46-Sec 32 12 00 - BITUMINOUS CONCRETE PAVING.pdf

PDF 132 KB Posted

Attached to
Heritage Hills WWTP Discharge Interconnection, Contract No. 6715-11 State and local contract opportunity
Solicitation number
Not on record
Issued by
Bucks County, Pennsylvania

About this file

This is a Bituminous Concrete Paving specification document for Upper Makefield Township's 2026 Road Program in Pennsylvania. The work encompasses asphalt paving of roadways including base course placement, binder course installation, and wearing course overlay operations. The project involves milling, base repair, leveling course application, manhole rim adjustments, and wearing course installation across various roads within Upper Makefield Township, with specific roadways and quantities defined in Exhibits A, B, and C of Section 01 22 00 Measurement and Payment. The specification requires all work to conform to Pennsylvania Department of Transportation (PennDOT) Publication 408 Specifications and Publication 27 for Bituminous Mixtures, as well as applicable Township standards for paving work on public property.

The specification establishes detailed material requirements including PennDOT Superpave bituminous concrete for base, binder, and wearing courses, with tack coat applied as Class E-8 emulsified asphalt per PennDOT Publication 408 Section 460. Work execution requires strict environmental conditions with asphalt placement prohibited when base surface temperature falls below 40 degrees Fahrenheit or when surfaces are wet or frozen. The contractor must achieve specific compaction standards using 10-ton rollers (minimum 5-ton rollers in trenches), maintain flatness tolerances of 1/4 inch variation measured over 10-foot straightedges, and ensure compacted thickness within 1/4 inch of design specifications. The contract includes a base bid and three alternate bids, with the contractor responsible for restoring any existing paving damaged during operations to its original condition at the contractor's expense.

View the file

Other files for this state and local contract opportunity

Other files attached to Heritage Hills WWTP Discharge Interconnection, Contract No. 6715-11, newest first.
File Type Posted
2-6715-11 CONTRACT DRAWINGS.pdf PDF
1-6715-11 CONTRACT DOCUMENTS.pdf PDF
4-Doc 00 43 13 - BID BOND.pdf PDF
55-Sec 01 70 00 - CONTRACT CLOSEOUT.pdf PDF
5-Doc 00 45 19 - NON-COLLUSION AFFIDAVIT.pdf PDF
18-Doc 00 65 19.19 - CONSENT OF SURETY.pdf PDF
40-Sec 31 20 00 - EARTHWORK.pdf PDF
27-Sec 01 32 16 - NARRATIVE CONSTRUCTION SCHEDULE.pdf PDF
14-Doc 00 65 19.13 - CONTRACTORS AFFIDAVIT.pdf PDF
26-Doc 00 73 00 - 01 - APPENDIX A COVER.pdf PDF
47-Sec 01 50 00 - CONSTRUCTION FACILITIES.pdf PDF
9-Doc 00 01 15 - LIST OF DRAWINGS.pdf PDF
8-Doc 00 41 00 - BID FORM - EBID.pdf PDF
36-Sec 01 26 73 - BITUMINOUS MATERIAL PRICE ADJUSTMENT.pdf PDF
52-Sec 32 05 19.13 - GEOTEXTILE.pdf PDF
13-Doc 00 62 16-CERTIFICATE OF INSURANCE.pdf PDF
44-Sec 32 01 17.61 - ASPHALT JOINT SEALING.pdf PDF
11-Doc 00 61 13.13 - PERFORMANCE BOND.pdf PDF
43-Sec 31 23 00 - EXCAVATION BACKFILL AND COMPACTION FOR ROADWAYS.pdf PDF
38-Sec 01 33 00 - SUBMITTALS.pdf PDF
12-Doc 00 52 00 - AGREEMENT.pdf PDF
30-Doc 00 72 00 - GENERAL CONDITIONS.pdf PDF
3-Doc 00 01 01 - TITLE SHEET AND COVER.pdf PDF
19-Doc 00 61 13.16 - PAYMENT BOND.pdf PDF
42-Sec 31 23 16.26 - ROCK REMOVAL.pdf PDF
17-Doc 00 21 13 - INSTRUCTIONS TO BIDDERS - EBID.pdf PDF
39-Doc 00 73 00 - 00 - SUPPLEMENTARY CONDITIONS.pdf PDF
25-Sec 01 22 00 - 03 - MP PAVEMENT MARKING QUANTITIES.pdf PDF
41-Sec 01 55 26 - TRAFFIC REGULATION.pdf PDF
34-Sec 01 40 00 - QUALITY CONTROL.pdf PDF
48-Doc 00 11 13 - ADVERTISEMENT FOR BIDS.pdf PDF
51-Sec 01 57 13 - EROSION SEDIMENT CONTROL.pdf PDF
45-Sec 32 01 16.71 - MILLING OF BITUMINOUS PAVEMENT SURFACE.pdf PDF
2-Doc 00 45 13 - BIDDER QUALIFICATION STATEMENT.pdf PDF
32-Sec 01 22 00 - 01 - MP BASE BID QUANTITIES.pdf PDF
54-Sec 32 17 23.33 - THERMOPLASTIC PAVEMENT MARKINGS.pdf PDF
21-Doc 00 91 13 - ADDENDA.pdf PDF
10-Doc 00 01 10 -TABLE OF CONTENTS.pdf PDF
22-Sec 01 32 36 - AUDIO-VIDEOTAPING.pdf PDF
56-2026 UMT Paving Map.pdf PDF
33-Sec 01 22 00 - 00 - MEASUREMENT AND PAYMENT.pdf PDF
53-Sec 01 60 00 - MATERIAL AND EQUIPMENT.pdf PDF
1-Doc 00 45 10 - BIDDER ACKNOWLEDGEMENT FORM.pdf PDF
20-Doc 00 73 00 - 01 - APPENDIX A PREVAILING WAGE RATES.pdf PDF
6-Doc 00 45 53 - AGREEMENT OF SURETY COMPANY.pdf PDF
15-Doc 00 65 19.16 - CONTRACTORS RELEASE OF LIENS.pdf PDF
24-Sec 01 11 13 - SUMMARY OF WORK.pdf PDF
7-Doc 00 21 13.1 - ELECTRONIC BIDDING INSTRUCTIONS.pdf PDF
31-Sec 01 22 00 - 02 - MP ALTERNATE BID QUANTITIES.pdf PDF
37-Sec 01 42 13 - ORGANIZATION AND REFERENCE ACRONYMS.pdf PDF
Show all 50

Heritage Hills WWTP Discharge Interconnection, Contract No. 6715-11 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BITUMINOUS CONCRETE PAVING

32 12 00-1

SECTION 32 12 00

PART 1 GENERAL

1.01 SECTION DESCRIPTION

A. The Work of this Section Includes:

1. Asphalt paving of roadways.

1.02 SYSTEM DESCRIPTION

A. Paving: Designed for traffic anticipated on the roadways.

1.03 RELATED SECTIONS

A. Section not used

1.04 QUALITY ASSURANCE

A. Reference Standards:

1. Pennsylvania Department of Transportation:

a. Publication 408 Specifications

b. Publication 27 – Specification for Bituminous Mixtures (Bulletin 27)

B. Perform Work in accordance with the latest edition of PennDOT Publication 408.

C. Mixing Plant: Conform to PennDOT Bulletin 27, chapter 1 Standards.

D. Conform to applicable Township standards for paving work on public property.

1.05 SUBMITTALS

A. Certificates:

Submit certification from bituminous and aggregate suppliers attesting that materials conform to the State Specifications in accordance with Section 01 33 00.

1.06 ENVIRONMENTAL REQUIREMENTS

A. Do not place asphalt when base surface temperature is less than 40 degrees F or base surface is wet or frozen.

1.07 JOB CONDITIONS

A. Restore existing paving outside the limits of the Work that is damaged by Contractor’s operations, to its original condition at the expense of Contractor.

PART 2 PRODUCTS

2.01 PAVING MATERIALS

A. Bituminous Concrete Base Course: PennDOT Superpave (Section 313 & 316 of Publication 408).

B. Binder Course: PennDOT Superpave (Section 410 & 413 of Publication 408).

C. Wearing Course: PennDOT Superpave (Section 410 & 413 of Publication 408).

D. Tack Coat: Per Section 460 of PennDOT Publication 408, except revise the first sentence to read:

Emulsified Asphalt, Class E-8 (AASHTO CSS-1h or SS-1h)

E. Joint Seal: Asphalt PG 64S-22 Sealant (Publication 408).

2.02 SUBBASE COURSE MATERIALS

A. Coarse Aggregate: PennDOT No. 2A (Section 703.2 of Publication 408).

2.03 PAINTING MATERIALS

32 12 00-2

A. Sections 962, PennDOT Publication 408.

PART 3 EXECUTION

3.01 EXAMINATION AND PREPARATION

A. Verify gradients and elevations of area to be paved.

B. Trim existing paving with minimum one (1) foot cutbacks to remove damaged areas. Cut straight joint lines and right angle offsets.

C. Remove any temporary paving material.

D. Proof-roll subgrade (10 ton roller) and replace any soft or unsuitable material with coarse aggregate.

Verify compacted subgrade is dry and ready to support paving and imposed loads.

E. Apply tack coat in accordance with PennDOT Publication 408 requirements prior to placing an overlay over existing paving or prior to placing a wearing coarse over a previous placed binder course.

F. Coat surfaces of any manhole or catch basin frames with oil to prevent bond with asphalt paving.

3.02 SUBBASE COURSE

A. Place PennDOT No. 2A coarse aggregate in continuous layers not exceeding 6 inches loose depth, and compact (10 ton roller) to required contours and elevations.

3.03 PLACING ASPHALT PAVEMENT

A. Place bituminous concrete base course on surface of compacted subbase course to compacted thickness (10 ton roller where possible; minimum 5 ton roller in trenches) as shown on Drawings.

B. Place binder and wearing courses to compacted thicknesses (10 ton roller except minimum 5 ton roller for binder course in trenches) as shown on the Drawings. Apply tack coat on completed binder course before placing wearing course should there be a delay between completion of binder course and placement of wearing course.

C. Place wearing course overlay to compacted thickness (10 ton roller) as and where shown on the Drawings.

D. Compact pavement by rolling to achieve even and smooth finish, without roller marks. Hand compact in areas inaccessible to rolling equipment. Rolling Patterns, compaction, and density should be in compliance with PennDOT Publication 408 requirements section 413 standards.

E. Where proposed asphalt paving adjoins existing asphalt paving, seal the joint with hot bituminous material in accordance with PennDOT Publication 408 requirements.

F. Provide painted markings where shown on Drawings.

3.04 TOLERANCES

A. Flatness: Maximum variation of 1/4 inch measured with 10 foot straight edge.

B. Compacted Scheduled Thickness: Within 1/4 inch of design thickness.

C. Variation from True Elevation: Within 1/2 inch.

END OF SECTION

File details come from the government source that posted it. Updated .