Heritage Hills WWTP Discharge Interconnection, Contract No. 6715-11 State and local contract opportunity
Solicitation number
Not on record
Issued by
Bucks County, Pennsylvania

About this file

This is a table of contents document for the Upper Makefield Township 2026 Road Paving Program Contract #26-00060 in Pennsylvania, outlining the structure and components of the procurement and contracting requirements for a road improvement project. The contract consists of a base bid and three alternate bids involving milling, base repair, leveling course, manhole rim adjustments, and wearing course improvements along various roads within Upper Makefield Township. The specific roadways and quantities associated with the base bid and each alternate are detailed in Exhibits A, B, and C of Section 01 22 00 Measurement and Payment. The document serves as an organizational guide for all contractual documents, including procurement requirements, general and supplementary conditions, performance specifications, and construction requirements organized across multiple divisions covering site and infrastructure work, bituminous paving, and related improvements.

The table of contents references key bidding documents and forms including advertisement for bids, instructions to bidders, bid forms, bid bonds, bidder qualification statements, non-collusion affidavits, performance bonds, payment bonds, and maintenance bonds. The contract incorporates prevailing wage requirements as detailed in Appendix A and public works employment verification as specified in Appendix B. Construction specifications address bituminous materials price adjustments, traffic regulation, soil erosion and sedimentation control, construction facilities, quality control, and contract closeout procedures. The procurement structure indicates a formal competitive bidding process with comprehensive bonding, insurance, and compliance requirements typical of public works projects in Pennsylvania.

View the file

Other files for this state and local contract opportunity

Other files attached to Heritage Hills WWTP Discharge Interconnection, Contract No. 6715-11, newest first.
File Type Posted
2-6715-11 CONTRACT DRAWINGS.pdf PDF
1-6715-11 CONTRACT DOCUMENTS.pdf PDF
52-Sec 32 05 19.13 - GEOTEXTILE.pdf PDF
13-Doc 00 62 16-CERTIFICATE OF INSURANCE.pdf PDF
44-Sec 32 01 17.61 - ASPHALT JOINT SEALING.pdf PDF
11-Doc 00 61 13.13 - PERFORMANCE BOND.pdf PDF
43-Sec 31 23 00 - EXCAVATION BACKFILL AND COMPACTION FOR ROADWAYS.pdf PDF
38-Sec 01 33 00 - SUBMITTALS.pdf PDF
12-Doc 00 52 00 - AGREEMENT.pdf PDF
30-Doc 00 72 00 - GENERAL CONDITIONS.pdf PDF
3-Doc 00 01 01 - TITLE SHEET AND COVER.pdf PDF
19-Doc 00 61 13.16 - PAYMENT BOND.pdf PDF
42-Sec 31 23 16.26 - ROCK REMOVAL.pdf PDF
17-Doc 00 21 13 - INSTRUCTIONS TO BIDDERS - EBID.pdf PDF
39-Doc 00 73 00 - 00 - SUPPLEMENTARY CONDITIONS.pdf PDF
25-Sec 01 22 00 - 03 - MP PAVEMENT MARKING QUANTITIES.pdf PDF
22-Sec 01 32 36 - AUDIO-VIDEOTAPING.pdf PDF
56-2026 UMT Paving Map.pdf PDF
33-Sec 01 22 00 - 00 - MEASUREMENT AND PAYMENT.pdf PDF
53-Sec 01 60 00 - MATERIAL AND EQUIPMENT.pdf PDF
1-Doc 00 45 10 - BIDDER ACKNOWLEDGEMENT FORM.pdf PDF
20-Doc 00 73 00 - 01 - APPENDIX A PREVAILING WAGE RATES.pdf PDF
6-Doc 00 45 53 - AGREEMENT OF SURETY COMPANY.pdf PDF
15-Doc 00 65 19.16 - CONTRACTORS RELEASE OF LIENS.pdf PDF
24-Sec 01 11 13 - SUMMARY OF WORK.pdf PDF
7-Doc 00 21 13.1 - ELECTRONIC BIDDING INSTRUCTIONS.pdf PDF
31-Sec 01 22 00 - 02 - MP ALTERNATE BID QUANTITIES.pdf PDF
37-Sec 01 42 13 - ORGANIZATION AND REFERENCE ACRONYMS.pdf PDF
49-Sec 32 12 23-RESTORATION OF PAVED SURFACES.pdf PDF
28-Sec 01 29 00 - CONTRACT CONSIDERATIONS.pdf PDF
23-Doc 00 73 00 - 03 - APPENDIX B COVER.pdf PDF
16-Doc 00 61 19 - MAINTENANCE BOND.pdf PDF
29-Doc 00 73 00 - 04 - APPENDIX B PUBLIC WORKS EMPLOYMENT VERIFICATION FORM.pdf PDF
50-Sec 01 31 00 - COORDINATION AND MEETINGS.pdf PDF
35-Sec 31 11 00-CLEARING AND GRUBBING.pdf PDF
41-Sec 01 55 26 - TRAFFIC REGULATION.pdf PDF
34-Sec 01 40 00 - QUALITY CONTROL.pdf PDF
48-Doc 00 11 13 - ADVERTISEMENT FOR BIDS.pdf PDF
51-Sec 01 57 13 - EROSION SEDIMENT CONTROL.pdf PDF
45-Sec 32 01 16.71 - MILLING OF BITUMINOUS PAVEMENT SURFACE.pdf PDF
2-Doc 00 45 13 - BIDDER QUALIFICATION STATEMENT.pdf PDF
32-Sec 01 22 00 - 01 - MP BASE BID QUANTITIES.pdf PDF
54-Sec 32 17 23.33 - THERMOPLASTIC PAVEMENT MARKINGS.pdf PDF
21-Doc 00 91 13 - ADDENDA.pdf PDF
4-Doc 00 43 13 - BID BOND.pdf PDF
55-Sec 01 70 00 - CONTRACT CLOSEOUT.pdf PDF
5-Doc 00 45 19 - NON-COLLUSION AFFIDAVIT.pdf PDF
46-Sec 32 12 00 - BITUMINOUS CONCRETE PAVING.pdf PDF
18-Doc 00 65 19.19 - CONSENT OF SURETY.pdf PDF
40-Sec 31 20 00 - EARTHWORK.pdf PDF
Show all 50

Heritage Hills WWTP Discharge Interconnection, Contract No. 6715-11 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TABLE OF CONTENTS

00 01 10-1

UPPER MAKEFIELD TOWNSHIP 2026 ROAD PAVING PROGRAM

CONTRACT #26-00060

Introductory Information

00 01 01 Project Title Page 00 01 10 Table of Contents 00 01 15 List of Drawing Sheets

DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP

Procurement Requirements

00 11 13 Advertisement for Bids 00 21 13 Instructions to Bidders 00 21 13.1 Instructions for Electronic Bidding 00 41 00 Bid Form 00 43 13 Bid Bond 00 45 10 Bidder’s Acknowledgement Form 00 45 13 Bidder Qualification Statement 00 45 19 Non-Collusion Affidavit 00 45 53 Agreement of Surety Company

Contracting Requirements

00 52 00 Agreement 00 61 13.13 Performance Bond 00 61 13.16 Payment Bond 00 61 19 Maintenance Bond 00 62 16 Certificate of Insurance 00 65 19.13 Contractor’s Affidavit 00 65 19.16 Contractor’s Release of Liens 00 65 19.19 Consent of Surety to Final Payment 00 72 00 General Conditions 00 73 00 Supplementary Conditions

Appendix A Prevailing Wage Determination Appendix B Public Works Employment Verification Form

00 91 13 Addenda

DIVISION 01 – GENERAL REQUIREMENTS

01 11 13 Summary of Work 01 22 00 Measurement and Payment Exhibit A Base Bid Roadway Breakdown Exhibit B Alternate Bids Roadway Breakdown Exhibit C Pavement Marking Quantities Summary 01 26 73 Bituminous Materials Price Adjustment 01 29 00 Contract Considerations 01 31 00 Coordination and Meetings 01 32 16 Narrative Construction Schedule 01 32 36 Audio-Videotaping 01 33 00 Submittals 01 40 00 Quality Control 01 42 13 Organization and Reference Acronyms 01 50 00 Construction Facilities and Temporary Controls 01 55 26 Traffic Regulation 01 57 17 Soil Erosion and Sedimentation Control 01 60 00 Materials and Equipment 01 70 00 Contract Closeout

00 01 10-2

DIVISION 32 – SITE AND INFRASTRUCTURE SUBGROUP

31 11 00 Clearing & Grubbing 31 20 00 Earthwork 31 23 16.26 Rock Removal 31 23 00 Excavation, Backfill and Compaction

DIVISION 32 – SITE AND INFRASTRUCTURE SUBGROUP

32 01 16.71 Milling of Bituminous Pavement Surface 32 01 17.61 Asphalt Joint Sealing 32 05 19.13 Geotextile 32 12 00 Bituminous Concrete Paving 32 12 23 Restoration of Paved Surfaces 32 18 23.33 Thermoplastic Pavement Markings