7TH FLOOR ROOF
N
8TH FLOOR SICU
8TH FLOOR KEY PLAN
1. EXISTING CONDITIONS ARE BASED ON INFORMATION OBTAINED FROM EXISTING DRAWINGS AND
FIELD SURVEY, AND SHALL NOT BE CONSTRUED "AS BUILT." THE CONTRACTOR SHALL FIELD
VERIFY EXISTING CONDITIONS PRIOR TO ONSET OF CONSTRUCTION.
2. THE CONTRACTOR SHALL COORDINATE WITH OWNER FOR ALL EXISTING EQUIPMENT AND
FURNITURE ITEMS THAT ARE TO BE SALVAGED OR REINSTALLED PRIOR TO THE
COMMENCEMENT OF DEMOLITION.
3. THE OWNER SHALL HAVE THE FIRST RIGHT TO ALL MATERIALS AND EQUIPMENT THAT ARE
REMOVED BY THE CONTRACTOR. THE CONTRACTOR SHALL VERIFY WHEN REMOVAL OF ITEMS
ARE TO BE RETAINED BY THE OWNER AT THE PRE CONSTRUCTION MEETING.
4. PATCH AND REPAIR SURFACES AND FINISHES AFFECTED BY THE DEMOLITION OR THE REMOVAL
OF CONSTRUCTION AS NECESSARY TO MAINTAIN THE FINISH QUALITY OF NEW SPACE.
5. FILL ALL DUCT AND PIPE PENETRATIONS IN DEMO AREA WITH 2 - HOUR RATED ASSEMBLY.
6. CONTRACTOR TO DEMOLISH BACK TO AND CAP ALL TAPS OFF OF MAIN BRANCHES PER
KEYNOTES ABOVE.
7. CONTRACTOR SHALL PROTECT REMAINING DUCTWORK AND PIPING FROM DAMAGE
THROUGHOUT CONSTRUCTION.
8. DESIGN BUILD TEAM AND A/E OF RECORD MUST FOLLOW ALL CURRENT NATIONAL TIL
STANDARDS, THROUGHOUT DESIGN AND CONSTRUCTION.
GENERAL DEMOLITION FLOOR PLAN NOTES
K
J
I
H
G2
G
F
E
21 3 4 5 6 7 8 9 9A 10 11 11a 12
VAV-151
VAV-122 VAV-125
VAV-129
VAV-121
VAV-116
VAV-115
VAV-114
VAV-148
VAV-117 VAV-118 VAV-119
VAV-113
VAV-112
VAV-100
VAV-102
VAV-103
VAV-104
VAV-105
VAV-106VAV-107VAV-108VAV-109
VAV-110
D6 D6
VAV-120
D6D6
D6
2" HHR 1" HHS
1 1/2" HHR
1 1/4" HHR 1" HHR
3/4"
3/4" HHS
2" HHS
1 1/2" HHS
1 1/4" HHS
D6
3/4" HHS
3/4" HHR
D6
D6
D6
D6
D6 D6 D6
VAV-146
VAV-142D6
D6
VAV-152
D6
D6 D6 D6
D6
D6
D6D6
D6
D6 D6D6
D6
D6 D6
D6
FCU-133 D7
FCU-143
D7
FCU-135
VAV-140
VAV-135
VAV-130
D7
EF-X
3/4" 3/4"
3/4" HWS UP
2" MPS DOWN
1" MPC FROM BELOW
3/4" HWR FROM ABOVE
2" MPS FROM BELOW
3/4" HWR DN
3/4" HWS UP
1" CHS UP
1" CHR DN
D20
D5
DEMOLITION KEYNOTES
D5 CONTRACTOR TO DEMOLISH EXISTING EXHAUST FAN.
D6 CONTRACTOR TO DEMOLISH 3/4" HHS/HHR PIPING FROM AIR TERMINAL UNIT BACK TO MAIN
BRANCH AND CAP.
D7 CONTRACTOR TO DEMOLISH 3/4" CHS/CHR PIPING FROM AIR TERMINAL UNIT BACK TO MAIN
BRANCH AND CAP.
D20 CONTRACTOR TO PREPARE CAPPED PIPING RUNS FOR EXPANSION.
N
1/8" = 1'-0"
MECHANICAL PIPING DEMOLITION PLAN - EIGHTH FLOOR1
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing #
VA Office Of Construction & Facilities Management Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
OK ARCH REG. NO. CA02295, EXP. 06/30/2023
OK ENGR REG. NO. CA7127, EXP. 06/30/2023
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
FULLY SPRINKLERED
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
STRUCTURAL ENGINEER
H2B, INC.
1225 N. LOOP WEST, SUITE 800
HOUSTON, TX 77008
(713) 864-2900
MECH / ELEC / PLUMB / TECH ENGINEER
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION, INC.
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
HEALTHCARE PLANNER
OCULUS INC.
1 S. MEMORIAL DR., SUITE 1500
ST. LOUIS, MO 63102
(314) 367-6100
SPUR PROJECT NUMBER: 1791.08
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(913) 369-7200
SEE FRONT COVER SHEET
FOR APPROVAL SIGNATURE
VERTICAL TRANSPORTATION
ENVIRONMENTAL HYGIENIST
TEC-AN, INC.
2517 S. PURDUE AVE.
OKLAHOMA CITY, OK 73128
(405) 681-7076
LERCH BATES
2001 BRYAN ST., SUITE 1930
DALLAS, TX 75201
(972) 294-5221
/2
/2
:2 :4
P
M
MDP101
MECHANICAL PIPING DEMOLTION PLAN -
EIGHTH FLOOR
JLF
56 OF 92JRM
100% RFP DOCUMENTS
CONSTRUCT SURGICAL INTENSIVE
CARE UNIT & RENOVATE
OPERATING ROOMS
08/02/2021
635-436
OKLAHOMA CITY VA HEALTHCARE SYSTEM
921 NE 13TH ST, OKLAHOMA CITY, OK 73104
No. REVISION DESCRIPTION DATE