About this file

This is a bid addendum issued by AE Works revising drawings and specifications for the Armed Forces Retirement Home Sheridan Building renovation project (Project No. AFRH-040). The addendum includes extensive updates to 41 architectural, structural, and mechanical drawings covering basement demolition, floor plans, clinical areas, servery spaces, toilet rooms, exterior details, and HVAC systems. Notable changes include revised details for balcony enclosures, trash chutes, and generator enclosures; updates to clinical area finishes and wall details; and additions of chiller plant demolition and new work plans.

The addendum also modifies 16 specification sections, including changes to air barriers, expansion control, wood doors, glazing, signage, and HVAC equipment. Key specification updates include adding stile and rail doors, revising hardware sets, updating glazing schedules, adding new sections for automatic door operators and fixed louvers, and incorporating reference specifications for hydronic pumps, heat exchangers, and centrifugal water chillers that were provided under separate procurement. The changes particularly focus on exterior envelope details, interior finishes, and mechanical systems integration.

View the file

Other files

File Type Posted
Amendment 0006 Solicitation 47PM0325R0002 2025 03 25.pdf PDF
Amendment 0005 RFI Responses 150 - 336 2025 03 18.pdf PDF
Amendment 0005 Solicitation 47PM0325R0002 2025 03 18 (2).pdf PDF
Amendment 0004 Solicitation 47PM0325R0002 2025 03 13.pdf PDF
H103 - CHILLER PLANT.pdf PDF
Amendment 0003 Technical Evaluation Factors-Best Value_ Trade Off 2025 03 04.pdf PDF
Amendment 0003 Solicitation 47PM0325R0002 2025 03 04.pdf PDF
A517 - EXTERIOR PLAN DETAILS.pdf PDF
A516 - EXTERIOR PLAN DETAILS.pdf PDF
087113 - Automatic Door Operator.pdf PDF
079500 - Exterior Expansion Control.pdf PDF
A427 - SPA ROOMS AND LAUNDRY ROOMS.pdf PDF
084113 - Aluminum-Framed Entrances and Storefronts.pdf PDF
A406 - CLINICAL AREAS- NURSE STATIONS - FIRST FLOOR.pdf PDF
AD100A - BASEMENT DEMOLITION PLAN A.pdf PDF
Amendment 0003 Solicitation_GC AFRH 2025 03 04.pdf PDF
236416 FL - Centrifugal Water Chillers- Addendum 3.pdf PDF
AI407 - TYPICAL ELEVATOR LOBBY FINISH PLANS AND ELEVATIONS (FLOORS 2-7).pdf PDF
107113 - Exterior Sun Control Devices.pdf PDF
088700 - Window Film.pdf PDF
AD100B - BASEMENT DEMOLITION PLAN B.pdf PDF
A405 - CLINICAL AREAS-NURSE STATIONS - FIRST FLOOR.pdf PDF
HD103 - CHILLER PLANT DEMO PLAN.pdf PDF
AI408 - TYPICAL NORTH- SOUTH ELEVATOR LOBBY FINISH PLANS (FLOORS 2-7).pdf PDF
A409 - ENLARGED TOILET ROOM PLANS AND ELEVATIONS.pdf PDF
087100 - Door Hardware.pdf PDF
101423.16 - Panel Signage.pdf PDF
A504 - EXTERIOR WALL SECTION DETAILS.pdf PDF
000110 Table of Contents.pdf PDF
H603 - HVAC DETAILS.pdf PDF
081416 - Flush Wood Doors.pdf PDF
A601 - DOOR SCHEDULE TYPES DETAILS.pdf PDF
S542 - STRUCTURAL BALCONY ENCLOSURE DETAILS.pdf PDF
A560 - TYPICAL ROOF DETAILS.pdf PDF
A503 - EXTERIOR WALL SECTION DETAILS.pdf PDF
A602 - DOOR SCHEDULE TYPES DETAILS.pdf PDF
S521 - STRUCTURAL ANNEX FRAMING DETAILS.pdf PDF
095000 - Wood Panel Ceiling.pdf PDF
S552 - STRUCTURAL TRASH CHUTE GENERATOR ENCLSOURE BALCONY ENCLOSURE DETAILS.pdf PDF
Amendment 0003 RFI Responses 1-149 2025 03 04.pdf PDF
235700 FL - Heat Exchangers for HVAC.pdf PDF
S401 - STRUCTURAL ROOF FRAMING PARTIAL PLANS.pdf PDF
Amendment 0003 Solicitation 47PM0325R0002 2025 03 04.pdf PDF
H804 - CONTROL DIAGRAMS.pdf PDF
AEWLA22050. Geotechnical Report. 10142022.pdf PDF
A412 - ENLARGED RESIDENT ROOM SHOWERS.pdf PDF
089119 - Fixed Louvers.pdf PDF
A112B - SECOND FLOOR REFLECTED CEILING PLAN B.pdf PDF
AI406 - FIRST FLOOR TOILET ROOM FINISH PLANS AND ELEVATIONS.pdf PDF
A102B - SECOND FLOOR PLAN B.pdf PDF
Show 40 more

Latest 50 of 90 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 Making Building Projects a Better Value aeworks.com

Armed Forces

Retirement Home

Project No.

AFRH-040

Armed Forces Retirement Home

Sheridan Building Bid Addendum

02.12.25

This Revision amends Drawings for the above titled project, as indicated below, and is hereby incorporated into the Contract Documents as part thereof.

Attachments:

Drawing(s):

• G001 – Cover Sheet

• S401 – Structural Roof Framing Partial Plans

• S521 – Structural Annex Framing Details

• S542 – Structural Balcony Enclosure Details

• S552 – Structural Trash Chute, Generator Enclosure, Balcony Enclosure Details

• AD100 – Overall Basement Demolition Plan

• AD100A – Basement Demolition Plan A

• AD100B – Basement Demolition Plan B

• AD101 – Overall First Floor Demolition Plan

• A102 – Overall Second Floor Plan

• A102B – Second Floor Plan B

• A112B – Second Floor Reflected Ceiling Plan B

• A405 – Clinical Areas/ Nurse Stations – First Floor

• A406 – Clinical Areas/ Nurse Stations – First Floor

• A407 – North Servery

• A408 – South Servery

• A409 – Enlarged Toilet Room Plans and Elevations

• A412 – Enlarged Toilet Room Plans and Elevations

• A427 – Spa Rooms and Laundry Rooms

• A503 – Exterior Wall Section Details

• A504 – Exterior Wall Section Details

• A516 – Exterior Plan Details

• A560 – Typical Roof Details

• A570 – Exterior Expansion Joint Diagrams

• A601 – Door Schedule, Types, Details

• A602 – Door Schedule, Types, Details

2 Making Building Projects a Better Value aeworks.com

Retirement Home

Project No.

AFRH-040

• AI401 – Entrance Lobby Finish Plan and Elevations

• AI402 – First Floor Elevator Lobby Finish Plans

• AI403 – Servery Finish Plan and Elevations

• AI405 - First Floor Enlarged Corridor Plans and Elevations

• AI406 - First Floor Toilet Room Finish Plans and Elevations

• AI407 – Typical Elevator Lobby Finish Plans and Elevations

• AI408 – Typical Enlarged Corridors and Elevations

• AS101 – First Floor Signage Plan

• AS102 – Typical Floor Signage Plan (Floors 2-7)

• HD103 – Chiller Plan Demo Plan

• H103 – New Chiller Plant Plan

• H603 - HVAC Details

• H701- HVAC Schedules

• H702- HVAC Schedules

• H804 – Control Diagrams

Specifications:

• 072713 Modified Bituminous Sheet Air Barrier

• 079500 Exterior Expansion Control

• 081416 Flush Wood Doors

• 084113 Aluminum Framed Entrance and Storefronts

• 087100 Door Hardware

• 087113 Automatic Door Operator

• 088000 Glazing

• 088125 Silicone Coated Spandrel Glass

• 088700 Window Film

• 089119 Fixed Louver

• 095000 Wood Panel Ceiling

• 101423.16 Panel Signage

• 107113 Exterior Sun Control Devices

• 232123 Hydronic Pumps

• 235700 Heat Exchangers for HVAC

• 236416 Centrifugal Water Chillers

DRAWINGS

3 Making Building Projects a Better Value aeworks.com

Retirement Home

Project No.

AFRH-040

1. G001 – COVER SHEET

a. DRAWING G001- COVER SHEET has been revised and is being reissued as an attachment to this Bid Addendum

i. Sheet List updated to include new sheet submissions

2. S401 – STRUCTURAL ROOF FRAMING PARTIAL PLANS

a. S401 – STRUCTURAL ROOF FRAMING PARTIAL PLANS has been revised and is being reissued as an attachment to this Bid Addendum

i. Additional section details are now included in the plan.

3. S521 – STRUCTURAL ANNEX FRAMING DETAILS

a. S521 – STRUCTURAL ANNEX FRAMING DETAILS has been revised and is being reissued as an attachment to this Bid Addendum

i. Revised details 5 and 6.

4. S542 – STRUCTURAL BALCONY ENCLOSURE DETAILS

a. S542 – STRUCTURAL BALCONY ENCLOSURE DETAILS has been

Addendum

i. Revised detail 10.

5. S552 – STRUCTURAL TRASH CHUTE, GENERATOR ENCLOSURE,

BALCONY ENCLOSURE DETAILS

a. S552 – STRUCTURAL TRASH CHUTE, GENERATOR ENCLOSURE, BALCONY ENCLOSURE DETAILS has been revised and is being reissued as an attachment to this Bid Addendum

i. Included new details 10, 11, 12, 13.

6. AD100 – OVERALL BASEMENT DEMOLITION PLAN

a. AD100 – OVERALL BASEMENT DEMOLITION PLAN has been revised and is being reissued as an attachment to this Bid Addendum

i. Revised general demolition note 15.

7. AD100A - BASEMENT DEMOLITION PLAN A

a. AD100A – BASEMENT DEMOLTITION PLAN A has been revised and is being reissued as an attachment to this Bid Addendum

i. Add demolition keynotes D32 and D33.

4 Making Building Projects a Better Value aeworks.com

Retirement Home

Project No.

AFRH-040

8. AD100B - BASEMENT DEMOLITION PLAN B

a. AD100B – BASEMENT DEMOLITION PLAN B has been revised and is being reissued as an attachment to this Bid Addendum

i. Add demolition keynotes D32 and D33.

9. AD101 - OVERALL FIRST FLOOR DEMOLITION PLAN

a. AD100 – OVERALL FIRST FLOOR DEMOLITION PLAN has been revised and is being reissued as an attachment to this Bid Addendum

i. Revised general demolition note 15.

10. A102 – OVERALL SECOND FLOOR PLAN

a. A102 -OVERALL SECOND FLOOR PLAN has been revised and is being reissued as an attachment to this Bid Addendum

i. Updates made to SPA 2414

11. A102B –SECOND FLOOR PLAN B

a. A102B -OVERALL SECOND FLOOR PLAN B has been revised and is being reissued as an attachment to this Bid Addendum

12. A112B - SECOND FLOOR REFLECTED CEILING PLAN B

a. A112B-SECOND FLOOR REFLECTED CEILING PLAN B has been

13. A405 – CLICNICAL AREALS/ NURSE STATION – FIRST FLOOR

a. A405 - CLICNICAL AREALS/ NURSE STATION – FIRST FLOOR has been revised and is being reissued as an attachment to this Bid

i. Elevation markers to clarify wall finishes added to Enlarged Clinical Areas Plans

14. A406 – CLICNICAL AREALS/ NURSE STATION – FIRST FLOOR

5 Making Building Projects a Better Value aeworks.com

Retirement Home

Project No.

AFRH-040

a. A406 - CLICNICAL AREALS/ NURSE STATION – FIRST FLOOR

i. Elevation markers to clarify wall finishes added to Toilet

15. A407 – NORTH SERVERY

a. A407 – NORTH SERVERY has been revised and is being reissued as an attachment to this Bid Addendum

i. Elevations include notes about locks on cabinets and drawers

ii. Redundant EQ-# removed

16. A408 – SOUTH SERVERY

a. A408 – SOUTH SERVERY has been revised and is being reissued

i. EQ- 30, 31 AND 32 tagged to match North Servery

17. A409 – ENLARGED TOILET ROOM PLANS AND ELEVATIONS

a. A409 – ENLARGED TOILET ROOM PLANS AND ELEVATIONS has been revised and is being reissued as an attachment to this Bid Addendum

i. Accessory Schedule has been updated.

18. A412 – ENLARGED TOILET ROOM PLANS AND ELEVATIONS

a. A412 – ENLARGED TOILET ROOM PLANS AND

i. Accessory Schedule and Detail 10 has been updated.

19. A427 – SPA ROOMS AND LAUNDRY ROOMS

a. A427 – SPA ROOMS AND LAUNDRY ROOMS has been revised and is being reissued as an attachment to this Bid Addendum

i. Accessory Schedule has been updated.

ii. References to wall finishes on elevations and plans have

6 Making Building Projects a Better Value aeworks.com

Retirement Home

Project No.

AFRH-040

been updated.

20. A503 – EXTERIOR WALL SECTION DETAILS

a. A503 – EXTERIOR WALL SECTION DETAILS has been revised and

i. Revised detail 7 to add curb wall for pre-compressed foam joint

21. A504 – EXTERIOR WALL SECTION DETAILS

a. A504 – EXTERIOR WALL SECTION DETAILS has been revised and

i. Revised details 1, 14, and 15 to add curb wall for pre-compressed foam joint

22. A516 – EXTERIOR PLAN DETAILS

a. A516 – EXTERIOR PLAN DETAILS has been revised and is being reissued as an attachment to this Bid Addendum

i. Revised detail 4 to include expansion joint

23. A517 – EXTERIOR PLAN DETAILS

a. A517 – EXTERIOR PLAN DETAILS has been revised and is being

i. Revised detail 3 to include expansion joint

24. A560 – EXTERIOR TYPICAL ROOF DETAILS

a. A560 – EXTERIOR TYPICAL ROOF DETAILS has been revised and

i. Added details for expansion joints at roof and existing parapet, added detail at standing seam roof and metal panel wall, revised detail at expansion joint of standing seam roof

25. A570 – EXTERIOR EXPANSION JOINT DIAGRAMS

a. A570 – EXTERIOR EXPANSION JOINT DIAGRAMS has been

Addendum

i. Added sheet to illustrate exterior expansion joint locations and reference details

26. A601 – DOOR SCHEDULE, TYPES, DETAILS

7 Making Building Projects a Better Value aeworks.com

Retirement Home

Project No.

AFRH-040

a. A601 – DOOR SCHEDULE, TYPES, DETIALS has been revised and

i. Added Details J6, H5 and H4.

ii. Added door and paint finishes.

27. A602 – DOOR SCHEDULE, TYPES, DETAILS

a. A602 – DOOR SCHEDULE, TYPES, DETIALS has been revised and

i. Added door and paint finishes.

28. AI401 – ENTRANCE LOBBY FINISH PLAN AND ELEVATIONS

a. AI401 – ENTRANCE LOBBY FINISH PLAN AND ELEVATIONS has

i. Finish tag updated for Vestibule 1019A

29. AI402 – FIRST FLOOR ELEVATOR LOBBY FINISH PLANS

a. AI402 – FIRST FLOOR ELEVATOR LOBBY FINISH PLANS has

i. Finish tags added to Elevator Lobby Plans

30. AI403 – SERVERY FINISH PLAN AND ELEVATIONS

a. AI403 – SERVERY FINISH PLAN AND ELEVATIONS has been

i. Added elevations 7 through 12 for Clinical Area Finishes

ii. Clarified Servery wallcovering on column

31. AI405 – FIRST FLOOR ENLARGED COORIDOR PLANS AND

ELEVATIONS

a. AI405 – FIRST FLOOR ENLARGED COORIDOR PLANS AND

i. Updated expansion joint locations and details

8 Making Building Projects a Better Value aeworks.com

Retirement Home

Project No.

AFRH-040

ii. Updated signage on elevations

32. AI406 – TYPICAL ELEVATOR LOBBY FINISH PLANS AND ELEVATIONS

a. AI407 – TYPICAL ELEVATOR LOBBY FINISH PLANS AND

i. Updated Elevation Reference

ii. Updated Wall Tile Dimensions

33. AI407 – TYPICAL ELEVATOR LOBBY FINISH PLANS AND ELEVATIONS

a. AI407 – TYPICAL ELEVATOR LOBBY FINISH PLANS AND

i. Added room name and number for clarity.

34. AI408 – TYPICAL ENLARGED COORIDORS AND ELEVATIONS

a. AI408 – TYPICAL ENLARGED COORIDORS AND ELEVATIONS

i. Added room name and number for clarity.

35. AS101 – FIRST FLOOR SIGNAGE PLAN

a. AS101 – FIRST FLOOR SIGNAGE PLAN has been revised and is

i. Removed references to VA Design Guide

36. AS102 – TYPICAL FLOOR SIGNAGE PLAN (FLOORS 2-7)

a. AS102 – TYPICAL FLOOR SIGNAGE PLAN (FLOORS 2-7) has

i. Removed references to VA Design Guide

37. HD103 – CHILLER PLANT DEMO PLAN

a. HD103 – CHILLER PLANT DEMO PLAN has been revised and is

9 Making Building Projects a Better Value aeworks.com

Retirement Home

Project No.

AFRH-040

being reissued as an attachment to this Bid Addendum

i. Cooling Tower Building Demo Plan has been added along with associated keynotes and key plan

38. H103 – NEW CHILLER PLANT PLAN

a. HD103 – NEW CHILLER PLANT PLAN has been revised and is

i. Cooling Tower Building New Work Plan has been added along with associated keynotes and key plan.

39. H603 – HVAC DETAILS

a. H603 – HVAC DETAILS has been revised and is being reissued as an attachment to this Bid Addendum

i. Chiller System Flow Diagram has been added

40. H702 – HVAC SCHEDULES

a. H702 – HVAC SCHEDULES has been revised and is being reissued

i. Chiller-associated schedules have been added and are to be Government Furnished / Contractor Installed

41. H804 – CONTROL DIAGRAMS

a. H804 – CONTROL DIAGRAMS has been revised and is being

i. Chiller controls, sequences, and points list have been added

SPECIFICATIONS

1. SPECIFICATION 072713 – Modified Bituminous Sheet Air Barrier

A. SPECIFICATION 072713 – Modified Bituminous Sheet Air Barrier is being provided as part this Bid Addendum

1. Added product to 2.4.D.

2. SPECIFICATION 079500 - Exterior Expansion Control

A. SPECIFICATION 079500 - Exterior Expansion Control is being provided as part this Bid Addendum

10 Making Building Projects a Better Value aeworks.com

Retirement Home

Project No.

AFRH-040

1. Revised products to 2.2 C. D. and E.

3. SPECIFICATION 081416 – Flush Wood Doors

A. SPECIFICATION 081416 – Flush Wood Doors is being provided as part this Bid Addendum

1. Added Stile and Rail Doors

4. SPECIFICATION 084113 – Aluminum Framed Entrance and Storefronts

A. SPECIFICATION 084113 – Aluminum Framed Entrance and Storefronts is being provided as part this Bid Addendum

1. Revised 2.1 PERFORMANCE REQUIREMENTS

5. SPECIFICATION 087100 – Door Hardware

A. SPECIFICATION 087100 – Door Hardware is being provided as part this Bid Addendum

1. Revised Hardware Sets 18, 19, and 20

6. SPECIFICATION 087113 – Automatic Door Operator

A. SPECIFICATION 087113 – Automatic Door Operator is being provided as part this Bid Addendum

1. New Section

7. SPECIFICATION 088000 – Glazing

A. SPECIFICATION 088000 – Glazing is being provided as part this Bid Addendum

1. Revised Glazing Schedule

8. SPECIFICATION 088125 – Silicone Coated Spandrel Glass

A. SPECIFICATION 088125 – Silicone Coated Spandrel Glass is being provided as part this Bid Addendum

1. Section deleted

9. SPECIFICATION 088700 – Window Film

A. SPECIFICATION 088700 – Window Film is being provided as part this Bid Addendum

1. Revised 2.1 A. Basis of Design

10. SPECIFICATION 089119 – Fixed Louver

A. SPECIFICATION 089119 – Fixed Louver is being provided as part this Bid Addendum

1. New section

11 Making Building Projects a Better Value aeworks.com

Retirement Home

Project No.

AFRH-040

11. SPECIFICATION 095000 – Wood Panel Ceiling

A. SPECIFICATION 095000 – Wood Panel Ceiling is being provided as part this Bid Addendum

1. Revised 2.2 A. 12. Acceptable Product:

12. SPECIFICATION 101423.16 – Panel Signage

A. SPECIFICATION 101423.16 – Panel Signage is being provided as part this Bid Addendum

1. New section

13. SPECIFICATION 107113 - Exterior Sun Control Devices

A. SPECIFICATION 107113 - Exterior Sun Control Devices is being provided as part this Bid Addendum

1. Added 1.1 b. Versoleil for storefront

14. SPECIFICATION 232123 – HYDRONIC PUMPS

A. SPECIFICATION 232123 – HYDRONIC PUMPS is being provided as part this Bid Addendum

1. Spec Section was provided in separate procurement contract. Section is for contractor reference.

15. SPECIFICATION 235700 – HEAT EXCHANGERS FOR HVAC

A. SPECIFICATION 235700 – HEAT EXCHANGERS FOR HVAC is being provided as part this Bid Addendum

1. Spec Section was provided in separate procurement contract. Section is for contractor reference.

16. SPECIFICATION 236416 – CENTRIFUGAL WATER CHILLERS

A. SPECIFICATION 236416 – CENTRIFUGAL WATER CHILLERS is being provided as part this Bid Addendum

1. Spec Section was provided in separate procurement contract. Section is for contractor reference.

File details come from the government source that posted it. Updated .