This is a technical specification document for thermoplastic pavement markings prepared for Upper Makefield Township in Pennsylvania. The specification details the requirements for furnishing and installing thermoplastic traffic lines, stop bars, crosswalks, legends, and arrows across various roads within the township as part of the 2026 Road Program, which includes a base bid and three alternate bids involving milling, base repair, leveling course, manhole rim adjustments, and wearing course work.

The specification requires materials to comply with PennDOT Publication 408 (2011) and AASHTO M 249 standards, with glass beads conforming to Type A specifications. Thermoplastic markings must be applied at a minimum thickness of 90 mils with a tolerance of ±3 mils, with glass beads applied immediately after at a minimum rate of 10 pounds per 100 square feet. The markings must achieve minimum retroreflectivity of 300 mcd/m²/lux for white and 250 mcd/m²/lux for yellow, measured within 21 days of installation using a 30-meter geometry retroreflectometer. Application is restricted to conditions where air and roadway temperatures range between 50°F and 90°F with wind speeds below 20 miles per hour. The contractor must provide protection for at least 30 minutes after application and is responsible for repainting defective areas at no additional cost. A 180-day guarantee period requires that at least 90 percent of material remains in place and functional for longitudinal markings per 1,000-foot sections and for transverse markings, legends, symbols, crosswalks, and stop lines on an individual basis.

View the file

Other files for this state and local contract opportunity

Other files attached to Heritage Hills WWTP Discharge Interconnection, Contract No. 6715-11, newest first.
File Type Posted
2-6715-11 CONTRACT DRAWINGS.pdf PDF
1-6715-11 CONTRACT DOCUMENTS.pdf PDF
52-Sec 32 05 19.13 - GEOTEXTILE.pdf PDF
13-Doc 00 62 16-CERTIFICATE OF INSURANCE.pdf PDF
44-Sec 32 01 17.61 - ASPHALT JOINT SEALING.pdf PDF
11-Doc 00 61 13.13 - PERFORMANCE BOND.pdf PDF
43-Sec 31 23 00 - EXCAVATION BACKFILL AND COMPACTION FOR ROADWAYS.pdf PDF
38-Sec 01 33 00 - SUBMITTALS.pdf PDF
12-Doc 00 52 00 - AGREEMENT.pdf PDF
30-Doc 00 72 00 - GENERAL CONDITIONS.pdf PDF
3-Doc 00 01 01 - TITLE SHEET AND COVER.pdf PDF
19-Doc 00 61 13.16 - PAYMENT BOND.pdf PDF
42-Sec 31 23 16.26 - ROCK REMOVAL.pdf PDF
17-Doc 00 21 13 - INSTRUCTIONS TO BIDDERS - EBID.pdf PDF
39-Doc 00 73 00 - 00 - SUPPLEMENTARY CONDITIONS.pdf PDF
25-Sec 01 22 00 - 03 - MP PAVEMENT MARKING QUANTITIES.pdf PDF
10-Doc 00 01 10 -TABLE OF CONTENTS.pdf PDF
22-Sec 01 32 36 - AUDIO-VIDEOTAPING.pdf PDF
56-2026 UMT Paving Map.pdf PDF
33-Sec 01 22 00 - 00 - MEASUREMENT AND PAYMENT.pdf PDF
53-Sec 01 60 00 - MATERIAL AND EQUIPMENT.pdf PDF
1-Doc 00 45 10 - BIDDER ACKNOWLEDGEMENT FORM.pdf PDF
20-Doc 00 73 00 - 01 - APPENDIX A PREVAILING WAGE RATES.pdf PDF
6-Doc 00 45 53 - AGREEMENT OF SURETY COMPANY.pdf PDF
15-Doc 00 65 19.16 - CONTRACTORS RELEASE OF LIENS.pdf PDF
24-Sec 01 11 13 - SUMMARY OF WORK.pdf PDF
7-Doc 00 21 13.1 - ELECTRONIC BIDDING INSTRUCTIONS.pdf PDF
31-Sec 01 22 00 - 02 - MP ALTERNATE BID QUANTITIES.pdf PDF
37-Sec 01 42 13 - ORGANIZATION AND REFERENCE ACRONYMS.pdf PDF
49-Sec 32 12 23-RESTORATION OF PAVED SURFACES.pdf PDF
28-Sec 01 29 00 - CONTRACT CONSIDERATIONS.pdf PDF
23-Doc 00 73 00 - 03 - APPENDIX B COVER.pdf PDF
16-Doc 00 61 19 - MAINTENANCE BOND.pdf PDF
29-Doc 00 73 00 - 04 - APPENDIX B PUBLIC WORKS EMPLOYMENT VERIFICATION FORM.pdf PDF
50-Sec 01 31 00 - COORDINATION AND MEETINGS.pdf PDF
35-Sec 31 11 00-CLEARING AND GRUBBING.pdf PDF
41-Sec 01 55 26 - TRAFFIC REGULATION.pdf PDF
34-Sec 01 40 00 - QUALITY CONTROL.pdf PDF
48-Doc 00 11 13 - ADVERTISEMENT FOR BIDS.pdf PDF
51-Sec 01 57 13 - EROSION SEDIMENT CONTROL.pdf PDF
45-Sec 32 01 16.71 - MILLING OF BITUMINOUS PAVEMENT SURFACE.pdf PDF
2-Doc 00 45 13 - BIDDER QUALIFICATION STATEMENT.pdf PDF
32-Sec 01 22 00 - 01 - MP BASE BID QUANTITIES.pdf PDF
21-Doc 00 91 13 - ADDENDA.pdf PDF
4-Doc 00 43 13 - BID BOND.pdf PDF
55-Sec 01 70 00 - CONTRACT CLOSEOUT.pdf PDF
5-Doc 00 45 19 - NON-COLLUSION AFFIDAVIT.pdf PDF
46-Sec 32 12 00 - BITUMINOUS CONCRETE PAVING.pdf PDF
18-Doc 00 65 19.19 - CONSENT OF SURETY.pdf PDF
40-Sec 31 20 00 - EARTHWORK.pdf PDF
Show all 50

Heritage Hills WWTP Discharge Interconnection, Contract No. 6715-11 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

THERMOPLASTIC TRAFFIC LINES AND MARKINGS

32 17 23.33-1

SECTION 32 17 23.33

HOT THERMOPLASTIC PAVEMENT MARKINGS

PART 1 GENERAL

1.01 DESCRIPTION OF WORK

A. This Work is the furnishing and installation of thermoplastic traffic lines and markings, of the indicated type and color with a surface application of glass beads. Thermoplastic pavement markings shall be used for all stop bars, crosswalks, legends, and arrows.

PART 2 PRODUCTS

2.01 MATERIALS

A. Materials used shall be in accordance with Section 960 of PennDOT Publication 408, dated 2011 and the latest supplements thereof. All materials shall be provided from a source listed in Bulletin 15 and conforming to AASHTO M 249.

B. Glass beads shall conform to Section 1103.14, Type A, of PennDOT Publication 408, dated 2011 and the latest supplements thereof.

PART 3 EXECUTION

3.01 GENERAL

A. Apply in accordance with applicable 67 Pa Code and PennDOT standards.

B. Employ traffic control measures in accordance with MUTCD Chapter 6 and PennDOT Publication 213, Work Zone Traffic Control Manual, at all times.

C. Construction shall be in accordance with PennDOT Publication 111, Traffic Control – Pavement Markings and Signing Standards

3.02 CONSTRUCTION

A. Application for Hot Thermoplastic:

1. Surface Preparation: For proper adhesion, perform surface preparation of the road surface and provide the pretreatment according to Bulletin 15 or recommended by the manufacturer.

Clean the roadway surface where the hot thermoplastic pavement markings will be applied.

Remove all surface treatment, laitance, curing compound, or any contaminants that would hinder adhesion. Clear any loose dirt and other debris from the application area. Surface preparation is incidental to the application of hot thermoplastic pavement markings, except for the removal of any pavement markings as specified by Engineer. Identify the location of the final pavement markings by applying spots on the pavement at 40-foot intervals. The Owner or Engineer will approve the locations. Apply on dry pavement when the air and roadway temperatures are between 50F and 90F and when the wind speed is less than 20 miles per hour.

2. Thermoplastic: Uniformly apply the markings at a minimum thickness of 90 mils ± 3 mils. A tolerance of ± 1/4 inch from the specified width will be allowed provided the variation is gradual and does not detract from the general appearance. For skip line patterns maintain a tolerance of ± 6 inches for each 40-foot cycle and ± 3 inch for each 10-foot skip line.

3. Glass Beads: Apply glass beads immediately after application of the markings at a minimum rate of 10 pounds per 100 square feet of markings. Uniformly distribute glass beads on the surface. Provide markings with an average minimum initial retroreflectivity of 300 mcd/m2/lux for white and 250 mcd/m2/lux for yellow. Under the direction and supervision of the Representative, measure retroreflectivity with a 30-meter geometry retroreflectometer, conforming to ASTM E-1710 within 21 days after installation in accordance with PTM No.

431.

THERMOPLASTIC TRAFFIC LINES AND MARKINGS

32 17 23.33-2

B. Protection of Surfaces

1. Provide satisfactory protection for pavement markings for at least 30 minutes or until material has dried sufficiently to prevent dirt pick-up and tracking from vehicular traffic.

2. Defective Markings: Repaint marked or damaged areas as directed by Engineer. Remove any markings placed incorrectly and replace them as directed by Engineer. Repair those markings, which after application and drying, are determined to be defective by Engineer.

Complete this work at no additional cost to Owner. Major problem areas and method of repair include the following:

(a) Insufficient thickness or line width, uneven cross-section—Prepare defective material by grinding or blast cleaning to remove a substantial amount of beads and the marking surface is roughened. Remove loose particles and debris with compressed air. Restripe the cleaned surface as specified in Sections 960.3(b) and (c).

(b) Inadequate retroreflectivity, glass bead coverage or retention—Remove defective markings and clean pavement surface, including 1 foot beyond each end of the affected area. Remove loose particles and debris with compressed air. Restripe the marking on the cleaned surface as specified in Sections 960.3(b) and (c).

3. Guarantee: Where directed, remove and replace material that has not remained within close conformity to location or has not remained effective in performing useful service for a period of 180 days from the date of acceptance. The minimum acceptable service is as follows:

(a) Longitudinal Markings. 90% of material remains in each 1,000-foot section of marking where the intersection unit is defined as material on an approach leg within 160 feet of the intersection.

(b) Transverse Markings, Legends, and Symbols. 90% of material remains for each individual legend, symbol, crosswalk, or stop line.

END OF SECTION

PART 1 GENERAL

File details come from the government source that posted it. Updated .