42-Sec 31 23 16.26 - ROCK REMOVAL.pdf

PDF 129 KB Posted

Attached to
Heritage Hills WWTP Discharge Interconnection, Contract No. 6715-11 State and local contract opportunity
Solicitation number
Not on record
Issued by
Bucks County, Pennsylvania

About this file

This is a technical specification document for rock removal work as part of Upper Makefield Township's 2026 Road Program in Pennsylvania. The specification outlines the scope of work for removing identified and discovered rock during excavation activities, including the use of mechanical methods to assist with rock removal. Rock is defined as solid mineral material weighing a minimum of 70,000 pounds that cannot be removed with standard heavy equipment without drilling, wedging, blasting, or mechanical surface impact equipment. The work includes excavation and removal by mechanical methods such as drilling holes and utilizing expansive tools, wedges, and mechanical disintegration compounds to fracture rock. Special requirements apply to rock excavation within ten feet of underground utilities or structures, which must be performed by hand with utmost care, and in areas with high tension power lines. Paving within roads must be pre-cut before blasting to prevent heaving beyond normal trench width. For utility trenches, excavation must extend six inches below the invert elevation of pipe and extend 12-16 inches wider than the pipe's outside diameter with a minimum of six inches on each side. The contractor must obtain all required permits from local and state agencies and comply with all permit conditions, including timely notifications.

The specification references the National Fire Protection Association's NFPA 495 Code for Manufacture, Transportation, Storage, and Use of Explosive Materials as the applicable standard. A seismic monitoring firm with five years of documented experience in seismic surveys is required. Shattered or fractured rock may be allowed as trench backfill where native backfill material is permitted, provided size requirements are met; otherwise, excavated rock must be removed from the site. All trench bottoms, foundation bearing surfaces, and cavities formed by removed rock must be visually inspected by the Resident Project Representative prior to further construction. The contractor must schedule work to avoid disruption to nearby occupied buildings and submit a construction progress schedule in accordance with applicable provisions.

View the file

Other files for this state and local contract opportunity

Other files attached to Heritage Hills WWTP Discharge Interconnection, Contract No. 6715-11, newest first.
File Type Posted
2-6715-11 CONTRACT DRAWINGS.pdf PDF
1-6715-11 CONTRACT DOCUMENTS.pdf PDF
52-Sec 32 05 19.13 - GEOTEXTILE.pdf PDF
13-Doc 00 62 16-CERTIFICATE OF INSURANCE.pdf PDF
44-Sec 32 01 17.61 - ASPHALT JOINT SEALING.pdf PDF
11-Doc 00 61 13.13 - PERFORMANCE BOND.pdf PDF
43-Sec 31 23 00 - EXCAVATION BACKFILL AND COMPACTION FOR ROADWAYS.pdf PDF
38-Sec 01 33 00 - SUBMITTALS.pdf PDF
12-Doc 00 52 00 - AGREEMENT.pdf PDF
30-Doc 00 72 00 - GENERAL CONDITIONS.pdf PDF
3-Doc 00 01 01 - TITLE SHEET AND COVER.pdf PDF
19-Doc 00 61 13.16 - PAYMENT BOND.pdf PDF
17-Doc 00 21 13 - INSTRUCTIONS TO BIDDERS - EBID.pdf PDF
39-Doc 00 73 00 - 00 - SUPPLEMENTARY CONDITIONS.pdf PDF
25-Sec 01 22 00 - 03 - MP PAVEMENT MARKING QUANTITIES.pdf PDF
41-Sec 01 55 26 - TRAFFIC REGULATION.pdf PDF
34-Sec 01 40 00 - QUALITY CONTROL.pdf PDF
48-Doc 00 11 13 - ADVERTISEMENT FOR BIDS.pdf PDF
51-Sec 01 57 13 - EROSION SEDIMENT CONTROL.pdf PDF
45-Sec 32 01 16.71 - MILLING OF BITUMINOUS PAVEMENT SURFACE.pdf PDF
2-Doc 00 45 13 - BIDDER QUALIFICATION STATEMENT.pdf PDF
32-Sec 01 22 00 - 01 - MP BASE BID QUANTITIES.pdf PDF
54-Sec 32 17 23.33 - THERMOPLASTIC PAVEMENT MARKINGS.pdf PDF
21-Doc 00 91 13 - ADDENDA.pdf PDF
10-Doc 00 01 10 -TABLE OF CONTENTS.pdf PDF
22-Sec 01 32 36 - AUDIO-VIDEOTAPING.pdf PDF
56-2026 UMT Paving Map.pdf PDF
33-Sec 01 22 00 - 00 - MEASUREMENT AND PAYMENT.pdf PDF
53-Sec 01 60 00 - MATERIAL AND EQUIPMENT.pdf PDF
1-Doc 00 45 10 - BIDDER ACKNOWLEDGEMENT FORM.pdf PDF
20-Doc 00 73 00 - 01 - APPENDIX A PREVAILING WAGE RATES.pdf PDF
6-Doc 00 45 53 - AGREEMENT OF SURETY COMPANY.pdf PDF
15-Doc 00 65 19.16 - CONTRACTORS RELEASE OF LIENS.pdf PDF
24-Sec 01 11 13 - SUMMARY OF WORK.pdf PDF
7-Doc 00 21 13.1 - ELECTRONIC BIDDING INSTRUCTIONS.pdf PDF
31-Sec 01 22 00 - 02 - MP ALTERNATE BID QUANTITIES.pdf PDF
37-Sec 01 42 13 - ORGANIZATION AND REFERENCE ACRONYMS.pdf PDF
49-Sec 32 12 23-RESTORATION OF PAVED SURFACES.pdf PDF
28-Sec 01 29 00 - CONTRACT CONSIDERATIONS.pdf PDF
23-Doc 00 73 00 - 03 - APPENDIX B COVER.pdf PDF
16-Doc 00 61 19 - MAINTENANCE BOND.pdf PDF
29-Doc 00 73 00 - 04 - APPENDIX B PUBLIC WORKS EMPLOYMENT VERIFICATION FORM.pdf PDF
50-Sec 01 31 00 - COORDINATION AND MEETINGS.pdf PDF
35-Sec 31 11 00-CLEARING AND GRUBBING.pdf PDF
4-Doc 00 43 13 - BID BOND.pdf PDF
55-Sec 01 70 00 - CONTRACT CLOSEOUT.pdf PDF
5-Doc 00 45 19 - NON-COLLUSION AFFIDAVIT.pdf PDF
46-Sec 32 12 00 - BITUMINOUS CONCRETE PAVING.pdf PDF
18-Doc 00 65 19.19 - CONSENT OF SURETY.pdf PDF
40-Sec 31 20 00 - EARTHWORK.pdf PDF
Show all 50

Heritage Hills WWTP Discharge Interconnection, Contract No. 6715-11 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROCK REMOVAL

31 23 16.26-1

SECTION 31 23 16.26

PART 1 GENERAL

1.01 SECTION DESCRIPTION:

A. The Work of This Section Includes:

1. Removal of identified and discovered rock during excavation.

2. Mechanical methods to assist rock removal.

1.02 RELATED INFORMATION

A. Related Work Specified Elsewhere:

1. Section 31 20 00: Earthwork

2. Section 31 23 33: Excavation, Backfill & Compaction

1.03 QUALITY ASSURANCE

A. Reference Standards:

1. National Fire Protection Association (NFPA): NFPA 495 - Code for Manufacture, Transportation, Storage, and Use of Explosive Materials

B. Seismic Monitoring Firm: Company specializing in seismic surveys with five (5) years documented experience.

1.04 DEFINITIONS

A. Rock: Solid mineral material of a size that cannot be removed with a "Trac-Hoe" style machine with a minimum weight of 70,000 pounds (without use of drilling and wedging, blasting, and/or mechanical surface impact equipment).

1.05 REGULATORY REQUIREMENTS

A. Obtain all required permits from various local and/or State agencies among which are those noted in Items B, C and D of Paragraph 1.23 of the Supplementary Conditions (Document 00 73 00).

B. Comply with all permit conditions including timely notifications to all required agencies/officials.

1.06 PROJECT CONDITIONS

A. Rock excavation within ten (10) feet of underground utilities or structures shall be done by hand with exercise of utmost care to avoid disturbance.

B. Special care shall be exercised in areas where high tension power lines are located.

C. Paving shall be pre-cut before blasting within roads to prevent paving from heaving beyond normal trench width.

31 23 16.26-2

1.07 SCHEDULING

A. Schedule Work under the provisions of Section 01 33 00 concerning the submittal for a Construction Progress Schedule.

B. Schedule Work to avoid disruption to occupied buildings nearby.

PART 2 PRODUCTS

Section not used.

PART 3 EXECUTION

3.01 EXAMINATION

A. Verify site conditions and note subsurface irregularities affecting work of this section.

3.02 PREPARATION

A. Identify required lines, levels, contours, and datum.

3.03 ROCK REMOVAL BY A MECHANICAL METHOD

A. Excavate and remove rock by the mechanical method.

B. Drill holes and utilize expansive tools, wedges, and/or mechanical disintegration compound to fracture rock.

C. Cut away rock at bottom of excavation to form level bearing.

D. Remove shaled layers to provide sound and unshattered base for footings and foundations.

E. In utility trenches, excavate to 6 inches below invert elevation of pipe and 12-16 inches wider than pipe outside diameter (minimum 6 inches on each side).

F. Shattered or fractured rock may be allowed by Owner as trench backfill where native backfill material is permitted provided that the size requirement in Section 31 23 33 (Item 2.03) is achieved. Otherwise, excavated rock must be removed from site.

G. Correct unrequired rock removal in accordance with the requirements of Section 31 23 33.

3.04 FIELD QUALITY CONTROL

A. Contractor shall provide for visual inspection by Resident Project Representative all trench bottoms, foundation bearing surfaces and cavities formed by removed rock prior to further construction.

END OF SECTION