01_Mold Report.pdf

PDF 4 MB Posted

Attached to
Y1AZ--Design Build, Construct SICU and Renovate Operating Rooms
Solicitation number
36C10F22R0036
Issued by

View the file

Other files

File Type Posted
Award Notice 36C10F24C0002.pdf PDF
36C10F22R0036 0004.pdf PDF
36C10F22R0036 0003.pdf PDF
36C10F22R0036 0002.pdf PDF
36C10F22R0036 0001.pdf PDF
36C10F22R0036.pdf PDF
45_PL102 - EIGHTH FLOOR -PLUMBING WASTE AND VENT PLAN.pdf PDF
40_PPD101 - SEVENTH FLOOR -PLUMBING DOMESTIC WATER DEMOLITION PLAN.pdf PDF
61_MHP100 - MECHANICAL DUCT and PIPING PLAN -ROOF LEVEL.pdf PDF
17_AF702 - FINISH PLAN -EIGHTH FLOOR.pdf PDF
07_ELEVATOR NARRATIVE.pdf PDF
52_MDH100 - MECHANICAL DUCT DEMOLITION PLAN -SEVENTH FLOOR.pdf PDF
100 percent RFP PLUMBING CALCS.pdf PDF
48_PJ101 - SEVENTH FLOOR -PLUMBING MEDICAL GAS PLAN.pdf PDF
55_MDP100 - MECHANICAL PIPING DEMOLTION PLAN -SEVENTH FLOOR.pdf PDF
44_PL101 - SEVENTH FLOOR -PLUMBING WASTE AND VENT PLAN.pdf PDF
24_QH105 - EQUIPMENT PLAN -EIGHTH FLOOR -AREA 1.pdf PDF
04_FIRE PROTECTION.pdf PDF
OR-SICU 100 percent Digital Material Board.pdf PDF
28_QH109 - INTERIOR EQUIPMENT ELEVATIONS.pdf PDF
27_QH108 - INTERIOR EQUIPMENT ELEVATIONS.pdf PDF
84_EY301 - SEVENTH FLOOR ELECTRICAL LOW VOLTAGE PLAN.pdf PDF
4_GI102 - LIFE SAFETY PLAN -EIGHTH FLOOR.pdf PDF
86_EP401 - ELECTRICAL LIGHTNING PROTECTION PLAN.pdf PDF
21_QH102 - EQUIPMENT PLAN -SEVENTH FLOOR -AREA 2.pdf PDF
13_AE115 - DIMENSION PLAN -EIGHTH FLOOR.pdf PDF
90_EP504 - ELECTRICAL DETAILS.pdf PDF
88_EP502 - SCHEDULES AND DETAILS.pdf PDF
26_QH107 - EQUIPMENT PLAN -EIGHTH FLOOR -AREA 3 and INTERIOR EQUIPMENT ELEVATIONS.pdf PDF
39_PLD102 - EIGHTH FLOOR -PLUMBING WASTE AND VENT DEMOLITION PLAN.pdf PDF
9_AE111 - REFERENCE PLAN -SEVENTH FLOOR.pdf PDF
12_AE114 - DIMENSION PLAN -SEVENTH FLOOR.pdf PDF
14_AE211 - REFLECTED CEILING PLAN -SEVENTH FLOOR.pdf PDF
Floor 7 Inventory OKC VAMC.pdf PDF
71_M-704 - MECHANICAL CONTROLS.pdf PDF
30_FA001 - FIRE ALARM_MASS NOTIFICATION GENERAL NOTES.pdf PDF
56_MDP101 - MECHANICAL PIPING DEMOLTION PLAN -EIGHTH FLOOR.pdf PDF
02_ARCHITECTURAL.pdf PDF
1_GI000 - COVER SHEET.pdf PDF
50_P-600 - PLUMBING SCHEDULES.pdf PDF
82_EL201 - SEVENTH FLOOR ELECTRICAL LIGHTING PLAN.pdf PDF
66_M-502 - MECHANICAL DETAILS.pdf PDF
60_MH103 - MECHANICAL ZONING and CONTROLS PLAN -EIGHTH FLOOR.pdf PDF
06_ELECTRICAL NARRATIVE.pdf PDF
02_STRUCTURAL NARRATIVE.pdf PDF
20_QH101 - EQUIPMENT PLAN -SEVENTH FLOOR -AREA 1.pdf PDF
38_PLD101 - SEVENTH FLOOR -PLUMBING WASTE AND VENT DEMOLITION PLAN.pdf PDF
Floor 8 Inventory OKC VAMC.pdf PDF
63_MP101 - MECHANICAL HVAC PIPING PLAN -EIGHTH FLOOR.pdf PDF
03_EQUIPMENT.pdf PDF
Show 40 more

Latest 50 of 122 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Mold Inspection

Report 7th & 8th Floor

OKC VA Hospital 921 NE 13th St.

Oklahoma City, OK 73104

07/31/2020

TABLE OF CONTENTS

1. ------------------------------------------------- INTRODUCTION

2. ------------------------------------------------- INSPECTION OBSERVIATIONS

3. ------------------------------------------------- VA REPRESNETATIVE INTERVIEW

4. ------------------------------------------------- FINDINGS AND RESULTS

9. ------------------------------------------------- RECOMMENDATIONS

9. -------------------------------------------------- REMEDIATION PROCEDURES

10.-------------------------------------------------- DRAWINGS OF SAMPLE LOCATIONS

13.-------------------------------------------------- LABORATORY RESULTS

INTRODUCTION

TEC-AN, Inc. was assigned by Spur Design a mold inspection of the renovation area on the 7th floor and addition of the 8th floor of the Oklahoma Veterans Administration Hospital located 921

N.E. 13th Street, Oklahoma City, Oklahoma.

In a meeting and walk through of the 7th and 8th floor with Seth Cavin, principle of Spur Design and Joyce Filsinger, Chief of Projects for the VA concerning the mold inspection. The general discussion related to the length of time the project has been sitting dormant and the General

Contractor’s lack of adherence to the drawings and specifications for the 8th floor SICU addition.

The contracts with the 7th and 8th floor contractors were terminated in 2016 by the VA.

Part of the 7th floor OR expansion and all the 8th floor SICU addition were stopped midway during construction due to the use of non-specification materials, equipment and not utilizing proper installation activities. The stoppage occurred in 2016 and little or no construction activities have occurred to date. Both the partial renovated area of the 7th and all the 8th floor have no conditioned air system operational currently.

Several of the windows on the 8th floor leaked and there has been some attempt to seal out the water intrusion. The 8th floor roof has had several leaks which have been sealed, however the roof leaks continue to occur.

TEC-AN, Inc. conducted an additional mold inspection on June 14th, 2020 with the collection of sheetrock wall plug samples primarily under the windows of the 7th and 8th floors. To complete the inspection an additional site visit occurred on June 29th, 2020 to collect tape lift samples and mold air samples from the 7th and 8th floors.

The plug samples, tape lift samples and air samples were analyzed by Quantem Laboratories of

Oklahoma City, Oklahoma with results in the body of this report.

INSPECTION OBSERVIATIONS

A mold inspection was conducted by Mold Inspection & Testing (MI&T) from December 9th, 2016 through December 12th, 2016. In review there looks to have been several locations on the

7th floor where the molded sheetrock was removed and disposed. With the original paper backed fiberglass insulation left in place.

7th Floor OR Expansion

The Mold Inspection conducted by Mold Inspection & Testing (MI&T) contained pictures of molded sheetrock walls and wall insulation on the 7th floor. However, the only issue noted in the report was inspecting the 7th floor after a pipe rupture with a note of no mold was visible.

During the TEC-AN, Inc. inspection it was noted there was no noticeable molded sheetrock walls and, in several areas, there was paperbacked fiberglass insulation in the open wall areas.

The paperbacked fiberglass insulation appeared to be the original insulation used during renovation.

There is a considerable amount of building materials stored throughout the 7th floor which appears to have been placed to be installed by the original contractor.

8th Floor Surgical Intensive Care Unit

The windows showed signs of water intrusion on the sills, sides and the top between the window and the building window openings. There was water staining on the wood used as window spacers between the window and the building window opening. It was noted a caulking was applied in the gaps to try and stop the water intrusion.

Several exterior metal windowsills were too wide, and the contractor cut the excess off and caulked the edges. This did not stop the rainwater from blowing into the space between the sill and the window opening.

Water staining was seen on the fire proofing, on unfinished floors and on interior sheetrock throughout the 8th floor. It was noted there are several openings through the roof deck to the exterior of the building.

There is a considerable amount of building materials stored throughout the 8th floor which appears to have been placed to be installed by the original contractor.

Roof

The following are several problems observed while inspecting the roof:

1. Roof drains are not resisted to allow water to drain properly which leaves a substantial amount of rainwater to stand on the roof.

2. The roofing material is of substandard quality and is showing signs of weathering and

UV deterioration.

3. Several areas the metal cap on the parapet wall were too wide and allows rain under the cap potentially migrating down into the parapet wall and under the roofing material.

VA REPRESENTATIVE INTERVIEW

Gary Cook and Grayson Cook of TEC-AN, Inc. met with Ms. Joyce Filsinger, Chief of Projects, for the Oklahoma City VA and Mr. John Wilson, COR, for the Oklahoma City VA to review some findings and address questions concerning the mold remediation and the time line for re-starting the construction project for completion.

Ms. Filsinger stated there has been removal of sheetrock walls with mold staining on the 7th floor. Gary Cook indicated the paperbacked fiberglass insulation has not been removed and the wall space has not been cleaned.

Ms. Filsinger and Mr. Wilson indicated the 8th floor has a considerable amount of rainwater intrusion from the windows and non-weatherproofed areas of the roof penetrations. Throughout the 8th floor there is stored building materials, such as sheet rock, which has been wet several times over the past four years

Ms. Filsinger and Mr. Wilson are concerned about the potential of finishing the new operating rooms on the 7th floor and the new SICU on the 8th floor while showing signs of considerable amount of mold contamination. Gary Cook questioned the estimated time before construction would resume. Both indicated there is several steps including the development of the overall scope, design and bid documents to be compiled and the selection of the contractor thus making the potential start date eighteen months out.

Eighteen months would mean a minimum of six season changes and the 7th and 8th floors would be directly impacted by temperature fluctuations and additional water intrusion of the seasons.

As there is no conditioned air system working in these spaces, this will enhance unmitigated mold growth.

FINDINGS AND RESULTS

Listed below are the laboratory results by floor consisting of the plug samples, tape lift samples and the air monitoring samples. All areas of the 7th floor OR expansion and the new construction on the 8th floor SICU have signs of mold contamination.

This section will cover the different types of samples collected and the results.

Mold Plug Samples – There were ten mold plug samples collected from sheetrock walls under the windows along the south and west exterior walls of the 7th floor. Seven (7) of the ten (10) plug samples collected tested positive for mold.

Sample # 07-01 07-02 07-03 07-04 07-05 07-06

Results Results Results Results Results Results

Alternaria Present Present

Ascospores Present Present

Aspergillus/Penicillium

Group

Present

Basidiospores Present

Bipolaris/Drechslera

Group (2)

Present

Cladosporium Present

Curvularia Present

Epicoccum Present

Hyphal Fragments Present Present

Pollen Present

Stachybotrys Present

No Mold Detected None detected

None detected

Sample # 07-07 07-08 07-09 07-10

Results Results Results Results

Ascospores Present

Hyphal Fragments Present Present

Stachybotrys Present

No Mold Detected None

Detected

Tape Lift Samples – There were two tape lift samples collected from the 7th floor in areas showing signs of mold growth. TL-701 was taken from the south exterior wall. TL-702 was taken from the northwest corner of the renovation project off the exterior wall.

Sample # TL-701 TL-702

Results Results

Acremonium

Alternaria Abundant

Aspergillus/Penicillium Group Abundant

Basidiospores

Bipolaris/Drechslera Group (2) Abundant

Cladisporium

Hyphal Fragments Abundant Abundant

Stachybotrys

No Mold Detected

7th Floor – There were three mold air samples collected from the 7th floor and one outside mold air sample collected. The outside sample was collected the day after a rain event and the temperature was 90 degrees and the relative humidity in the area collected was 82 percent.

Sample # Outside SP-701 SP-702 SP-703

Volume (L) 75 75 75 75

Detection Limit 13 13 13 13

Results

Counts/m3 Results

Counts/m3

Results

Counts/m3

Results

Counts/m3

Alternaria 413 80 Present

Ascospores 4800 1640 720 Present

Aspergillus/Penicillium Group 67 13

Basidioscopes 547 253 240 Present

Bipolaris/Drechslera Group (2) 53 Present

Cercospora 40 67 Present

Cerebella

Chaetomium Present

Cladosporium 18800 3013 800 Present

Curvularia Present

Epicoccum 13 Present

Fusarium

Helicomyces 13 13 13 Present

Hyphal Fragments 27 13 27 Present

Mildew

Nigrospora 13 Present

Periconia/Myxomycetes/Smuts 13 27 67 Present

Pithomyces/Ulocladium Present

Pollen 40 Present

Stachybotrys Present

Overloaded: Mold Present XX

Total results (Count/m3) 24759 5173 1893

Percent Coverage (%) 3% 2% 5% 95%

Overloaded:

Mold Present

8th Floor Surgical Intensive Care Unit – Mold Plug Samples – There were twelve mold plug samples collected from sheetrock walls under the windows along the north, west and southwest exterior walls of the 8th floor. Five (12) of the seventeen (17) plug samples collected tested positive for mold.

Sample # 08-01 08-02 08-03 08-04 08-05 08-06

Results Results Results Results Results Results

Ascospores Present

Hyphal Fragments Present Present

Nigrospora Present

Periconial/Myxomycetes/

Smuts

Present

Pollen Present

Stemphylium Present

No Mold Detected No Mold

Detected

No Mold

Detected

No Mold

Sample # 08-07 08-08 08-09 08-10 08-11 08-12

Results Results Results Results Results Results

Alternaria Present Present Present Present

Ascospores Present Present

Basidiospores Present Present Present

Bipolaris/Drechslera

Group (2)

Present

Cladosporium Present

Hyphal Fragments Present Present Present Present

Periconia/Myxomycetes/

Smuts

Present

Pollen Present Present Present Present Present

No Mold Detected No Mold

Samples # 08-13 08-14 08-15 08-16 08-17

Results Results Results Results Results

Alternaria Present Present

Ascospores Present

Aspergillus/Penicillium

Group

Present Present

Basidiospores Present Present

Bipolaris/Drechslera

Group (2)

Present

Cladosporium Present Present Present

Hyphal Fragments Present Present Present Present

Periconia/Myxomycete/

Smuts

Present Present

Pollen Present Present Present Present

No Mold Detected No Mold

8th Floor Surgical Intensive Care Unit - Tape Lift Samples – There were four tape lift samples collected from the 8th floor in areas showing signs of mold growth. TL-801, TL-802, TL-803 and TL-804 were all taken from the north exterior wall (reference sample location drawing).

Sample # TL-801 TL-802 TL-803 TL-804

Results Results Results Results

Acremonium Moderate

Alternaria Few Few Abundant

Aspergillus/Penicillium

Group

Moderate

Basidiospores Few

Bipolaris/Drechslera

Group (2)

Cladosporium Moderate

Hyphal Fragments Moderate Few Abundant

Stachybotrys Few

No Mold Detected No Mold Detected

8th Floor Surgical Intensive Care Unit – There were four mold air samples collected from the 8th floor and one outside mold air sample collected. The outside sample was collected the day after a rain event and the temperature was 90 degrees and the relative humidity in the area sampled was collected was 82 percent.

Sample # Outside SP-801 SP-802 SP-803 SP-804

Volume (L) 75 75 75 75 75

Detection limit 13 13 13 13 13 Results

Count/m3

Results

Count/m3

Results

Count/m3

Results

Count/m3

Results

Count/m3

Alternaria 413 147 67 187 53

Ascospores 4800 920 960 880 560

Aspergillus/Penicillium

Group

27 80

Basidiospores 547 293 427 347 253

Bipolaris/Drechslera

Group (2)

53 13 27 13

Cercospora 40 13 27 40

Cerebella 13

Chaetomium

Cladosporium 18800 2400 2187 2440 1293

Curvularia

Epicoccum 27 13 13

Fusarium 13

Helicomyces 13 13 13

Hyphal Fragments 27 40 93 120 53

Mildew 13

Nigrospora 13 13 13

Periconia/Myxomycetes/

Smuts

13 107 67 200 13

Pithomyces/Ulocladium 13 27

Pollen 40 107 40 13

Polythrincium 13

Overloaded; Mold

Present

Total Results

(Counts/m3)

24759 4080 3960 4320 2344

Percentage coverage (%) 3% 30% 30% 35% 20%

RECOMMENDATIONS

1. Monitor all areas of the 7th and 8th floor and take the necessary steps to minimize mold growth until a new start date has been determined.

2. Repair all windows to assure a watertight seal.

3. Inspect and remove all building materials showing signs of mold contamination stored on the 7th and 8th floors.

4. Repair or replace roof to ensure all leaks have been stopped.

5. Remove all sheetrock walls and paperbacked fiberglass from the targeted area and clean the wall space with a biocide.

6. Replace the sheetrock walls with a mold resistance sheetrock wall.

7. Paint surfaces with a mold killing primer before finish paint is applied.

REMEDIATION PROCEDURES

1. All employees conducting remediation are to don the proper PPE.

2. Place HEP equipped air scrubbers in the remediation area.

3. Remove sheetrock, paperbacked fiberglass insulation, ducting and related waste.

4. Place waste in a 4-mil poly disposal bag, twist the bag opening and tape closed or wrap the waste in a 4-mil poly sheet and tape closed all the edges.

5. Transport all waste in a poly cart draped with 4-mil poly sheet.

6. Determine the best way to transport the waste out of the hospital.

7. Transport waste during the less active times in the hospital to transport waste.

Microbiology Analytical Report (Results)

Date Received: 06/15/2020

Project: VA Hospital 7th and 8th Floor

QuanTEM Lab ID: 323733

Analyzed By: Claudia Cubillos

Methodology: Bulk, Qualitative NonCulturable, MM003, MM004, MM005 Location: 921 NE 13th OKC, OK

Project No: N/A

Account Number: A363

Received By: Elena LaFarge

Date Analyzed: 06/16/2020

Client: Tec-An, Inc.

2517 Purdue Dr.

Oklahoma City, OK 73125

AIHA-LAP, LLC: 101352

Results Results Results Results Results Results

323733-001 323733-002 323733-003 323733-004 323733-005 323733-006QuanTEM Sample ID

07-01 07-02 07-03 07-04 07-05 07-06Client Sample ID

Present PresentAlternaria

Present PresentAscospores

PresentAspergillus/Penicillium Group

PresentBasidiospores

PresentBipolaris/Drechslera Group (2)

PresentCladosporium

PresentCurvularia

PresentEpicoccum

Present PresentHyphal Fragments

PresentPollen

PresentStachybotrys

X XNo Mold Detected

No Mold

Detected

No Mold

Detected

Comments

Page 1 of 306/16/2020

Project: VA Hospital 7th and 8th Floor

QuanTEM Lab ID: 323733

Analyzed By: Claudia Cubillos

Methodology: Bulk, Qualitative NonCulturable, MM003, MM004, MM005 Location: 921 NE 13th OKC, OK

Project No: N/A

Account Number: A363

Received By: Elena LaFarge

Date Analyzed: 06/16/2020

Client: Tec-An, Inc.

2517 Purdue Dr.

Oklahoma City, OK 73125

AIHA-LAP, LLC: 101352

Results Results Results Results

323733-007 323733-008 323733-009 323733-010QuanTEM Sample ID

07-07 07-08 07-09 07-10Client Sample ID

PresentAscospores

Present PresentHyphal Fragments

PresentStachybotrys

XNo Mold Detected

No Mold

Detected

Page 2 of 306/16/2020

Approved:

Claudia Cubillos, Laboratory Analyst

Microbiology Analytical Report (Signature Page)

Unless otherwise noted, upon receipt the condition of the sample was acceptable for analysis.

(2)Also includes spores from Exosporium, Exserohilum and Helminthosporium

The results taken from your home, building, etc. cannot be interpreted without physical inspection of the contaminated area or without considering the building’s characteristics and the factors that led to the present condition. Interpretation of results is the responsibility of the company or individual who conducted the investigation.

This report shall not be reproduced except in full, without the written approval of the laboratory.

This report may not be used to claim endorsement by AIHA-LAP, LLC. or any agency of the U.S. Government.

Customer provided data such as volumes, areas, etc., cannot be verified by QuanTEM Laboratories, LLC.

Date Received: 06/15/2020

Project: VA Hospital 7th and 8th Floor

QuanTEM Lab ID: 323733

Analyzed By: Claudia Cubillos

Methodology: Bulk, Qualitative NonCulturable, MM003, MM004, MM005 Location: 921 NE 13th OKC, OK

Project No: N/A

Account Number: A363

Received By: Elena LaFarge

Date Analyzed: 06/16/2020

Client: Tec-An, Inc.

2517 Purdue Dr.

Oklahoma City, OK 73125

AIHA-LAP, LLC: 101352

Page 3 of 306/16/2020

Project: VA Hospital 7th & 8th Floor

QuanTEM Lab ID: 323734

Analyzed By: Robin Brady Naik

Methodology: Bulk, Qualitative NonCulturable, MM003, MM004, MM005 Location: 921 NE 13th OKC, OK

Project No: N/A

Account Number: A363

Received By: Robin Brady Naik

Date Analyzed: 06/16/2020

Client: Tec-An, Inc.

2517 Purdue Dr.

Oklahoma City, OK 73125

AIHA-LAP, LLC: 101352

Results Results Results Results Results Results

323734-001 323734-002 323734-003 323734-004 323734-005 323734-006QuanTEM Sample ID

08-01 08-02 08-03 08-04 08-05 08-06Client Sample ID

PresentAscospores

Present PresentHyphal Fragments

PresentNigrospora

PresentPericonia/Myxomycetes/Smuts

PresentPollen

PresentStemphylium

X X XNo Mold Detected

No Mold

Detected

No Mold

Detected

No Mold

Detected

Page 1 of 406/16/2020

Project: VA Hospital 7th & 8th Floor

QuanTEM Lab ID: 323734

Analyzed By: Robin Brady Naik

Methodology: Bulk, Qualitative NonCulturable, MM003, MM004, MM005 Location: 921 NE 13th OKC, OK

Project No: N/A

Account Number: A363

Received By: Robin Brady Naik

Date Analyzed: 06/16/2020

Client: Tec-An, Inc.

2517 Purdue Dr.

Oklahoma City, OK 73125

AIHA-LAP, LLC: 101352

Results Results Results Results Results Results

323734-007 323734-008 323734-009 323734-010 323734-011 323734-012QuanTEM Sample ID

08-07 08-08 08-09 08-10 08-11 08-12Client Sample ID

Present Present Present PresentAlternaria

Present PresentAscospores

Present Present PresentBasidiospores

PresentBipolaris/Drechslera Group (2)

PresentCladosporium

Present Present Present PresentHyphal Fragments

PresentPericonia/Myxomycetes/Smuts

Present Present Present Present PresentPollen

XNo Mold Detected

No Mold

Detected

Page 2 of 406/16/2020

Project: VA Hospital 7th & 8th Floor

QuanTEM Lab ID: 323734

Analyzed By: Robin Brady Naik

Methodology: Bulk, Qualitative NonCulturable, MM003, MM004, MM005 Location: 921 NE 13th OKC, OK

Project No: N/A

Account Number: A363

Received By: Robin Brady Naik

Date Analyzed: 06/16/2020

Client: Tec-An, Inc.

2517 Purdue Dr.

Oklahoma City, OK 73125

AIHA-LAP, LLC: 101352

Results Results Results Results Results

323734-013 323734-014 323734-015 323734-016 323734-017QuanTEM Sample ID

08-13 08-04 08-15 08-06 08-17Client Sample ID

Present PresentAlternaria

PresentAscospores

Present PresentAspergillus/Penicillium Group

Present PresentBasidiospores

PresentBipolaris/Drechslera Group (2)

Present Present PresentCladosporium

Present Present Present PresentHyphal Fragments

Present PresentPericonia/Myxomycetes/Smuts

Present Present Present PresentPollen

XNo Mold Detected

No Mold

Detected

Page 3 of 406/16/2020

Robin Brady Naik, Analyst

Microbiology Analytical Report (Signature Page)

Unless otherwise noted, upon receipt the condition of the sample was acceptable for analysis.

(2)Also includes spores from Exosporium, Exserohilum and Helminthosporium

Results are preliminary pending quality control review. Clients will be notified immediately if a report revision is necessary.

The results taken from your home, building, etc. cannot be interpreted without physical inspection of the contaminated area or without considering the building’s characteristics and the factors that led to the present condition. Interpretation of results is the responsibility of the company or individual who conducted the investigation.

This report shall not be reproduced except in full, without the written approval of the laboratory.

This report may not be used to claim endorsement by AIHA-LAP, LLC. or any agency of the U.S. Government.

Customer provided data such as volumes, areas, etc., cannot be verified by QuanTEM Laboratories, LLC.

Date Received: 06/15/2020

Project: VA Hospital 7th & 8th Floor

QuanTEM Lab ID: 323734

Analyzed By: Robin Brady Naik

Methodology: Bulk, Qualitative NonCulturable, MM003, MM004, MM005 Location: 921 NE 13th OKC, OK

Project No: N/A

Account Number: A363

Received By: Robin Brady Naik

Date Analyzed: 06/16/2020

Client: Tec-An, Inc.

2517 Purdue Dr.

Oklahoma City, OK 73125

Page 4 of 406/16/2020

Date Received: 06/30/2020

Project: VA Hospital 7th 8th Floor

QuanTEM Lab ID: 324172

Analyzed By: Robin Brady Naik

Methodology: Tape, Qualitative NonCulturable, MM002

Location: 921 NE 13th OKC, OK

Project No: N/A

Account Number: A363

Received By: Elena LaFarge

Date Analyzed: 06/30/2020

Client: Tec-An, Inc.

2517 Purdue Dr.

Oklahoma City, OK 73125

AIHA-LAP, LLC: 101352

Results Results Results Results Results Results

324172-001 324172-002 324172-003 324172-004 324172-005 324172-006QuanTEM Sample ID

TL-701 TL-702 TL-801 TL-802 TL-803 TL-804Client Sample ID

ModerateAcremonium

Abundant Few Few AbundantAlternaria

Abundant ModerateAspergillus/Penicillium Group

FewBasidiospores

AbundantBipolaris/Drechslera Group (2)

ModerateCladosporium

Abundant Abundant Moderate Few AbundantHyphal Fragments

FewStachybotrys

XNo Mold Detected

No Mold

Detected

Page 1 of 206/30/2020

Microbiology Analytical Report (Signature Page)

Unless otherwise noted, upon receipt the condition of the sample was acceptable for analysis.

(2)Also includes spores from Exosporium, Exserohilum and Helminthosporium

Few=10 or fewer fungal structures detected over area analyzed; Abundant=fungal structures detected in 75% or more of the area analyzed or more than 500 fungal structures present; Moderate=fungal structure concentrations between few & abundant.

The results taken from your home, building, etc. cannot be interpreted without physical inspection of the contaminated area or without considering the building’s characteristics and the factors that led to the present condition. Interpretation of results is the responsibility of the company or individual who conducted the investigation.

This report shall not be reproduced except in full, without the written approval of the laboratory.

This report may not be used to claim endorsement by AIHA-LAP, LLC. or any agency of the U.S. Government.

Customer provided data such as volumes, areas, etc., cannot be verified by QuanTEM Laboratories, LLC.

Date Received: 06/30/2020

Project: VA Hospital 7th 8th Floor

QuanTEM Lab ID: 324172

Analyzed By: Robin Brady Naik

Methodology: Tape, Qualitative NonCulturable, MM002

Location: 921 NE 13th OKC, OK

Project No: N/A

Account Number: A363

Received By: Elena LaFarge

Date Analyzed: 06/30/2020

Client: Tec-An, Inc.

2517 Purdue Dr.

Oklahoma City, OK 73125

Page 2 of 206/30/2020

Date Received: 06/29/2020

Project: VA Hospital

QuanTEM Lab ID: 324162

Analyzed By: Robin Brady Naik

Methodology: Spore Trap, Quantitative NonCulturable, MM001 Location: 921 NE 13th OKC, OK

Project No: N/A

Account Number: A363

Received By: Robin Brady Naik

Date Analyzed: 06/30/2020

Client: Tec-An, Inc.

2517 Purdue Dr.

Oklahoma City, OK 73125

AIHA-LAP, LLC: 101352

Results

Counts/m³

Results

Counts/m³

Results

Counts/m³

Results

Counts/m³

Results

Counts/m³

Results

Counts/m³

324162-001 324162-002 324162-003 324162-004 324162-005 324162-006QuanTEM Sample ID

Outside SP-701 SP-702 SP-703 SP-801 SP-802Client Sample ID

75 75 75 75 75 75Volume (L)

13 13 13 13 13 13Detection Limit

413 80 Present 147 67Alternaria

4800 1640 720 Present 920 960Ascospores

67 13Aspergillus/Penicillium Group

547 253 240 Present 293 427Basidiospores

53 Present 13Bipolaris/Drechslera Group (2)

40 67 Present 13 27Cercospora

13Cerebella

PresentChaetomium

18800 3013 800 Present 2400 2187Cladosporium

PresentCurvularia

13 Present 27Epicoccum

13Fusarium

13 13 13 Present 13Helicomyces

27 13 27 Present 40 93Hyphal Fragments

13Mildew

13 Present 13Nigrospora

13 27 67 Present 107 67Periconia/Myxomycetes/Smuts

Present 13 27Pithomyces/Ulocladium

40 Present 107 40Pollen

PresentStachybotrys

XOverloaded; Mold Present

24759 5173 1893 4080 3960Total Results (Counts/m³)

3 2 5 95 30 30Percent Coverage (%)

Overloaded;

Mold Present

Page 1 of 506/30/2020

Project: VA Hospital

QuanTEM Lab ID: 324162

Analyzed By: Robin Brady Naik

Methodology: Spore Trap, Quantitative NonCulturable, MM001 Location: 921 NE 13th OKC, OK

Project No: N/A

Account Number: A363

Received By: Robin Brady Naik

Date Analyzed: 06/30/2020

Client: Tec-An, Inc.

2517 Purdue Dr.

Oklahoma City, OK 73125

AIHA-LAP, LLC: 101352

Results

Counts/m³

Results

Counts/m³

324162-007 324162-008QuanTEM Sample ID

SP-803 SP-804Client Sample ID

75 75Volume (L)

13 13Detection Limit

187 53Alternaria

880 560Ascospores

27 80Aspergillus/Penicillium Group

347 253Basidiospores

27 13Bipolaris/Drechslera Group (2)

40Cercospora

2440 1293Cladosporium

13 13Epicoccum

13Helicomyces

120 53Hyphal Fragments

13Nigrospora

200 13Periconia/Myxomycetes/Smuts

13Pollen

13Polythrincium

4320 2344Total Results (Counts/m³)

35 20Percent Coverage (%)

Page 2 of 506/30/2020

Microbiology Analytical Report (Counts)

Project: VA Hospital

QuanTEM Lab ID: 324162

Analyzed By: Robin Brady Naik

Methodology: Spore Trap, Quantitative NonCulturable, MM001 Location: 921 NE 13th OKC, OK

Project No: N/A

Account Number: A363

Received By: Robin Brady Naik

Date Analyzed: 06/30/2020

Client: Tec-An, Inc.

2517 Purdue Dr.

Oklahoma City, OK 73125

AIHA-LAP, LLC: 101352

Counts Counts Counts Counts Counts Counts

324162-001 324162-002 324162-003 324162-004 324162-005 324162-006QuanTEM Sample ID

Outside SP-701 SP-702 SP-703 SP-801 SP-802Client Sample ID

75 75 75 75 75 75Volume (L)

31 6 11 5Alternaria

360 123 54 69 72Ascospores

5 1Aspergillus/Penicillium Group

41 19 18 22 32Basidiospores

4 1Bipolaris/Drechslera Group (2)

3 5 1 2Cercospora

1Cerebella

1410 226 60 180 164Cladosporium

1 2Epicoccum

1Fusarium

1 1 1 1Helicomyces

2 1 2 3 7Hyphal Fragments

1Mildew

1 1Nigrospora

1 2 5 8 5Periconia/Myxomycetes/Smuts

1 2Pithomyces/Ulocladium

3 8 3Pollen

Page 3 of 506/30/2020

Microbiology Analytical Report (Counts)

Project: VA Hospital

QuanTEM Lab ID: 324162

Analyzed By: Robin Brady Naik

Methodology: Spore Trap, Quantitative NonCulturable, MM001 Location: 921 NE 13th OKC, OK

Project No: N/A

Account Number: A363

Received By: Robin Brady Naik

Date Analyzed: 06/30/2020

Client: Tec-An, Inc.

2517 Purdue Dr.

Oklahoma City, OK 73125

AIHA-LAP, LLC: 101352

Counts Counts

324162-007 324162-008QuanTEM Sample ID

SP-803 SP-804Client Sample ID

75 75Volume (L)

14 4Alternaria

66 42Ascospores

2 6Aspergillus/Penicillium Group

26 19Basidiospores

2 1Bipolaris/Drechslera Group (2)

3Cercospora

183 97Cladosporium

1 1Epicoccum

1Helicomyces

9 4Hyphal Fragments

1Nigrospora

15 1Periconia/Myxomycetes/Smuts

1Pollen

1Polythrincium

Page 4 of 506/30/2020

Microbiology Analytical Report (Signature Page)

Unless otherwise noted, upon receipt the condition of the sample was acceptable for analysis.

(2)Also includes spores from Exosporium, Exserohilum and Helminthosporium

Percent coverage = amount of particulate matter. With 25-50% coverage, results may be underestimated; with 50-70% coverage, results will be underestimated; with >70% coverage, slides are designated overloaded (too dirty to count).

The results taken from your home, building, etc. cannot be interpreted without physical inspection of the contaminated area or without considering the building’s characteristics and the factors that led to the present condition. Interpretation of results is the responsibility of the company or individual who conducted the investigation.

This report shall not be reproduced except in full, without the written approval of the laboratory.

This report may not be used to claim endorsement by AIHA-LAP, LLC. or any agency of the U.S. Government.

Customer provided data such as volumes, areas, etc., cannot be verified by QuanTEM Laboratories, LLC.

Date Received: 06/29/2020

Project: VA Hospital

QuanTEM Lab ID: 324162

Analyzed By: Robin Brady Naik

Methodology: Spore Trap, Quantitative NonCulturable, MM001 Location: 921 NE 13th OKC, OK

Project No: N/A

Account Number: A363

Received By: Robin Brady Naik

Date Analyzed: 06/30/2020

Client: Tec-An, Inc.

2517 Purdue Dr.

Oklahoma City, OK 73125

Page 5 of 506/30/2020