About this file

This is a demolition plan drawing (AD100B) showing the basement level demolition scope for the Sheridan Building renovation project at the Armed Forces Retirement Home in Washington DC. The drawing is dated February 18, 2025 and was produced by AE Works.

The demolition plan provides detailed notes and specifications for removing various building elements including foundation materials, windows, plumbing fixtures, handrails, doors, floor/wall finishes, mechanical equipment, and ceiling systems. Key demolition items include salvaging 4" limestone panels, removing concrete ramps and stairs, demolishing existing slabs and pavement, and removing acoustical ceiling systems. The drawing includes precise measurements and dimensions for demolition work, with a demolition legend distinguishing between existing elements to remain versus those to be demolished. The plan is part of the construction bid documents package and appears to be one section (Part B) of the overall basement demolition scope for this major renovation project.

View the file

Other files

File Type Posted
Amendment 0006 Solicitation 47PM0325R0002 2025 03 25.pdf PDF
Amendment 0005 RFI Responses 150 - 336 2025 03 18.pdf PDF
Amendment 0005 Solicitation 47PM0325R0002 2025 03 18 (2).pdf PDF
Amendment 0004 Solicitation 47PM0325R0002 2025 03 13.pdf PDF
H103 - CHILLER PLANT.pdf PDF
Amendment 0003 Technical Evaluation Factors-Best Value_ Trade Off 2025 03 04.pdf PDF
Amendment 0003 Solicitation 47PM0325R0002 2025 03 04.pdf PDF
A517 - EXTERIOR PLAN DETAILS.pdf PDF
A516 - EXTERIOR PLAN DETAILS.pdf PDF
087113 - Automatic Door Operator.pdf PDF
079500 - Exterior Expansion Control.pdf PDF
A427 - SPA ROOMS AND LAUNDRY ROOMS.pdf PDF
084113 - Aluminum-Framed Entrances and Storefronts.pdf PDF
A406 - CLINICAL AREAS- NURSE STATIONS - FIRST FLOOR.pdf PDF
AD100A - BASEMENT DEMOLITION PLAN A.pdf PDF
Amendment 0003 Solicitation_GC AFRH 2025 03 04.pdf PDF
236416 FL - Centrifugal Water Chillers- Addendum 3.pdf PDF
AI407 - TYPICAL ELEVATOR LOBBY FINISH PLANS AND ELEVATIONS (FLOORS 2-7).pdf PDF
107113 - Exterior Sun Control Devices.pdf PDF
088700 - Window Film.pdf PDF
A405 - CLINICAL AREAS-NURSE STATIONS - FIRST FLOOR.pdf PDF
HD103 - CHILLER PLANT DEMO PLAN.pdf PDF
AI408 - TYPICAL NORTH- SOUTH ELEVATOR LOBBY FINISH PLANS (FLOORS 2-7).pdf PDF
A409 - ENLARGED TOILET ROOM PLANS AND ELEVATIONS.pdf PDF
087100 - Door Hardware.pdf PDF
101423.16 - Panel Signage.pdf PDF
A504 - EXTERIOR WALL SECTION DETAILS.pdf PDF
000110 Table of Contents.pdf PDF
H603 - HVAC DETAILS.pdf PDF
AFRH-Sheridan Pre-Bid Addendum 2-12-25.pdf PDF
081416 - Flush Wood Doors.pdf PDF
A601 - DOOR SCHEDULE TYPES DETAILS.pdf PDF
S542 - STRUCTURAL BALCONY ENCLOSURE DETAILS.pdf PDF
A560 - TYPICAL ROOF DETAILS.pdf PDF
A503 - EXTERIOR WALL SECTION DETAILS.pdf PDF
A602 - DOOR SCHEDULE TYPES DETAILS.pdf PDF
S521 - STRUCTURAL ANNEX FRAMING DETAILS.pdf PDF
095000 - Wood Panel Ceiling.pdf PDF
S552 - STRUCTURAL TRASH CHUTE GENERATOR ENCLSOURE BALCONY ENCLOSURE DETAILS.pdf PDF
Amendment 0003 RFI Responses 1-149 2025 03 04.pdf PDF
235700 FL - Heat Exchangers for HVAC.pdf PDF
S401 - STRUCTURAL ROOF FRAMING PARTIAL PLANS.pdf PDF
Amendment 0003 Solicitation 47PM0325R0002 2025 03 04.pdf PDF
H804 - CONTROL DIAGRAMS.pdf PDF
AEWLA22050. Geotechnical Report. 10142022.pdf PDF
A412 - ENLARGED RESIDENT ROOM SHOWERS.pdf PDF
089119 - Fixed Louvers.pdf PDF
A112B - SECOND FLOOR REFLECTED CEILING PLAN B.pdf PDF
AI406 - FIRST FLOOR TOILET ROOM FINISH PLANS AND ELEVATIONS.pdf PDF
A102B - SECOND FLOOR PLAN B.pdf PDF
Show 40 more

Latest 50 of 90 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

18 19 21 23 25 26 27

N

M

L

K

J

G

F

E

D

C

B

A

HS

GS

FS

ES

DS

CS

BS

AS

NS

29S 30S 31S 32S

A.5

B.5

C.5

D.5

E.5

F.5

26.5

G.6

24.2

G326

SUPPLY

G325

SUPPLY

G329

FREEZER

G330

SUPPLY

G328

SUPPLY

G327

TOILET

H.1

BANK

G014

THRIFT SHOP

G324A

FAN ROOM

G320

MEN'S

G015

STORAGE

G018

STORAGE

G012A

THRIFT SHOP

G324A

STAIRS

G-3

STORAGE

G018

VESTIBULE

G322

OFFICE

G322A

MECHANICAL

G323

JC

G321

TRASH ROOM

G021 STAIRS

G-7

TRANSFORMER

ROOM

G023

MECHANICAL

G022

FIRE PUMP RM

G020

STORAGE

G023

ELECTRICAL

G403

ELEVATOR LOBBY

G026

CORRIDOR

G029

MECHANICAL

G404MECHANICAL

G405

STORAGE

G407

CERAMICS ROOM

G409

OFFICE

G411

KILN ROOM

G408

TOILET

G410

P A

R T

B A

D

0B

P A

R T

A A

D

0A

F.9

G.5

27.8

D5

D2

TYP.

D5

D8

D6

D1

TYP.

D4

D4

TYP.

TYP.

D4

D7

D7

D18

41' - 0" D18

2'

/4

7'

4'

5'

4'

D15

D15

D15

D15

D15

D15

4'

2'

4'

4'

5'

4'

4'

5'

4'

4'

5'

4'

4'

5'

4'

1/

2"

D18

D1

D1

12' - 0"

3'

3' - 0"

D7

D20

TYP.

4'

4'

4'

4'

4'

4'

4'

4'

4'

4'

4' - 0"

4'

4'

4'

41' - 2"

4'

4'

D20

TYP.

P A

R T

B A

D

0B

P A

R T

A A

D

0A

D1

D13

D22

D23

TYP.

D23

D20

TYP.

TYP.

D24

G324B

MECHANICAL

G324

P/X STORE

STAIRS

G-4

D4

AD2022

AD2032 AD203 1

SOUTH LOADING

DOCK

G400

D28

D16

D16

D16

D16

AD201

AD202

AD2034

D24

D24

R A

M P

TO

SCOTT

BLDG

SEE CS-SERIES

AND MECH

HD107

D28

UP

D1

UP

UP

D30

D17

D32

D32

D32

D33

D33

D33

D33

D33

DEMOLITION LEGEND

EXISTING TO REMAIN

DEMOLISH EXISTING CONSTRUCTION

N

DATE:

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT NAME:

CLIENT:

418 BEAVER STREET

SEWICKLEY, PA 15143

PH: 412.287.7333

www.aeworks.com

PROFESSIONAL:

COPYRIGHT 2024 BY AE WORKS LTD ALL RIGHTS RESERVED.

SUBMISSION:

CONSTRUCTION BID

DOCUMENTS

AE WORKS®

A u to d e s k D o c s

/A F

R H

-0

S h e ri d a n /A

F R

H -0

A R

C H

-2

.r v t

/1

/2

:0

:0

P

M

AD100B

AEW

Checker

AFRH-033

BASEMENT DEMOLITION

PLAN B

AFRH SHERIDAN

RENOVATION

140 ROCK CREEK

CHURCH ROAD,

NORTHWEST,

WASHINGTON, DC

ARMED FORCES

RETIREMENT HOME -

WASHINGTON D.C.

11/13/24 1/8" = 1'-0"

BASEMENT DEMOLITION PLAN B

DEMOLITION KEYNOTES

D1 REMOVE EXISTING FOUNDATION AND ASPHALT/CONCRETE HARDSCAPE MATERIAL.

FOR NEW STRUCTURAL FOUNDATION WORK, SEE S-SERIES DWGS.

D2 REMOVE EXISTING WINDOW.

D3 REMOVE AND SALVAGE ALL BOWLING ALLEY FLOOR FINISHES, PIN SETTING

EQUIPMENT, GUTTERS, TRIM, WALL PANELS, BALL RETURN TRACK AND MECHANISM

AND ALL ASSOCIATED MATERIAL. PROVIDE ALL MATERIALS TO AFRH.

D4 REMOVE EXISTING COLUMN AND SURROUNDING FURRING, STUDS, DRYWALL AND

FINISHES. COORDINATE WITH S-SERIES DWGS AND PROVIDE ADEQUATE

TEMPORARY BRACING.

D5 REMOVE SINK, PLUMBING FIXTURES AND ASSOCIATED ITEMS. SEE P-SERIES.

D6 REMOVE TOILET AND ASSOCIATED PLUMBING. SEE P-SERIES DWGS.

D7 REMOVE HAND RAIL AND GAURD RAIL FROM EXISTING STRINGERS AND WALL

MOUNTS, STAIRS TO REMAIN.

D8 REMOVE EXISTING DOOR, FRAME, AND ASSOCIATED HARDWARE.

D9 CUT SLAB FOR TRASH CHUTE. SEE S-SERIES DWGS. FOR DETAILS.

D10 REMOVE ALL FLOOR AND WALL FINISHES, BASE, TRIM ETC DOWN TO EXISTING

CONSTRUCTION AND PREP FOR NEW FINISHES.

D11 REMOVE EXISTING BALCONY RAILING AS INDICATED, CURB TO REMAIN.

D12 REMOVE EXISTING STEEL BOLLARD.

D13 EXISTING ELECTRICAL EQUIPMENT TO REMAIN, PROTECT DURING DEMOLITION. SEE

E-SERIES DWGS.

D14 REMOVE EXISTING VESTIBULE INCLUDING ROOF, WALL PANELS AND ALL

ASSOCIATED SUPPORT STRUCTURE.

D15 SALVAGE 4" THICK LIMESTONE PANEL (AND GRANITE PANEL WHEN PRESENT).

REMOVE CMU, LINTEL, WINDOW AND ASSOCIATED SUPPORT ITEMS WITHIN

PORTION OF WALL INDICATED .

D16 REMOVE MECHANICAL DUCTWORK AND EQUIPMENT. SEE M-SERIES DWGS.

D17 REMOVE EXISTING EXTERIOR BULKHEAD ABOVE THIS PASSAGEWAY. SALVAGE

LIMESTONE PANELS FOR REUSE, REMOVE SOFFIT, INTERNAL SUPPORT, LIGHT

FIXTURES, MECHANICAL DUCTWORK, GRILLES AND CEILING MOUNTED ITEMS.

D18 REMOVE CONCRETE RAMP AND WALL MOUNTED RAILING.

D19 REMOVE STRUCTURAL STEEL FRAMING, SOFFIT AND ASSOCIATED

LIMESTONE/GRANITE WALL PANELS ABOVE. SEE S-SERIES DWGS.

D20 REMOVE FINISHES DOWN TO EXISTING CMU OR CONCRETE COL., TYPICAL AT ALL

EXTERIOR WALL LOCATIONS.

D22 PROVIDE WEATHER RESISTANT BARRIER DURING DEMOLITION UNTIL NEW

CONSTRUCTION IS WEATHER TIGHT.

D23 APPLY VAPOR BARRIER ON WOOD FURRING @ 24" O.C. TO CMU WALL DURING

DEMOLITION PHASE.

D24 REMOVE EXISTING SLAB AND SURROUNDING PAVEMENT, SEE S-SERIES DWGS.

D25 REMOVE ROOF MOUNTED EQUIPMENT, ROOF MEMBRANE, BALLAST ASSOCIATED

MATERIAL AND ROOF STRUCTURE IN IT'S ENTIRETY, SEE S-SERIES DWGS.

D26 REMOVE EXISTING CONT. CONCRETE CURB.

D27 REMOVE EXISTING FLOOR DRAIN IN BALCONY, CAP DRAIN LINE AND FILL WITH

CONCRETE TOPPING, SEE P AND S-SERIES DWGS.

D28 REMOVE EXISTING CONCRETE STAIR, LANDING AND GAURDRAILING.

D29 EXISTING BUILDING EXPANSION JOINT, REMOVE COVER PLATE AND PREP AREA

FOR NEW JOINT MATERIAL/COVER IN NEW WORK.

D30 REMOVE EXISTING ROOF LADDER AND CAGE ABOVE.

D31 REMOVE WINDOW AND LOWER PORTION OF WALL TO ALLOW FOR NEW DOOR AND

FRAME INSTALLATION IN NEW WORK.

D32 REMOVE ACOUSTICAL CEILING TILE GRID SYSTEM, GYP BOARD BULKHEADS,

CEILING MOUNTED DEVICES, LIGHT FIXTURES, AND ALL ASSOCIATED SUPPORT

STRUCTURE IN THIS ROOM.

D33 REMOVE HARD PLASTER/GYP BOARD CEILING, CEILING MOUNTED DEVICES, LIGHT

FIXTURES, AND ALL ASSOCIATED SUPPORT STRUCTURE IN THIS ROOM.

NO DATE REVISION

1 02/12/2025 BID ADDENDUM

Sheets
AD100B - BASEMENT DEMOLITION PLAN B

File details come from the government source that posted it. Updated .