47-Sec 01 50 00 - CONSTRUCTION FACILITIES.pdf
PDF 111 KB Posted
- Attached to
- Heritage Hills WWTP Discharge Interconnection, Contract No. 6715-11 State and local contract opportunity
- Solicitation number
- Not on record
- Issued by
- Bucks County, Pennsylvania
About this file
This is a Construction Facilities and Temporary Controls specification document for Upper Makefield Township's 2026 Road Program in Pennsylvania. The specification outlines the contractor's responsibilities for providing temporary utilities, controls, and facilities necessary to execute roadwork that includes milling, base repair, leveling course, manhole rim adjustments, and wearing course improvements along various township roads. The work scope encompasses temporary electricity, lighting, ventilation, communications, water and sanitary facilities, as well as construction barriers, enclosures, fencing, dust control, and water management. The contractor must maintain a six-foot-high fence around the construction site with locked vehicular and pedestrian gates, provide daily progress cleaning and waste removal, implement dust control measures as directed by the Resident Project Representative, and maintain temporary lighting for both construction operations and security purposes.
The specification places all costs for temporary facilities and controls as the contractor's responsibility at no additional cost to the Owner beyond the contract price. The contractor must protect installed work, existing facilities, and adjacent properties from damage, grade the site for proper drainage, and maintain excavations free of water through pumping equipment as needed. Upon completion, the contractor is responsible for cleaning and repairing any damage caused by temporary installations, restoring existing facilities to their original condition, and removing all temporary utilities and controls. The document references related sections for traffic regulation and final closeout cleaning but does not specify pricing terms, bid amounts, or award information, which would be detailed in the associated measurement and payment exhibits and bidding documents.
View the file
Other files for this state and local contract opportunity
Show all 50
Heritage Hills WWTP Discharge Interconnection, Contract No. 6715-11 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS
01 50 00-1
SECTION 01 50 00
PART 1 GENERAL
1.01 GENERAL
A. The Work of this Section shall be the responsibility of the contractor as noted in the Summary of
Work: Section 01 11 13.
1.02 SECTION INCLUDES
A. Temporary Utilities: Electricity, lighting, ventilation, communications service, water and sanitary facilities.
B. Temporary Controls: Barriers, enclosures and fencing, protection of the Work, water control and dust control.
C. Construction Facilities: Access roads, parking, progress cleaning, project signage, and temporary buildings.
1.03 RELATED SECTIONS
A. Section 01 55 26: Traffic Regulation.
B. Section 01 70 00: Contract Closeout: Final cleaning.
1.04 TEMPORARY ELECTRICITY
A. Cost: By Contractor; provide and pay for power service required from utility source.
1.05 TEMPORARY LIGHTING FOR CONSTRUCTION PURPOSES
A. Provide and maintain lighting for construction operations and for security purposes.
B. Provide branch wiring from power source to distribution boxes with lighting conductors, pigtails, and lamps as required.
C. Maintain lighting and provide routine repairs.
1.06 BARRIERS
A. Provide barriers to prevent unauthorized entry to construction areas, and to protect existing facilities and adjacent properties from damage from construction operations and demolition.
B. Protect non-owned vehicular traffic, stored materials, site, and structures from damage.
1.07 FENCING
A. Construction: Contractor's option.
B. Provide 6 foot high fence around construction site; equip with vehicular and pedestrian gates with locks.
1.08 WATER CONTROL
A. Grade site to drain. Maintain excavations free of water. Provide, operate, and maintain pumping equipment.
B. Protect site from puddling or running water.
01 50 00-2
1.09 PROTECTION OF INSTALLED WORK
A. Protect installed Work and provide special protection where specified in individual specification sections.
B. Provide temporary and removable protection for installed Products. Control activity in immediate work area to prevent damage.
1.10 PROGRESS CLEANING AND WASTE REMOVAL
A. Maintain areas free of waste materials, debris, and rubbish. Maintain site in a clean and orderly condition.
B. Collect and remove waste materials, debris, and rubbish from site daily and dispose off-site.
1.12 PROJECT IDENTIFICATION
A. No other signs are allowed without Owner permission except those required by law.
1.13 REMOVAL OF UTILITIES, FACILITIES, AND CONTROLS
A. Clean and repair damage caused by installation or use of temporary work.
B. Restore existing facilities used during construction to original condition. Restore permanent facilities used during construction to specified condition.
1.12 DUST CONTROL
A. Execute Work by methods to minimize raising dust from construction operations.
B. Provide positive means (i.e. use of sprinkling water or other methods approved by the Resident Project Representative) to prevent air-borne dust from dispersing into atmosphere.
C. Dust control measures shall be employed when required in the opinion of the Resident Project
Representative at no additional cost to Owner.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
END OF SECTION