Audio-Videotaping Specification Summary

This is a technical specification document for audio-videotaping services required by the Municipal Authority of the Borough of Morrisville, Pennsylvania, for the 2026 Design/Build Curb Ramp Project. The specification establishes requirements for professional electrographic documentation of municipal construction projects using color DVD or CD recordings. The contractor must engage a professional electrographer actively experienced in preparing video documentation for similar municipal construction projects and submit the electrographer for Owner review and approval prior to commencing any work. Two complete copies of project DVDs and/or CDs must be provided to the Owner's Engineer for approval, with any unacceptable recordings to be re-recorded at no additional charge. All recording shall be performed during daylight hours with good visibility and no recording shall occur when more than 10 percent of the project ground area is covered with snow unless otherwise authorized. The contract term extends through project completion, with all DVDs and CDs becoming the property of the Owner upon approval and acceptance.

The specification mandates professional-grade equipment including a mobile unit with camera lens positioned at least 12 feet from ground level for proper perspective, capable of producing NTSC-525 lines/60 field video output with minimum 500 TV lines resolution and geometric distortion not exceeding 1.5 percent. The contractor must provide professional-grade DVD or CD recording equipment with sufficient media quantity for complete documentation and shall supply all necessary lighting and power to eliminate shadow areas. Audio must include project identification (date, project name, municipality, location, direction of travel, and viewing side) followed by electrographer narrative commentary recorded simultaneously with video. Video must display transparent digital information including date and time continuously on the upper left portion of the screen. Coverage shall encompass the entire project site with a minimum 15-foot buffer zone on each side of designated roadways, documenting all surface features including driveways, road surfaces, sidewalks, drainage culverts, utilities, retaining walls, curbs, and drainage ditches. The rate of travel shall not exceed 48 feet per minute, and all DVDs and CDs must be properly identified with roll number, street/road viewing, tape counter information, viewing side, starting point, direction, and ending destination point on both the disk and storage cases.

View the file

Other files

File Type Posted
53-Sec 10 14 53 - POST MOUNTED SIGNS.pdf PDF
9-Doc 00 45 10 - BIDDER ACKNOWLEDGEMENT FORM.pdf PDF
45-Sec 01 50 00 - CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS.pdf PDF
39-Sec 01 31 00 - COORDINATION AND MEETINGS.pdf PDF
18-Doc 00 62 16 - CERTIFICATE OF INSURANCE.pdf PDF
35-Doc 00 91 13 - ADDENDA.pdf PDF
29-Doc 00 73 00 6 - RESPONSIBLE - CONTRACTOR ORDINANCE.pdf PDF
48-Sec 01 70 00 - CONTRACT CLOSEOUT.pdf PDF
30-Doc 00 73 00 07 - APPENDIX D - COVER.pdf PDF
13-Doc 00 45 53 - AGREEMENT OF SURETY COMPANY.pdf PDF
54-Sec 31 23 33 - EXCAVATION BACKFILL AND COMPACTION.pdf PDF
32-Doc 00 73 00 08 Part 1 Contract Language Requirements.pdf PDF
42-Sec 01 33 00 - SUBMITTALS.pdf PDF
49-Sec 02 41 16 - DEMOLITION.pdf PDF
6-Doc 00 21 13.1 - INSTRUCTIONS FOR ELECTRONIC BIDDING.pdf PDF
58-Sec 32 13 13 - PORTLAND CEMENT CONCRETE PAVING.pdf PDF
22-Doc 00 72 00 - GENERAL CONDITIONS.pdf PDF
55-Sec 32 01 17.61 - POLYMER MODIFED ASPHALT JOINT AND CRACK SEALING.pdf PDF
46-Sec 01 55 26 - TRAFFIC REGULATION.pdf PDF
38-Sec 01 29 00 - CONTRACT CONSIDERATIONS.pdf PDF
56-Sec 32 12 00 - BITUMINOUS CONCRETE PAVING.pdf PDF
2-Doc 00 01 10-TOC.pdf PDF
24-Doc 00 73 00 1 - APPENDIX A - COVER.pdf PDF
19-Doc 00 65 19.13 - CONTRACTORS AFFIDAVIT.pdf PDF
43-Sec 01 40 00 - QUALITY CONTROL.pdf PDF
31-Doc 00 73 00 07 APPENDIX D - CDBG AND STATE REQUIREMENTS.pdf PDF
36-Sec 01 11 13 - SUMMARY OF WORK.pdf PDF
1-Doc 00 01 01 - TITLE SHEET AND COVER.pdf PDF
5-Doc 00 21 13 - INSTRUCTIONS TO BIDDERS - EBID.pdf PDF
34-Doc 00 73 00 10 - Part 3 Section 3 Requirements.pdf PDF
40-Sec 01 32 16 - NARRATIVE CONSTRUCTION SCHEDULE.pdf PDF
20-Doc 00 65 19.16 - CONTRACTORS RELEASE OF LIENS.pdf PDF
50-Sec 03 11 00 - CONCRETE FORMWORK.pdf PDF
59-Sec 32 17 23.33 - THERMOPLASTIC PAVEMENT MARKINGS.pdf PDF
37-Sec 01 22 00 - MEASUREMENT AND PAYMENT.pdf PDF
25-Doc 00 73 00 1 - APPENDIX A - DAVIS BACON FEDERAL WAGE DETERMINATION.pdf PDF
62-CDBG Curb Ramp Concept Plans.pdf PDF
44-Sec 01 42 13 - ORGANIZATION AND REFERENCE ACRONYMS.pdf PDF
15-Doc 00 61 13.13 - PERFORMANCE BOND.pdf PDF
47-Sec 01 60 00 - MATERIAL AND EQUIPMENT.pdf PDF
16-Doc 00 61 13.16 - PAYMENT BOND.pdf PDF
4-Doc 00 11 13 - ADVERTISEMENT FOR BIDS.pdf PDF
57-Sec 32 12 23 - RESTORATION OF PAVED SURFACES.pdf PDF
52-Sec 03 30 00 - CAST IN PLACE CONCRETE.pdf PDF
61-Sec 32 92 00 - FINISH GRADING, SEEDING, AND SODDING.pdf PDF
23-Doc 00 73 00 0 - SUPPLEMENTARY CONDITIONS.pdf PDF
7-Doc 00 41 00 - BID FORM - EBID.pdf PDF
17-Doc 00 61 19 - MAINTENANCE BOND.pdf PDF
10-Doc 00 45 13 - BIDDER QUALIFICATION STATEMENT.pdf PDF
21-Doc 00 65 19.19 - CONSENT OF SURETY.pdf PDF
Show 40 more

Latest 50 of 125 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AUDIO-VIDEOTAPING

01 32 36-1

SECTION 01 32 36

PART 1 GENERAL

1.01 DESCRIPTION

A. Contractor shall utilize a professional electrographer who is actively engaged in preparation of color DVD or CD recordings for municipal construction projects, similar to the Work included in this Contract.

1.02 QUALITY ASSURANCE

A. Owner may make such investigations as Owner deems necessary to determine the ability of the electrographer to perform the work. Contractor shall furnish to Owner all such information and data for this purpose as requested by Owner. Owner reserves the right to reject any electrographer if the investigation of such electrographer fails to satisfy Owner that such electrographer is properly qualified to carry out the work specified herein. Upon rejection of an electrographer by Owner, Contractor shall engage the services of another electrographer, who shall be subject to a similar review and approval process by Owner specified herein, prior to approval by Owner.

B. No construction shall begin prior to review and approval of the DVD’s and/or CD’s covering the existing conditions of the entire project area by Owner’s Engineer. Any recordings that are unacceptable to Owner’s Engineer shall be re-recorded by the electrographer at no additional charge.

All DVD’s and/or CD’s and written records shall become the property of Owner, upon approval and acceptance.

1.03 SUBMITTALS

A. Two (2) complete copies of project DVD’s and/or CD’s shall be provided to Owner’s Engineer for approval.

1.04 JOB CONDITIONS

A. All recording shall be performed during days when good visibility is available. No recording shall be done during when more than ten (10) percent of the project’s ground area is covered with snow, unless otherwise authorized by Owner’s Engineer.

PART 2 PRODUCTS

2.01 EQUIPMENT

A. Mobile Unit

When conventional wheeled vehicles are used, the distance from the camera lens to the ground shall be at least twelve (12) feet in order to ensure that the proper perspective is obtained. In some instances, recorded coverage will be required in areas not accessible by conventional wheeled vehicles. In that case, such coverage shall be obtained by walking or special conveyance approved by Owner’s Engineer.

B. Camera

Video output from the camera used must be capable of producing NTSC-525 lines/60 field. Video output shall provide resolution in the “Y” channel, minimum 500 TV lines at center, utilizing a bias lit beam split prism, in combination with a professional and/or industrial charge-coupled device (CCD) camera, for optimum color imagery and minimum lag through 3.1 meter-candles (10 foot-candles), with geometric distortion not to exceed 1.5% of picture height at any point in the picture area.

C. Audio-video recording medium

Contractor’s electrographer shall utilize professional-grade DVD or CD recording equipment in the preparation of the project recordings. Contractor’s electrographer shall provide a sufficient quantity of

01 32 36-2

DVD’s or CD’s to properly and completely record the work. DVD’s and/or CD’s shall become the property of Owner at the completion of the project.

D. Lighting

Contractor shall provide, if necessary, all lighting and power that is required to fill in any “shadow” areas caused by trees, signs, structures, or other objects.

2.02 RECORDED INFORMATION

A. Audio

Each DVD or CD shall begin with the current date, project name and municipality, and be followed by the general location (intersecting street, municipal boundary line, etc.). The viewing side and direction of progress (northerly, southeasterly, etc.) shall also be included.

B. Video

Periodic transparent alpha-numeric information consisting of the project name, description of area covered, direction of travel, viewing side, etc. shall appear on the screen. All video recordings shall, by electronic means, display continuously and simultaneously generated transparent digital information to include the date and time of recording. The date information shall contain the month, day and year (i.e. 4/15/11) and shall be placed directly below the time information. The time information shall consist of hours, minutes and seconds, separated by colons (i.e. 11:42:22). This transparent information shall appear on the extreme upper left hand third of the screen (or as approved by Owner’s Engineer).

C. Audio-Video Tracks

The DVD or CD shall consist of both visual and audio information, recorded simultaneously. Tracks shall consist of original live recordings and shall not be copies of previous recordings. Audio track shall contain the narrative commentary of the electrographer, recorded simultaneously with his fixed elevation visual record of construction. Owner’s Engineer shall have the option of recording comments on the audio track.

PART 3 EXECUTION

3.01 DVD OR CD COVERAGE

A. The entire project site shall be recorded. The zone of influence shall be extended a minimum of 15 feet from each side of each roadway designated to receive a mill and overlay.

B. Recorded coverage shall include all surface features located within the above mentioned area supported by appropriate audio description. Audio description shall be made simultaneously with video coverage. Such coverage shall include, but not be limited to, all existing driveways, road surface, sidewalks, signs, drainage culverts, visible utilities, retaining walls, railroad grade crossing features, parking areas, curbs, and drainage ditches located within the zone of influence.

C. When applicable, house numbers shall be used to identify houses or other buildings, in such a manner that proposed system structures (i.e. manholes) may be located by reference.

D. The rate of speed in the direction of travel of conveyance shall not exceed 48 feet per minute.

Panning rates and zoom rates shall be controlled sufficiently so that object clarity will not be obscured during playback.

3.02 IDENTIFICATION

A. All DVD’s or CD’s (on the disk and on storage cases) shall be properly identified by number, location, date, project name, and municipality in a manner acceptable to Owner’s Engineer.

B. A record of the contents of each DVD or CD shall be supplied by a sheet identifying each segment in the disk by location. This shall include roll number, street or road viewing, tape counter number, viewing side, starting point, traveling direction and ending destination point.

01 32 36-3

END OF SECTION