About this file

This is an architectural floor plan (drawing A102B) showing the second floor layout of the Sheridan Building renovation project at the Armed Forces Retirement Home in Washington DC. The drawing, created by AE Works, details residential units, corridors, stairs, elevators, laundry facilities, and utility rooms on the second floor. The plan includes detailed dimensions, construction legends, keynotes, and general construction notes specifying partition types, blocking requirements, and wall finish specifications. Notable features include multiple residential units (labeled as Unit A2, D3, D4, etc.), two stairwells (2-4 and 2-7), elevator lobby, janitor closets, and communal laundry/trash rooms. The drawing contains precise measurements, wall types, fire safety equipment locations, and references to other detailed architectural drawings for specific unit layouts. The scale is 1/8" = 1'-0" and the drawing is dated 11/13/24 as part of the construction bid documents.

View the file

Other files

File Type Posted
Amendment 0006 Solicitation 47PM0325R0002 2025 03 25.pdf PDF
Amendment 0005 RFI Responses 150 - 336 2025 03 18.pdf PDF
Amendment 0005 Solicitation 47PM0325R0002 2025 03 18 (2).pdf PDF
Amendment 0004 Solicitation 47PM0325R0002 2025 03 13.pdf PDF
H103 - CHILLER PLANT.pdf PDF
Amendment 0003 Technical Evaluation Factors-Best Value_ Trade Off 2025 03 04.pdf PDF
Amendment 0003 Solicitation 47PM0325R0002 2025 03 04.pdf PDF
A517 - EXTERIOR PLAN DETAILS.pdf PDF
A516 - EXTERIOR PLAN DETAILS.pdf PDF
087113 - Automatic Door Operator.pdf PDF
079500 - Exterior Expansion Control.pdf PDF
A427 - SPA ROOMS AND LAUNDRY ROOMS.pdf PDF
084113 - Aluminum-Framed Entrances and Storefronts.pdf PDF
A406 - CLINICAL AREAS- NURSE STATIONS - FIRST FLOOR.pdf PDF
AD100A - BASEMENT DEMOLITION PLAN A.pdf PDF
Amendment 0003 Solicitation_GC AFRH 2025 03 04.pdf PDF
236416 FL - Centrifugal Water Chillers- Addendum 3.pdf PDF
AI407 - TYPICAL ELEVATOR LOBBY FINISH PLANS AND ELEVATIONS (FLOORS 2-7).pdf PDF
107113 - Exterior Sun Control Devices.pdf PDF
088700 - Window Film.pdf PDF
AD100B - BASEMENT DEMOLITION PLAN B.pdf PDF
A405 - CLINICAL AREAS-NURSE STATIONS - FIRST FLOOR.pdf PDF
HD103 - CHILLER PLANT DEMO PLAN.pdf PDF
AI408 - TYPICAL NORTH- SOUTH ELEVATOR LOBBY FINISH PLANS (FLOORS 2-7).pdf PDF
A409 - ENLARGED TOILET ROOM PLANS AND ELEVATIONS.pdf PDF
087100 - Door Hardware.pdf PDF
101423.16 - Panel Signage.pdf PDF
A504 - EXTERIOR WALL SECTION DETAILS.pdf PDF
000110 Table of Contents.pdf PDF
H603 - HVAC DETAILS.pdf PDF
AFRH-Sheridan Pre-Bid Addendum 2-12-25.pdf PDF
081416 - Flush Wood Doors.pdf PDF
A601 - DOOR SCHEDULE TYPES DETAILS.pdf PDF
S542 - STRUCTURAL BALCONY ENCLOSURE DETAILS.pdf PDF
A560 - TYPICAL ROOF DETAILS.pdf PDF
A503 - EXTERIOR WALL SECTION DETAILS.pdf PDF
A602 - DOOR SCHEDULE TYPES DETAILS.pdf PDF
S521 - STRUCTURAL ANNEX FRAMING DETAILS.pdf PDF
095000 - Wood Panel Ceiling.pdf PDF
S552 - STRUCTURAL TRASH CHUTE GENERATOR ENCLSOURE BALCONY ENCLOSURE DETAILS.pdf PDF
Amendment 0003 RFI Responses 1-149 2025 03 04.pdf PDF
235700 FL - Heat Exchangers for HVAC.pdf PDF
S401 - STRUCTURAL ROOF FRAMING PARTIAL PLANS.pdf PDF
Amendment 0003 Solicitation 47PM0325R0002 2025 03 04.pdf PDF
H804 - CONTROL DIAGRAMS.pdf PDF
AEWLA22050. Geotechnical Report. 10142022.pdf PDF
A412 - ENLARGED RESIDENT ROOM SHOWERS.pdf PDF
089119 - Fixed Louvers.pdf PDF
A112B - SECOND FLOOR REFLECTED CEILING PLAN B.pdf PDF
AI406 - FIRST FLOOR TOILET ROOM FINISH PLANS AND ELEVATIONS.pdf PDF
Show 40 more

Latest 50 of 90 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

19 21 23 25 26 27 28

N

MM

LL

JJ

H

G

F

E

D

C

B

A

HS

GS

FS

ES

DS

CS

BS

AS

NS

29S

29S

30S 31S

31S

32S

32S

TELECOM

ELEC.

UNIT C2

UNIT C1

UNIT A2 OPP

UNIT D8

STAIRS

2-7

UNIT A2 OPP

UNIT A2

ELEVATOR LOBBY

JANITOR

ELEC

CORRIDOR

UNIT E1

UNIT D9

UNIT A2 OPP

UNIT A2 OPP

UNIT A2 OPP

UNIT A2 OPP

UNIT D8

STAIRS

2-4

UNIT A1

LAUNDRY

TRASH

CORRIDOR

CORRIDOR

CORRIDOR

UNIT D7

UNIT D2

UNIT D3 OPP

UNIT D3

UNIT D4

UNIT D4 OPP

UNIT D5 OPP

2308LAUNDRY

STAIRS

2-3

UNIT D6

UNIT D6 OPP

UNIT A3

A301

A302

A302

P A

R T

B A

2B

P A

R T

A A

2A

2-7

2301 2302

2305 2306

23102307

VESTIBULE

2-

A311

SF23

SF2

SF2

SF2

SF3

SF2

SF2

SF1

SF19 SF19SF1

SF1A

SF2A

SF2A

SF3A

SF2A

SF2A

SF2A

SF2A

CW2 CW2 CW3

CW2

CW1

CW1

CW2

CW1

CW2

CW1

CW1

SF18

SF1A

SF1

SF8A

SF8A

SF8A

SF8A

SF8A

SF8A

SF8A

SF16A

SF16A

SF8SF8SF8SF8SF8SF8SF8

8' - 1 3/8"

4'

/4

5'

5'

5'

5'

8'

5'

5'

5'

5'

5'

5'

5'

5'

5'

5'

5'

8' - 1 3/8"

4'

/4

5'

5'

5'

5'

8'

5'

5'

5'

/4

5'

/4

5'

5'

5'

5'

5'

3'

3'

8' - 4 3/8"

/4

5'

5'

5'

5'

5'

5'

5'

5'

5'

5'

1' - 1"

3' - 4" 1' - 1 3/4"

11' - 0" 5' - 6" 11' - 0" 5' - 6" 6' - 10 3/4" 5' - 6 3/4"

42' - 1 1/2"

6'

/8

5.03

5.03

5.03

C1

C1

C1

C1

C1

C1

C1

B3

5'

0"

C1 D3

C1

C1

C1

C1

G1 C1

C1

A4

C1

C1 C1

C1 C1

C1

C1

D3

A4

C1

C1

C1

C1

C1 B3

A4

C1

C1

C1

C1 C1C1

C1

C1

C1

G1

SF4 SF4A

SF4 SF4A

2414A

TLT

2414A

C1

A4

A4

2'

3' - 3"

FE

FE

FE

FE

FE

A4

D2

C1

D2

D2

25' - 6 7/8"

D2

5'

1/ 4"

2'

/2

3'

3/ 8"

7'

/4

B3

A210

A211

A2112

A2202 1

OPP.

OPP.

OPP.

SPA

A

C1

A4

G1

D2

D2

C1

C1

D2

A4

D2

C1

C1

D2

D2

C1

C1

C1

C1

C1

C1

B3

D2 D2 D2

B3

C1

A4C1

A4

C1

C1

G1

C1

G1

G1

C1

A4

C1

D4

D2

C1 C1

C1C1

G1

C1 C1

A4

C1

C1

C1

C1

C1

D3

C1

7.12

7.12

G1 G1 G1

D3

D3

D3

D3

D3

D3D3

D3

D3 D3

D3 D3

D3

D3

D3

D3

D3

D3

D3

D3

D3

D3

D3

D3 D3

A4

D3

D3

D2

F2

D3 A4

D3

D3

D3

D3

D3

D3

D3

D3

D3

D3

D3

D3D3

D3

D3

D3

A4

18' - 4 3/8" 17' - 2 3/8" 18' - 0" 18' - 0" 18' - 0"

/8

/8

1/ 2"

/4

8'

/8

/2

/4

/8

/8

/4

/2

7' - 8 1/8" 16' - 8 7/8" 11' - 7 3/4" 11' - 6 3/4"

23' - 10 1/2" 16' - 4"

9' - 9 1/8" 7' - 8" 7' - 10 5/8"

7' - 2 3/4"

5'

7'

/4

20' - 6 1/2"

4' - 3 1/2"

/8

1/ 4"

7'

/8

8' - 9 1/8" 15' - 8 1/8" 11' - 2"

1/ 4"

1/ 8"

/8

/4

1/ 4"

1'

UP DN

EJ

EJEJ

A707

A707

UP

DN

UP

DN

A401

A401

A401

2000A

D3 G1

D3

D3

SEE 1/A419 FOR

TYPICAL ENLARGED

UNIT PLAN

SEE 1/A419 FOR

TYPICAL ENLARGED

UNIT PLAN

SEE 3/A419 FOR

TYPICAL ENLARGED

UNIT PLAN

SEE 3/A419 FOR

TYPICAL ENLARGED

UNIT PLAN

SEE 3/A419 FOR

TYPICAL ENLARGED

UNIT PLAN

SEE 3/A419 FOR

TYPICAL ENLARGED

UNIT PLAN

SEE 3/A419 FOR

TYPICAL ENLARGED

UNIT PLAN

SEE 1/A420 FOR

TYPICAL ENLARGED

UNIT PLAN

SEE 1/A421 FOR

TYPICAL ENLARGED

UNIT PLAN

SEE 3/A421 FOR

TYPICAL ENLARGED

UNIT PLAN

SEE 3/A422 FOR

TYPICAL ENLARGED

UNIT PLAN

SEE 3/A422 FOR

TYPICAL ENLARGED

UNIT PLAN

SEE 1/A423 FOR

TYPICAL ENLARGED

UNIT PLAN

SEE 1/A423 FOR

TYPICAL ENLARGED

UNIT PLAN

SEE 3/A423 FOR

TYPICAL ENLARGED

UNIT PLAN

SEE 1/A424 FOR

TYPICAL ENLARGED

UNIT PLAN SEE 1/A424 FOR

TYPICAL ENLARGED

UNIT PLAN

SEE 3/A424 FOR

TYPICAL ENLARGED

UNIT PLAN

SEE 3/A424 FOR

TYPICAL ENLARGED

UNIT PLAN

SEE 1/A425 FOR

TYPICAL ENLARGED

UNIT PLAN

SEE 3/A425 FOR

TYPICAL ENLARGED

UNIT PLAN

SEE 5/A425 FOR

TYPICAL ENLARGED

UNIT PLAN

SEE 1/A426 FOR

TYPICAL ENLARGED

UNIT PLAN

SEE 3/A426 FOR

TYPICAL ENLARGED

UNIT PLAN

EJ

EJ

EJ

EJ

A707 EJ

EJ

FE

FE

7"

7"

7"

12' - 0"6' - 10 7/8"

D2

D3

A515

SIM,

OPP

A515

A504

A504

A427

CONSTRUCTION LEGEND

PARTITION EXISTING

TO REMAIN

FE BRACKET MOUNTED

FIRE EXTINGUISHER

PARTITION, SEE

SCHEDULE FOR TYPE

EXISTING

OPENING TO

REMAIN

FIRE EXTINGUISHER

CABINET (SEMI-

RECESSED

FE

318' SLAB HEIGHT ABOVE

SEE LEVEL

A1

WINDOW TAG

WALL TAG

SF

1.01 KEYNOTE

EJ

BUILDING EXPANSION JOINT

N

DATE:

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT NAME:

CLIENT:

418 BEAVER STREET

SEWICKLEY, PA 15143

PH: 412.287.7333

www.aeworks.com

PROFESSIONAL:

COPYRIGHT 2024 BY AE WORKS LTD ALL RIGHTS RESERVED.

SUBMISSION:

CONSTRUCTION BID

DOCUMENTS

AE WORKS®

A u to d e s k D o c s

/A F

R H

-0

S h e ri d a n /A

F R

H -0

A R

C H

-2

.r v t

/1

/2

:3

:0

P

M

A102B

TW/AW

DC

AFRH-033

SECOND FLOOR PLAN B

AFRH SHERIDAN

RENOVATION

140 ROCK CREEK

CHURCH ROAD,

NORTHWEST,

WASHINGTON, DC

ARMED FORCES

RETIREMENT HOME -

WASHINGTON D.C.

11/13/241/8" = 1'-0"

SECOND FLOOR PLAN B

KEYNOTES

3.01 CAST IN PLACE CONCRETE STAIR WITH WALL MOUNTED HAND RAILING. SEE DETAILS

ON SHEET A401.

3.02 CAST IN PLACE CONCRETE SLAB, ALIGN WITH EXISTING. COORDINATE RECESS WITH

S-SERIES DWGS.

3.03 CAST IN PLACE CONCRETE RAMP. SEE DETAILS.

3.04 CAST IN PLACE CONCRETE INFILL OF EXISTING ATRIUM SPACE. SEE S-SERIES DWGS.

5.01 STRUCTURAL STEEL COLUMN. SEE S-SERIES DWGS.

5.02 8" DIA. BOLLARD - REFER TO DETAIL

5.03 METAL GUARD AND HANDRAIL SYSTEM, WELD TO EXISTING METAL STRINGERS. SEE

STAIR DETAILS.

5.04 METAL HAND RAIL (36" A.F.F.), WALL MOUNTED.

5.09 METAL UTILITY GAURDRAIL WITH 12" SEE STAIR DETAILS.

5.10 STRUCTURAL STEEL FRAMING ABOVE - REFER TO S-SERIES DWGS.

5.11 STEEL LADDER

7.11 ROOF WALKWAY PADS

7.12 STONE BALLAST BORDER

9.07 SAND, PRIME, PAINT, AND RECAULK.

11.01 VACUUM EQUIPMENT (BY OWNER)

11.02 FALL PROTECTION ANCHOR, TYPICAL

11.03 FALL PROTECTION ROOF ANCHOR POST CABLE SUPPORT, TYPICAL

11.04 FALL PROTECTION CABLE, TYPICAL

11.05 FALL PROTECTION ANCHOR, ANCHORED TO COLUMN

12.03 MOTORIZED WINDOW ROLLER SHADES (WRS-3), SEE FINISH LEGEND

12.04 FROSTED WINDOW FILM APPLIED TO INTERIOR WINDOW SURFACE, SEE FINISH

LEGEND

14.01 EXISTING ELEVATOR TO REMAIN

21.01 NEW STANDPIPE VALVE, REFER TO FP-SERIES DWGS.

22.01 LAUNDRY TUB SINK, REFER TO P-SERIES DWGS.

NO DATE REVISION

1 02/12/2025 BID ADDENDUM

GENERAL CONSTRUCTION NOTES

1. PARTITION TYPES: UNLESS OTHERWISE NOTED, NEW PARTITIONS SHALL BE TYPE A3.

AT EXISTING COLUMNS AND PERIMETER NEW PARTITIONS SHALL BE D3 UNLESS NOTED

OTHERWISE.

2. CONTRACTOR TO COORDINATE ALL BLOCKING FOR CASEWORK , ACCESSORIES, ETC.

3. PROVIDE ADEQUATE BACKUP AND BLOCKING FOR ALL WALL OR CEILING MOUNTED

EQUIPMENT, ARCHITECTURAL WOODWORK, HANDRAILS, LIGHTING, OR OTHER

MISCELLANEOUS ITEMS AS SHOWN ON DRAWINGS.

4. REFER TO REFLECTED CEILING PLANS FOR THE CEILING TYPE AND HEIGHT.

COORDINATE HEIGHTS OF GYPSUM BOARD WITH CEILING HEIGHT AND WITH PARTITION

DETAILS SHOWN HERE.

5. REFER TO FINISH SCHEDULE, INTERIOR ELEVATIONS, AND ARCHITECTURAL

CASEWORK DETAILS FOR WALL FINISHES AND WALL MOUNTED ACCESSORIES TO

COORDINATE BLOCKING REQUIREMENTS.

6. AT CERAMIC TILE, INSTALL CEMENTITIOUS BACKER BOARD. SHIM BACKER BOARD AS

REQUIRED TO RESULT IN A FLUSH TRANSITION TO NON-BACKER BOARD.

7. IN TOILET ROOMS, PROVIDE MOISTURE RESISTANT GYPSUM BOARD ON ALL WALLS.

8. PARTITION THICKNESS DIMENSIONS AS SHOWN ARE MINIMUM NOMINAL DIMENSIONS.

ACTUAL DIMENSIONS MAY DIFFER SLIGHTLY TO SUIT FIELD CONDITIONS.

Sheets
A102 - OVERALL SECOND FLOOR PLAN
A102B - SECOND FLOOR PLAN B
A112B - SECOND FLOOR REFLECTED CEILING PLAN B
A405 - CLINICAL AREAS/NURSE STATIONS - FIRST FLOOR
A406 - CLINICAL AREAS/ NURSE STATIONS - FIRST FLOOR
A407 - NORTH SERVERY
A408 - SOUTH SERVERY
A409 - ENLARGED TOILET ROOM PLANS AND ELEVATIONS
A412 - ENLARGED RESIDENT ROOM SHOWERS
A427 - SPA ROOMS AND LAUNDRY ROOMS
A601 - DOOR SCHEDULE, TYPES, DETAILS
A602 - DOOR SCHEDULE, TYPES, DETAILS
AI401 - ENTRANCE LOBBY FINISH PLAN AND ELEVATIONS
AI402 - FIRST FLOOR ELEVATOR LOBBY FINISH PLANS AND ELEVATIONS
AI403 - SERVERY FINISH PLAN AND ELEVATIONS
AI405 - FIRST FLOOR ENLARGED CORRIDOR PLANS AND ELEVATIONS
AI406 - FIRST FLOOR TOILET ROOM FINISH PLANS AND ELEVATIONS
AI408 - TYPICAL NORTH/ SOUTH ELEVATOR LOBBY FINISH PLANS (FLOORS 2-7)
AS-101 - FIRST FLOOR SIGNAGE PLAN
AS-102 - TYPICAL FLOOR SIGNAGE PLAN (FLOORS 2-7)

File details come from the government source that posted it. Updated .