44-Sec 32 01 17.61 - ASPHALT JOINT SEALING.pdf

PDF 116 KB Posted

Attached to
Heritage Hills WWTP Discharge Interconnection, Contract No. 6715-11 State and local contract opportunity
Solicitation number
Not on record
Issued by
Bucks County, Pennsylvania

About this file

This specification document outlines the asphalt joint sealing requirements for Upper Makefield Township's 2026 Road Program in Pennsylvania. The work includes joint sealing along all curb lines, butt joints, and around utilities using polymer modified asphalt joint sealing methods. The project requires the use of asphalt cement PG 64-22 meeting PennDOT Bulletin 25 specifications, combined with reclaimed granulated rubber at a ratio of two pounds of RGR per gallon of asphalt cement. Contractors must prepare joints and cracks measuring one-eighth to one inch wide with polymer modified asphalt applied level with the pavement surface, while joints and cracks exceeding one inch in width must be filled with Bituminous Wearing Course FJ-1. Surface preparation requires cleaning pavement four to six inches on either side of joints or cracks using compressed air at least 100 psi at the source, followed by air blasting immediately prior to sealing.

The specification mandates strict operational requirements for material handling and application. Asphalt cement and reclaimed granulated rubber must be blended in an oil-jacketed double wall kettle with indirect heating at temperatures between 350°F and 380°F for thirty minutes, with maximum operating temperatures not exceeding 400°F. Sealing operations are restricted to ambient temperatures between 40°F and 90°F, with no bituminous overlay placement permitted within seventy-two hours of sealing unless approved by the Engineer. Contractors must seal joints and curb lines within one week of road paving completion. All bituminous materials require certification with comprehensive documentation including test results, tank numbers, company lot numbers, viscosity and penetration data, and producer verification that materials are contamination-free and compatible with specified aggregates.

View the file

Other files for this state and local contract opportunity

Other files attached to Heritage Hills WWTP Discharge Interconnection, Contract No. 6715-11, newest first.
File Type Posted
1-6715-11 CONTRACT DOCUMENTS.pdf PDF
2-6715-11 CONTRACT DRAWINGS.pdf PDF
41-Sec 01 55 26 - TRAFFIC REGULATION.pdf PDF
34-Sec 01 40 00 - QUALITY CONTROL.pdf PDF
48-Doc 00 11 13 - ADVERTISEMENT FOR BIDS.pdf PDF
51-Sec 01 57 13 - EROSION SEDIMENT CONTROL.pdf PDF
45-Sec 32 01 16.71 - MILLING OF BITUMINOUS PAVEMENT SURFACE.pdf PDF
2-Doc 00 45 13 - BIDDER QUALIFICATION STATEMENT.pdf PDF
32-Sec 01 22 00 - 01 - MP BASE BID QUANTITIES.pdf PDF
54-Sec 32 17 23.33 - THERMOPLASTIC PAVEMENT MARKINGS.pdf PDF
21-Doc 00 91 13 - ADDENDA.pdf PDF
52-Sec 32 05 19.13 - GEOTEXTILE.pdf PDF
13-Doc 00 62 16-CERTIFICATE OF INSURANCE.pdf PDF
11-Doc 00 61 13.13 - PERFORMANCE BOND.pdf PDF
43-Sec 31 23 00 - EXCAVATION BACKFILL AND COMPACTION FOR ROADWAYS.pdf PDF
38-Sec 01 33 00 - SUBMITTALS.pdf PDF
12-Doc 00 52 00 - AGREEMENT.pdf PDF
30-Doc 00 72 00 - GENERAL CONDITIONS.pdf PDF
3-Doc 00 01 01 - TITLE SHEET AND COVER.pdf PDF
19-Doc 00 61 13.16 - PAYMENT BOND.pdf PDF
42-Sec 31 23 16.26 - ROCK REMOVAL.pdf PDF
17-Doc 00 21 13 - INSTRUCTIONS TO BIDDERS - EBID.pdf PDF
39-Doc 00 73 00 - 00 - SUPPLEMENTARY CONDITIONS.pdf PDF
25-Sec 01 22 00 - 03 - MP PAVEMENT MARKING QUANTITIES.pdf PDF
10-Doc 00 01 10 -TABLE OF CONTENTS.pdf PDF
22-Sec 01 32 36 - AUDIO-VIDEOTAPING.pdf PDF
56-2026 UMT Paving Map.pdf PDF
33-Sec 01 22 00 - 00 - MEASUREMENT AND PAYMENT.pdf PDF
53-Sec 01 60 00 - MATERIAL AND EQUIPMENT.pdf PDF
1-Doc 00 45 10 - BIDDER ACKNOWLEDGEMENT FORM.pdf PDF
20-Doc 00 73 00 - 01 - APPENDIX A PREVAILING WAGE RATES.pdf PDF
6-Doc 00 45 53 - AGREEMENT OF SURETY COMPANY.pdf PDF
15-Doc 00 65 19.16 - CONTRACTORS RELEASE OF LIENS.pdf PDF
24-Sec 01 11 13 - SUMMARY OF WORK.pdf PDF
7-Doc 00 21 13.1 - ELECTRONIC BIDDING INSTRUCTIONS.pdf PDF
31-Sec 01 22 00 - 02 - MP ALTERNATE BID QUANTITIES.pdf PDF
37-Sec 01 42 13 - ORGANIZATION AND REFERENCE ACRONYMS.pdf PDF
49-Sec 32 12 23-RESTORATION OF PAVED SURFACES.pdf PDF
28-Sec 01 29 00 - CONTRACT CONSIDERATIONS.pdf PDF
23-Doc 00 73 00 - 03 - APPENDIX B COVER.pdf PDF
16-Doc 00 61 19 - MAINTENANCE BOND.pdf PDF
29-Doc 00 73 00 - 04 - APPENDIX B PUBLIC WORKS EMPLOYMENT VERIFICATION FORM.pdf PDF
50-Sec 01 31 00 - COORDINATION AND MEETINGS.pdf PDF
35-Sec 31 11 00-CLEARING AND GRUBBING.pdf PDF
4-Doc 00 43 13 - BID BOND.pdf PDF
55-Sec 01 70 00 - CONTRACT CLOSEOUT.pdf PDF
5-Doc 00 45 19 - NON-COLLUSION AFFIDAVIT.pdf PDF
46-Sec 32 12 00 - BITUMINOUS CONCRETE PAVING.pdf PDF
18-Doc 00 65 19.19 - CONSENT OF SURETY.pdf PDF
40-Sec 31 20 00 - EARTHWORK.pdf PDF
Show all 50

Heritage Hills WWTP Discharge Interconnection, Contract No. 6715-11 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASPHALT JOINT SEALING

32 01 17.61-1

SECTION 32 01 17.61

POLYMER MODIFIED ASPHALT JOINT SEALING

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Asphalt Joint Sealing

1.02 DESCRIPTION OF WORK

A. This work includes joint sealing along all curb lines, butt joints and around utilities.

PART 2 PRODUCTS

2.01 ASPHALT CEMENT PG 64-22

A. Obtain material meeting the requirements of PennDOT Bulletin 25 from a producer listed in Bulletin 15.

1. Quality Control Section 01 40 00

2. Certification

a. General

1) When a bituminous material tank is filled, submit a copy of the required test results to the MTD for verification of compliance with Department specifications.

2) Specify the type of material, tank number, and company lot number of the certificate for cross-reference to the bill of lading.

3) Have a responsible company official sign the certificate.

4) Obtain a verification sample from each batch. A batch is a tank completely filled, partially filled, or refilled with a blend of residual and new material.

5) Test one-half (1/2) sample and forward the results to the MTD. Forward the remaining one-half (1/2) sample to the MTD for testing. The MTD will evaluate quality control on the basis of three (3) consecutive verification samples.

b. Levels of Certification

1) Use the same levels of certification as specified in PennDOT Publication 408, Section 106.03(b)3.

c. Handling and Transportation, Section 01 60 00

1) Furnish the vendor’s bill of lading for each shipment (one copy retained by the vendor and one copy included with the shipment to the project). Use a form acceptable to the MTD, containing the following information:

a) Statement that material has been testing and meets Department specifications.

b) Class of Material

c) Tank Number

d) Company Batch Number

e) Date of Shipment

f) Producer’s Name and Location

g) Name and Location of Consignee, (Bituminous Concrete Plant or Maintenance

District)

h) Mix or Application Temperatures, Minimum and Maximum

i) Viscosity at 140F

j) Penetration oat 77F

k) Trailer Number

l) Specific Gravity of Asphalt Cement at 77F

ASPHALT JOINT SEALING

32 01 17.61-2

m) Statement that the material is compatible with job aggregate E-4, E-5, E-10, E-11, E- 12, MC-400, and MC-800)

n) Percent Bitumen Residue by Weight (for liquid bituminous materials only)

o) Quality of Material

p) Statement that the shipment container was determined to be reasonably free of contamination immediately prior to loading

PART 3 EXECUTION

3.01 GENERAL

A. Provide a mixture of asphalt cement and reclaimed granulated rubber, combined to the specified proportions, or furnish a premixed composition as specified in Section 469.2(c) or (d).

3.02 MIXING PROCEDURES

A. Combine the PG 64-22 and reclaimed granulated rubber to obtain a mixture having proportions of two (2 lbs) pounds of RGR per gallon of asphalt cement. Blend the PG 64-22 and reclaimed granulated rubber in an oil-jacketed double wall kettle (indirect heating) equipped with agitator and two (2") inch hot asphalt pump. Provide separate thermometers for oil bath. Heat and agitate the mixture with the temperature range of 350F - 380F for thirty (30) minutes. Do not allow the operating temperature in the kettle to exceed 400F.

B. For premixed material, as specified in Section 469.2(c) or (d), obtain the safe heating temperature range and recommended pouring temperature from the manufacturer’s shipping container. Place the material within this temperature range, and as close as possible to the recommended pouring temperature. Maintain a safe heating temperature. Do not maintain any single batch of material at the pouring temperature for more than four (4) hours. Reheat only in accordance with manufacturer’s recommendations.

3.03 SURFACE PREPARATION

A. Apply sealer only after cracks, joints, and adjacent pavement surfaces are clean, dry, and free of any loose material and debris. Clean the pavement for four (4") to six (6") inches on either side of the joint or crack. Air blast cracks and joints immediately prior to sealing. Use a compresses air stream of at least 100 psi measured at the source, or use a hot compressed air lance for cleaning and drying damp cracks in the bituminous pavements. Care should be taken to ensure that damage to the surrounding pavement area from overheating does not occur. Seal joints and cracks (1/8) to one (1") inch wide with polymer modified asphalt. Fill joints and cracks in excess of one (1) inch in width Bituminous Wearing Course, FJ-1, in lieu of sealing.

3.04 SEALING

A. Seal joints and cracks from (1/2”) to (1”) inch wide with asphalt sealant and filling joints over (1”) wide with Bituminous Wearing Course FJ-1.

B. Apply polymer modified asphalt to prepared joints, level with the pavement surface, using a wand followed by a standard “V” shaped asphalt squeegee. Leave no more than 1/8 inch buildup. Do not place sealer when the air temperature is below 40F or above 90F, unless otherwise permitted by the Engineer if the hot compressed air lance used can sufficiently warm the crack to ensure adhesion between the pavement and the sealer. Do not place bituminous overlay within seventy-two (72) hours of sealing unless permitted by Engineer.

C. Contractor shall seal joints and curb lines within 1 week of the road being paved.

END OF SECTION