5_AD011 - DEMOLITION PLAN -SEVENTH FLOOR.pdf

PDF 478 KB Posted

Attached to
Y1AZ--Design Build, Construct SICU and Renovate Operating Rooms
Solicitation number
36C10F22R0036
Issued by

View the file

Other files

File Type Posted
Award Notice 36C10F24C0002.pdf PDF
36C10F22R0036 0004.pdf PDF
36C10F22R0036 0003.pdf PDF
36C10F22R0036 0002.pdf PDF
36C10F22R0036 0001.pdf PDF
36C10F22R0036.pdf PDF
45_PL102 - EIGHTH FLOOR -PLUMBING WASTE AND VENT PLAN.pdf PDF
40_PPD101 - SEVENTH FLOOR -PLUMBING DOMESTIC WATER DEMOLITION PLAN.pdf PDF
61_MHP100 - MECHANICAL DUCT and PIPING PLAN -ROOF LEVEL.pdf PDF
17_AF702 - FINISH PLAN -EIGHTH FLOOR.pdf PDF
07_ELEVATOR NARRATIVE.pdf PDF
52_MDH100 - MECHANICAL DUCT DEMOLITION PLAN -SEVENTH FLOOR.pdf PDF
100 percent RFP PLUMBING CALCS.pdf PDF
48_PJ101 - SEVENTH FLOOR -PLUMBING MEDICAL GAS PLAN.pdf PDF
55_MDP100 - MECHANICAL PIPING DEMOLTION PLAN -SEVENTH FLOOR.pdf PDF
44_PL101 - SEVENTH FLOOR -PLUMBING WASTE AND VENT PLAN.pdf PDF
24_QH105 - EQUIPMENT PLAN -EIGHTH FLOOR -AREA 1.pdf PDF
04_FIRE PROTECTION.pdf PDF
OR-SICU 100 percent Digital Material Board.pdf PDF
28_QH109 - INTERIOR EQUIPMENT ELEVATIONS.pdf PDF
27_QH108 - INTERIOR EQUIPMENT ELEVATIONS.pdf PDF
84_EY301 - SEVENTH FLOOR ELECTRICAL LOW VOLTAGE PLAN.pdf PDF
4_GI102 - LIFE SAFETY PLAN -EIGHTH FLOOR.pdf PDF
86_EP401 - ELECTRICAL LIGHTNING PROTECTION PLAN.pdf PDF
21_QH102 - EQUIPMENT PLAN -SEVENTH FLOOR -AREA 2.pdf PDF
13_AE115 - DIMENSION PLAN -EIGHTH FLOOR.pdf PDF
90_EP504 - ELECTRICAL DETAILS.pdf PDF
88_EP502 - SCHEDULES AND DETAILS.pdf PDF
26_QH107 - EQUIPMENT PLAN -EIGHTH FLOOR -AREA 3 and INTERIOR EQUIPMENT ELEVATIONS.pdf PDF
39_PLD102 - EIGHTH FLOOR -PLUMBING WASTE AND VENT DEMOLITION PLAN.pdf PDF
9_AE111 - REFERENCE PLAN -SEVENTH FLOOR.pdf PDF
12_AE114 - DIMENSION PLAN -SEVENTH FLOOR.pdf PDF
14_AE211 - REFLECTED CEILING PLAN -SEVENTH FLOOR.pdf PDF
01_Mold Report.pdf PDF
Floor 7 Inventory OKC VAMC.pdf PDF
71_M-704 - MECHANICAL CONTROLS.pdf PDF
30_FA001 - FIRE ALARM_MASS NOTIFICATION GENERAL NOTES.pdf PDF
56_MDP101 - MECHANICAL PIPING DEMOLTION PLAN -EIGHTH FLOOR.pdf PDF
02_ARCHITECTURAL.pdf PDF
1_GI000 - COVER SHEET.pdf PDF
50_P-600 - PLUMBING SCHEDULES.pdf PDF
82_EL201 - SEVENTH FLOOR ELECTRICAL LIGHTING PLAN.pdf PDF
66_M-502 - MECHANICAL DETAILS.pdf PDF
60_MH103 - MECHANICAL ZONING and CONTROLS PLAN -EIGHTH FLOOR.pdf PDF
06_ELECTRICAL NARRATIVE.pdf PDF
02_STRUCTURAL NARRATIVE.pdf PDF
20_QH101 - EQUIPMENT PLAN -SEVENTH FLOOR -AREA 1.pdf PDF
38_PLD101 - SEVENTH FLOOR -PLUMBING WASTE AND VENT DEMOLITION PLAN.pdf PDF
Floor 8 Inventory OKC VAMC.pdf PDF
63_MP101 - MECHANICAL HVAC PIPING PLAN -EIGHTH FLOOR.pdf PDF
Show 40 more

Latest 50 of 122 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FD

FD

FD

1. EXISTING CONDITIONS ARE BASED ON INFORMATION OBTAINED FROM EXISTING DRAWINGS

AND FIELD SURVEY, AND SHALL NOT BE CONSTRUED "AS BUILT." THE CONTRACTOR SHALL

FIELD VERIFY EXISTING CONDITIONS PRIOR TO ONSET OF CONSTRUCTION.

2. THE CONTRACTOR SHALL COORDINATE WITH OWNER FOR ALL EXISTING EQUIPMENT AND

FURNITURE ITEMS THAT ARE TO BE SALVAGED OR REINSTALLED PRIOR TO THE

COMMENCEMENT OF DEMOLITION.

3. ALL WALL PARTITIONS SHOWN DASHED ARE TO BE REMOVED. THE CONTRACTOR SHALL

PATCH ALL PARTITIONS, CEILINGS, AND FLOORS AFFECTED BY DEMOLITION TO MATCH

ADJACENT CONSTRUCTION.

4. ALL DOORS SHOWN DASHED ARE TO BE REMOVED ALL ASSOCIATED DOOR FRAMES TO BE

REMOVED UNLESS NOTED.

5. THE OWNER SHALL HAVE THE FIRST RIGHT TO ALL MATERIALS AND EQUIPMENT THAT ARE

REMOVED BY THE CONTRACTOR. THE CONTRACTOR SHALL VERIFY WHEN REMOVAL OF ITEMS

ARE TO BE RETAINED BY THE OWNER AT THE PRE CONSTRUCTION MEETING.

6. CLEAN AND PREPARE ALL SURFACES AFFECTED BY DEMOLITION TO PRODUCE FLAT, EVEN

SURFACE TO RECEIVE NEW FINISHES.

7. CONTRACTOR SHALL PROTECT ALL EXISTING BUILDING SURFACES TO REMAIN.

8. PATCH AND REPAIR SURFACES AND FINISHES AFFECTED BY THE DEMOLITION OR THE

REMOVAL OF CONSTRUCTION AS NECESSARY TO MAINTAIN THE FINISH QUALITY OF NEW

SPACE.

9. FILL ALL DUCT AND PIPE PENETRATIONS IN AREA OF DEMOLITION WITH 1 HOUR RATED

ASSEMBLY. FILL WITH 2 - HOUR RATED ASSEMBLY ADJACENT AND WITHIN 2-HOUR

CONSTRUCTION.

10. COORDINATE SCHEDULING OF ANY DEMOLITION/PLACEMENT OF RATED WALL CONSTRUCTION

WITH FIRE/LIFE SAFETY A.H.J.

11. VERIFY CONDITION OF EXISTING CONSTRUCTION TO REMAIN. PROVIDE BOARD AND FINISH

WHERE REQUIRED.

12. EXISTING SPRAY-ON FIREPROOFING TO BE PROTECTED DURING DEMOLITION AND NEW

CONSTRUCTION. NEW FIRE PROOFING TO BE APPLIED BY CONTRACTOR AT NO EXPENSE IF

DAMAGED DURING CONSTRUCTION

13. REMOVE ALL EXISTING GYPSUM BOARD WITHIN SCOPE OF RENOVATED AREA AND PROVIDE

NEW GYPSUM BOARD PER DEFINED PARTITION TYPES.

GENERAL DEMOLITION FLOOR PLAN NOTES

1 2 3 4 5 6 7 8 9 10 11 11a

C1

D

E

F

G

H

I

J

K

9A

G2

2.16

2.272.27

2.16 2.16

2.162.16

2.20

2.16

2.16

2.25

2.59

2.16

2.162.16 2.23

2.162.16

2.16

2.16 2.16

2.16

2.16

2.16

2.27

2.27 2.16

2.16

2.162.16

2.162.162.16

2.16 2.16

2.16

2.16

2.16

2.16

2.16

2.27

2.16

2.162.16

2.162.16

2.16

2.16

2.16

2.16

2.272.162.16

2.16 2.59

2.21

2.202.162.16

2.162.16

2.27

2.27

2.16

2.27

2.16

2.27

2.162.16 2.16

2.16

2.27

2.16

2.27 2.16

2.27

2.16

2.27

2.16

2.162.16

2.16

2.162.16

2.202.20

2.27

2.162.16

2.27

2.27

2.27

2.27

2.16

2.16

PUMP

TECHNICIAN

7F126

CLEAN

UTILITY

7F124

EQUIP STOR.

7F113h

PUMP ROOM

7F109a

I.T. CLO

7F112

MEDICAL

STORAGE

ANESTHESIA

GAS

7F127

ELEVATOR

P-12

CARDIAC

O.R.3

7F109

SUB-STER.

7F113d

SCRUB

7F107a

CORRIDOR

C7 3F

HYBRID

O.R.10

7F110CNTRL RM

7F110a

ANGIO

EQUIP

7F111

CORRIDOR

C7 5F

STORAGE

7F107i

GAS STOR.

7F107h

CORRIDOR

C7 6F

RECOVERY

7F108

CONSULT

7F103

ISOLATION

7F108e

OR CTR

7F155

HAC

7F107b

CLEAN

7F108aSOIL

7F108d

TLT

7F108c

TLT

7F108b

ELEVATOR

P-8

ELEVATOR

P-7

ELEVATOR

P-9

ELEVATOR

P-10

ELEVATOR

LOBBY

C7 1F

TLT

7F106

TLT

7F105

TLT

7F101a

TLT

7F101b

CORRIDOR

C7 8F

CORRIDOR

C7 11F

ELEC. CLO.

7F116

ELEC. CLO.

7F116a

CORRIDOR

C7 2F

PRE-OP

7F154

STORAGE

7F123

SCRUB

7F120

GENERAL

O.R. #2

7F122

GENERAL

O.R. #1

7F118

SUB

STERILE

7F113b

SHAFT

SUB

STERILE

7F113a

H.A.C.

7F114CARDIAC

O.R. #4

7F128

CLEAN

UTILITY

7F129

X-RAY

STORAGE

7F130

H.A.C.

7F131 SCRUB

7F132

SUB

STERILE

7F133c

ISOLATION

ROOM

7F108g

OFFICE

ANESTHESIOLOGY

7F109

OFFICE

ANESTHESIOLOGY

7F110

OFFICE

ANESTHESIOLOGY

7F111

OFFICE

ANESTHESIOLOGY

7F112

CONTROL

7F155

NERVE

BLOCK

ROOM

7F154b

OFFICE

ANESTHESIOLOGY

7F154c

BEDPAN

CLOSET

7F154a

6'-4" 2'-5"

7'-4" 3"

2.16

2.16

2.27

2'-1" 6'-4"

3'-1 1/2"2'-6" 2'-2 1/2"

3'-4 1/2"

17'-8"

27'-2"

7' -0

6'

-9

2' -1

1"

1' -1

1/

2"

1' -1

1" 4'

-4

5"

8'-2 1/2" 10'-8 1/2"

'-9

F

V

'-1

1"

'-8

4'-0"

CORRIDOR

C7 4F

2.512.51

2.512.51

2.512.51

2.512.51

2.512.51

2.512.51

2.16

4' -1

0"

2.27

3' -4

5' -2

/2

2.20

2.20

2.16

2.16

2.27

3'-4"

1'-11"

'-2

STAIR 10

1' -1

/4

3'-7 1/2" 20'-3" 3'-10 1/2"

STAIR 8

STAIR 8

2.27

2.272.27

2.27

2.272.27

2.27

2.272.27

2.272.27

2.27 2.27

2.59

2.27

2.27

2.27

2.27

2.27

2.272.27

2.27

2.27

2.27

2.27

2.27

2.27

2.59

2.59

2.59

2.59

2.59

2.59

2.512.51

2.592.59

2.61

2.61 2.61 2.61 2.61 2.61 2.61 2.61

2.61

2.61

2.61

2.61

2.61

2.642.642.642.642.642.642.64

2.64

2.64

2.64

2.64

2.64

2.64

2.64

2.59

2.66

2.66

2.66

2.66

2.662.66

2.66

2.66

2.66

2.66

2.66

2.66

2.66

2.66

2.66

2.66

2.66

2.66

8.95

N

RECOVERY &

SURGICAL WAITING

7TH FLOOR KEY PLAN

POST- OP

OPERATING ROOMS

EXISTING WALL CONSTRUCTION TO BE

DEMOLISHED IN ITS ENTIRETY

EXISTING DOOR AND FRAME TO BE

DEMOLISHED IN THEIR ENTIRETY

AREA OF NO WORK

EXISTING WALLS TO REMAIN

DEMOLITION PLAN LEGEND

EXISTING WINDOW AND FRAME TO BE

DEMOLISHED IN THEIR ENTIRETY

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS:

Drawing #

VA Office Of Construction & Facilities Management Approval:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

OK ARCH REG. NO. CA02295, EXP. 06/30/2023

OK ENGR REG. NO. CA7127, EXP. 06/30/2023

The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.

FULLY SPRINKLERED

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

STRUCTURAL ENGINEER

H2B, INC.

1225 N. LOOP WEST, SUITE 800

HOUSTON, TX 77008

(713) 864-2900

MECH / ELEC / PLUMB / TECH ENGINEER

FIRE PROTECTION ENGINEER

POOLE FIRE PROTECTION, INC.

19910 WEST 161ST STREET

OLATHE, KANSAS 66062

(913) 829-8690

HEALTHCARE PLANNER

OCULUS INC.

1 S. MEMORIAL DR., SUITE 1500

ST. LOUIS, MO 63102

(314) 367-6100

SPUR PROJECT NUMBER: 1791.08

SPUR DESIGN

11020 KING STREET, SUITE 350

OVERLAND PARK, KS 66210

(913) 369-7200

SEE FRONT COVER SHEET

FOR APPROVAL SIGNATURE

VERTICAL TRANSPORTATION

ENVIRONMENTAL HYGIENIST

TEC-AN, INC.

2517 S. PURDUE AVE.

OKLAHOMA CITY, OK 73128

(405) 681-7076

LERCH BATES

2001 BRYAN ST., SUITE 1930

DALLAS, TX 75201

(972) 294-5221

/2

/2

:1 :5

P

M

AD011

DEMOLITION PLAN - SEVENTH FLOOR

ZDL

5 OF 92JNK

100% RFP DOCUMENTS

CONSTRUCT SURGICAL INTENSIVE

CARE UNIT & RENOVATE

OPERATING ROOMS

08/02/2021

635-436

OKLAHOMA CITY VA HEALTHCARE SYSTEM

921 NE 13TH ST, OKLAHOMA CITY, OK 73104

N

1/8" = 1'-0"

SEVENTH FLOOR DEMOLITION PLAN

KEYNOTE LEGEND

2.16 DEMOLISH EXISTING WALL CONSTRUCTION TO EXTENT INDICATED

2.20 DEMOLISH EXISTING WINDOW SYSTEM

2.21 DEMOLISH EXISTING CASEWORK AND/OR COUNTER IN ITS ENTIRETY

2.23 DEMOLISH EXISTING WATER CLOSET AND ASSOCIATED PLUMBING - REFERENCE PLUMBING

DRAWINGS FOR ADDITIONAL INFORMATION

2.25 DEMOLISH EXISTING MOP SINK - REFERENCE PLUMBING DRAWINGS FOR ADDITIONAL

INFORMATION

2.27 REMOVE AND RETAIN EXISTING DOOR AND FRAME - SALVAGED DOOR AND FRAME TO BE

RETURNED TO VA

2.51 EXISTING FLOOR TO BE LEVELED DOWN TO EXISTING CONCRETE SLAB - SLAB TO REMAIN

FREE OF DEBRIS, ADHESIVES, MORTAR, GROUT, OR ANY OTHER MATERIAL

2.59 DEMOLISH PARTITON FOR INSTALLATION OF NEW DOOR.

2.61 REMOVE EXISTING GYPSUM BOARD AND INSULATION

2.64 REMOVE EXISTING WINDOW SYSTEM AND SALVAGE FOR REINSTALLATION.

2.66 CONTRACTOR TO CONFIRM AND PRESERVE EXISTING 1 HOUR FIRE PROOFING AT ALL

COLUMNS.

8.95 NEW ELEVATOR DOORS. CONTRACTOR TO COORDINATE SIZE AND LOCATION WITH

ELEVATOR MANUFACTURER.

No. REVISION DESCRIPTION DATE

File details come from the government source that posted it. Updated .