52-Sec 03 30 00 - CAST IN PLACE CONCRETE.pdf

PDF 107 KB Posted

Attached to
Morrisville Borough 2026 Design/Build Curb Ramp Project
Solicitation number
Not on record
Issued by
Bucks County, Pennsylvania

About this file

This is a technical specification document for cast-in-place concrete work prepared for the Municipal Authority of the Borough of Morrisville, Pennsylvania, in support of their 2026 Design/Build Curb Ramp Project. The specification covers the installation of plain cement concrete curbs, concrete curb ramps, and sidewalks in compliance with ACI standards and PennDOT Publication 408 requirements. The work includes materials sourcing, concrete mixing and placement procedures, finishing standards, curing protocols, and quality control measures. All concrete materials must meet specified ASTM standards, including Type I Portland cement, ASTM C33 aggregates, air-entraining agents for exterior-exposed work, and chemical admixtures as approved by the engineer. The specification requires broom finishing of concrete surfaces, immediate curing protection, and contractor-provided quality control testing as directed by the design engineer. Electronic bid submissions are required through PennBid by November 13, 2025, at 10:00 AM, with project execution on a 45 consecutive calendar day timeline from the Notice to Proceed.

The contract requires a 10% bid bond or certified check, performance bonds, labor and material payment bonds, and comprehensive insurance documentation from qualified bidders. Contractors must demonstrate prior completion of at least three similar projects valued at 75% or more of the proposed contract amount and provide proof of liquid assets to establish financial capability. The project involves a base bid plus seven alternate bids for ADA and PennDOT-compliant curb ramps with associated sidewalks, curbing, and sign relocation at multiple specified locations within Morrisville Borough. All materials, labor, and equipment must conform to PennDOT Publication 408 and Borough Standards, with the Municipal Authority separately procuring water system materials under an alternative contract. No specific budget amount was disclosed, and no set-aside designations for disadvantaged enterprises were explicitly mentioned in the documentation.

View the file

Other files

File Type Posted
53-Sec 10 14 53 - POST MOUNTED SIGNS.pdf PDF
9-Doc 00 45 10 - BIDDER ACKNOWLEDGEMENT FORM.pdf PDF
45-Sec 01 50 00 - CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS.pdf PDF
39-Sec 01 31 00 - COORDINATION AND MEETINGS.pdf PDF
18-Doc 00 62 16 - CERTIFICATE OF INSURANCE.pdf PDF
35-Doc 00 91 13 - ADDENDA.pdf PDF
29-Doc 00 73 00 6 - RESPONSIBLE - CONTRACTOR ORDINANCE.pdf PDF
48-Sec 01 70 00 - CONTRACT CLOSEOUT.pdf PDF
30-Doc 00 73 00 07 - APPENDIX D - COVER.pdf PDF
13-Doc 00 45 53 - AGREEMENT OF SURETY COMPANY.pdf PDF
54-Sec 31 23 33 - EXCAVATION BACKFILL AND COMPACTION.pdf PDF
32-Doc 00 73 00 08 Part 1 Contract Language Requirements.pdf PDF
42-Sec 01 33 00 - SUBMITTALS.pdf PDF
49-Sec 02 41 16 - DEMOLITION.pdf PDF
6-Doc 00 21 13.1 - INSTRUCTIONS FOR ELECTRONIC BIDDING.pdf PDF
58-Sec 32 13 13 - PORTLAND CEMENT CONCRETE PAVING.pdf PDF
22-Doc 00 72 00 - GENERAL CONDITIONS.pdf PDF
55-Sec 32 01 17.61 - POLYMER MODIFED ASPHALT JOINT AND CRACK SEALING.pdf PDF
46-Sec 01 55 26 - TRAFFIC REGULATION.pdf PDF
38-Sec 01 29 00 - CONTRACT CONSIDERATIONS.pdf PDF
56-Sec 32 12 00 - BITUMINOUS CONCRETE PAVING.pdf PDF
2-Doc 00 01 10-TOC.pdf PDF
24-Doc 00 73 00 1 - APPENDIX A - COVER.pdf PDF
19-Doc 00 65 19.13 - CONTRACTORS AFFIDAVIT.pdf PDF
43-Sec 01 40 00 - QUALITY CONTROL.pdf PDF
31-Doc 00 73 00 07 APPENDIX D - CDBG AND STATE REQUIREMENTS.pdf PDF
36-Sec 01 11 13 - SUMMARY OF WORK.pdf PDF
1-Doc 00 01 01 - TITLE SHEET AND COVER.pdf PDF
5-Doc 00 21 13 - INSTRUCTIONS TO BIDDERS - EBID.pdf PDF
34-Doc 00 73 00 10 - Part 3 Section 3 Requirements.pdf PDF
40-Sec 01 32 16 - NARRATIVE CONSTRUCTION SCHEDULE.pdf PDF
20-Doc 00 65 19.16 - CONTRACTORS RELEASE OF LIENS.pdf PDF
50-Sec 03 11 00 - CONCRETE FORMWORK.pdf PDF
59-Sec 32 17 23.33 - THERMOPLASTIC PAVEMENT MARKINGS.pdf PDF
37-Sec 01 22 00 - MEASUREMENT AND PAYMENT.pdf PDF
25-Doc 00 73 00 1 - APPENDIX A - DAVIS BACON FEDERAL WAGE DETERMINATION.pdf PDF
62-CDBG Curb Ramp Concept Plans.pdf PDF
44-Sec 01 42 13 - ORGANIZATION AND REFERENCE ACRONYMS.pdf PDF
15-Doc 00 61 13.13 - PERFORMANCE BOND.pdf PDF
47-Sec 01 60 00 - MATERIAL AND EQUIPMENT.pdf PDF
16-Doc 00 61 13.16 - PAYMENT BOND.pdf PDF
4-Doc 00 11 13 - ADVERTISEMENT FOR BIDS.pdf PDF
57-Sec 32 12 23 - RESTORATION OF PAVED SURFACES.pdf PDF
61-Sec 32 92 00 - FINISH GRADING, SEEDING, AND SODDING.pdf PDF
41-Sec 01 32 36 - AUDIO-VIDEOTAPING.pdf PDF
23-Doc 00 73 00 0 - SUPPLEMENTARY CONDITIONS.pdf PDF
7-Doc 00 41 00 - BID FORM - EBID.pdf PDF
17-Doc 00 61 19 - MAINTENANCE BOND.pdf PDF
10-Doc 00 45 13 - BIDDER QUALIFICATION STATEMENT.pdf PDF
21-Doc 00 65 19.19 - CONSENT OF SURETY.pdf PDF
Show 40 more

Latest 50 of 125 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CAST-IN-PLACE CONCRETE

03 30 00-1

SECTION 03 30 00

PART 1 – GENERAL

1.01 SECTION INCLUDES

A. Plain Cement Concrete Curbs

B. Concrete Curb Ramps and Sidewalk

1.02 RELATED SECTIONS

A. Related Work Specified Elsewhere:

1. Section 03 11 00: Concrete Formwork

1.03 REFERENCES

A. ACI 301: Structural Concrete for Buildings.

B. ACI 302: Guide for Concrete Floor and Slab Construction.

C. ACI 304: Recommended Practice for Measuring, Mixing, Transporting and Placing

Concrete.

D. ACI 305R: Hot Weather Concreting.

E. ACI 306R: Cold Weather Concreting.

F. ACI 308: Standard Practice for Curing Concrete.

G. ASTM C31: Practices for Making and Curing Concrete Test Specimens in the Field.

H. ASTM C33: Concrete Aggregates.

I. ASTM C39: Test Method for Compressive Strength of Cylindrical Concrete Specimens.

J. ASTM C42: Methods of Obtaining and Testing Drilled Cores and Sawed Beams of Concrete.

K. ASTM C94: Ready-Mixed Concrete.

L. ASTM C150: Portland Cement.

M. ASTM C172: Method of Sampling Fresh Mixed Concrete.

N. ASTM C260: Air Entraining Admixtures for Concrete.

O. ASTM C494: Chemical Admixtures for Concrete.

P. ASTM C618: Fly Ash and Raw or Calcinated Natural Pozzolan for Use as a Mineral

Admixture in Portland Cement Concrete.

03 30 00-2

Q. ASTM D1751: Preformed Expansion Joint Fillers for Concrete Paving and Structural Construction (Non-extruding and Resilient Bituminous Types).

1.04 SUBMITTALS FOR REVIEW

A. Product Data: Provide concrete delivery form.

1.05 QUALITY ASSSURANCE

A. Perform Work in accordance with ACI 301.

B. Maintain one copy of each document on-site.

C. Acquire cement and aggregate from same source for all Work.

D. Conform to ACI 305R when concreting during hot weather.

E. Conform to ACI 306R when concreting during cold weather.

PART 2 – PRODUCTS

2.01 CONCRETE MATERIALS

A. Cement: ASTM C150, Type I – Normal.

B. Fine and Coarse Aggregates: ASTM C33.

C. Water: Clean and not detrimental to concrete.

2.02 ADMIXTURES

A. Air Entrainment: ASTM C260.

B. Chemical: ASTM C494 – Type A – Water Reducing, Type C – Accelerating, Type E – Water

Reducing and Accelerating.

C. Fly Ash: ASTM C618.

2.03 ACCESSORIES

A. Non-Shrink Grout: Premixed compound consisting of non-metallic aggregate, cement, water reducing and plasticizing agents; capable of developing minimum compressive strength of 2,400 psi in 48 hours and 7,000 psi in 28 days.

2.04 JOINT DEVICES AND FILLER MATERIALS

A. Joint Filler Type A: ASTM D1751; Asphalt impregnated fiberboard or felt, 1/4 inch thick;

tongue and groove profile.

2.05 CONCRETE MIX

A. Mix concrete in accordance with ACI 304 and Section 704, PennDOT Publication 408

Specifications. Deliver concrete in accordance with ASTM C94 and Section 704, PennDOT Publication 408 Specifications.

B. Select proportions for normal weight concrete in accordance with ACI 301 Method 1.

03 30 00-3

C. Provide concrete to meet the criteria in Section 704 of PennDOT Publication 408 for the applicable Class of concrete for the use. Supply Class A and/or Class AA concrete as necessary to comply with the Contract Documents, including Drawings.

D. Use accelerating admixtures in cold weather only when approved by Engineer. Use of admixtures will not relax cold weather placement requirements.

E. Use calcium chloride only when approved by Design Engineer.

F. Use set retarding admixtures during hot weather only when approved by Design Engineer.

G. Add air entraining agent to normal weight concrete mix for work exposed to exterior.

PART 3 – EXECUTION

3.01 EXAMINATION

A. Verify site conditions in accordance with the Contract Documents.

B. Verify requirements for concrete cover over reinforcement.

C. Verify that anchors, seats, plates, reinforcement and other items to be cast into concrete are accurately placed, positioned securely, and will not cause hardship in placing concrete.

3.02 PREPARATION

A. Prepare previously placed concrete by cleaning with steel brush and applying bonding agent in accordance with manufacturer’s instructions.

B. In locations where new concrete is doweled to existing work, drill holes in existing concrete, insert steel dowels and pack solid with non-shrink grout.

C. Coordinate the placement of joint devices with erection of concrete formwork and placement of form accessories.

3.03 PLACING CONCRETE

A. Place concrete in accordance with ACI 304.

B. Notify Engineer minimum 24 hours prior to commencement of operations.

C. Ensure reinforcement, inserts, embedded parts, formed expansion and contraction joints are not disturbed during concrete placement.

3.04 CONCRETE FINISHING

A. Broom finish.

3.05 CURING AND PROTECTION

A. Immediately after placement, protect concrete from premature drying, excessively hot or cold temperatures, and mechanical injury.

B. Maintain concrete with minimal moisture loss at relatively constant temperature for period necessary for hydration of cement and hardening of concrete.

03 30 00-4

3.06 FIELD QUALITY CONTROL

A. Contractor will provide testing, adjusting, and balancing as directed by Design Engineer during construction to provide quality control.

B. Provide free access to Work and cooperate with appointed firm.

3.07 PATCHING

A. Allow Engineer to inspect concrete surfaces immediately upon removal of forms.

B. Excessive honeycomb or embedded debris in concrete is not acceptable. Notify Engineer upon discovery.

C. Patch imperfections in accordance with ACI 301.

D. Remove or break off form ties for walls and seal openings with non-shrink grout providing a smooth finish.

3.08 DEFECTIVE CONCRETE

A. Defective Concrete: Concrete not conforming to required lines, details, dimensions, tolerances or specified requirements.

B. Repair or replacement of defective concrete will be determined by the Engineer.

C. Do not patch, fill, touch-up, repair, or replace exposed concrete except upon express direction of Engineer for each individual area.

END OF SECTION