This is a mechanical demolition plan drawing (HD103) showing the chiller plant demolition layout for the Armed Forces Retirement Home Sheridan Building renovation project in Washington, D.C. The drawing details the demolition scope for an existing chiller plant and associated equipment.

The plan specifies demolition of existing chillers, pumps, expansion tanks, water treatment systems, and associated piping in the mechanical room. Key components to be removed include condenser water pumps at the cooling tower building, chilled water and condenser water piping, VFDs, and various hydronic piping risers. The drawing indicates that existing cooling towers are to remain in place, while one centrifugal chiller is to be relocated to a new chiller plant location. The work requires coordination with AFRH and submission of a detailed timeline for approval. The drawing provides both a detailed chiller plant demolition plan at 1/4"=1'-0" scale and a mechanical demolition plan for the cooling tower building at 1/8"=1'-0" scale, with comprehensive demolition notes and equipment identification.

View the file

Other files

File Type Posted
Amendment 0006 Solicitation 47PM0325R0002 2025 03 25.pdf PDF
Amendment 0005 RFI Responses 150 - 336 2025 03 18.pdf PDF
Amendment 0005 Solicitation 47PM0325R0002 2025 03 18 (2).pdf PDF
Amendment 0004 Solicitation 47PM0325R0002 2025 03 13.pdf PDF
H103 - CHILLER PLANT.pdf PDF
Amendment 0003 Technical Evaluation Factors-Best Value_ Trade Off 2025 03 04.pdf PDF
Amendment 0003 Solicitation 47PM0325R0002 2025 03 04.pdf PDF
A517 - EXTERIOR PLAN DETAILS.pdf PDF
A516 - EXTERIOR PLAN DETAILS.pdf PDF
087113 - Automatic Door Operator.pdf PDF
079500 - Exterior Expansion Control.pdf PDF
A427 - SPA ROOMS AND LAUNDRY ROOMS.pdf PDF
084113 - Aluminum-Framed Entrances and Storefronts.pdf PDF
A406 - CLINICAL AREAS- NURSE STATIONS - FIRST FLOOR.pdf PDF
AD100A - BASEMENT DEMOLITION PLAN A.pdf PDF
Amendment 0003 Solicitation_GC AFRH 2025 03 04.pdf PDF
236416 FL - Centrifugal Water Chillers- Addendum 3.pdf PDF
AI407 - TYPICAL ELEVATOR LOBBY FINISH PLANS AND ELEVATIONS (FLOORS 2-7).pdf PDF
107113 - Exterior Sun Control Devices.pdf PDF
088700 - Window Film.pdf PDF
AD100B - BASEMENT DEMOLITION PLAN B.pdf PDF
A405 - CLINICAL AREAS-NURSE STATIONS - FIRST FLOOR.pdf PDF
AI408 - TYPICAL NORTH- SOUTH ELEVATOR LOBBY FINISH PLANS (FLOORS 2-7).pdf PDF
A409 - ENLARGED TOILET ROOM PLANS AND ELEVATIONS.pdf PDF
087100 - Door Hardware.pdf PDF
101423.16 - Panel Signage.pdf PDF
A504 - EXTERIOR WALL SECTION DETAILS.pdf PDF
000110 Table of Contents.pdf PDF
H603 - HVAC DETAILS.pdf PDF
AFRH-Sheridan Pre-Bid Addendum 2-12-25.pdf PDF
081416 - Flush Wood Doors.pdf PDF
A601 - DOOR SCHEDULE TYPES DETAILS.pdf PDF
S542 - STRUCTURAL BALCONY ENCLOSURE DETAILS.pdf PDF
A560 - TYPICAL ROOF DETAILS.pdf PDF
A503 - EXTERIOR WALL SECTION DETAILS.pdf PDF
A602 - DOOR SCHEDULE TYPES DETAILS.pdf PDF
S521 - STRUCTURAL ANNEX FRAMING DETAILS.pdf PDF
095000 - Wood Panel Ceiling.pdf PDF
S552 - STRUCTURAL TRASH CHUTE GENERATOR ENCLSOURE BALCONY ENCLOSURE DETAILS.pdf PDF
Amendment 0003 RFI Responses 1-149 2025 03 04.pdf PDF
235700 FL - Heat Exchangers for HVAC.pdf PDF
S401 - STRUCTURAL ROOF FRAMING PARTIAL PLANS.pdf PDF
Amendment 0003 Solicitation 47PM0325R0002 2025 03 04.pdf PDF
H804 - CONTROL DIAGRAMS.pdf PDF
AEWLA22050. Geotechnical Report. 10142022.pdf PDF
A412 - ENLARGED RESIDENT ROOM SHOWERS.pdf PDF
089119 - Fixed Louvers.pdf PDF
A112B - SECOND FLOOR REFLECTED CEILING PLAN B.pdf PDF
AI406 - FIRST FLOOR TOILET ROOM FINISH PLANS AND ELEVATIONS.pdf PDF
A102B - SECOND FLOOR PLAN B.pdf PDF
Show 40 more

Latest 50 of 90 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CC

BB

AA

A.5A.5

B.5B.5

26 26.5

26.5

24.2

24.2 24.5

24.5

(X)EXPANSION TANK

(X)CH-1 (X)CH-2

(X) 10" CWR

(X) 10" CWS

(X) 6" CHWS

(X) 6" CHWR

(X) 6" CHWR

(X) 8" CHWR

8" (X) 6"CHWS

(X)CHWP-3

(X)CHWP-4

(X)CHWP-2

(X)CHWP-1

(X)WATER TREATMENT SYSTEM

(X)AS-1

CT

(E)14" CWS

(E)14" CWR

(E)12" CWS

(E)12" CWR

(E)COOLING TOWER (E)COOLING TOWER

(X)CWP (X)CWP9 910 10

N

DATE:

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT NAME:

THIS SQUARE APPEARS 1/2"x1/2"

ON FULL SIZE SHEETS

CLIENT:

418 BEAVER STREET

SEWICKLEY, PA 15143

PH: 412.287.7333

www.aeworks.com

PROFESSIONAL:

COPYRIGHT 2024 BY AE WORKS LTD ALL RIGHTS RESERVED.

SUBMISSION:

CONSTRUCTION BID

DOCUMENTS

AE WORKS®

A u to d e s k D o c s /A

F R

H -0

S h e ri d a n /A

F R

H -0

M

E P

-2

.r v t

/1

/2

:3

:1

P

M

HD103

AA

MJC

AFRH-033

CHILLER PLANT DEMO

PLAN

AFRH SHERIDAN

RENOVATION

140 ROCK CREEK CHURCH ROAD,

NORTHWEST,

WASHINGTON, DC

ARMED FORCES

RETIREMENT HOME -

WASHINGTON D.C.

11-13-2024

CHILLER PLANT DEMOLITION NOTES

1 DEMOLISH EXISTING CHILLER ALONG WITH ASSOCIATED VALVES.

2 DEMOLISH EXISTING PUMPS AND ASSOCIATED VALVES.

3 DEMOLISH EXISTING EXPANSION TANK.

4 DEMOLISH EXISTING WATER TREATMENT SYSTEM.

5 DEMOLISH EXISTING AIR SEPARATOR.

6 DEMOLISH EXISTING CHILLED WATER AND CONDENSER WATER PIPING IN THIS

MECHANICAL ROOM.

7 EXISTING CONDENSER WATER SUPPLY AND RETURN FROM COOLING TOWER.

8 REMOVE CENTRIFUGAL CHILLER FROM THIS AREA AND RELOCATE TO LOCATION OF NEW

CHILLER PLANT TO BE INSTALLED AND PUT INTO SERVICE. SEE SHEET H103.

9 DEMOLISH EXISTING CONDENSER WATER PUMPS LOCATED AT COOLING TOWER

BUILDING. EXISTING PIPING AND VALVES TO REMAIN FOR NEW PUMP CONNECTIONS.

10 REMOVAL OF EQUIPMENT WILL REQUIRE ISOLATING MAINS AT SHUT OFF VALVES.

11 EXISTING COOLING TOWERS TO REMAIN.

12 REMOVE CWP VFD'S.

(TYP.)

(TYP.)

(TYP.)

(TYP.)

(TYP.)

1/4" = 1'-0"

CHILLER PLANT DEMOLITION PLAN

GENERAL DEMOLITION NOTES

1 ALL WORK WILL BE SCHEDULED AND COORDINATED JOINTLY WITH THE

AFRH. A DETAILED JOB TIMELINE WILL BE ESTABLISHED AND SUBMITTED

FOR REVIEW AND APPROVAL.

2 REFER TO ARCHITECTURAL SHEETS FOR ADDITIONAL REQUIREMENTS.

3 EXISTING VERTICAL FAN COIL UNITS AND FLOOR MOUNTED HEATERS ARE

TO BE DEMOLISHED ALONG WITH ASSOCIATED PIPING, ACCESSORIES AND

CONTROLS. DEMO CHILLED WATER, HOT WATER AND CONDENSATE

DRAINAGE PIPING BACK TO THE RISER AND CAP AS CLOSE AS POSSIBLE.

4 ALL REHEAT COILS TO BE DEMOLISHED WITH THE ASSOCIATED DUCTWORK.

5 EXISTING VENTILATION AND EXHAUST AIR RISERS TO REMAIN. DUCTWORK

TO BE CAPPED AND PREPARED FOR NEW DUCTWORK.

6 HOT/CHILLED WATER RISERS H/C 1, 3, 4, 8, 9, 10, 12, 13, 14A,14B, 14C, 15, 16,

18, 19, 22, 23, 24, 25, 26, 27, 30, 32, 34, 35, 38, 39, 40, 41, 42, 43, 44, 46, 48, 49, 52, 54, 55, 56, 58, 59, 59A, 59B,59C TO BE DEMOLISHED AND NEW RISERS

PROVIDED AS INDICATED IN NEW PLAN. SIZE AS INDICATED IN PIPING RISER

DIAGRAM. ALL OTHER EXISTING HYDRONIC PIPING RISERS TO REMAIN PER

KEYNOTES. PIPING TO BE CAPPED AND PREPARED FOR NEW FAN COIL UNIT

INSTALLATION.

NO DATE REVISION

1 2/12/2025 BID ADDENDUM

1/8" = 1'-0"

MECHANICAL DEMOLITION PLAN - COOLING TOWER BUILDING

12-FEB-25

Sheets
H103 - NEW CHILLER PLANT PLAN
H603 - HVAC DETAILS
H702 - HVAC SCHEDULES
H804 - CONTROL DIAGRAMS
HD103 - CHILLER PLANT DEMO PLAN

File details come from the government source that posted it. Updated .