44_PL101 - SEVENTH FLOOR -PLUMBING WASTE AND VENT PLAN.pdf

PDF 601 KB Posted

Attached to
Y1AZ--Design Build, Construct SICU and Renovate Operating Rooms
Solicitation number
36C10F22R0036
Issued by

View the file

Other files

File Type Posted
Award Notice 36C10F24C0002.pdf PDF
36C10F22R0036 0004.pdf PDF
36C10F22R0036 0003.pdf PDF
36C10F22R0036 0002.pdf PDF
36C10F22R0036 0001.pdf PDF
36C10F22R0036.pdf PDF
45_PL102 - EIGHTH FLOOR -PLUMBING WASTE AND VENT PLAN.pdf PDF
40_PPD101 - SEVENTH FLOOR -PLUMBING DOMESTIC WATER DEMOLITION PLAN.pdf PDF
61_MHP100 - MECHANICAL DUCT and PIPING PLAN -ROOF LEVEL.pdf PDF
17_AF702 - FINISH PLAN -EIGHTH FLOOR.pdf PDF
07_ELEVATOR NARRATIVE.pdf PDF
52_MDH100 - MECHANICAL DUCT DEMOLITION PLAN -SEVENTH FLOOR.pdf PDF
100 percent RFP PLUMBING CALCS.pdf PDF
48_PJ101 - SEVENTH FLOOR -PLUMBING MEDICAL GAS PLAN.pdf PDF
55_MDP100 - MECHANICAL PIPING DEMOLTION PLAN -SEVENTH FLOOR.pdf PDF
24_QH105 - EQUIPMENT PLAN -EIGHTH FLOOR -AREA 1.pdf PDF
04_FIRE PROTECTION.pdf PDF
OR-SICU 100 percent Digital Material Board.pdf PDF
28_QH109 - INTERIOR EQUIPMENT ELEVATIONS.pdf PDF
27_QH108 - INTERIOR EQUIPMENT ELEVATIONS.pdf PDF
84_EY301 - SEVENTH FLOOR ELECTRICAL LOW VOLTAGE PLAN.pdf PDF
4_GI102 - LIFE SAFETY PLAN -EIGHTH FLOOR.pdf PDF
86_EP401 - ELECTRICAL LIGHTNING PROTECTION PLAN.pdf PDF
21_QH102 - EQUIPMENT PLAN -SEVENTH FLOOR -AREA 2.pdf PDF
13_AE115 - DIMENSION PLAN -EIGHTH FLOOR.pdf PDF
90_EP504 - ELECTRICAL DETAILS.pdf PDF
88_EP502 - SCHEDULES AND DETAILS.pdf PDF
26_QH107 - EQUIPMENT PLAN -EIGHTH FLOOR -AREA 3 and INTERIOR EQUIPMENT ELEVATIONS.pdf PDF
39_PLD102 - EIGHTH FLOOR -PLUMBING WASTE AND VENT DEMOLITION PLAN.pdf PDF
9_AE111 - REFERENCE PLAN -SEVENTH FLOOR.pdf PDF
12_AE114 - DIMENSION PLAN -SEVENTH FLOOR.pdf PDF
14_AE211 - REFLECTED CEILING PLAN -SEVENTH FLOOR.pdf PDF
01_Mold Report.pdf PDF
Floor 7 Inventory OKC VAMC.pdf PDF
71_M-704 - MECHANICAL CONTROLS.pdf PDF
30_FA001 - FIRE ALARM_MASS NOTIFICATION GENERAL NOTES.pdf PDF
56_MDP101 - MECHANICAL PIPING DEMOLTION PLAN -EIGHTH FLOOR.pdf PDF
02_ARCHITECTURAL.pdf PDF
1_GI000 - COVER SHEET.pdf PDF
50_P-600 - PLUMBING SCHEDULES.pdf PDF
82_EL201 - SEVENTH FLOOR ELECTRICAL LIGHTING PLAN.pdf PDF
66_M-502 - MECHANICAL DETAILS.pdf PDF
60_MH103 - MECHANICAL ZONING and CONTROLS PLAN -EIGHTH FLOOR.pdf PDF
06_ELECTRICAL NARRATIVE.pdf PDF
02_STRUCTURAL NARRATIVE.pdf PDF
20_QH101 - EQUIPMENT PLAN -SEVENTH FLOOR -AREA 1.pdf PDF
38_PLD101 - SEVENTH FLOOR -PLUMBING WASTE AND VENT DEMOLITION PLAN.pdf PDF
Floor 8 Inventory OKC VAMC.pdf PDF
63_MP101 - MECHANICAL HVAC PIPING PLAN -EIGHTH FLOOR.pdf PDF
03_EQUIPMENT.pdf PDF
Show 40 more

Latest 50 of 122 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2 3 4 5 6 7 8 9 9A 10 12

C

C1

D

E

F

G

G2

H

I

J

K

2" V

3" SS

3" V

3" SS

3" SS

3" SS

3" V

4" SS3" SS

3" V

4" SS

6" ST

2" V

2" V

2" V

2" V2" V

2" V

2" V

2" V

2" V

2" V

2" V

2" SS

4" S

S

4" SS4" SS

2" V

2" V

2" V

2" V

2" V

2" V

ELEC

CLOSET

7F-133

HAC

7F-131

X-RAY

STORAGE

7F-130

STORAGE

7F-129

STORAGE

SCRUB

GAS

CYLINDERS

CONTROL

ROOM

723B

SCRUB

7F-132

SUB-STER

7F-113c

CARDIAC

OR 4

xx

NEURO

EQUIP

NEUROSURGERY

OR 9

728A

HYBRID OR

723A

SCRUB

HYBRID

STORAGE

723C

CARDIAC

OR 3

720A

STORAGE

GAS

STORAGE

TOILET

CORRIDOR

COR-7-10

CORRIDOR

COR-7-12

CORRIDOR

COR-7-11

CORRIDOR

COR-7-8

BIOMED

COMMUNICATION

EXISTING

CLEAN

CORE

7F-113

SUB-STER

7F-113g

SOILED

UTILITY

7F-153

CORRIDOR

C7 12F

CORRIDOR

COR-7-3

POST-OP

AREA

CLEAN

SUPPLY

STORAGE

SOILED

UTILITY

STORAGE

CLEAN

SUPPLY

EQUIPMENT

STORAGE

720C IT CLOSET

ELEVATOR

P-12

SUB-STER

7F-113b

HAC

GENERAL

OR 2

7F-122

GENERAL

OR 1

7F-118

SCRUB

7F-120

STORAGE

7F-119

SUB-STER

7F-113a

HAC

7F-114

EXIST. ELEC

CLOSET

7F-116a

EXIST. ELEC

CLOSET

7F-116

SOILED

UTILITY

TOILET

MEDICATION

STORAGE

RECOVERY

ELEVATOR

LOBBY

COR-7-1

ELEVATOR

P-8

ELEVATOR

P-7

ELEVATOR

P-9

ELEVATOR

P-10 STAIR 8

CORRIDOR

COR-7-2

EXIST.

TELECOM

7F100

PUMP

ROOM &

ABG

720B

CORRIDOR

COR-7-4

ELEC

CLOSET

7F-133

HAC

7F-131

X-RAY

STORAGE

7F-130

STORAGE

7F-129

STORAGE

GAS

CYLINDERS

IMAGE

EQUIP

COMPONENT

ROOM

CONTROL

ROOM

723B

HAC

SCRUB

7F-132

SUB-STER

7F-113c

CARDIAC

OR 4

xx

NEUROSURGERY

OR 9

728A

SCRUB

HYBRID

STORAGE

723C

CARDIAC

OR 3

720A

STORAGE

GAS

STORAGE

CORRIDOR

COR-7-10

CORRIDOR

COR-7-12

CORRIDOR

COR-7-11

CORRIDOR

COR-7-9

CORRIDOR

COR-7-8

BIOMED

COMMUNICATION

EXISTING

CLEAN

CORE

7F-113

SUB-STER

7F-113g

CORRIDOR

COR-7-6

SOILED

UTILITY

7F-153

CORRIDOR

C7 12F

CORRIDOR

COR-7-3

POST-OP

AREA

MEDICATION

TOILET

STORAGE

STORAGE

CLEAN

SUPPLY

EQUIPMENT

STORAGE

720C IT CLOSET

ELEVATOR

P-12

SUB-STER

7F-113b

HAC

GENERAL

OR 2

7F-122

GENERAL

OR 1

7F-118

STORAGE

7F-121

SCRUB

7F-120

STORAGE

7F-119

SUB-STER

7F-113a

HAC

7F-114

EXIST. ELEC

CLOSET

7F-116a

EXIST. ELEC

CLOSET

7F-116

SOILED

UTILITY

TOILET

RECOVERY

ISOLATION

BAY

CONSULT

OR

COUNTER

702A

ELEVATOR

LOBBY

COR-7-1

ELEVATOR

P-8

ELEVATOR

P-7

ELEVATOR

P-9

ELEVATOR

P-10 STAIR 8

TOILET

701C

TOILET

701B

CORRIDOR

COR-7-2

SURGICAL

WAITING

701A

EXIST.

TELECOM

7F100

PUMP

ROOM &

ABG

720B

ANTE ROOM

CORRIDOR

COR-7-4

2" V

3" V

4" ST

4" ST 4" ST

4" ST

6" ST

6" S

T

6" ST

4" S

T

4" SS-UF

(E) 4"

VENT

STACK

(E) 6" VENT STACK

(E) 4"

VENT

STACK

(E) 6" VENT STACK

(E) 4"

VENT

STACK

4" ST

6" ST

(E) 4"

VENT

STACK

4" SS 4" SS

3" SS 3" SS

2" SS

4" S

S

4" S

S

4" SS

2" SS

4" SS 4" SS

2" S

S 2"

S S

2" SS

2" S

S

2" SS

4" SS

4" S

S 4" S

S

5 6

4" S

S

5 6

2" SS4" SS

4" S

S

4" S

S

P-418

P-418

P-103

P-103

P-418 P-418

P-418

P-502

P-103

10 P-103P-103

4" S

S

4" SS

4" S

S

P-608

4" SS

P-418

EXIST. 4" WASTE

STACK

EXIST. WASTE STACK

2" SS

2" V

2" S

S 5

(E) 4"

WASTE

STACK

2" V

EXIST. 2" V UP

EXIST. 2" V

FR. BLW.

2" SS

4" S

S

P-528

2" SS-UF

2" S

S -U

F

4" SS-UF

P-505

P-505

P-708

P-505

P-708

PATIENT

BAY

704G

PATIENT

BAY

704F

PATIENT

BAY

704E

PATIENT

BAY

704C

PATIENT

BAY

704A

PATIENT

BAY

704B

PATIENT

BAY

704J

PATIENT

BAY

704H

RECOVERY

BAY

711A

RECOVERY

BAY

711B

RECOVERY

BAY

711C

RECOVERY

BAY

711D

FD-C

FD-C

2" SS

NOT IN SCOPE

P-413

P-413

P-413

P-413

P-528

P-528

P-413

P-418

P-413

P-413

2" S

S

4" SS

RECOVERY

BAY

711L

RECOVERY

BAY

711K

RECOVERY

BAY

711J

RECOVERY

BAY

711H

RECOVERY

BAY

711G

RECOVERY

BAY

711F

RECOVERY

BAY

711E

NURSE

STATION

711M

EXISTING TO REMAIN.

N

RECOVERY &

SURGICAL WAITING

7TH FLOOR KEY PLAN

PHASE-TWO

POST- OP

OPERATING ROOMS

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS:

Drawing #

VA Office Of Construction & Facilities Management Approval:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

OK ARCH REG. NO. CA02295, EXP. 06/30/2023

OK ENGR REG. NO. CA7127, EXP. 06/30/2023

The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.

FULLY SPRINKLERED

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

STRUCTURAL ENGINEER

H2B, INC.

1225 N. LOOP WEST, SUITE 800

HOUSTON, TX 77008

(713) 864-2900

MECH / ELEC / PLUMB / TECH ENGINEER

FIRE PROTECTION ENGINEER

POOLE FIRE PROTECTION, INC.

19910 WEST 161ST STREET

OLATHE, KANSAS 66062

(913) 829-8690

HEALTHCARE PLANNER

OCULUS INC.

1 S. MEMORIAL DR., SUITE 1500

ST. LOUIS, MO 63102

(314) 367-6100

SPUR PROJECT NUMBER: 1791.08

SPUR DESIGN

11020 KING STREET, SUITE 350

OVERLAND PARK, KS 66210

(913) 369-7200

SEE FRONT COVER SHEET

FOR APPROVAL SIGNATURE

VERTICAL TRANSPORTATION

ENVIRONMENTAL HYGIENIST

TEC-AN, INC.

2517 S. PURDUE AVE.

OKLAHOMA CITY, OK 73128

(405) 681-7076

LERCH BATES

2001 BRYAN ST., SUITE 1930

DALLAS, TX 75201

(972) 294-5221

/2

/2

:5

:1

A

M

PL101

SEVENTH FLOOR - PLUMBING WASTE

AND VENT PLAN

GH

44 OF 92JRM

100% RFP DOCUMENTS

CONSTRUCT SURGICAL INTENSIVE

CARE UNIT & RENOVATE

OPERATING ROOMS

08/02/2021

635-436

OKLAHOMA CITY VA HEALTHCARE SYSTEM

921 NE 13TH ST, OKLAHOMA CITY, OK 73104

N

1/8" = 1'-0"

SEVENTH FLOOR - PLUMBING WASTE AND VENT PLAN

PLUMBING KEYNOTES

1 CONNECT NEW SANITARY TO EXISTING SANITARY SEWER AT THIS APPROXIMATE LOCATION.

CONTRACTOR TO VERIFY SIZE AND LOCATION.

2 CONNECT NEW VENT TO EXISTING VENT PIPE AT THIS APPROXIMATE LOCATION. CONTRACTOR TO

VERIFY SIZE AND LOCATION.

5 2" WASTE FROM ABOVE.

6 4" WASTE FROM ABOVE.

10 CONNECT FIXTURE TO EXISTING ROUGH-IN. CONTRACTOR TO VERIFY CONDITION OF PIPE BEFORE

CONNECTION IS MADE.

13 4" WASTE DOWN/ 2" VENT UP.

14 ROUTE SANITARY SEWER ABOVE FLOOR WITH MINIMUM SLOPE.

21 EXISTING ROOF DRAIN FROM ABOVE.

29 2" VENT UP FROM FIXTURE.

32 DRAIN PIPE ROUTED IN SURGICAL SUITE SHALL BE DOUBLE CONTAINMENT TO OUTSIDE OF SURGICAL

SUITE.

34 PLUMBING FIXTURES FURNISHED BY OWNER. CONTRACTOR TO VERIFY CONDITION OF FIXTURE BEFORE

INSTALLATION.

36 ROUTE SANITARY SEWER BELOW FLOOR WITH MINIMUM SLOPE.

38 2" WASTE DOWN/ 1-1/2" VENT UP FROM FIXTURE.

PLUMBING GENERAL NOTE:

1. THE FINAL SIZING AND ROUTING SHALL BE DONE BY THE DESIGNER OF RECORD.

2. DESIGN BUILD TEAM AND A/E OF RECORD MUST FOLLOW ALL CURRENT VA NATIONAL TIL

STANDARDS, INCLUDING VA NATIONAL CAD STANDARDS, THROUGHOUT DESIGN AND

CONSTRUCTION.

No. REVISION DESCRIPTION DATE

File details come from the government source that posted it. Updated .