49-Sec 32 12 23-RESTORATION OF PAVED SURFACES.pdf
PDF 119 KB Posted
- Attached to
- Heritage Hills WWTP Discharge Interconnection, Contract No. 6715-11 State and local contract opportunity
- Solicitation number
- Not on record
- Issued by
- Bucks County, Pennsylvania
About this file
This is a technical specification document for the Restoration of Paved Surfaces section (32 12 23) related to Upper Makefield Township's 2026 Road Program in Pennsylvania. The specification outlines comprehensive requirements for pavement restoration work including temporary paving, permanent paving, asphalt overlay, shoulder restoration, driveways, concrete curb and gutter repairs, stormwater inlets and piping, and street signage. All work must comply with Pennsylvania Department of Transportation standards, including Publication 408 Specifications, Publication 27 for Bituminous Mixtures, and Publication 37 for Bituminous Materials. Contractors are required to submit certifications from bituminous and aggregate suppliers, PennDOT-approved Job Mix Formulas for each bituminous concrete mix, and PennDOT-approved Mix Designs for each concrete class. Traffic control measures must be implemented in accordance with Section 01 55 26 and relevant PennDOT and local municipal permits, with all repaved areas requiring authorization from the Resident Project Representative before opening to traffic.
The specification requires specific material grades and placement procedures, including PennDOT Superpave bituminous materials for base, binder, leveling, and wearing courses, with tack coat applied as Class E-8 Emulsified Asphalt and joint seals using Asphalt PG 64-22 Sealant. Temporary paving must be completed within ten working days of trench backfilling and remain in place for a minimum of ninety days on state roads. Permanent paving requires compaction using minimum 5-ton rollers in trenches and 10-ton rollers on standard applications, with specific thickness requirements shown on project drawings. Contractors are responsible for restoring existing pavement damaged by construction operations, maintaining all paving throughout the contract maintenance period, and replacing pavement markings in their original locations. The specification includes detailed procedures for restoring various driveway surfaces—including concrete, blacktop, earth, stone, gravel, brick, and cobblestone—and for repairing or replacing damaged curbs, gutters, and stormwater infrastructure to match existing conditions.
View the file
Other files for this state and local contract opportunity
Show all 50
Heritage Hills WWTP Discharge Interconnection, Contract No. 6715-11 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RESTORATION OF PAVED SURFACES
32 12 23-1
SECTION 32 12 23
PART 1 - GENERAL
1.01 SECTION DESCRIPTION
A. The Work of This Section Includes:
1. Temporary Paving
2. Permanent Paving
3. Asphalt Overlay
4. Shoulder Restoration
5. Driveways
6. Concrete Curb and Gutter Repairs
7. Stormwater Inlets and Piping
8. Street Signage
1.02 RELATED SECTIONS
A. Related Work specified elsewhere:
1. Section 01 55 26: Traffic Regulation
2. Section 32 12 00: Bituminous Concrete Paving
1.03 QUALITY ASSURANCE
A. Referenced Standards:
1. Pennsylvania Department of Transportation:
a. Publication 408 Specifications
b. Publication 27 - Specification for Bituminous Mixtures (Bulletin 27)
c. Publication 37 - Specification for Bituminous Materials (Bulletin 25)
d. Publication 213 – Temporary Traffic Control Guidelines
1.04 SUBMITTALS
A. Certificates:
1. Submit certification from bituminous and aggregate suppliers attesting that materials conform to the State Specifications in accordance with Section 01 33 00.
2. Submit a PennDOT approved Job Mix Formula for each bituminous concrete mix required.
3. Submit a PennDOT approved Mix Design for each concrete class and use required.
1.05 JOB CONDITIONS
A. Control of Traffic:
1. Take measures to control traffic during repaving operations. Do not allow traffic on repaved areas until authorized by the Resident Project Representative.
2. Employ traffic control measures in accordance with the requirements of Section
01 55 26 including pertinent permits by PennDOT and local municipal agencies having jurisdiction.
B. Restore existing paving outside the limits of the Work, that is damaged by Contractor's operations, to its original condition at the expense of Contractor.
32 12 23-2
PART 2 - PRODUCTS
2.01 BITUMINOUS PAVING MATERIALS AND AGGREGATES
A. Base Course: PennDOT Superpave (Section 313 & 316 of Publication 408).
B. Binder Course: PennDOT Superpave (Section 410 & 413 of Publication 408).
C. Leveling Course: PennDOT Superpave (Section 410 & 413 of Publication 408).
D. Wearing Course: PennDOT Superpave (Section 410 & 413 of Publication 408).
E. Tack Coat: Per Section 460 of PennDOT Publication 408, except revise the first sentence to read:
Emulsified Asphalt, Class E-8 (AASHTO CSS-1h or SS-1h)
F. Joint Seal: Asphalt PG 64-22 Sealant (Publication 408).
G. Coarse Aggregate: PennDOT No. 2A (Section 703 of Publication 408).
PART 3 - EXECUTION
3.01 TEMPORARY PAVING
A. Provide temporary paving immediately upon completion of trench backfilling. Unpaved trenches shall not remain unpaved longer than ten (10) working days after backfilling.
B. Complete trench backfill with coarse aggregate in accordance with the Drawings and Publication 408 requirements.
C. Trim existing paving with minimum one (1) foot cutbacks to remove damaged areas. Cut straight joint lines and right angle offsets.
D. Place temporary paving material consisting of bituminous concrete base course to the required depth shown on the Drawings for the entire width of the trench. Place with a maximum lift thickness of three
(3) inches and compact each lift individually using a trench roller (minimum 5 ton).
E. Continuously maintain temporary paving to the satisfaction of the Resident Project Representative and the State and local municipal road departments having jurisdiction. Temporary paving on State roads must remain in place for a minimum of ninety (90) days.
3.02 PERMANENT PAVING
A. Place bituminous concrete base course on surface of compacted subbase course to compacted thickness (10 ton roller where possible; minimum 5 ton roller in trenches) as shown on Drawings.
B. Place binder and wearing courses to compacted thicknesses (10 ton roller except minimum 5 ton roller for binder course in trenches) as shown on the Drawings. Apply tack coat, per Section 32 12 00, on completed binder course before placing wearing course should there be a delay between completion of binder course and placement of wearing course.
C. Place wearing course overlay to compacted thickness (10 ton roller) as and where shown on the
Drawings.
D. Compact pavement by rolling to achieve even and smooth finish, without roller marks. Hand compact in areas inaccessible to rolling equipment.
E. Where proposed asphalt paving adjoins existing asphalt paving, seal the joint with Asphalt PG 64-22 Sealant in accordance with Publication 408 Specifications.
F. Replace pavement markings in their former location which were covered or destroyed.
G. Maintain permanent paving to the satisfaction of the Resident Project Representative and the local municipal and State road departments having jurisdiction throughout the Contract maintenance period.
32 12 23-3
3.03 ASPHALT OVERLAY
A. Where indicated on the Drawings, or directed by the Resident Project Representative, place an asphalt overlay.
B. Construct in accordance with Publication 408 Specifications.
C. Replace pavement markings in their former location which were covered or destroyed.
3.04 SHOULDER RESTORATION
A. Restore shoulders in accordance with the Drawings.
3.05 DRIVEWAYS
A. Trim concrete and bituminous driveway surfaces to remove damaged areas. Saw cut straight joint lines parallel to the centerline of the trench. Cut offsets at right angles to the trench centerline.
B. Restore existing portland cement concrete driveways with a 6" layer of concrete reinforced with 6 x 6 l0/l0 wire mesh.
C. Restore existing blacktop driveways in kind or with minimum 1-1/2" layer wearing course over 6" layer of 2A aggregate.
D. Restore earth driveways with a 6" layer of 2A stone backfill.
E. Restore stone or gravel driveways in kind.
F. Restore brick driveways with like bricks placed on a 4" thick wet sand bed. Place bricks in like pattern and spacing.
G. Restore cobblestone driveways with cobblestone placed on a 4" thick wet sand bed. Place cobblestones in like pattern and spacing.
3.06 CONCRETE CURB AND GUTTER REPAIRS
A. Replace curbs and gutters damaged by construction to match existing.
B. Reconstruct curbs and gutters to the first expansion joint on either side of the damaged portion. Install expansion joint material.
3.07 STORMWATER INLETS AND PIPING
A. Repair or replace storm water inlets and piping damaged by construction to match existing inlets.
B. The Resident Project Representative will determine whether the frame and grate assembly of each affected storm water inlet is suitable for reuse once it has been removed by Contractor.
C. Construct or repair storm water inlets and piping in accordance with relevant section of Publication 408 Specifications.
3.08 STREET SIGNAGE
A. Reinstall any signage removed to allow for construction activities at the original location.
END OF SECTION
File details come from the government source that posted it. Updated .