55-Sec 32 01 17.61 - POLYMER MODIFED ASPHALT JOINT AND CRACK SEALING.pdf
PDF 138 KB Posted
- Solicitation number
- Not on record
- Issued by
- Bucks County, Pennsylvania
About this file
This is a technical specification document for polymer modified asphalt joint and crack sealing work prepared for the Municipal Authority of the Borough of Morrisville in Bucks County, Pennsylvania, as part of their 2026 Design/Build Curb Ramp Project. The specification outlines the materials, products, and execution requirements for cleaning and sealing pavement surface joints associated with the removal and replacement of concrete curb and curb ramps. The work involves the application of polymer modified asphalt sealant to joints ranging from 1/8 inch to 1 inch wide, with cleaning extending 4 to 6 inches on either side of joints. The specification requires PG 64-22 asphalt cement meeting PennDOT Bulletin 25 standards, combined with reclaimed granulated rubber at a ratio of 2 pounds per gallon of asphalt cement. All materials must be obtained from producers listed in PennDOT Bulletin 15, with comprehensive certification and quality control documentation required for each batch or tank shipment.
The specification establishes detailed procedural requirements for mixing, heating, and application of the sealant material. Mixing procedures require an oil-jacketed double wall kettle with indirect heating, maintaining temperatures between 350°F and 380°F for 30 minutes without exceeding 400°F. Surface preparation demands air blast cleaning using compressed air at minimum 100 psi or hot compressed air lances, with application permitted only when air temperatures range between 40°F and 90°F. The sealer must be applied level with the pavement surface using a wand and V-shaped squeegee, with no more than 1/8 inch buildup allowed. No bituminous overlay may be placed within 72 hours of sealing unless approved by the Engineer. Contractor certification of material compatibility with specified aggregates and contamination-free shipment containers is mandatory, with all work conducted in accordance with PennDOT Publication 408 and Borough Standards.
View the file
Other files
Show 40 more
Latest 50 of 125 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
POLYMER MODIFIED ASPHALT JOINT AND CRACK SEALING
32 01 17.61-1
SECTION 32 01 17.61
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Asphaltic Joint and Crack Sealing
1.02 DESCRIPTION OF WORK
A. This work is the cleaning and sealing of pavement surface joints associated with the removal and replacement of concrete curb and curb ramps with polymer modified asphalt.
PART 2 PRODUCTS
2.01 ASPHALT CEMENT PG 64-22
A. Obtain material meeting the requirements of PennDOT Bulletin 25 from a producer listed in Bulletin 15.
1. Quality Control Section 01 40 00
2. Certification
a. General
1) When a bituminous material tank is filled, submit a copy of the required test results to the MTD for verification of compliance with Department specifications.
2) Specify the type of material, tank number, and company lot number of the certificate for cross-reference to the bill of lading.
3) Have a responsible company official sign the certificate.
4) Obtain a verification sample from each batch. A batch is a tank completely filled, partially filled, or refilled with a blend of residual and new material.
5) Test one-half (1/2) sample and forward the results to the MTD. Forward the remaining one-half (1/2) sample to the MTD for testing. The MTD will evaluate quality control on the basis of three (3) consecutive verification samples.
b. Levels of Certification
1) Use the same levels of certification as specified in PennDOT Publication 408, Section 701.1(b)2, except substitute the word “batch” for the word “silo.”
c. Handling and Transportation, Section 01 60 00
1) Furnish the vendor’s bill of lading for each shipment (one copy retained by the vendor and one copy included with the shipment to the project). Use a form acceptable to the MTD, containing the following information:
a) Statement that material has been testing and meets Department specifications.
b) Class of Material
c) Tank Number
d) Company Batch Number
e) Date of Shipment
f) Producer’s Name and Location
g) Name and Location of Consignee, (Bituminous Concrete Plant or
32 01 17.61-2
Maintenance District)
h) Mix or Application Temperatures, Minimum and Maximum
i) Viscosity at 140F
j) Penetration at 77F
k) Trailer Number
l) Specific Gravity of Asphalt Cement at 77F
m) Statement that the material is compatible with job aggregate E-4, E-5, E-10, E-11, E-12, MC-400, and MC-800
n) Percent Bitumen Residue by Weight (for liquid bituminous materials only)
o) Quality of Material
p) Statement that the shipment container was determined to be reasonably free of contamination immediately prior to loading
PART 3 EXECUTION
3.01 GENERAL
A. Provide a mixture of asphalt cement and reclaimed granulated rubber, combined to the specified proportions, or furnish a premixed composition as specified in Section 469.2(c) or (d).
3.02 MIXING PROCEDURES
A. Combine the PG 64-22 and reclaimed granulated rubber to obtain a mixture having proportions of two (2 lbs) pounds of RGR per gallon of asphalt cement. Blend the PG 64-22 and reclaimed granulated rubber in an oil-jacketed double wall kettle (indirect hating) equipped with agitator and two (2") inch hot asphalt pump. Provide separate thermometers for oil bath. Heat and agitate the mixture with the temperature range of 350F - 380F for thirty
(30) minutes. Do not allow the operating temperature in the kettle to exceed 400F.
B. For premixed material, as specified in Section 469.2(c) or (d), obtain the safe heating temperature range and recommended pouring temperature from the manufacturer’s shipping container. Place the material within this temperature range, and as close as possible to the recommended pouring temperature. Maintain a safe heating temperature. Do not maintain any single batch of material at the pouring temperature for more than four (4) hours. Reheat only in accordance with manufacturer’s recommendations.
3.03 SURFACE PREPARATION
A. Apply sealer only after joints and adjacent pavement surfaces are clean, dry, and free of any loose material and debris. Clean the pavement for four (4") to six (6") inches on either side of the joint. Air blast joints immediately prior to sealing. Use a compressed air stream of at least 100 psi measured at the source, or use a hot compressed air lance for cleaning and drying damp cracks in the bituminous pavements. Care should be taken to ensure that damage to the surrounding pavement area from overheating does not occur. Seal joints (1/8) to one (1") inch wide with polymer modified asphalt.
3.04 SEALING
A. Apply polymer modified asphalt to prepared joints, level with the pavement surface, using a wand followed by a standard “V” shaped asphalt squeegee. Leave no more than 1/8 inch buildup. Do not place sealer when the air temperature is below 40F or above 90F, unless otherwise permitted by the Engineer if the hot compressed air lance used can sufficiently warm the crack to ensure adhesion between the pavement and the sealer. Do not place bituminous overlay within seventy-two (72) hours of sealing unless permitted by Engineer.
02547-3
END OF SECTION