55-Sec 32 01 17.61 - POLYMER MODIFED ASPHALT JOINT AND CRACK SEALING.pdf

PDF 138 KB Posted

Attached to
Morrisville Borough 2026 Design/Build Curb Ramp Project
Solicitation number
Not on record
Issued by
Bucks County, Pennsylvania

About this file

This is a technical specification document for polymer modified asphalt joint and crack sealing work prepared for the Municipal Authority of the Borough of Morrisville in Bucks County, Pennsylvania, as part of their 2026 Design/Build Curb Ramp Project. The specification outlines the materials, products, and execution requirements for cleaning and sealing pavement surface joints associated with the removal and replacement of concrete curb and curb ramps. The work involves the application of polymer modified asphalt sealant to joints ranging from 1/8 inch to 1 inch wide, with cleaning extending 4 to 6 inches on either side of joints. The specification requires PG 64-22 asphalt cement meeting PennDOT Bulletin 25 standards, combined with reclaimed granulated rubber at a ratio of 2 pounds per gallon of asphalt cement. All materials must be obtained from producers listed in PennDOT Bulletin 15, with comprehensive certification and quality control documentation required for each batch or tank shipment.

The specification establishes detailed procedural requirements for mixing, heating, and application of the sealant material. Mixing procedures require an oil-jacketed double wall kettle with indirect heating, maintaining temperatures between 350°F and 380°F for 30 minutes without exceeding 400°F. Surface preparation demands air blast cleaning using compressed air at minimum 100 psi or hot compressed air lances, with application permitted only when air temperatures range between 40°F and 90°F. The sealer must be applied level with the pavement surface using a wand and V-shaped squeegee, with no more than 1/8 inch buildup allowed. No bituminous overlay may be placed within 72 hours of sealing unless approved by the Engineer. Contractor certification of material compatibility with specified aggregates and contamination-free shipment containers is mandatory, with all work conducted in accordance with PennDOT Publication 408 and Borough Standards.

View the file

Other files

File Type Posted
53-Sec 10 14 53 - POST MOUNTED SIGNS.pdf PDF
9-Doc 00 45 10 - BIDDER ACKNOWLEDGEMENT FORM.pdf PDF
45-Sec 01 50 00 - CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS.pdf PDF
39-Sec 01 31 00 - COORDINATION AND MEETINGS.pdf PDF
18-Doc 00 62 16 - CERTIFICATE OF INSURANCE.pdf PDF
35-Doc 00 91 13 - ADDENDA.pdf PDF
29-Doc 00 73 00 6 - RESPONSIBLE - CONTRACTOR ORDINANCE.pdf PDF
48-Sec 01 70 00 - CONTRACT CLOSEOUT.pdf PDF
30-Doc 00 73 00 07 - APPENDIX D - COVER.pdf PDF
13-Doc 00 45 53 - AGREEMENT OF SURETY COMPANY.pdf PDF
54-Sec 31 23 33 - EXCAVATION BACKFILL AND COMPACTION.pdf PDF
32-Doc 00 73 00 08 Part 1 Contract Language Requirements.pdf PDF
42-Sec 01 33 00 - SUBMITTALS.pdf PDF
49-Sec 02 41 16 - DEMOLITION.pdf PDF
6-Doc 00 21 13.1 - INSTRUCTIONS FOR ELECTRONIC BIDDING.pdf PDF
58-Sec 32 13 13 - PORTLAND CEMENT CONCRETE PAVING.pdf PDF
22-Doc 00 72 00 - GENERAL CONDITIONS.pdf PDF
46-Sec 01 55 26 - TRAFFIC REGULATION.pdf PDF
38-Sec 01 29 00 - CONTRACT CONSIDERATIONS.pdf PDF
56-Sec 32 12 00 - BITUMINOUS CONCRETE PAVING.pdf PDF
2-Doc 00 01 10-TOC.pdf PDF
24-Doc 00 73 00 1 - APPENDIX A - COVER.pdf PDF
19-Doc 00 65 19.13 - CONTRACTORS AFFIDAVIT.pdf PDF
43-Sec 01 40 00 - QUALITY CONTROL.pdf PDF
31-Doc 00 73 00 07 APPENDIX D - CDBG AND STATE REQUIREMENTS.pdf PDF
36-Sec 01 11 13 - SUMMARY OF WORK.pdf PDF
1-Doc 00 01 01 - TITLE SHEET AND COVER.pdf PDF
5-Doc 00 21 13 - INSTRUCTIONS TO BIDDERS - EBID.pdf PDF
34-Doc 00 73 00 10 - Part 3 Section 3 Requirements.pdf PDF
40-Sec 01 32 16 - NARRATIVE CONSTRUCTION SCHEDULE.pdf PDF
20-Doc 00 65 19.16 - CONTRACTORS RELEASE OF LIENS.pdf PDF
50-Sec 03 11 00 - CONCRETE FORMWORK.pdf PDF
59-Sec 32 17 23.33 - THERMOPLASTIC PAVEMENT MARKINGS.pdf PDF
37-Sec 01 22 00 - MEASUREMENT AND PAYMENT.pdf PDF
25-Doc 00 73 00 1 - APPENDIX A - DAVIS BACON FEDERAL WAGE DETERMINATION.pdf PDF
62-CDBG Curb Ramp Concept Plans.pdf PDF
44-Sec 01 42 13 - ORGANIZATION AND REFERENCE ACRONYMS.pdf PDF
15-Doc 00 61 13.13 - PERFORMANCE BOND.pdf PDF
47-Sec 01 60 00 - MATERIAL AND EQUIPMENT.pdf PDF
16-Doc 00 61 13.16 - PAYMENT BOND.pdf PDF
4-Doc 00 11 13 - ADVERTISEMENT FOR BIDS.pdf PDF
57-Sec 32 12 23 - RESTORATION OF PAVED SURFACES.pdf PDF
52-Sec 03 30 00 - CAST IN PLACE CONCRETE.pdf PDF
61-Sec 32 92 00 - FINISH GRADING, SEEDING, AND SODDING.pdf PDF
41-Sec 01 32 36 - AUDIO-VIDEOTAPING.pdf PDF
23-Doc 00 73 00 0 - SUPPLEMENTARY CONDITIONS.pdf PDF
7-Doc 00 41 00 - BID FORM - EBID.pdf PDF
17-Doc 00 61 19 - MAINTENANCE BOND.pdf PDF
10-Doc 00 45 13 - BIDDER QUALIFICATION STATEMENT.pdf PDF
21-Doc 00 65 19.19 - CONSENT OF SURETY.pdf PDF
Show 40 more

Latest 50 of 125 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

POLYMER MODIFIED ASPHALT JOINT AND CRACK SEALING

32 01 17.61-1

SECTION 32 01 17.61

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Asphaltic Joint and Crack Sealing

1.02 DESCRIPTION OF WORK

A. This work is the cleaning and sealing of pavement surface joints associated with the removal and replacement of concrete curb and curb ramps with polymer modified asphalt.

PART 2 PRODUCTS

2.01 ASPHALT CEMENT PG 64-22

A. Obtain material meeting the requirements of PennDOT Bulletin 25 from a producer listed in Bulletin 15.

1. Quality Control Section 01 40 00

2. Certification

a. General

1) When a bituminous material tank is filled, submit a copy of the required test results to the MTD for verification of compliance with Department specifications.

2) Specify the type of material, tank number, and company lot number of the certificate for cross-reference to the bill of lading.

3) Have a responsible company official sign the certificate.

4) Obtain a verification sample from each batch. A batch is a tank completely filled, partially filled, or refilled with a blend of residual and new material.

5) Test one-half (1/2) sample and forward the results to the MTD. Forward the remaining one-half (1/2) sample to the MTD for testing. The MTD will evaluate quality control on the basis of three (3) consecutive verification samples.

b. Levels of Certification

1) Use the same levels of certification as specified in PennDOT Publication 408, Section 701.1(b)2, except substitute the word “batch” for the word “silo.”

c. Handling and Transportation, Section 01 60 00

1) Furnish the vendor’s bill of lading for each shipment (one copy retained by the vendor and one copy included with the shipment to the project). Use a form acceptable to the MTD, containing the following information:

a) Statement that material has been testing and meets Department specifications.

b) Class of Material

c) Tank Number

d) Company Batch Number

e) Date of Shipment

f) Producer’s Name and Location

g) Name and Location of Consignee, (Bituminous Concrete Plant or

32 01 17.61-2

Maintenance District)

h) Mix or Application Temperatures, Minimum and Maximum

i) Viscosity at 140F

j) Penetration at 77F

k) Trailer Number

l) Specific Gravity of Asphalt Cement at 77F

m) Statement that the material is compatible with job aggregate E-4, E-5, E-10, E-11, E-12, MC-400, and MC-800

n) Percent Bitumen Residue by Weight (for liquid bituminous materials only)

o) Quality of Material

p) Statement that the shipment container was determined to be reasonably free of contamination immediately prior to loading

PART 3 EXECUTION

3.01 GENERAL

A. Provide a mixture of asphalt cement and reclaimed granulated rubber, combined to the specified proportions, or furnish a premixed composition as specified in Section 469.2(c) or (d).

3.02 MIXING PROCEDURES

A. Combine the PG 64-22 and reclaimed granulated rubber to obtain a mixture having proportions of two (2 lbs) pounds of RGR per gallon of asphalt cement. Blend the PG 64-22 and reclaimed granulated rubber in an oil-jacketed double wall kettle (indirect hating) equipped with agitator and two (2") inch hot asphalt pump. Provide separate thermometers for oil bath. Heat and agitate the mixture with the temperature range of 350F - 380F for thirty

(30) minutes. Do not allow the operating temperature in the kettle to exceed 400F.

B. For premixed material, as specified in Section 469.2(c) or (d), obtain the safe heating temperature range and recommended pouring temperature from the manufacturer’s shipping container. Place the material within this temperature range, and as close as possible to the recommended pouring temperature. Maintain a safe heating temperature. Do not maintain any single batch of material at the pouring temperature for more than four (4) hours. Reheat only in accordance with manufacturer’s recommendations.

3.03 SURFACE PREPARATION

A. Apply sealer only after joints and adjacent pavement surfaces are clean, dry, and free of any loose material and debris. Clean the pavement for four (4") to six (6") inches on either side of the joint. Air blast joints immediately prior to sealing. Use a compressed air stream of at least 100 psi measured at the source, or use a hot compressed air lance for cleaning and drying damp cracks in the bituminous pavements. Care should be taken to ensure that damage to the surrounding pavement area from overheating does not occur. Seal joints (1/8) to one (1") inch wide with polymer modified asphalt.

3.04 SEALING

A. Apply polymer modified asphalt to prepared joints, level with the pavement surface, using a wand followed by a standard “V” shaped asphalt squeegee. Leave no more than 1/8 inch buildup. Do not place sealer when the air temperature is below 40F or above 90F, unless otherwise permitted by the Engineer if the hot compressed air lance used can sufficiently warm the crack to ensure adhesion between the pavement and the sealer. Do not place bituminous overlay within seventy-two (72) hours of sealing unless permitted by Engineer.

02547-3

END OF SECTION