This is a Contract Closeout specification document (Section 01 70 00) prepared for Upper Makefield Township's 2026 Road Program in Pennsylvania, outlining the procedures and requirements for project completion and final acceptance. The specification covers comprehensive closeout procedures including final cleaning of interior and exterior surfaces, equipment adjustment and sanitization, site debris removal, and submission of final applications for payment. The contractor must maintain on-site project record documents including marked-up drawings, specifications, addenda, change orders, shop drawings, and manufacturer's instructions, with all actual revisions and product substitutions documented concurrent with construction progress. Prior to final payment, the contractor must submit various documentation including payroll certification forms (for contracts exceeding $25,000), waivers of liens from all subcontractors and suppliers, maintenance bonds, Material Form CS-4171 for asphalt paving to satisfy Liquid Fuels funding requirements, equipment warranties, and CD/DVD copies of preconstruction documentation.
The specification does not address specific pricing terms, set-asides, or incumbent contractor information, as it functions as a standard closeout procedure applicable to the project's base bid and three alternate bids involving milling, base repair, leveling course, manhole rim adjustments, and wearing course work across various roads in Upper Makefield Township. Final payment is contingent upon completion of all punchlist items within contract time, successful final inspection by the Engineer, and submission of all required documentation. The Liquid Fuels funding requirement identified in the specification indicates that asphalt paving materials are funded through Pennsylvania's Liquid Fuels program, requiring specific material documentation for closeout compliance.
View the file
Other files for this state and local contract opportunity
Show all 50
Heritage Hills WWTP Discharge Interconnection, Contract No. 6715-11 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT CLOSEOUT
01 70 00-1
SECTION 01 70 00
PART 1 GENERAL
1.01 SECTION DESCRIPTION
A. The Work of This Section Includes:
1. Closeout procedures.
2. Final cleaning.
3. Adjusting.
4. Project record documents.
5. Operation and maintenance manual.
6. Spare parts and maintenance Products.
7. Other documentation.
1.02 RELATED SECTIONS
A. Section not used.
1.03 CLOSEOUT PROCEDURES
A. Submit written certification that Contract Documents have been reviewed, Work has been inspected, and that Work is complete in accordance with Contract Documents and ready for Engineer's review.
B. Engineer shall make a final inspection and prepare a punchlist of items remaining to be completed or corrected prior to final acceptance in accordance with Article 14, paragraph 14.06 of the General Conditions.
C. Complete all items on the punchlist, plus any new items that may be subsequently added, as soon as possible and within the Contract Time.
D. Provide submittals to Engineer that are required by governing or other authorities.
E. Submit final Application for Payment identifying total adjusted Contract Price, previous payments, and remaining amount due.
F. Final Payment will not be made until final completion and acceptance of the Work.
G. Owner will occupy all portions of the Project upon Substantial Completion upon completion and acceptance as specified in Section 01 11 13.
1.04 FINAL CLEANING
A. Execute final cleaning prior to final Project inspection.
B. Clean interior and exterior glass and surfaces exposed to view; remove temporary labels, stains and foreign substances, polish transparent and glossy surfaces, vacuum carpeted and soft surfaces.
C. Clean equipment and fixtures to a sanitary condition with cleaning materials appropriate to the surface and material being cleaned.
D. Clean or replace filters of operating equipment.
E. Clean debris from roofs, gutters, downspouts, and drainage systems.
F. Clean site; sweep paved areas, rake clean landscaped surfaces.
G. Remove waste and surplus materials, rubbish, and construction facilities from the site.
1.05 ADJUSTING
A. Adjust operating Products and equipment to ensure smooth and unhindered operation.
1.06 PROJECT RECORD DOCUMENTS
A. Maintain on-site one set of the following record documents; record actual revisions to the Work:
1. Drawings.
01 70 00-2
2. Specifications.
3. Addenda.
4. Change Orders and other modifications to the Contract.
5. Reviewed Shop Drawings, Product data, and samples.
6. Manufacturer’s instructions for assembly, installation and adjusting.
B. Ensure entries are complete and accurate, enabling future reference by Owner.
C. Store record documents separate from documents used for construction.
D. Record information concurrent with construction progress.
E. Specifications: Legibly mark and record at each Product section description of actual Products installed, including the following:
1. Manufacturer's name and product model and number.
2. Product substitutions or alternates utilized.
3. Changes made by Addenda and modifications.
F. Record Drawings and Shop Drawings: Legibly mark each item to record actual construction including:
1. Measured depth of foundations in relation to finish main floor datum.
2. Measured horizontal and vertical locations of underground utilities and appurtenances, referenced to permanent surface improvements.
3. Measured locations of internal utilities and appurtenances concealed in construction, referenced to visible and accessible features of the Work.
4. Field changes of dimension and detail.
5. Details not on original Contract Drawings.
G. Delete Engineer's title block and seal from all documents.
H. Submit documents to Engineer with claim for final Application for Payment.
1.07 OTHER DOCUMENTATION
A. Provide data and documentation properly completed and executed prior to final Application for Payment as Engineer may reasonably require including:
1. Payroll Certification forms by Contractor and all Subcontractors (if price exceeds $25,000).
2. Waiver of Liens by all Subcontractors and Suppliers or Contractor's Affidavit, Contractor's
Release of Liens and Consent of Surety to Final Payment.
3. Maintenance Bond.
4. CS-4171 Material Form from Suppliers for asphalt used during paving to closeout
Liquid Fuels funding requirements.
5. Any Change Orders with supporting documentation which remain to be submitted.
6. Test and/or sample results.
7. Equipment warranties.
8. CD/DVD copies of preconstruction documentation.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
END OF SECTION