About this file

This is a mechanical engineering drawing showing the piping and ductwork plans for a new chiller plant installation at the Armed Forces Retirement Home in Washington D.C. The drawing (H103) details the layout of chillers, pumps, heat exchangers, and associated piping systems including chilled water supply/return lines (CHWS/CHWR) and condenser water lines (CWS/CWR).

The plans include specifications for equipment installation including new 6" concrete equipment pads, condenser water chemical treatment systems, VFD controls for primary and secondary chilled water pumps, isolation valves, and refrigerant leak detection systems with warning lights and alarms. Key components shown include two chillers (CH-1 and CH-2), primary and secondary chilled water pumps (CHWP-P1/P2 and CHWP-S1/S2), and cooling tower connections. The drawing notes that certain equipment (chillers, heat exchangers, pumps, air separator and expansion tank) will be produced under a separate contract, while piping and power connections are to be performed under this contract. The drawing is dated February 12, 2025 and is marked as a Construction Bid Document.

View the file

Other files

File Type Posted
Amendment 0006 Solicitation 47PM0325R0002 2025 03 25.pdf PDF
Amendment 0005 RFI Responses 150 - 336 2025 03 18.pdf PDF
Amendment 0005 Solicitation 47PM0325R0002 2025 03 18 (2).pdf PDF
Amendment 0004 Solicitation 47PM0325R0002 2025 03 13.pdf PDF
Amendment 0003 Technical Evaluation Factors-Best Value_ Trade Off 2025 03 04.pdf PDF
Amendment 0003 Solicitation 47PM0325R0002 2025 03 04.pdf PDF
A517 - EXTERIOR PLAN DETAILS.pdf PDF
A516 - EXTERIOR PLAN DETAILS.pdf PDF
087113 - Automatic Door Operator.pdf PDF
079500 - Exterior Expansion Control.pdf PDF
A427 - SPA ROOMS AND LAUNDRY ROOMS.pdf PDF
084113 - Aluminum-Framed Entrances and Storefronts.pdf PDF
A406 - CLINICAL AREAS- NURSE STATIONS - FIRST FLOOR.pdf PDF
AD100A - BASEMENT DEMOLITION PLAN A.pdf PDF
Amendment 0003 Solicitation_GC AFRH 2025 03 04.pdf PDF
236416 FL - Centrifugal Water Chillers- Addendum 3.pdf PDF
AI407 - TYPICAL ELEVATOR LOBBY FINISH PLANS AND ELEVATIONS (FLOORS 2-7).pdf PDF
107113 - Exterior Sun Control Devices.pdf PDF
088700 - Window Film.pdf PDF
AD100B - BASEMENT DEMOLITION PLAN B.pdf PDF
A405 - CLINICAL AREAS-NURSE STATIONS - FIRST FLOOR.pdf PDF
HD103 - CHILLER PLANT DEMO PLAN.pdf PDF
AI408 - TYPICAL NORTH- SOUTH ELEVATOR LOBBY FINISH PLANS (FLOORS 2-7).pdf PDF
A409 - ENLARGED TOILET ROOM PLANS AND ELEVATIONS.pdf PDF
087100 - Door Hardware.pdf PDF
101423.16 - Panel Signage.pdf PDF
A504 - EXTERIOR WALL SECTION DETAILS.pdf PDF
000110 Table of Contents.pdf PDF
H603 - HVAC DETAILS.pdf PDF
AFRH-Sheridan Pre-Bid Addendum 2-12-25.pdf PDF
081416 - Flush Wood Doors.pdf PDF
A601 - DOOR SCHEDULE TYPES DETAILS.pdf PDF
S542 - STRUCTURAL BALCONY ENCLOSURE DETAILS.pdf PDF
A560 - TYPICAL ROOF DETAILS.pdf PDF
A503 - EXTERIOR WALL SECTION DETAILS.pdf PDF
A602 - DOOR SCHEDULE TYPES DETAILS.pdf PDF
S521 - STRUCTURAL ANNEX FRAMING DETAILS.pdf PDF
095000 - Wood Panel Ceiling.pdf PDF
S552 - STRUCTURAL TRASH CHUTE GENERATOR ENCLSOURE BALCONY ENCLOSURE DETAILS.pdf PDF
Amendment 0003 RFI Responses 1-149 2025 03 04.pdf PDF
235700 FL - Heat Exchangers for HVAC.pdf PDF
S401 - STRUCTURAL ROOF FRAMING PARTIAL PLANS.pdf PDF
Amendment 0003 Solicitation 47PM0325R0002 2025 03 04.pdf PDF
H804 - CONTROL DIAGRAMS.pdf PDF
AEWLA22050. Geotechnical Report. 10142022.pdf PDF
A412 - ENLARGED RESIDENT ROOM SHOWERS.pdf PDF
089119 - Fixed Louvers.pdf PDF
A112B - SECOND FLOOR REFLECTED CEILING PLAN B.pdf PDF
AI406 - FIRST FLOOR TOILET ROOM FINISH PLANS AND ELEVATIONS.pdf PDF
A102B - SECOND FLOOR PLAN B.pdf PDF
Show 40 more

Latest 50 of 90 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

DN

EE

DD

CC

BB

AA

FS FS

A.5A.5

B.5B.5

C.5C.5

D.5D.5

E.5E.5

22 24

CHWP-S1

CHWP-S2

CH-1

CH-2

HX-1

8" CHWR

6" C

H W

S

8" CHWS 6" CHWS

8" C

H W

S

8" C

H W

S

3-WAY VALVE

6" C

H W

R

A S

-1

C W

S14

C W

R

8" C

H W

R

E T

-1

8" CHWR

6" CHWR

10" CWR

10" CWS

10" CWR

10" CWS 8" CHWS

14" CWS

14" CWR

8"

CHWP-P2

CHWP-P1

8" CHWR

24.2

24.2

V-12

V-10

V-9

V-11

V-15

V-14

V-18

EF-MECH

PROVIDE

LOUVER w/

4.57 SQ FT

NET FREE

AREA.

36"H x 36"W

PROVIDE LOUVER

w/ 6.4 SQ FT NET

FREE AREA.

42"H x 48"W

PROVIDE LOUVER w/

6.4 SQ FT NET FREE

AREA.

42"H x 48"W

V-5 V-7

10" CWR

10" CWS

V-6 V-8

V-1

V-3

V-2

V-4

V-13

UH-1

UH-1

FOR CONTINUATION

SEE HP100B

R V

R V

CC

BB

AA

A.5A.5

B.5B.5

C.5C.5

22 24

24.2

24.2

PROVIDE

LOUVER w/

4.57 SQ FT

NET FREE

AREA.

36"H x 36"W

PROVIDE

LOUVER w/

6.4 SQ FT

NET FREE

AREA.

42"H x 48"W

PROVIDE

LOUVER w/ 6.4

SQ FT NET FREE

AREA.

42"H x 48"W

CH-2

CH-1

CHWP-P1

CHWP-P2

CHWP-S1

CHWP-S2

26"x16"

26"x16" RA

26"x16" RA

EF-MECH

26"x16"

UH-1

UH-1

S

S

CT

(E)14" CWS

(E)14" CWR

(E)12" CWS

(E)12" CWR

(E)COOLING TOWER (E)COOLING TOWER

18 18

CWP-1 CWP-216

N

DATE:

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT NAME:

CLIENT:

418 BEAVER STREET

SEWICKLEY, PA 15143

PH: 412.287.7333

www.aeworks.com

PROFESSIONAL:

COPYRIGHT 2024 BY AE WORKS LTD ALL RIGHTS RESERVED.

SUBMISSION:

CONSTRUCTION BID

DOCUMENTS

AE WORKS®

A u to d e s k D o c s /A

F R

H -0

S h e ri d a n /A

F R

H -0

M

E P

-2

.r v t

/1

/2

:3

:1

P

M

H103

AA

MJC

AFRH-033

NEW CHILLER PLANT

PLAN

AFRH SHERIDAN

RENOVATION

140 ROCK CREEK CHURCH

ROAD, NORTHWEST,

WASHINGTON, DC

ARMED FORCES

RETIREMENT HOME -

WASHINGTON D.C.

11-13-2024 1/4" = 1'-0"

CHILLER PLANT PIPING NEW PLAN

CHILLER PLANT NEW WORK KEYNOTES

1 NEW 6" THICK CONCRETE EQUIPMENT PADS.

2 NEW CONDENSER WATER CHEMICAL TREATMENT SKID AND ASSOCIATED PUMPS, TANKS,

CHEMICALS, AND CONTROLS. CONNECT AUTOMATIC FEEDER SYSTEM TO CONDENSER WATER

LOOP PIPING AS REQUIRED.

3 WATER TREATMENT SYSTEM CONTROL PANEL

4 PRIMARY CHWP VFD

5 SECONDARY CHWP VFD

6 FREE COOLING HEAT EXCHANGER ISOLATION VALVE.

7 CHILLER 2-POSITION ISOLATION VALVE.

8 CONDENSER WATER SUPPLY BYPASS VALVE.

9 8-IN CROSSOVER VALVE FOR PUMP REDUNDANCY.

10 REFRIGERANT RELIEF VENT PIPING TO TERMINATE A MINIMUM OF 24'-2" ABOVE FINSIHED

GRADE. CONTRACTOR MUST SIZE PER MANUFACTURER'S RECOMMENDATIONS.

11 BLUE REFRIGERANT LEAK WARNING STROBE LIGHT, ONE ON EACH SIDE OF THE WALL, MOUNT

AT 8'-0" AFF.

12 REFRIGERANT MONITOIRING SYSTEM PANEL.

13 EXISTING CONDENSER WATER SUPPLY AND RETURN FROM COOLING TOWER.

14 REFRIGERANT LEAK WARNING ALARM HORN, MOUNT AT 8'-0" AFF.

15 REFRIGERANT SENSOR FOR CHILLER LEAK DETECTION SYSTEM.

16 CONNECT NEW CONDENSER WATER PUMP TO EXISTING CONDENSER WATER SUPPLY AND

RETURN PIPING AT COOLING TOWER BUILDING.

17 CONDENSER WATER PUMP DISCONNECT SWITCH.

18 3 WAY TOWER BYPASS VALVE.

1 1

1 1

1 1

(TYP.)

(TYP.)

(TYP.)

ELECTRICAL EQUIPMENT AREA

1/4" = 1'-0"

CHILLER PLANT DUCTWORK PLAN

CHILLER PLANT GENERAL NOTES

1 EQUIPMENT TO BE PRODCUED UNDER DIFFERENT CONTRACT: CHILLERS, PLATE AND

FRAME HEAT EXCHANGERS, CHWPS, CWPS, AIR SEPARATOR AND EXPANSION TANK.

2 PIPING AND POWER CONECTIONS TO EQUIPMENT TO BE PERFORMED UNDER THIS

CONTRACT.

NO DATE REVISION

1 2/12/2025 BID ADDENDUM

1/8" = 1'-0"

MECHANICAL NEW WORK PLAN - COOLING TOWER BUILDING

12-FEB-25

File details come from the government source that posted it. Updated .