This technical specification document outlines the requirements for post-mounted sign fabrication and installation for the Municipal Authority of the Borough of Morrisville's 2026 Design/Build Curb Ramp Project in Bucks County, Pennsylvania. The work scope encompasses the furnishing and installation of fabricated aluminum signs mounted on steel S or W beam posts with breakaway systems, in accordance with PennDOT Publication 408 Section 931 standards. All materials must comply with specified sections of PennDOT Publication 408, including sections addressing material standards for aluminum and steel components. Installation requirements mandate that posts be erected plumb without twisting, bending, or deformation, with signs properly leveled, aligned, centered, and fastened using hardware detailed in the TC 8700 Standard Series. The project timeline specifies a 45 consecutive calendar day contract duration from the Notice to Proceed, with electronic bid submissions required through PennBid by November 13, 2025, at 10:00 AM.

Sign installation locations are approximate, with exact positioning to be established on-site and marked by stake or paint marks with identifying symbols. Contractors must ensure damaged posts and signs are repaired or replaced as necessary. The project requires bidders to demonstrate prior experience with at least three similar projects valued at 75 percent or more of the proposed contract amount. Performance bonds, labor and material payment bonds, maintenance bonds, and comprehensive insurance documentation are mandatory. A 10 percent bid bond or certified check payable to the Owner is required with each bid submission. No specific budget range is disclosed in the documentation, and bidders must adhere to all PennDOT Publication 408 standards and Borough Standards for the complete curb ramp project, which includes sidewalks, curbing, and sign relocation in addition to sign installation work.

View the file

Other files

File Type Posted
9-Doc 00 45 10 - BIDDER ACKNOWLEDGEMENT FORM.pdf PDF
45-Sec 01 50 00 - CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS.pdf PDF
39-Sec 01 31 00 - COORDINATION AND MEETINGS.pdf PDF
18-Doc 00 62 16 - CERTIFICATE OF INSURANCE.pdf PDF
35-Doc 00 91 13 - ADDENDA.pdf PDF
29-Doc 00 73 00 6 - RESPONSIBLE - CONTRACTOR ORDINANCE.pdf PDF
48-Sec 01 70 00 - CONTRACT CLOSEOUT.pdf PDF
30-Doc 00 73 00 07 - APPENDIX D - COVER.pdf PDF
13-Doc 00 45 53 - AGREEMENT OF SURETY COMPANY.pdf PDF
54-Sec 31 23 33 - EXCAVATION BACKFILL AND COMPACTION.pdf PDF
32-Doc 00 73 00 08 Part 1 Contract Language Requirements.pdf PDF
42-Sec 01 33 00 - SUBMITTALS.pdf PDF
49-Sec 02 41 16 - DEMOLITION.pdf PDF
6-Doc 00 21 13.1 - INSTRUCTIONS FOR ELECTRONIC BIDDING.pdf PDF
58-Sec 32 13 13 - PORTLAND CEMENT CONCRETE PAVING.pdf PDF
22-Doc 00 72 00 - GENERAL CONDITIONS.pdf PDF
55-Sec 32 01 17.61 - POLYMER MODIFED ASPHALT JOINT AND CRACK SEALING.pdf PDF
46-Sec 01 55 26 - TRAFFIC REGULATION.pdf PDF
38-Sec 01 29 00 - CONTRACT CONSIDERATIONS.pdf PDF
56-Sec 32 12 00 - BITUMINOUS CONCRETE PAVING.pdf PDF
2-Doc 00 01 10-TOC.pdf PDF
24-Doc 00 73 00 1 - APPENDIX A - COVER.pdf PDF
19-Doc 00 65 19.13 - CONTRACTORS AFFIDAVIT.pdf PDF
43-Sec 01 40 00 - QUALITY CONTROL.pdf PDF
31-Doc 00 73 00 07 APPENDIX D - CDBG AND STATE REQUIREMENTS.pdf PDF
36-Sec 01 11 13 - SUMMARY OF WORK.pdf PDF
1-Doc 00 01 01 - TITLE SHEET AND COVER.pdf PDF
5-Doc 00 21 13 - INSTRUCTIONS TO BIDDERS - EBID.pdf PDF
34-Doc 00 73 00 10 - Part 3 Section 3 Requirements.pdf PDF
40-Sec 01 32 16 - NARRATIVE CONSTRUCTION SCHEDULE.pdf PDF
20-Doc 00 65 19.16 - CONTRACTORS RELEASE OF LIENS.pdf PDF
50-Sec 03 11 00 - CONCRETE FORMWORK.pdf PDF
59-Sec 32 17 23.33 - THERMOPLASTIC PAVEMENT MARKINGS.pdf PDF
37-Sec 01 22 00 - MEASUREMENT AND PAYMENT.pdf PDF
25-Doc 00 73 00 1 - APPENDIX A - DAVIS BACON FEDERAL WAGE DETERMINATION.pdf PDF
62-CDBG Curb Ramp Concept Plans.pdf PDF
44-Sec 01 42 13 - ORGANIZATION AND REFERENCE ACRONYMS.pdf PDF
15-Doc 00 61 13.13 - PERFORMANCE BOND.pdf PDF
47-Sec 01 60 00 - MATERIAL AND EQUIPMENT.pdf PDF
16-Doc 00 61 13.16 - PAYMENT BOND.pdf PDF
4-Doc 00 11 13 - ADVERTISEMENT FOR BIDS.pdf PDF
57-Sec 32 12 23 - RESTORATION OF PAVED SURFACES.pdf PDF
52-Sec 03 30 00 - CAST IN PLACE CONCRETE.pdf PDF
61-Sec 32 92 00 - FINISH GRADING, SEEDING, AND SODDING.pdf PDF
41-Sec 01 32 36 - AUDIO-VIDEOTAPING.pdf PDF
23-Doc 00 73 00 0 - SUPPLEMENTARY CONDITIONS.pdf PDF
7-Doc 00 41 00 - BID FORM - EBID.pdf PDF
17-Doc 00 61 19 - MAINTENANCE BOND.pdf PDF
10-Doc 00 45 13 - BIDDER QUALIFICATION STATEMENT.pdf PDF
21-Doc 00 65 19.19 - CONSENT OF SURETY.pdf PDF
Show 40 more

Latest 50 of 125 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

POST MOUNTED SIGNS

10 14 53-1

SECTION 10 14 53

POST MOUNTED SIGNS

PART 1 GENERAL

1.01 DESCRIPTION OF WORK

A. This work is the furnishing and installation of fabricated aluminum signs of the type indicated on steel S or W beam posts and breakaway system in accordance with Section 931 of PennDOT Publication 408.

PART 2 PRODUCTS

2.01 MATERIAL

A. Materials used shall be in accordance with Sections 1103.02, 1103.03, 1103.07 and 1103.11 of PennDOT Publication 408.

PART 3 EXECUTION

3.01 CONSTRUCTION

A. General

Installation as shown on the Standard Drawings. Erect posts plumb using a method that does not twist, bend or otherwise deform the posts. Before erection, correct twisted, bent, or deformed posts. Erect signs by a method that does not twist, bend, or otherwise deform the signs. Level, correctly align, and then center signs on the posts and properly fasten. Repair or replace damage posts and signs.

Fasten the signs to the posts with the necessary hardware as detailed in TC 8700 Standard

Series.

B. Location

The indicated location of sign installations is approximate with the exact location established at the site. Mark longitudinal and lateral location by stake or paint marks with an identifying symbol.

END OF SECTION