This is a door schedule drawing (A602) detailing specifications for doors on the second and third floors of the Armed Forces Retirement Home Sheridan Building renovation project in Washington DC. The schedule provides comprehensive specifications for over 100 doors, including door numbers, dimensions, materials, finishes, hardware sets, and fire ratings.

The doors are primarily 3'0" x 7'0" with some variations up to 3'6" width. Most doors are specified as wood (WD) or hollow metal (HM) construction with P-11A finish and HM frames with P-2 or P-11B finishes. Fire ratings are predominantly 3/4 HR or 1.5 HR, and many doors require card access control. The schedule includes details for both corridor-facing doors and interior unit doors, with specific hardware sets ranging from 2.0 to 25.0. Special notes indicate locations where corridor doors (P-2 finish) interface with unit interior doors (P-11B finish). The drawing was issued as part of the construction bid documents dated February 18, 2025, by AE Works.

View the file

Other files

File Type Posted
Amendment 0006 Solicitation 47PM0325R0002 2025 03 25.pdf PDF
Amendment 0005 RFI Responses 150 - 336 2025 03 18.pdf PDF
Amendment 0005 Solicitation 47PM0325R0002 2025 03 18 (2).pdf PDF
Amendment 0004 Solicitation 47PM0325R0002 2025 03 13.pdf PDF
H103 - CHILLER PLANT.pdf PDF
Amendment 0003 Technical Evaluation Factors-Best Value_ Trade Off 2025 03 04.pdf PDF
Amendment 0003 Solicitation 47PM0325R0002 2025 03 04.pdf PDF
A517 - EXTERIOR PLAN DETAILS.pdf PDF
A516 - EXTERIOR PLAN DETAILS.pdf PDF
087113 - Automatic Door Operator.pdf PDF
079500 - Exterior Expansion Control.pdf PDF
A427 - SPA ROOMS AND LAUNDRY ROOMS.pdf PDF
084113 - Aluminum-Framed Entrances and Storefronts.pdf PDF
A406 - CLINICAL AREAS- NURSE STATIONS - FIRST FLOOR.pdf PDF
AD100A - BASEMENT DEMOLITION PLAN A.pdf PDF
Amendment 0003 Solicitation_GC AFRH 2025 03 04.pdf PDF
236416 FL - Centrifugal Water Chillers- Addendum 3.pdf PDF
AI407 - TYPICAL ELEVATOR LOBBY FINISH PLANS AND ELEVATIONS (FLOORS 2-7).pdf PDF
107113 - Exterior Sun Control Devices.pdf PDF
088700 - Window Film.pdf PDF
AD100B - BASEMENT DEMOLITION PLAN B.pdf PDF
A405 - CLINICAL AREAS-NURSE STATIONS - FIRST FLOOR.pdf PDF
HD103 - CHILLER PLANT DEMO PLAN.pdf PDF
AI408 - TYPICAL NORTH- SOUTH ELEVATOR LOBBY FINISH PLANS (FLOORS 2-7).pdf PDF
A409 - ENLARGED TOILET ROOM PLANS AND ELEVATIONS.pdf PDF
087100 - Door Hardware.pdf PDF
101423.16 - Panel Signage.pdf PDF
A504 - EXTERIOR WALL SECTION DETAILS.pdf PDF
000110 Table of Contents.pdf PDF
H603 - HVAC DETAILS.pdf PDF
AFRH-Sheridan Pre-Bid Addendum 2-12-25.pdf PDF
081416 - Flush Wood Doors.pdf PDF
A601 - DOOR SCHEDULE TYPES DETAILS.pdf PDF
S542 - STRUCTURAL BALCONY ENCLOSURE DETAILS.pdf PDF
A560 - TYPICAL ROOF DETAILS.pdf PDF
A503 - EXTERIOR WALL SECTION DETAILS.pdf PDF
S521 - STRUCTURAL ANNEX FRAMING DETAILS.pdf PDF
095000 - Wood Panel Ceiling.pdf PDF
S552 - STRUCTURAL TRASH CHUTE GENERATOR ENCLSOURE BALCONY ENCLOSURE DETAILS.pdf PDF
Amendment 0003 RFI Responses 1-149 2025 03 04.pdf PDF
235700 FL - Heat Exchangers for HVAC.pdf PDF
S401 - STRUCTURAL ROOF FRAMING PARTIAL PLANS.pdf PDF
Amendment 0003 Solicitation 47PM0325R0002 2025 03 04.pdf PDF
H804 - CONTROL DIAGRAMS.pdf PDF
AEWLA22050. Geotechnical Report. 10142022.pdf PDF
A412 - ENLARGED RESIDENT ROOM SHOWERS.pdf PDF
089119 - Fixed Louvers.pdf PDF
A112B - SECOND FLOOR REFLECTED CEILING PLAN B.pdf PDF
AI406 - FIRST FLOOR TOILET ROOM FINISH PLANS AND ELEVATIONS.pdf PDF
A102B - SECOND FLOOR PLAN B.pdf PDF
Show 40 more

Latest 50 of 90 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATE:

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT NAME:

CLIENT:

418 BEAVER STREET

SEWICKLEY, PA 15143

PH: 412.287.7333

www.aeworks.com

PROFESSIONAL:

COPYRIGHT 2024 BY AE WORKS LTD ALL RIGHTS RESERVED.

SUBMISSION:

CONSTRUCTION BID

DOCUMENTS

AE WORKS

A u to d e s k D o c s

/A F

R H

-0

S h e ri d a n /A

F R

H -0

A R

C H

-2

.r v t

/1

/2

:4

:5

P

M

A602

AEW

Checker

AFRH-033

DOOR SCHEDULE,

TYPES, DETAILS

AFRH SHERIDAN

RENOVATION

140 ROCK CREEK

CHURCH ROAD,

NORTHWEST,

WASHINGTON, DC

ARMED FORCES

RETIREMENT HOME -

WASHINGTON D.C.

11/13/24

3-7 FLOOR DOOR SCHEDULE

DOOR

NUMBER

PAIR

OF

DOORS WIDTH

DOOR FRAME

Head Detail Jamb Detail HW Set

FIRE

RATING

CARD

ACCESS HUB

E407

DETAIL

# COMMENTSHEIGHT TYPE MATERIAL FINISH TYPE MATERIAL FINISH

THIRD FLOOR

3-1 3' - 0" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 7.0 1.5 HR No

3-2 3' - 0" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 7.0 1.5 HR No

3-3 3' - 0" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 7.0 1.5 HR No

3-4 3' - 0" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 7.0 1.5 HR No

3-5 3' - 0" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 7.0 1.5 HR No

3-6 3' - 0" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 7.0 1.5 HR No

3-7 3' - 0" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 7.0 1.5 HR No

3000 3' - 6" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 25.0 1.5 HR No 10

3000A 3' - 6" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 25.0 1.5 HR No 10

3001 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 3-2 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3002 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 3-2 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3003 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 3-3 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3004 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 3-3 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3005 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 3-3 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3006 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 3-3 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3007 3' - 4" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 3-9 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3008 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 3-9 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3009 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 3-8 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3010 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 3-8 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3011 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 3-8 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3012 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 3-8 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3013 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 3-7 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3014 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 3-7 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3016 3' - 0" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 10.0 3/4 HR Yes 3-3 3

3017 PR 3' - 2" 7' - 0" F HM P-11A F3 HM P-2 H1 J1 6.0 3/4 HR No

3017A PR 3' - 2" 7' - 0" F HM P-11A F3 HM P-2 H1 J1 6.0 3/4 HR No

3018 PR 3' - 2" 7' - 0" F WD P-11A F3 HM P-2 H1 J1 12.0 3/4 HR No

3019 3' - 0" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 10.0 3/4 HR Yes 3-8 3

3020 3' - 0" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 10.0 3/4 HR Yes 3-8 3

3101 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 3-2 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3102 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 3-2 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3103 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 3-2 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3104 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 3-1 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3105 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 3-1 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3106 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 3-1 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3107 3' - 6" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 3-1 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3108 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 3-1 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3109 3' - 0" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 9.0 3/4 HR No

3110 3' - 0" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 9.0 3/4 HR No

3111 3' - 4" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 9.0 3/4 HR Yes 3-2 3

3112 PR 3' - 2" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 6.1 3/4 HR No 6 PANIC BAR

3113 3' - 4" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 9.0 3/4 HR Yes 3-2 3

3201 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 3-3 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3202 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 3-3 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3203 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 3-4 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3204 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 3-4 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3205 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 3-4 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3206 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 3-4 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3207 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 3-4 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3208 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 3-4 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3209 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 3-4 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3210 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 3-4 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3211 3' - 0" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 9.0 3/4 HR No

3301 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 3-8 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3302 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 3-8 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3303 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 3-5 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3304 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 3-5 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3305 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 3-5 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3306 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 3-5 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3307 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 3-5 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3308 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 3-5 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3309 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 3-5 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3310 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 3-5 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3311 3' - 0" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 9.0 3/4 HR No

3401 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-7 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3402 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-7 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3403 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-7 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3404 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-6 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3405 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-6 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3406 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-6 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3407 3' - 6" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-6 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3408 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-6 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

3409 3' - 0" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 13.0 3/4 HR No

3410 3' - 0" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 13.0 3/4 HR No

3411 3' - 0" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 9.0 3/4 HR Yes 3-7 3

3412 PR 3' - 2" 7' - 0" F WD P-11A F1 HM P-2 H1 J1 6.1 3/4 HR No 6 PANIC BAR

3413 3' - 0" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 9.0 3/4 HR Yes 3-7 3

3414 3' - 0" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 15.0 3/4 HR No

3414A 3' - 0" 7' - 0" F WD P-11A F1 HM P-2 H1 J1 14.0 3/4 HR No

SECOND FLOOR DOOR SCHEDULE

DOOR

NUMBER

PAIR

OF

DOORS WIDTH

DOOR FRAME

Head Detail Jamb Detail HW Set

FIRE

RATING

CARD

ACCESS HUB

E407

DETAIL # COMMENTSHEIGHT TYPE MATERIAL FINISH TYPE MATERIAL FINISH

SECOND FLOOR

2-1 3' - 0" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 7.0 1.5 HR No

2-2 3' - 0" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 7.0 1.5 HR No

2-3 3' - 0" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 7.0 1.5 HR No

2-4 3' - 0" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 7.0 1.5 HR No

2-5 3' - 0" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 7.0 1.5 HR No

2-6 3' - 0" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 7.0 1.5 HR No

2-7 3' - 0" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 7.0 1.5 HR No

2000 3' - 6" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 25.0 1.5 HR No 10

2000A 3' - 6" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 25.0 1.5 HR No 10

2000B 3' - 0" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 2.0 N/A Yes 8

2001 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-2 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2002 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-2 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2003 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-3 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2004 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-3 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2005 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-3 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2006 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-3 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2007 3' - 4" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-9 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2008 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-9 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2009 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-8 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2010 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-8 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2011 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-8 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2012 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-8 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2013 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-7 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2014 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-7 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2015 3' - 0" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 9.0 3/4 HR Yes 2-3 3

2016 3' - 0" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 9.0 3/4 HR Yes 2-3 3

2017 PR 3' - 2" 7' - 0" F HM P-11A F3 HM P-2 H1 J1 6.0 3/4 HR No

2017A PR 3' - 2" 7' - 0" F HM P-11A F3 HM P-2 H1 J1 6.0 3/4 HR No

2018 PR 3' - 2" 7' - 0" F WD P-11A F3 HM P-2 H1 J1 12.0 3/4 HR No

2019 3' - 0" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 9.0 3/4 HR Yes 2-8 3

2020 3' - 0" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 9.0 3/4 HR Yes 2-8 3

2021A 3' - 0" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 2.0 N/A Yes 8

2022A 3' - 0" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 2.0 N/A Yes 8

2101 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-2 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2102 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-2 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2103 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-2 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2104 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-1 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2105 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-1 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2106 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-1 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2107 3' - 6" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-1 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2108 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-1 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2109 3' - 0" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 9.0 3/4 HR No

2110 3' - 0" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 9.0 3/4 HR No

2111 3' - 4" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 9.0 3/4 HR Yes 2-2 3

2112 PR 3' - 2" 7' - 0" F HM P-11A F3 HM P-2 H1 J1 6.1 3/4 HR No 6 PANIC BAR

2113 3' - 0" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 9.0 3/4 HR Yes 2-2 3

2201 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-3 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2202 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-3 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2203 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-4 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2204 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-4 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2205 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-4 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2206 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-4 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2207 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-4 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2208 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-4 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2209 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-4 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2210 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-4 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2211 3' - 0" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 9.0 3/4 HR No

2301 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-8 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2302 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-8 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2303 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-5 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2304 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-5 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2305 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-5 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2306 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-5 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2307 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-5 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2308 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-5 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2309 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-5 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2310 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-5 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2311 3' - 0" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 9.0 3/4 HR No 3

2401 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-7 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2402 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-7 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2403 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-7 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2404 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-6 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2405 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-6 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2406 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-6 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2407 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-6 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2408 3' - 0" 7' - 0" FP WD P-11A F1 HM P-2/P-11B H1 J1 17.0 3/4 HR Yes 2-6 3 P-2 CORRIDOR. P-11B UNIT INTERIOR. SEE

SCHEDULE BELOW FOR DOORS WITHIN UNIT

2409 3' - 0" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 13.0 3/4 HR No

2410 3' - 0" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 13.0 3/4 HR No

2411 3' - 0" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 9.0 3/4 HR Yes 2-7 3

2412 PR 3' - 2" 7' - 0" F WD P-11A F3 HM P-2 H1 J1 6.1 3/4 HR No 6 PANIC BAR

2413 3' - 0" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 9.0 3/4 HR Yes 2-7 3

2414 3' - 0" 7' - 0" F HM P-11A F1 HM P-2 H1 J1 15.0 3/4 HR Yes

2414A 3' - 0" 7' - 0" F WD P-11A F1 HM P-2 H1 J1 14.0 3/4 HR No

3-7 FLOOR DOOR SCHEDULE - WITHIN UNIT

UNIT DOOR

NUMBER

PAIR

OF

DOORS WIDTH

DOOR FRAME

Head Detail Jamb Detail HW Set COMMENTSHEIGHT TYPE MATERIAL FINISH TYPE MATERIAL FINISH

A 3' - 0" 7' - 0" AD WD P-11A F2 HM P-11B H2 J2 22.0 P-11, EGGSHELL

B 3' - 0" 7' - 0" F WD P-11A F2 HM P-11B H3 J3 19.0 P-11, EGGSHELL

B1 2' - 8" 7' - 0" F WD P-11A F2 HM P-11B H3 J3 20.0 P-11, EGGSHELL

C 5' - 0" 7' - 0" C WD P-11A F3 HM P-11B H3 J3 21.0 P-11, EGGSHELL

D PR 2' - 6" 7' - 0" FG WD P-11A F5 HM P-11B H3 J3 18.0 P-11, EGGSHELL

D1 PR 3' - 0" 7' - 0" FG WD P-11A F5 HM P-11B H3 J3 18.0 P-11, EGGSHELL

SECOND FLOOR DOOR SCHEDULE - WITHIN UNIT

UNIT DOOR

NUMBER

PAIR

OF

DOORS WIDTH

DOOR FRAME

Head Detail Jamb Detail HW Set COMMENTSHEIGHT TYPE MATERIAL FINISH TYPE MATERIAL FINISH

A 3' - 0" 7' - 0" AD WD P-11A F2 HM P-11B H2 J2 22.0 P-11, EGGSHELL

B 3' - 0" 7' - 0" F WD P-11A F2 HM P-11B H3 J3 19.0 P-11, EGGSHELL

B1 2' - 8" 7' - 0" F WD P-11A F2 HM P-11B H3 J3 20.0 P-11, EGGSHELL

C 5' - 0" 7' - 0" C WD P-11A F3 HM P-11B H3 J3 21.0 P-11, EGGSHELL

D PR 2' - 6" 7' - 0" FG WD P-11A F5 HM P-11B H3 J3 18.0 P-11, EGGSHELL

D1 PR 3' - 0" 7' - 0" FG WD P-11A F5 HM P-11B H3 J3 18.0 P-11, EGGSHELL

NO DATE REVISION

1 02/12/2025 BID ADDENDUM

1 1

1 1 1 1

Sheets
A102 - OVERALL SECOND FLOOR PLAN
A102B - SECOND FLOOR PLAN B
A112B - SECOND FLOOR REFLECTED CEILING PLAN B
A405 - CLINICAL AREAS/NURSE STATIONS - FIRST FLOOR
A406 - CLINICAL AREAS/ NURSE STATIONS - FIRST FLOOR
A407 - NORTH SERVERY
A408 - SOUTH SERVERY
A409 - ENLARGED TOILET ROOM PLANS AND ELEVATIONS
A412 - ENLARGED RESIDENT ROOM SHOWERS
A427 - SPA ROOMS AND LAUNDRY ROOMS
A601 - DOOR SCHEDULE, TYPES, DETAILS
A602 - DOOR SCHEDULE, TYPES, DETAILS
AI401 - ENTRANCE LOBBY FINISH PLAN AND ELEVATIONS
AI402 - FIRST FLOOR ELEVATOR LOBBY FINISH PLANS AND ELEVATIONS
AI403 - SERVERY FINISH PLAN AND ELEVATIONS
AI405 - FIRST FLOOR ENLARGED CORRIDOR PLANS AND ELEVATIONS
AI406 - FIRST FLOOR TOILET ROOM FINISH PLANS AND ELEVATIONS
AI408 - TYPICAL NORTH/ SOUTH ELEVATOR LOBBY FINISH PLANS (FLOORS 2-7)
AS-101 - FIRST FLOOR SIGNAGE PLAN
AS-102 - TYPICAL FLOOR SIGNAGE PLAN (FLOORS 2-7)

File details come from the government source that posted it. Updated .