02_STRUCTURAL NARRATIVE.pdf

PDF 5 MB Posted

Attached to
Y1AZ--Design Build, Construct SICU and Renovate Operating Rooms
Solicitation number
36C10F22R0036
Issued by

View the file

Other files

File Type Posted
Award Notice 36C10F24C0002.pdf PDF
36C10F22R0036 0004.pdf PDF
36C10F22R0036 0003.pdf PDF
36C10F22R0036 0002.pdf PDF
36C10F22R0036 0001.pdf PDF
36C10F22R0036.pdf PDF
45_PL102 - EIGHTH FLOOR -PLUMBING WASTE AND VENT PLAN.pdf PDF
40_PPD101 - SEVENTH FLOOR -PLUMBING DOMESTIC WATER DEMOLITION PLAN.pdf PDF
61_MHP100 - MECHANICAL DUCT and PIPING PLAN -ROOF LEVEL.pdf PDF
17_AF702 - FINISH PLAN -EIGHTH FLOOR.pdf PDF
07_ELEVATOR NARRATIVE.pdf PDF
52_MDH100 - MECHANICAL DUCT DEMOLITION PLAN -SEVENTH FLOOR.pdf PDF
100 percent RFP PLUMBING CALCS.pdf PDF
48_PJ101 - SEVENTH FLOOR -PLUMBING MEDICAL GAS PLAN.pdf PDF
55_MDP100 - MECHANICAL PIPING DEMOLTION PLAN -SEVENTH FLOOR.pdf PDF
44_PL101 - SEVENTH FLOOR -PLUMBING WASTE AND VENT PLAN.pdf PDF
24_QH105 - EQUIPMENT PLAN -EIGHTH FLOOR -AREA 1.pdf PDF
04_FIRE PROTECTION.pdf PDF
OR-SICU 100 percent Digital Material Board.pdf PDF
28_QH109 - INTERIOR EQUIPMENT ELEVATIONS.pdf PDF
27_QH108 - INTERIOR EQUIPMENT ELEVATIONS.pdf PDF
84_EY301 - SEVENTH FLOOR ELECTRICAL LOW VOLTAGE PLAN.pdf PDF
4_GI102 - LIFE SAFETY PLAN -EIGHTH FLOOR.pdf PDF
86_EP401 - ELECTRICAL LIGHTNING PROTECTION PLAN.pdf PDF
21_QH102 - EQUIPMENT PLAN -SEVENTH FLOOR -AREA 2.pdf PDF
13_AE115 - DIMENSION PLAN -EIGHTH FLOOR.pdf PDF
90_EP504 - ELECTRICAL DETAILS.pdf PDF
88_EP502 - SCHEDULES AND DETAILS.pdf PDF
26_QH107 - EQUIPMENT PLAN -EIGHTH FLOOR -AREA 3 and INTERIOR EQUIPMENT ELEVATIONS.pdf PDF
39_PLD102 - EIGHTH FLOOR -PLUMBING WASTE AND VENT DEMOLITION PLAN.pdf PDF
9_AE111 - REFERENCE PLAN -SEVENTH FLOOR.pdf PDF
12_AE114 - DIMENSION PLAN -SEVENTH FLOOR.pdf PDF
14_AE211 - REFLECTED CEILING PLAN -SEVENTH FLOOR.pdf PDF
01_Mold Report.pdf PDF
Floor 7 Inventory OKC VAMC.pdf PDF
71_M-704 - MECHANICAL CONTROLS.pdf PDF
30_FA001 - FIRE ALARM_MASS NOTIFICATION GENERAL NOTES.pdf PDF
56_MDP101 - MECHANICAL PIPING DEMOLTION PLAN -EIGHTH FLOOR.pdf PDF
02_ARCHITECTURAL.pdf PDF
1_GI000 - COVER SHEET.pdf PDF
50_P-600 - PLUMBING SCHEDULES.pdf PDF
82_EL201 - SEVENTH FLOOR ELECTRICAL LIGHTING PLAN.pdf PDF
66_M-502 - MECHANICAL DETAILS.pdf PDF
60_MH103 - MECHANICAL ZONING and CONTROLS PLAN -EIGHTH FLOOR.pdf PDF
06_ELECTRICAL NARRATIVE.pdf PDF
20_QH101 - EQUIPMENT PLAN -SEVENTH FLOOR -AREA 1.pdf PDF
38_PLD101 - SEVENTH FLOOR -PLUMBING WASTE AND VENT DEMOLITION PLAN.pdf PDF
Floor 8 Inventory OKC VAMC.pdf PDF
63_MP101 - MECHANICAL HVAC PIPING PLAN -EIGHTH FLOOR.pdf PDF
03_EQUIPMENT.pdf PDF
Show 40 more

Latest 50 of 122 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA PROJECT NUMBER

VA CONTRACT NUMBER

VA TASK ORDER NUMBER

635-456

VA101F-17-D-2913

36C10F20N0048

PROJECT NAME OKCVAMC OR & SICU DB Package

OVERALL PROJECT SUMMARY

This structural narrative is intended as a Design-Build (DB) RFP narrative for completing the construction of the 7th and 8th floors, totaling approximately 32,274 GSF. The 7th floor will be renovated into three new operating rooms and the recently installed vertical addition of the 8th floor will be new Surgical Intensive Care Unit (SICU) space.

The majority of structural work for the vertical addition was completed by a previous contractor.

Therefore, the Level 1 requirements identified in the Department of Veterans Affairs A/E

Submission Instructions for Design-Build Projects are not pertinent or were provided as part of the original SICU vertical addition project.

However, numerous items must still be addressed by the DB Contractor to finalize the project.

No structural drawings will be included in the DB RFP bridging documents.

SITE VISIT

A site visit was conducted on June 25, 2020, to review the existing conditions and to identify structural related items that must be addressed by the DB Contractor.

1. Excess concrete and/or drywall mud was observed 2. A ventilation fan that was on the old roof is still on the floor. This must be removed and the floor installed within a room on the new 8th floor. This must leveled. be removed, relocated and the opening infilled.

36C10F20N0048 Construct Surgical Intensive Care & Renovate Operating Rooms

VA TASK ORDER NUMBER

635-456

VA101F-17-D-2913

3. The demolition of the existing framing and the 4. The concrete infill on the stair treads is cracked installation of the new framing at the existing elevators and the stair treads deflect downward significantly and machine room must be completed. under applied pressure and must be removed and replaced or repaired.

5. The weld quality of the weld connecting the stair 6. The quality of the stair landings must be inspected treads to the stringers must be inspected and repaired and repaired as needed. Excess bolt length as needed. No welds were observed connecting the protruding from the wall must be cut neatly.

riser to the tread above.

VA TASK ORDER NUMBER

635-456

VA101F-17-D-2913

7. The vertical expansion of the columns in the 8. The expansion joint along gridline 10 should be southeast stairway should be inspected for compliance inspected for continuity and installation completed.

with the original design drawings and corrected as necessary. The unneeded fur-out should be removed.

9. The spray-applied fireproofing was missing in areas on beams and the underside of the metal deck throughout both levels and must be repaired.

During our site visit, no removal of finishes was completed and, therefore, other conditions may exist that need to be corrected or completed once uncovered.

VA TASK ORDER NUMBER

635-456

VA101F-17-D-2913

ANTI-TERRORISM/FORCE PROTECTION

According to the Department of Veterans Affairs Physical Security Design Manual, “Design and construction standards are provided for the physical security of new buildings, additions, and major alterations. The manual further defines major alterations as “a project where the area of renovation, including any associated addition, is equal to or greater than 50 percent of the area in the building in which the work is to be performed.”

This 32,274 GSF project is below the 50 percent threshold and, therefore, not subject to the requirements of the Physical Security Design Manual.

36C10F20N0048