 - EQUIPMENT PLAN -EIGHTH FLOOR -AREA 1.pdf PDF
04_FIRE PROTECTION.pdf PDF
OR-SICU 100 percent Digital Material Board.pdf PDF
28_QH109 - INTERIOR EQUIPMENT ELEVATIONS.pdf PDF
27_QH108 - INTERIOR EQUIPMENT ELEVATIONS.pdf PDF
84_EY301 - SEVENTH FLOOR ELECTRICAL LOW VOLTAGE PLAN.pdf PDF
4_GI102 - LIFE SAFETY PLAN -EIGHTH FLOOR.pdf PDF
86_EP401 - ELECTRICAL LIGHTNING PROTECTION PLAN.pdf PDF
21_QH102 - EQUIPMENT PLAN -SEVENTH FLOOR -AREA 2.pdf PDF
13_AE115 - DIMENSION PLAN -EIGHTH FLOOR.pdf PDF
90_EP504 - ELECTRICAL DETAILS.pdf PDF
88_EP502 - SCHEDULES AND DETAILS.pdf PDF
26_QH107 - EQUIPMENT PLAN -EIGHTH FLOOR -AREA 3 and INTERIOR EQUIPMENT ELEVATIONS.pdf PDF
39_PLD102 - EIGHTH FLOOR -PLUMBING WASTE AND VENT DEMOLITION PLAN.pdf PDF
9_AE111 - REFERENCE PLAN -SEVENTH FLOOR.pdf PDF
12_AE114 - DIMENSION PLAN -SEVENTH FLOOR.pdf PDF
14_AE211 - REFLECTED CEILING PLAN -SEVENTH FLOOR.pdf PDF
01_Mold Report.pdf PDF
Floor 7 Inventory OKC VAMC.pdf PDF
71_M-704 - MECHANICAL CONTROLS.pdf PDF
30_FA001 - FIRE ALARM_MASS NOTIFICATION GENERAL NOTES.pdf PDF
56_MDP101 - MECHANICAL PIPING DEMOLTION PLAN -EIGHTH FLOOR.pdf PDF
02_ARCHITECTURAL.pdf PDF
1_GI000 - COVER SHEET.pdf PDF
50_P-600 - PLUMBING SCHEDULES.pdf PDF
82_EL201 - SEVENTH FLOOR ELECTRICAL LIGHTING PLAN.pdf PDF
66_M-502 - MECHANICAL DETAILS.pdf PDF
60_MH103 - MECHANICAL ZONING and CONTROLS PLAN -EIGHTH FLOOR.pdf PDF
06_ELECTRICAL NARRATIVE.pdf PDF
02_STRUCTURAL NARRATIVE.pdf PDF
20_QH101 - EQUIPMENT PLAN -SEVENTH FLOOR -AREA 1.pdf PDF
38_PLD101 - SEVENTH FLOOR -PLUMBING WASTE AND VENT DEMOLITION PLAN.pdf PDF
Floor 8 Inventory OKC VAMC.pdf PDF
63_MP101 - MECHANICAL HVAC PIPING PLAN -EIGHTH FLOOR.pdf PDF
03_EQUIPMENT.pdf PDF
Show 40 more

Latest 50 of 122 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: 5/25/2021

7TH FLOOR PLUMBING CALC.

Engineer:

Designer: GH

Project No:1791.08

Project Title: OR/SICU REMODEL

SUPPLY HOT SEWER

Each Total Each Total Each Total Water Closet (Flush Valve) Public 10 0 0 6 0

Water Closet (Flush Valve) Private 5 6 30 0 4 20

Lavatory Public 2 0 1.5 0 1 0

Lavatory Private 5 0.75 3.75 0.5 2.5 1 5

Sink 6 2 12 1.5 9 2 12

Service Sink 1 3 3 2.25 2.25 2 2

Urinal 1 0 0 4 0

Scrub Sink 4 0 3 0 3 0

Bathroom Group Public (valve) 8 0 1.5 0 6 0

Bathroom Group Private (tank) 4 0 1.5 0 5 0

Brm. Grp. w / Shower Public (valve) 8 0 3 0 6 0

Brm. Grp. w / Shower Private (tank) 6 0 3 0 5 0

Clinical Sink 2 10 20 2 4 6 12

Bathtub 4 0 3 0 2 0

Whirlpool 10 0 10 0 8 0

Shower 1 4 4 3 3 2 2

Group Shower 0 0 0

3 Comp. Sink 5 0 4 0 4 0

2 Comp. Sink 4 0 2 0 3 0

Dishwashing Machine 8 0 6 0 5 0

Hydrant 3 0 0 0

Water Closet (Flush Tank) Public 2 0 0 4 0

Water Closet (Flush Tank) Private 2 0 0 4 0

Laundry Sink 3 0 2.25 0 2 0

Clothes Washer 4 0 3 0 3 0

Floor Drain 0 0 2 0

EWC / DF 0.25 0 0 0.25 0

Ice Maker 1 0 0 0 1 0

0 0 0

TOTAL FIXTURE UNITS 72.75 20.75 53

GPM 62 17

PIPE SIZE

MAIN SIZE

SEWER VENT WATER (GPM)

SIZE HORIZ. UNITS VERT. UNITS V. SIZE S.S. SIZE L UNITS SIZE CW HW

2" 6 10 2" 2" 200' 12 1/2" 4 3

3" 20 48 2" 3" 150' 10 3/4" 8 6

4" 180 240 2" 3" 110' 21 1" 17 11

6" 620 960 2" 4" 35' 43 1-1/4" 25 20

8" 1400 2200 3" 3" 680' 53 1-1/2" 50 40

3" 3" 620' 102 2" 92 60

3" 4" 250' 43 2-1/2" 150 90

3" 4" 200' 140 3" 225 125

4" 4" 580' 540 3-1/2" 300 150

FIXTURE TYPE QTY

Total Building

Date: 5/25/2021

8TH FLOOR PLUMBING CALC.

Engineer:

Designer:GH

Project No:1791.08

Project Title: OR/SICU REMODEL

SUPPLY HOT SEWER

Each Total Each Total Each Total Water Closet (Flush Valve) Public 10 0 0 6 0

Water Closet (Flush Valve) Private 20 6 120 0 4 80

Lavatory Public 2 2 4 1.5 3 1 2

Lavatory Private 31 0.75 23.25 0.5 15.5 1 31

Sink 1 2 2 1.5 1.5 2 2

Service Sink 1 3 3 2.25 2.25 2 2

Urinal 1 0 0 4 0

Scrub Sink 4 0 3 0 3 0

Bathroom Group Public (valve) 8 0 1.5 0 6 0

Bathroom Group Private (tank) 4 0 1.5 0 5 0

Brm. Grp. w / Shower Public (valve) 8 0 3 0 6 0

Brm. Grp. w / Shower Private (tank) 6 0 3 0 5 0

Clinical Sink 1 10 10 2 2 6 6

Bathtub 4 0 3 0 2 0

Whirlpool 10 0 10 0 8 0

Shower 1 4 4 3 3 2 2

Group Shower 0 0 0

3 Comp. Sink 5 0 4 0 4 0

2 Comp. Sink 4 0 2 0 3 0

Dishwashing Machine 8 0 6 0 5 0

Hydrant 3 0 0 0

Water Closet (Flush Tank) Public 2 0 0 4 0

Water Closet (Flush Tank) Private 2 0 0 4 0

Laundry Sink 3 0 2.25 0 2 0

Clothes Washer 4 0 3 0 3 0

Floor Drain 0 0 2 0

EWC / DF 0.25 0 0 0.25 0

Ice Maker 1 0 0 0 1 0

0 0 0

TOTAL FIXTURE UNITS 166.25 27.25 125

GPM 87 20

PIPE SIZE

MAIN SIZE

SEWER VENT WATER (GPM)

SIZE HORIZ. UNITS VERT. UNITS V. SIZE S.S. SIZE L UNITS SIZE CW HW

2" 6 10 2" 2" 200' 12 1/2" 4 3

3" 20 48 2" 3" 150' 10 3/4" 8 6

4" 180 240 2" 3" 110' 21 1" 17 11

6" 620 960 2" 4" 35' 43 1-1/4" 25 20

8" 1400 2200 3" 3" 680' 53 1-1/2" 50 40

3" 3" 620' 102 2" 92 60

3" 4" 250' 43 2-1/2" 150 90

3" 4" 200' 140 3" 225 125

4" 4" 580' 540 3-1/2" 300 150

FIXTURE TYPE QTY

Total Building

Project:

Location:

Client:

VA Project No.:

Spur Project No.: 1791.08

Date:

Calculated By:

Area Quantity Per Room Per Bed Per Outlet Simultaneous Use Factor (%) Total (SCFM)

Anesthetizing Locations

Special Surgery 2 0.5 - - 100% 1

Major Surgery 4 0.5 - - 100% 2

Minor Surgery 0.5 - - 75% 0

Emergency Surgery 0.5 - - 50% 0

Radiology 0.5 - - 25% 0

Cardiac Catheterization 4 0.5 - - 50% 1

Acute-Care Locations

Recovery Room 14 - 2 - 50% 14

SICU/CCU 0 - 2 - 50% 0

Emergency Room - 2 - 50% 0

Neonatal ICU - 1.5 - 75% 0

Dialysis Unit - - 0.5 10% 0

Subacute-Care Locations

Nursery - - 0.5 25% 0

Patient Rooms - 0.5 - 10% 0

Exam & Treatment 1 - - 10% 0

Pre-Op Holding 10 - - 1.5 10% 1.5

Respiratory Care - 1 - 50% 0

Pulmonary Function Lab - - 1 50% 0

Other

Anesthesia Workroom 1.5 - - 10% 0

Respirator-Care Workroom 1.5 - - 10% 0

Nursery Workroom 1.5 - - 10% 0

Equipment Repair - - 1.5 10% 0

Total 19.5

OR/SICU REMODEL

Free-Air Design Flow (SCFM)

Medical Gas MedAir Flow Rate

OKC VA Medical Center

Veterans Administration

VAPN: VA635-436

May 23, 2021

GH

7TH FLOOR

Two existing Powerex (model MSD05044k5 99 CFM @ 50 PSI) air compressors located in the basement will be adequate for the proposed demand.

Client:

VA Project No.:

Spur Project No.: 1791.08

Date:

Calculated By:

Area Quantity Per Room Per Bed Per Outlet Simultaneous Use Factor (%) Total (SCFM)

Anesthetizing Locations

Special Surgery 0.5 - - 100% 0

Major Surgery 0.5 - - 100% 0

Minor Surgery 0.5 - - 75% 0

Emergency Surgery 0.5 - - 50% 0

Radiology 0.5 - - 25% 0

Cardiac Catheterization 0.5 - - 50% 0

Acute-Care Locations

Recovery Room - 2 - 50% 0

SICU/CCU 16 - 2 - 50% 16

Emergency Room - 2 - 50% 0

Neonatal ICU - 1.5 - 75% 0

Dialysis Unit - - 0.5 10% 0

Subacute-Care Locations

Nursery - - 0.5 25% 0

Patient Rooms - 0.5 - 10% 0

Exam & Treatment 1 - - 10% 0

Pre-Op Holding - - 1.5 10% 0

Respiratory Care - 1 - 50% 0

Pulmonary Function Lab - - 1 50% 0

Other

Anesthesia Workroom 1.5 - - 10% 0

Respirator-Care Workroom 1.5 - - 10% 0

Nursery Workroom 1.5 - - 10% 0

Equipment Repair - - 1.5 10% 0

Total 16

Project Description

Free-Air Design Flow (SCFM)

Medical Gas MedAir Flow Rate

Location Description VA Medical Center -Anytown, State

Veterans Administration

VAPN: VA635-436

May 23, 2021

GH

8TH FLOOR

Two existing Powerex (model MSD05044k5 99 CFM @ 50 PSI) air compressors located in the basement will be adequate for the proposed demand.

Client:

VA Project No.:

Spur Project No.: 1791.08

Date:

Calculated By:

Area Room* Outlet* Per Room Per Bed Per Outlet Simultaneous Use Factor (%) Total (SCFM)

Anesthetizing Locations

Specialized Surgeries (open heart, organ transplant, etc.)

1 14 - 1.5 100% 14

Major Operating Rooms 17 - 1.5 100% 34

Crystoscopy 2 - - 100% 0

Delivery Room 1 - - 100% 0

Emergency Operating Room 3 - - 100% 0

Other Anesthetizing Areas (minor OR, orthopedic

OR, cardiac catheterization, radiology, induction rooms, etc.)

1 - - 50% 0

Waste Anesthetic Gas Evacuation 1 - - 100% 0

Acute-Care (non-anesthetizing locations)

Post_Operative Recovery Room - 3 - 50% 0

OB Recovery Room - 2 - 50% 0

Intensive Care Units (except cardiac - 2 - 75% 0

Emergency Room - 1 - 100% 0

Cardiac Intensive Care - 2 - 50% 0

Neonatal ICU - 1 - 50% 0

Subacute Patient Care Areas

Normal Nursery - - 1 10% 0

Premature Nursery - 1 - 20% 0

Labor/Birthing - 1 - 10% 0

Patient Room (surgical) - 1.5 - 50% 10.5

Patient Room (medical) - 1 - 10% 1

Exam & Treatment Rooms - - 1 10% 0

Other Areas

Autopsy - - 2 20% 0

Central Supply - - 1.5 10% 0

Respiratory Care Department - - 1.5 5% 0

Equipment Repare, Calibration, and Teaching - - 1.5 10% 0

Medical Lab - - 1 10% 0

Total (scfm) 59.5

Elevation (ft) 1000

Altitude Correction Factor 1.04

Altitude Correction (scfm) 61.88

Vacuum Level (in Hg) 19 *Default to 19 in Hg (NFPA 99 Recommendation)

*only applicable to Specialized Surgeries

OR/SICU REMODEL

Free-Air Design Flow (SCFM)

Medical Gas MedVac Flow Rate

OKC VA Medical Center

Veterans Administration

VAPN: VA635-436

May 23, 2021

GH

Description 7TH FLOOR

Quantity

TWO EXISTING VS-12 SULLAIR 20 HP

MEDICAL VACUUMS IN BASEMENT. EACH

VACUUM = 310 CFM, TOTAL OF 620 CFM.

Client:

VA Project No.:

Spur Project No.: 1791.08

Date:

Calculated By:

Area Room* Outlet* Per Room Per Bed Per Outlet Simultaneous Use Factor (%) Total (SCFM)

Anesthetizing Locations

Specialized Surgeries (open heart, organ transplant, etc.)

14 - 1.5 100% 0

Major Operating Rooms 17 - 1.5 100% 0

Crystoscopy 2 - - 100% 0

Delivery Room 1 - - 100% 0

Emergency Operating Room 3 - - 100% 0

Other Anesthetizing Areas (minor OR, orthopedic

OR, cardiac catheterization, radiology, induction rooms, etc.)

1 - - 50% 0

Waste Anesthetic Gas Evacuation 1 - - 100% 0

Acute-Care (non-anesthetizing locations)

Post_Operative Recovery Room - 3 - 50% 0

OB Recovery Room - 2 - 50% 0

Intensive Care Units (except cardiac - 2 - 75% 0

Emergency Room - 1 - 100% 0

Cardiac Intensive Care - 2 - 50% 0

Neonatal ICU - 1 - 50% 0

Subacute Patient Care Areas

Normal Nursery - - 1 10% 0

Premature Nursery - 1 - 20% 0

Labor/Birthing - 1 - 10% 0

Patient Room (surgical) - 1.5 - 50% 24

Patient Room (medical) - 1 - 10% 0

Exam & Treatment Rooms - - 1 10% 0

Other Areas

Autopsy - - 2 20% 0

Central Supply - - 1.5 10% 0

Respiratory Care Department - - 1.5 5% 0

Equipment Repare, Calibration, and Teaching - - 1.5 10% 0

Medical Lab - - 1 10% 0

Total (scfm) 24

Elevation (ft) 1000

Altitude Correction Factor 1.04

Altitude Correction (scfm) 24.96

Vacuum Level (in Hg) 19 *Default to 19 in Hg (NFPA 99 Recommendation)

REQUIRES A 4" VACUUM LINE

EXISTING VS-12 SULLAIR 20 HP = 310 SCFM

*only applicable to Specialized Surgeries

OR/SICU REMODEL

Free-Air Design Flow (SCFM)

Medical Gas MedVac Flow Rate

OKC VA Medical Center

Veterans Administration

VAPN: VA635-436

May 23, 2021

GH

Description 8TH FLOOR

Quantity

TWO EXISTING VS-12 SULLAIR 20 HP

MEDICAL VACUUMS IN BASEMENT. EACH

VACUUM = 310 CFM, TOTAL OF 620 CFM.

OKCVAHC - SICU OR RENOVATION

PRELIMINARY

7th FLOOR OXYGEN

ROOM OUTLETS LPM per TOTAL

QTY QTY/ROOM OUTLET LPM

post op 8 2 4 64.00

Recovery 9 2 4 72.00

Cardiac OR 1 2 4 8.00

Hybris OR 1 3 4 12.00

Neuro OR 1 2 4 8.00

0.00

TOTAL # BED 20 TOTAL # OUTLETS 16

PEAK CALCULATED DEMAND (LPM) 164.0

#CYLINDERS PER BANK HIGH PRESSURE 4.73

4500 gallon/500 gallon emergency Bulk Oxygen will be adequate for proposed demand.

TOTAL CALCULATED FLOW (LPM)

DESCRIPTION

Oxygen Cal. 7th floor Page 1 O2

OKCVAHC - SICU OR RENOVATION

PRELIMINARY

8th FLOOR OXYGEN

ROOM OUTLETS LPM per TOTAL

QTY QTY/ROOM OUTLET LPM

SICU 16 2 4 128.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

TOTAL # BED 16 TOTAL # OUTLETS 24

PEAK CALCULATED DEMAND (LPM) 128.0

#CYLINDERS PER BANK HIGH PRESSURE 3.78

4500 gallon/500 gallon emergency Bulk Oxygen will be adequate for proposed demand.

TOTAL CALCULATED FLOW (LPM)

DESCRIPTION

Oxygen Cal. 8th floor Page 1 O2

PROJECT: OR/SICU REMODEL

LOCATION: OKC

CLIENT: OKCVAMC

JOB NUMBER: 1791.08

DATE: 5/23/2021

CALCULATED BY: GH

PLUMBING SYSTEM: NITROUS OXIDE

ROOM/ NO. OF FLOW PER SIMULTANEOUS TOTAL

FLOOR AREA DEPARTMENT OUTLETS OUTLET (CFM) USE FACTOR (%) SCFM

7TH OR'S MEDICAL BOOMS 6 X 1.0 X 100 = 6.00

(1 outlet each, 2 BOOMS)

7TH FLOOR SUBTOTALS 6 X 1.0 X 100 = 6.00

Pipe sizing calculations:

Longest Run (Manifold to OR = 350 Feet

1.4 (40% Fittings)

Allowable Friction Loss = 5 psi max. press. drop x 100 = 1.02 psi/100 490 Feet

Use more stringent of 1.0 psi/100 ft per ASPE data book, Chapter 32

Service line from manifold = 3/4" size

4 CYLINDERS LOCATED IN THE BASEMENT

EA. BANK HAS 834 SCFH AVAILABLE. will be adequate for the proposed demand.

PROJECT: OR/SICU REMODEL

LOCATION: OKC VA HOSPITAL

CLIENT: OKCVAMC

JOB NUMBER: 1791.08

DATE: 5/23/2021

CALCULATED BY: GH

PLUMBING SYSTEM: NITROGEN

ROOM/ NO. OF FLOW PER SIMULTANEOUS TOTAL

FLOOR AREA DEPARTMENT OUTLETS OUTLET (CFM) USE FACTOR (%) SCFM

7th floor OR rooms 3 Operating Rooms (future outlets) 6 X 15 X 100 = 90.00

2 outlets each

6 90.00

0.00

90.00

Assume nitrogen system shall be set at 160 psi.

Pipe sizing calculations:

Longest Run (Manifold to OR #2 - 378) = 350 Feet

1.4 (40% Fittings)

Allowable Friction Loss = 16 psi max. press. drop x 100 = 3.27 psi/100

490 Feet Use more stringent of 2.0 psi/100 ft per ASPE data book, Chapter 32

Service line from manifold = 1" size

8 H-BOTTLES ON SITE. EACH PRODUCES 250 CFM =

2000 CFM

MONTHLY AVERAGE IS 12 BOTTLES A MONTH / ABOUT

100 CFM PER DAY.

8 CYLINDERS LOCATED IN THE BASEMENT

EA. BANK HAS 2188 SCFH AVAILABLE @ 167 psi. RECOMMEND

INCREASING FROM 4 H-TYPE BOTTLES EACH BANK TO 6 H-TYPE

BOTTLES FOR PROPOSED DEMAND.

Medical Vacuum Source Sizing

C.G.A. P-2.1 Method

Enter the quantity of the units requested:Counting Use Simul. Total

Units in SCFM Use % Usage

Surgical Procedures

PreOp Holding 0 Bed(s) @ 1.5 ea. x 15% =

Major Invasive 0 Room(s) @ 3.5 ea. x 100% =

Minor Invasive 0 Room(s) @ 3.5 ea. x 100% =

Trauma and Emergency 0 Room(s) @ 3 ea. x 100% =

Catherization & Lab work 0 Room(s) @ 1 ea. x 10% =

Endoscopy 0 Room(s) @ 1 ea. x 10% =

Recovery 0 Bed(s) @ 1.5 ea. x 50% =

WAGD (If into the Med-Surg. Vacuum) 5 Room(s) @ 2 ea. x 100% = 10

Tests and Outpatient Procedures

X-ray, CAT, NMR, PET scans 0 Room(s) @ 1.5 ea. x 30% =

Dialysis 0 Bed(s) @ 1.5 ea. x 30% =

Exam and Minor Treatment 0 Room(s) @ 1 ea. x 10% =

EEG/EKG 0 Room(s) @ 1 ea. x 10% =

Pulmonary Function Bed or station@ 1.5 ea. x 30% =

Respiratory Care Bed or station@ 1.5 ea. x 30% =

Observation 0 Bed or station@ 1 ea. x 10% =

Perinatal and Pediatric

Birthing or LDRP Room(s) @ 1 ea. x 100% =

Delivery Room Room(s) @ 1 ea. x 100% =

Nursery Inlet(s) @ 1 ea. x 10% =

NICU Bed(s) @ 1 ea. x 25% =

Intensive Care

Adult ICU, CCU, etc. 0 Bed(s) @ 2 ea. x 75% =

Pediatric ICU (Except NICU) Bed(s) @ 2 ea. x 75% =

Emergency (not surgical) 0 Bed(s) @ 1 ea. x 100% =

Equipment Maintenance

Workrooms 0 Station(s) @ 1.5 ea. x 10% =

Laboratory

Medical Lab Uses 0 Station(s) @ 1.5 ea. x 25% =

Other

Patient rooms 0 Room(s) @ 1 ea. x 10% =

@ ea. x =

Overall Base Total 10

Ventilators

Ventilator add in 0 Unit(s) @ 0.5 ea. x 10% = 0

Peak Calculated Demand 10 SCFM (283 lpm) at 19 inches Hg

MODEL # VA03D-060H-D 3 HP

Medical Air Sizing Calculator © POSIT Inc. 1995 6/7/2021

WASTE ANESTHESIA GAS DISPOSAL UNIT

7TH FLOOR PLUMB CALCS
8TH FLOOR PLUMB CALCS
7TH FLOOR MA CALC
8TH FLOOR MA CALC
7TH FLOOR MED VAC CALC
8TH FLOOR MED VAC CALC
7TH FLOOR OXYGEN CALC
8TH FLOOR OXYGEN CALC
1791.08 Calc-Medical Gas Nitrous Oxide (v1.0)
17091.08 Calc-Medical Gas Nitrogen (v1.0)
MedVac Sizing Calculator WAGD

File details come from the government source that posted it. Updated .