About this file

This is a demolition plan drawing (AD100A) for the basement level of the Sheridan Building renovation project at the Armed Forces Retirement Home in Washington, DC. The drawing shows detailed demolition requirements for various spaces including a bowling alley, post office, mechanical rooms, storage areas, wood shops, hobby rooms, and locker rooms.

The plan includes specific demolition notes outlining requirements such as removal of foundation materials, windows, bowling alley equipment (to be salvaged), columns, plumbing fixtures, handrails, doors, floor/wall finishes, and ceiling systems. Key dimensional information and room numbers are provided throughout the drawing. The plan is dated February 12, 2025 and was prepared by AE Works Ltd. Notable spaces affected include a facility maintenance area, bowling alley with pin setting equipment, various corridors, mechanical/electrical rooms, and support spaces. The drawing includes both general demolition notes and specific keynotes detailing the scope and requirements for different demolition activities.

View the file

Other files

File Type Posted
Amendment 0006 Solicitation 47PM0325R0002 2025 03 25.pdf PDF
Amendment 0005 RFI Responses 150 - 336 2025 03 18.pdf PDF
Amendment 0005 Solicitation 47PM0325R0002 2025 03 18 (2).pdf PDF
Amendment 0004 Solicitation 47PM0325R0002 2025 03 13.pdf PDF
H103 - CHILLER PLANT.pdf PDF
Amendment 0003 Technical Evaluation Factors-Best Value_ Trade Off 2025 03 04.pdf PDF
Amendment 0003 Solicitation 47PM0325R0002 2025 03 04.pdf PDF
A517 - EXTERIOR PLAN DETAILS.pdf PDF
A516 - EXTERIOR PLAN DETAILS.pdf PDF
087113 - Automatic Door Operator.pdf PDF
079500 - Exterior Expansion Control.pdf PDF
A427 - SPA ROOMS AND LAUNDRY ROOMS.pdf PDF
084113 - Aluminum-Framed Entrances and Storefronts.pdf PDF
A406 - CLINICAL AREAS- NURSE STATIONS - FIRST FLOOR.pdf PDF
Amendment 0003 Solicitation_GC AFRH 2025 03 04.pdf PDF
236416 FL - Centrifugal Water Chillers- Addendum 3.pdf PDF
AI407 - TYPICAL ELEVATOR LOBBY FINISH PLANS AND ELEVATIONS (FLOORS 2-7).pdf PDF
107113 - Exterior Sun Control Devices.pdf PDF
088700 - Window Film.pdf PDF
AD100B - BASEMENT DEMOLITION PLAN B.pdf PDF
A405 - CLINICAL AREAS-NURSE STATIONS - FIRST FLOOR.pdf PDF
HD103 - CHILLER PLANT DEMO PLAN.pdf PDF
AI408 - TYPICAL NORTH- SOUTH ELEVATOR LOBBY FINISH PLANS (FLOORS 2-7).pdf PDF
A409 - ENLARGED TOILET ROOM PLANS AND ELEVATIONS.pdf PDF
087100 - Door Hardware.pdf PDF
101423.16 - Panel Signage.pdf PDF
A504 - EXTERIOR WALL SECTION DETAILS.pdf PDF
000110 Table of Contents.pdf PDF
H603 - HVAC DETAILS.pdf PDF
AFRH-Sheridan Pre-Bid Addendum 2-12-25.pdf PDF
081416 - Flush Wood Doors.pdf PDF
A601 - DOOR SCHEDULE TYPES DETAILS.pdf PDF
S542 - STRUCTURAL BALCONY ENCLOSURE DETAILS.pdf PDF
A560 - TYPICAL ROOF DETAILS.pdf PDF
A503 - EXTERIOR WALL SECTION DETAILS.pdf PDF
A602 - DOOR SCHEDULE TYPES DETAILS.pdf PDF
S521 - STRUCTURAL ANNEX FRAMING DETAILS.pdf PDF
095000 - Wood Panel Ceiling.pdf PDF
S552 - STRUCTURAL TRASH CHUTE GENERATOR ENCLSOURE BALCONY ENCLOSURE DETAILS.pdf PDF
Amendment 0003 RFI Responses 1-149 2025 03 04.pdf PDF
235700 FL - Heat Exchangers for HVAC.pdf PDF
S401 - STRUCTURAL ROOF FRAMING PARTIAL PLANS.pdf PDF
Amendment 0003 Solicitation 47PM0325R0002 2025 03 04.pdf PDF
H804 - CONTROL DIAGRAMS.pdf PDF
AEWLA22050. Geotechnical Report. 10142022.pdf PDF
A412 - ENLARGED RESIDENT ROOM SHOWERS.pdf PDF
089119 - Fixed Louvers.pdf PDF
A112B - SECOND FLOOR REFLECTED CEILING PLAN B.pdf PDF
AI406 - FIRST FLOOR TOILET ROOM FINISH PLANS AND ELEVATIONS.pdf PDF
A102B - SECOND FLOOR PLAN B.pdf PDF
Show 40 more

Latest 50 of 90 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2N

2N

3N

3N

4N

4N 5 6 7 8 10 12

14 15 16 17 18

N

M

L

K

J

H

G

F

E

D

C

B

A

HN

GN

FN

EN

DN

CN

BN

AN

NN

1N

1N

15.5 16.5

6.2

A.5

C.5

D.5

14.28.8

H.1

CORRIDOR

G111D

POST OFFICE

G111

VESTIBULE

G111C

STAIRS

G-1

SORTING

G111B

POSTAL SERVICE

G111A

MECHANICAL

G110

MECHANICAL

G107

WRAPPING RM

G105

ELEV EQUIP

G104

STOR

G106

BEAUTY SALON

G105A

STOR

G103

TOILET

G101

STORAGE

G102

CORRIDOR

G100

TRANSFORMER

ROOM

G001

LAUNDRY

G002

STAIRS

G-6

CORRIDOR

G003

MECHANICAL

G202

ELEC

G006

STORAGE

G004

WOMEN'S

G007JC

G008

CORRIDOR

G209

RESIDENT

COMPUTER GAME

ROOM

G211A

WOOD SHOP

G211

HOBBY ROOM

G206

FAN ROOM

G207

HOBBY ROOM

G205

WOOD SHOP

G210

PAINT ROOM

G213

STAIRS

G-2

WOOD SHOP

G208

STOR

G010

CORRIDOR

G011

STOR

G302

STOR

G304

CORRIDOR

G315JC

G306

EQUIP

G308

OFFICE

G312

STOR

G316

ELEC

G316A

MECHANICAL

G314

SAUNA

G311

SAUNA

G305

WOMEN'S

LOCKERS

G310

TOILETS

G309

TOILETS

G307

MEN'S LOCKERS

G303

STORAGE

G301

BANK

G014

ELEVATOR LOBBY

G013

STORAGE

G012A

P A

R T

B A

D

0B

P A

R T

A A

D

0A

17.8

5.5 17.5

D24

D3

D3 D2

TYP.

D1

D6D6

D5

D5

D5

D5

G315C

OFFICE

G315D

CONF/BREAKG315B

OFFICE

G315A

OFFICE/STORAGE

D4

TYP.

D4

TYP.

D8

D4

D24

TYP.

D2

TYP.

5.3

D4 D4

D4

TYP.

D6

D5

D5

D7

STAIRS

G-5

D7

D7

D7

D12

TYP.

D15

D15

D15

D15

D15

4'

5'

4'

4'

4'

5'

4'

4'

5'

4'

4'

5'

4'

4'

5'

4'

D17

D18

D18

7'

46' - 0"

8'

0"

23' - 5"

D18

D19

1/

2"

12' - 0" 2'

- 0

2'

D1

D1

4'

7'

7'

4'

4'

4'

4'

4'

D20

TYP.

D20

D20

TYP.

TYP.

61' - 2"11

38' - 11"

4'

4'

4' - 0"

7'

15' - 1" 4' - 0" 5' - 0" 4' - 0" 5' - 0" 4' - 0" 5' - 0" 4' - 0" 15' - 1"

4'

4'

G315

FACILITY

MAINTENANCE

AREA

P A

R T

B A

D

0B

P A

R T

A A

D

0A

D22

D22

76' - 2"

D18D18

G201

BOWLING ALLEY

G201A

PIN SETTING

D13

D23

D23

TYP.

TYP.

D1

D24

D24 D24

STORAGE

G012

D28

AD2036

AD202

AD201 2

AD203 5

NORTH LOADING

DOCK

G000

AD201

AD2034AD203 3

D7

AD301

AD301

R A

M P

R A

M P

D28

UP

1' - 1" 14' - 9" 2' - 2"

UP

UP

UP

D30

D17

AD301

A504

D32

D32

D32 D32

D32

D32

D32

D32

D32

D32

D32 D32

D32

D32

D32

D32

D33

DEMOLITION LEGEND

EXISTING TO REMAIN

DEMOLISH EXISTING CONSTRUCTION

N

DATE:

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT NAME:

CLIENT:

418 BEAVER STREET

SEWICKLEY, PA 15143

PH: 412.287.7333

www.aeworks.com

PROFESSIONAL:

COPYRIGHT 2024 BY AE WORKS LTD ALL RIGHTS RESERVED.

SUBMISSION:

CONSTRUCTION BID

DOCUMENTS

AE WORKS®

A u to d e s k D o c s

/A F

R H

-0

S h e ri d a n /A

F R

H -0

A R

C H

-2

.r v t

/1

/2

:1

:2

P

M

AD100A

TW

DC

AFRH-033

BASEMENT DEMOLITION

PLAN A

AFRH SHERIDAN

RENOVATION

140 ROCK CREEK

CHURCH ROAD,

NORTHWEST,

WASHINGTON, DC

ARMED FORCES

RETIREMENT HOME -

WASHINGTON D.C.

11/13/24

DEMOLITION KEYNOTES

D1 REMOVE EXISTING FOUNDATION AND ASPHALT/CONCRETE HARDSCAPE MATERIAL.

FOR NEW STRUCTURAL FOUNDATION WORK, SEE S-SERIES DWGS.

D2 REMOVE EXISTING WINDOW.

D3 REMOVE AND SALVAGE ALL BOWLING ALLEY FLOOR FINISHES, PIN SETTING

EQUIPMENT, GUTTERS, TRIM, WALL PANELS, BALL RETURN TRACK AND MECHANISM

AND ALL ASSOCIATED MATERIAL. PROVIDE ALL MATERIALS TO AFRH.

D4 REMOVE EXISTING COLUMN AND SURROUNDING FURRING, STUDS, DRYWALL AND

FINISHES. COORDINATE WITH S-SERIES DWGS AND PROVIDE ADEQUATE

TEMPORARY BRACING.

D5 REMOVE SINK, PLUMBING FIXTURES AND ASSOCIATED ITEMS. SEE P-SERIES.

D6 REMOVE TOILET AND ASSOCIATED PLUMBING. SEE P-SERIES DWGS.

D7 REMOVE HAND RAIL AND GAURD RAIL FROM EXISTING STRINGERS AND WALL

MOUNTS, STAIRS TO REMAIN.

D8 REMOVE EXISTING DOOR, FRAME, AND ASSOCIATED HARDWARE.

D9 CUT SLAB FOR TRASH CHUTE. SEE S-SERIES DWGS. FOR DETAILS.

D10 REMOVE ALL FLOOR AND WALL FINISHES, BASE, TRIM ETC DOWN TO EXISTING

CONSTRUCTION AND PREP FOR NEW FINISHES.

D11 REMOVE EXISTING BALCONY RAILING AS INDICATED, CURB TO REMAIN.

D12 REMOVE EXISTING STEEL BOLLARD.

D13 EXISTING ELECTRICAL EQUIPMENT TO REMAIN, PROTECT DURING DEMOLITION. SEE

E-SERIES DWGS.

D14 REMOVE EXISTING VESTIBULE INCLUDING ROOF, WALL PANELS AND ALL

ASSOCIATED SUPPORT STRUCTURE.

D15 SALVAGE 4" THICK LIMESTONE PANEL (AND GRANITE PANEL WHEN PRESENT).

REMOVE CMU, LINTEL, WINDOW AND ASSOCIATED SUPPORT ITEMS WITHIN

PORTION OF WALL INDICATED .

D16 REMOVE MECHANICAL DUCTWORK AND EQUIPMENT. SEE M-SERIES DWGS.

D17 REMOVE EXISTING EXTERIOR BULKHEAD ABOVE THIS PASSAGEWAY. SALVAGE

LIMESTONE PANELS FOR REUSE, REMOVE SOFFIT, INTERNAL SUPPORT, LIGHT

FIXTURES, MECHANICAL DUCTWORK, GRILLES AND CEILING MOUNTED ITEMS.

D18 REMOVE CONCRETE RAMP AND WALL MOUNTED RAILING.

D19 REMOVE STRUCTURAL STEEL FRAMING, SOFFIT AND ASSOCIATED

LIMESTONE/GRANITE WALL PANELS ABOVE. SEE S-SERIES DWGS.

D20 REMOVE FINISHES DOWN TO EXISTING CMU OR CONCRETE COL., TYPICAL AT ALL

EXTERIOR WALL LOCATIONS.

D22 PROVIDE WEATHER RESISTANT BARRIER DURING DEMOLITION UNTIL NEW

CONSTRUCTION IS WEATHER TIGHT.

D23 APPLY VAPOR BARRIER ON WOOD FURRING @ 24" O.C. TO CMU WALL DURING

DEMOLITION PHASE.

D24 REMOVE EXISTING SLAB AND SURROUNDING PAVEMENT, SEE S-SERIES DWGS.

D25 REMOVE ROOF MOUNTED EQUIPMENT, ROOF MEMBRANE, BALLAST ASSOCIATED

MATERIAL AND ROOF STRUCTURE IN IT'S ENTIRETY, SEE S-SERIES DWGS.

D26 REMOVE EXISTING CONT. CONCRETE CURB.

D27 REMOVE EXISTING FLOOR DRAIN IN BALCONY, CAP DRAIN LINE AND FILL WITH

CONCRETE TOPPING, SEE P AND S-SERIES DWGS.

D28 REMOVE EXISTING CONCRETE STAIR, LANDING AND GAURDRAILING.

D29 EXISTING BUILDING EXPANSION JOINT, REMOVE COVER PLATE AND PREP AREA

FOR NEW JOINT MATERIAL/COVER IN NEW WORK.

D30 REMOVE EXISTING ROOF LADDER AND CAGE ABOVE.

D31 REMOVE WINDOW AND LOWER PORTION OF WALL TO ALLOW FOR NEW DOOR AND

FRAME INSTALLATION IN NEW WORK.

D32 REMOVE ACOUSTICAL CEILING TILE GRID SYSTEM, GYP BOARD BULKHEADS,

CEILING MOUNTED DEVICES, LIGHT FIXTURES, AND ALL ASSOCIATED SUPPORT

STRUCTURE IN THIS ROOM.

D33 REMOVE HARD PLASTER/GYP BOARD CEILING, CEILING MOUNTED DEVICES, LIGHT

FIXTURES, AND ALL ASSOCIATED SUPPORT STRUCTURE IN THIS ROOM.

1/8" = 1'-0"

BASEMENT - DEMOLITION PLAN A

NO DATE REVISION

1 02/12/2025 BID ADDENDUM

Sheets
AD100A - BASEMENT DEMOLITION PLAN A

File details come from the government source that posted it. Updated .