This is a Table of Contents document for a Design/Build Curb Ramp Project procurement issued by the Municipal Authority of the Borough of Morrisville, Pennsylvania, under Contract No. 2026-00118, utilizing Community Development Block Grant (CDBG) funding. The project encompasses the installation of ADA and PennDOT-compliant curb ramps along with associated sidewalks, curbing, and sign relocation/installation at specified locations within Morrisville Borough. The procurement includes one base bid and seven alternate bids, with all materials, labor, and equipment required to comply with PennDOT Publication 408 and Borough Standards. Electronic bid submissions are required through PennBid by November 13, 2025, at 10:00 AM, with public opening at the Municipal Authority office located at 35 Union Street, Morrisville, PA 19067. The contract duration is set at 45 consecutive calendar days from the Notice to Proceed. No specific award date or renewal options are identified in the document.

Each bid must be accompanied by a certified check or bid bond equal to not less than ten percent (10%) of the total bid amount, with bonds required to be from companies licensed to conduct business in Pennsylvania. Bidders must demonstrate financial capability through proof of liquid assets and must have completed at least three similar projects valued at 75% or more of the proposed contract amount. Performance bonds, labor and material payment bonds, and a maintenance bond are required, along with comprehensive insurance documentation. The project is CDBG-funded, with the Owner separately purchasing all water system materials under a separate contract. Bidders are subject to Davis-Bacon wage rates, federal labor standards provisions, and Section 3 requirements. The contract incorporates PennDOT utility permit requirements, including specifications for pavement restoration, directional drilling, and road restoration techniques. No specific budget range was disclosed in the solicitation materials.

View the file

Other files

File Type Posted
53-Sec 10 14 53 - POST MOUNTED SIGNS.pdf PDF
9-Doc 00 45 10 - BIDDER ACKNOWLEDGEMENT FORM.pdf PDF
45-Sec 01 50 00 - CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS.pdf PDF
39-Sec 01 31 00 - COORDINATION AND MEETINGS.pdf PDF
18-Doc 00 62 16 - CERTIFICATE OF INSURANCE.pdf PDF
35-Doc 00 91 13 - ADDENDA.pdf PDF
29-Doc 00 73 00 6 - RESPONSIBLE - CONTRACTOR ORDINANCE.pdf PDF
48-Sec 01 70 00 - CONTRACT CLOSEOUT.pdf PDF
30-Doc 00 73 00 07 - APPENDIX D - COVER.pdf PDF
13-Doc 00 45 53 - AGREEMENT OF SURETY COMPANY.pdf PDF
54-Sec 31 23 33 - EXCAVATION BACKFILL AND COMPACTION.pdf PDF
32-Doc 00 73 00 08 Part 1 Contract Language Requirements.pdf PDF
42-Sec 01 33 00 - SUBMITTALS.pdf PDF
49-Sec 02 41 16 - DEMOLITION.pdf PDF
6-Doc 00 21 13.1 - INSTRUCTIONS FOR ELECTRONIC BIDDING.pdf PDF
58-Sec 32 13 13 - PORTLAND CEMENT CONCRETE PAVING.pdf PDF
22-Doc 00 72 00 - GENERAL CONDITIONS.pdf PDF
55-Sec 32 01 17.61 - POLYMER MODIFED ASPHALT JOINT AND CRACK SEALING.pdf PDF
46-Sec 01 55 26 - TRAFFIC REGULATION.pdf PDF
38-Sec 01 29 00 - CONTRACT CONSIDERATIONS.pdf PDF
56-Sec 32 12 00 - BITUMINOUS CONCRETE PAVING.pdf PDF
24-Doc 00 73 00 1 - APPENDIX A - COVER.pdf PDF
19-Doc 00 65 19.13 - CONTRACTORS AFFIDAVIT.pdf PDF
43-Sec 01 40 00 - QUALITY CONTROL.pdf PDF
31-Doc 00 73 00 07 APPENDIX D - CDBG AND STATE REQUIREMENTS.pdf PDF
36-Sec 01 11 13 - SUMMARY OF WORK.pdf PDF
1-Doc 00 01 01 - TITLE SHEET AND COVER.pdf PDF
5-Doc 00 21 13 - INSTRUCTIONS TO BIDDERS - EBID.pdf PDF
34-Doc 00 73 00 10 - Part 3 Section 3 Requirements.pdf PDF
40-Sec 01 32 16 - NARRATIVE CONSTRUCTION SCHEDULE.pdf PDF
20-Doc 00 65 19.16 - CONTRACTORS RELEASE OF LIENS.pdf PDF
50-Sec 03 11 00 - CONCRETE FORMWORK.pdf PDF
59-Sec 32 17 23.33 - THERMOPLASTIC PAVEMENT MARKINGS.pdf PDF
37-Sec 01 22 00 - MEASUREMENT AND PAYMENT.pdf PDF
25-Doc 00 73 00 1 - APPENDIX A - DAVIS BACON FEDERAL WAGE DETERMINATION.pdf PDF
62-CDBG Curb Ramp Concept Plans.pdf PDF
44-Sec 01 42 13 - ORGANIZATION AND REFERENCE ACRONYMS.pdf PDF
15-Doc 00 61 13.13 - PERFORMANCE BOND.pdf PDF
47-Sec 01 60 00 - MATERIAL AND EQUIPMENT.pdf PDF
16-Doc 00 61 13.16 - PAYMENT BOND.pdf PDF
4-Doc 00 11 13 - ADVERTISEMENT FOR BIDS.pdf PDF
57-Sec 32 12 23 - RESTORATION OF PAVED SURFACES.pdf PDF
52-Sec 03 30 00 - CAST IN PLACE CONCRETE.pdf PDF
61-Sec 32 92 00 - FINISH GRADING, SEEDING, AND SODDING.pdf PDF
41-Sec 01 32 36 - AUDIO-VIDEOTAPING.pdf PDF
23-Doc 00 73 00 0 - SUPPLEMENTARY CONDITIONS.pdf PDF
7-Doc 00 41 00 - BID FORM - EBID.pdf PDF
17-Doc 00 61 19 - MAINTENANCE BOND.pdf PDF
10-Doc 00 45 13 - BIDDER QUALIFICATION STATEMENT.pdf PDF
21-Doc 00 65 19.19 - CONSENT OF SURETY.pdf PDF
Show 40 more

Latest 50 of 125 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TABLE OF CONTENTS

00 01 10-1

MORRISVILLE BOROUGH

CONTRACT 2026-00118

FILE NO. 26-00118

MORRISVILLE BOROUGH 2026 CDBG DESIGN/BUILD CURB RAMP PROJECT

PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP

Division 00 – Procurement and Contracting Requirements

Procurement Requirements

00 01 15 Table of Contents – List Of Drawings 00 11 13 Advertisement For Bids 00 21 13 Instructions To Bidders 00 21 13.1 Instructions for Submitting Electronic Bids 00 41 00 Bid Form (electronic) 00 43 13 Bid Bond 00 45 10 Bidder’s Acknowledgement Form 00 45 13 Bidder Qualification Statement 00 45 13.1 Contractor Responsibility Certification 00 45 19 Non-Collusion Affidavit 00 45 53 Agreement of Surety Company

Contracting Requirements

00 52 00 Agreement 00 61 13.13 Performance Bond 00 61 13.16 Payment Bond 00 61 19 Maintenance Bond 00 62 16 Certificate of Insurance 00 65 19.13 Contractor’s Affidavit 00 65 19.16 Contractor’s Release of Liens 00 65 19.19 Consent of Surety to Final Payment 00 72 00 General Conditions 00 73 00 Supplementary Conditions APPENDIX A Davis Bacon Wage Rates Determination APPENDIX B Public Works Employment Verification Form APPENDIX C Responsible Contractor Ordinance

APPENDIX D

Part1 CDBG Contract Attachments Part2 Federal Labor Standard Provisions Part3 Section 3 Requirements 00 91 13 Addenda

SPECIFICATIONS GROUP

GENERAL REQUIREMENTS SUBGROUP

Division 01 – General Requirements

01 11 13 Summary of Work 01 22 00 Measurement and Payment 01 29 00 Contract Considerations 01 31 00 Coordination and Meetings 01 32 16 Narrative Construction Schedule 01 32 36 Audio-Videotaping

00 01 10-2

01 33 00 Submittals 01 40 00 Quality Control 01 42 13 Organization and Reference Acronyms 01 50 00 Construction Facilities and Temporary Controls 01 55 26 Traffic Regulation 01 60 00 Materials and Equipment 01 70 00 Contract Closeout

SITE AND INFRASTRUCTURE SUBGROUP

Division 02 – Existing Conditions 02 41 16 Demolition

Division 03 – Concrete 03 11 00 Concrete Formwork 03 20 00 Concrete Reinforcement 03 30 00 Cast In Place Concrete

Division 10 – Specialties 10 14 53 Post Mounted Signs

Division 31 – Earthwork 31 23 33 Excavation, Backfill, and Compaction

Division 32 – Exterior Improvements 32 01 17.61 Polymer Modified Asphalt Joint and Crack Sealing 32 12 00 Bituminous Concrete Paving 32 12 23 Restoration of Paved Surfaces 32 13 13 Portland Cement Concrete Paving 32 17 23.33 Thermoplastic Pavement Markings 32 17 26 ADA Detectable Warning Surface 32 92 00 Finish Grading, Seeding, and Sodding

File details come from the government source that posted it. Updated .