This is a demolition plan drawing (AD100B) showing the basement level demolition scope for the Sheridan Building renovation project at the Armed Forces Retirement Home in Washington DC. The drawing is dated February 18, 2025 and was produced by AE Works.
The demolition plan provides detailed notes and specifications for removing various building elements including foundation materials, windows, plumbing fixtures, handrails, doors, floor/wall finishes, mechanical equipment, and ceiling systems. Key demolition items include salvaging 4" limestone panels, removing concrete ramps and stairs, demolishing existing slabs and pavement, and removing acoustical ceiling systems. The drawing includes precise measurements and dimensions for demolition work, with a demolition legend distinguishing between existing elements to remain versus those to be demolished. The plan is part of the construction bid documents package and appears to be one section (Part B) of the overall basement demolition scope for this major renovation project.
View the file
Other files
Show 40 more
Latest 50 of 90 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
18 19 21 23 25 26 27
N
M
L
K
J
G
F
E
D
C
B
A
HS
GS
FS
ES
DS
CS
BS
AS
NS
29S 30S 31S 32S
A.5
B.5
C.5
D.5
E.5
F.5
26.5
G.6
24.2
G326
SUPPLY
G325
SUPPLY
G329
FREEZER
G330
SUPPLY
G328
SUPPLY
G327
TOILET
H.1
BANK
G014
THRIFT SHOP
G324A
FAN ROOM
G320
MEN'S
G015
STORAGE
G018
STORAGE
G012A
THRIFT SHOP
G324A
STAIRS
G-3
STORAGE
G018
VESTIBULE
G322
OFFICE
G322A
MECHANICAL
G323
JC
G321
TRASH ROOM
G021 STAIRS
G-7
TRANSFORMER
ROOM
G023
MECHANICAL
G022
FIRE PUMP RM
G020
STORAGE
G023
ELECTRICAL
G403
ELEVATOR LOBBY
G026
CORRIDOR
G029
MECHANICAL
G404MECHANICAL
G405
STORAGE
G407
CERAMICS ROOM
G409
OFFICE
G411
KILN ROOM
G408
TOILET
G410
P A
R T
B A
D
0B
P A
R T
A A
D
0A
F.9
G.5
27.8
D5
D2
TYP.
D5
D8
D6
D1
TYP.
D4
D4
TYP.
TYP.
D4
D7
D7
D18
41' - 0" D18
2'
/4
7'
4'
5'
4'
D15
D15
D15
D15
D15
D15
4'
2'
4'
4'
5'
4'
4'
5'
4'
4'
5'
4'
4'
5'
4'
1/
2"
D18
D1
D1
12' - 0"
3'
3' - 0"
D7
D20
TYP.
4'
4'
4'
4'
4'
4'
4'
4'
4'
4'
4' - 0"
4'
4'
4'
41' - 2"
4'
4'
D20
TYP.
P A
R T
B A
D
0B
P A
R T
A A
D
0A
D1
D13
D22
D23
TYP.
D23
D20
TYP.
TYP.
D24
G324B
MECHANICAL
G324
P/X STORE
STAIRS
G-4
D4
AD2022
AD2032 AD203 1
SOUTH LOADING
DOCK
G400
D28
D16
D16
D16
D16
AD201
AD202
AD2034
D24
D24
R A
M P
TO
SCOTT
BLDG
SEE CS-SERIES
AND MECH
HD107
D28
UP
D1
UP
UP
D30
D17
D32
D32
D32
D33
D33
D33
D33
D33
DEMOLITION LEGEND
EXISTING TO REMAIN
DEMOLISH EXISTING CONSTRUCTION
N
DATE:
DRAWN BY:
CHECKED BY:
PROJ. NO:
DRAWING NO:
DRAWING TITLE:
PROJECT NAME:
CLIENT:
418 BEAVER STREET
SEWICKLEY, PA 15143
PH: 412.287.7333
www.aeworks.com
PROFESSIONAL:
COPYRIGHT 2024 BY AE WORKS LTD ALL RIGHTS RESERVED.
SUBMISSION:
CONSTRUCTION BID
DOCUMENTS
AE WORKS®
A u to d e s k D o c s
/A F
R H
-0
S h e ri d a n /A
F R
H -0
A R
C H
-2
.r v t
/1
/2
:0
:0
P
M
AD100B
AEW
Checker
AFRH-033
BASEMENT DEMOLITION
PLAN B
AFRH SHERIDAN
RENOVATION
140 ROCK CREEK
CHURCH ROAD,
NORTHWEST,
WASHINGTON, DC
ARMED FORCES
RETIREMENT HOME -
WASHINGTON D.C.
11/13/24 1/8" = 1'-0"
BASEMENT DEMOLITION PLAN B
DEMOLITION KEYNOTES
D1 REMOVE EXISTING FOUNDATION AND ASPHALT/CONCRETE HARDSCAPE MATERIAL.
FOR NEW STRUCTURAL FOUNDATION WORK, SEE S-SERIES DWGS.
D2 REMOVE EXISTING WINDOW.
D3 REMOVE AND SALVAGE ALL BOWLING ALLEY FLOOR FINISHES, PIN SETTING
EQUIPMENT, GUTTERS, TRIM, WALL PANELS, BALL RETURN TRACK AND MECHANISM
AND ALL ASSOCIATED MATERIAL. PROVIDE ALL MATERIALS TO AFRH.
D4 REMOVE EXISTING COLUMN AND SURROUNDING FURRING, STUDS, DRYWALL AND
FINISHES. COORDINATE WITH S-SERIES DWGS AND PROVIDE ADEQUATE
TEMPORARY BRACING.
D5 REMOVE SINK, PLUMBING FIXTURES AND ASSOCIATED ITEMS. SEE P-SERIES.
D6 REMOVE TOILET AND ASSOCIATED PLUMBING. SEE P-SERIES DWGS.
D7 REMOVE HAND RAIL AND GAURD RAIL FROM EXISTING STRINGERS AND WALL
MOUNTS, STAIRS TO REMAIN.
D8 REMOVE EXISTING DOOR, FRAME, AND ASSOCIATED HARDWARE.
D9 CUT SLAB FOR TRASH CHUTE. SEE S-SERIES DWGS. FOR DETAILS.
D10 REMOVE ALL FLOOR AND WALL FINISHES, BASE, TRIM ETC DOWN TO EXISTING
CONSTRUCTION AND PREP FOR NEW FINISHES.
D11 REMOVE EXISTING BALCONY RAILING AS INDICATED, CURB TO REMAIN.
D12 REMOVE EXISTING STEEL BOLLARD.
D13 EXISTING ELECTRICAL EQUIPMENT TO REMAIN, PROTECT DURING DEMOLITION. SEE
E-SERIES DWGS.
D14 REMOVE EXISTING VESTIBULE INCLUDING ROOF, WALL PANELS AND ALL
ASSOCIATED SUPPORT STRUCTURE.
D15 SALVAGE 4" THICK LIMESTONE PANEL (AND GRANITE PANEL WHEN PRESENT).
REMOVE CMU, LINTEL, WINDOW AND ASSOCIATED SUPPORT ITEMS WITHIN
PORTION OF WALL INDICATED .
D16 REMOVE MECHANICAL DUCTWORK AND EQUIPMENT. SEE M-SERIES DWGS.
D17 REMOVE EXISTING EXTERIOR BULKHEAD ABOVE THIS PASSAGEWAY. SALVAGE
LIMESTONE PANELS FOR REUSE, REMOVE SOFFIT, INTERNAL SUPPORT, LIGHT
FIXTURES, MECHANICAL DUCTWORK, GRILLES AND CEILING MOUNTED ITEMS.
D18 REMOVE CONCRETE RAMP AND WALL MOUNTED RAILING.
D19 REMOVE STRUCTURAL STEEL FRAMING, SOFFIT AND ASSOCIATED
LIMESTONE/GRANITE WALL PANELS ABOVE. SEE S-SERIES DWGS.
D20 REMOVE FINISHES DOWN TO EXISTING CMU OR CONCRETE COL., TYPICAL AT ALL
EXTERIOR WALL LOCATIONS.
D22 PROVIDE WEATHER RESISTANT BARRIER DURING DEMOLITION UNTIL NEW
CONSTRUCTION IS WEATHER TIGHT.
D23 APPLY VAPOR BARRIER ON WOOD FURRING @ 24" O.C. TO CMU WALL DURING
DEMOLITION PHASE.
D24 REMOVE EXISTING SLAB AND SURROUNDING PAVEMENT, SEE S-SERIES DWGS.
D25 REMOVE ROOF MOUNTED EQUIPMENT, ROOF MEMBRANE, BALLAST ASSOCIATED
MATERIAL AND ROOF STRUCTURE IN IT'S ENTIRETY, SEE S-SERIES DWGS.
D26 REMOVE EXISTING CONT. CONCRETE CURB.
D27 REMOVE EXISTING FLOOR DRAIN IN BALCONY, CAP DRAIN LINE AND FILL WITH
CONCRETE TOPPING, SEE P AND S-SERIES DWGS.
D28 REMOVE EXISTING CONCRETE STAIR, LANDING AND GAURDRAILING.
D29 EXISTING BUILDING EXPANSION JOINT, REMOVE COVER PLATE AND PREP AREA
FOR NEW JOINT MATERIAL/COVER IN NEW WORK.
D30 REMOVE EXISTING ROOF LADDER AND CAGE ABOVE.
D31 REMOVE WINDOW AND LOWER PORTION OF WALL TO ALLOW FOR NEW DOOR AND
FRAME INSTALLATION IN NEW WORK.
D32 REMOVE ACOUSTICAL CEILING TILE GRID SYSTEM, GYP BOARD BULKHEADS,
CEILING MOUNTED DEVICES, LIGHT FIXTURES, AND ALL ASSOCIATED SUPPORT
STRUCTURE IN THIS ROOM.
D33 REMOVE HARD PLASTER/GYP BOARD CEILING, CEILING MOUNTED DEVICES, LIGHT
FIXTURES, AND ALL ASSOCIATED SUPPORT STRUCTURE IN THIS ROOM.
NO DATE REVISION
1 02/12/2025 BID ADDENDUM
| Sheets |
| AD100B - BASEMENT DEMOLITION PLAN B |
File details come from the government source that posted it. Updated .